Loading...
HomeMy WebLinkAbout26074 Section 38.710.160 Telecommunication Submittal Materials.Draft Ord Telecommunications Submittal Materials - Page 1 of 3 - Sec. 38.710.160. Submittal materials for telecommunications. A. The following information must be submitted for review of wireless facilities as applicable. Failure to provide required materials will result in a determination that the application is incomplete, and the application will not be processed. The table below identifies required submittal materials by facility scale. Items marked ● Required, ○ Conditional / As Applicable, or — Not Required. This table is intended for application completeness determinations. Required Material Large Scale (Macro) Facilities Small Wireless Facilities Micro-Scale Facilities Eligible Facilities Request (EFR) Completed Application Form ● ● ● ● Application & Review Fees ● ● ● ● Narrative of Standards Compliance (per 38.370.040) ● ● — — Technical Justification for Design, Location, Height, and Placement/Location ● — — — Technical Reason Collocation is Not an Option ● — — — Photo Simulations ● ● — — Landowner Authorization Letter ● ● ● ● Proof of Ownership/Lease/ Consent ● ● ● ● If Applicable, Statement of FCC Exemption from Environmental Review (with citation and details) ● ● ● ● Boundary & Topographic Survey (Sealed) ● ● — — Existing Conditions Photos ● — — ● Site Plan/Construction Drawings (including ground equipment layout and dimensions, facility elevation, facility height, concealment, landscape, screening, fall-zone, set back, fencing, signage) ● ● ● ● Telecommunications Submittal Materials - Page 2 of 3 - Landscape & Screening Plan ● ● — — Structural (Design) Analysis (PE Sealed) (as set forth by the building department and latest codes) ● ● ● ● Foundation Design ● — — — Antenna Mount Analysis ● — — ● Collocation Capacity Certification and Statement of Willingness to Allow Collocation at Reasonable Rates to all Providers ● — — — Engineering Statement Collocation Requirements are Met (per 38.330.040.B) ● — — — Redacted tenant lease(s) for initial tenant and all collocations ● ● — — RF Statement of Need ● ● — — RF Propagation Maps ● ● — — Geographic Search Ring Map ● — — — Inventory of Applicant’s Sites ● ● — — Inventory of Surrounding Buildings or Structures (greater than 50’ within one-mile radius) ● — — — FCC RF Emissions Compliance Statement/Report ● ● ● ● FCC RF Interference Compliance Statement ● ● ● ● FAA Determination No Hazard (Form 7460-1) ● — — — NEPA / SHPO Documentation ● ○ — — Floodplain / Wetlands Documentation ○ ○ — — Visual Impact Analysis ● ○ — — Right-of-Way Permit (if applicable) ○ ● ○ — Utility Coordination Letters ○ ○ — — Telecommunications Submittal Materials - Page 3 of 3 - Traffic / Mont. Dept. Transportation Plan ○ ○ — — Address List & Mailing Envelopes per 38.730.020 ● ○ — — Abandonment & Removal Plan ● ○ — — Maintenance & Access Plan ● ● ● ● Emergency Contact Information ● ● ● ● Notes: ● Required = must be submitted for application completeness ○ Conditional = required when applicable based on location, zoning, or facility design — Not Required = not applicable for this facility scale B. Prior to submitting an application for a large scale, or small wireless facility, the applicant must complete a concept review per 38.740 with the community development department. The purpose of the concept review is to acquaint the participants with the applicable requirements of this division 38.330, as well as with any preliminary concerns the department may have. C. The applicant's concept review submittal must include the following information in addition to the materials required by 38.710.190 with regard to the proposed facility: 1. Overall height; 2. Number of antennas and antenna arrays proposed, including those of other providers to be collocated; 3. Type of wireless communication services to be provided; and 4. Design and coordination of ground equipment compounds.