Loading...
The URL can be used to link to this page
Your browser does not support the video tag.
Home
My WebLink
About
South University District Ph 3 Block 4 Off-Site Improvements
UGESDEXISTINGOHEGEXISTINGPROPOSEDPROPOSEDSDUGECOMMGCIVIL PLAN SHEET INDEX - OFF-SITEABBREVIATIONSLEGENDUGESDSTREET LIGHTING PLAN SHEET INDEX - OFF-SITET1.0BLOCK 4 OFF-SITE IMPROVEMENTSSOUTH UNIVERSITY DISTRICT PH. 3BOZEMAN, MONTANA1 7/25/2023 COB INF. SUBMITTAL ZWL CDP 2 9/15/2023 COB INF RC 1 SUBMITTAL ZWL CDP 3 3/6/2024 COORDINATION/BID SET ZWL CDP 5 11/25/2024 COB INF RC 2 SUBMITTAL ZWL CDP 6 7/8/2025 CONSTRUCTION SET ZWL CDP 7 1/26/2026 RECORD DRAWINGS ZWL JWF PROFESSIONALENGINEERS &SURVEYORSSTAHLYENGINEERING& ASSOCIATESBLOCK 4 - OFF-SITE IMPROVEMENTS RTR HOLDINGS II, LLCRECORD DRAWINGSJANUARY 26, 2026ENGINEER OF RECORD:QUALITY CONTROL REVIEWER:,PETITLESHEET,PE GENERAL CIVIL NOTES GENERAL UTILITY NOTESWATER SYSTEM NOTESCONSTRUCTION STAKING NOTESSANITARY SEWER SYSTEM NOTESPRODUCTPARTY RESPONSIBLE TEST FREQUENCYTEST REQUIREMENT & STANDARDON-SITE MATERIALS TESTINGPRODUCTPARTY RESPONSIBLE FOR SUBMITTALREQUIRED SUBMITTALS PRIOR TO MOBILIZATIONREQUIRED SUBMITTALS DURING CONSTRUCTIONMATERIALS SUBMITTALS REQUIREDDESIGN CONTROL POINT TABLEC0.11 7/25/2023 COB INF. SUBMITTAL ZWL CDP 2 9/15/2023 COB INF RC 1 SUBMITTAL ZWL CDP 3 3/6/2024 COORDINATION/BID SET ZWL CDP 5 11/25/2024 COB INF RC 2 SUBMITTAL ZWL CDP 6 7/8/2025 CONSTRUCTION SET ZWL CDP 7 1/26/2026 RECORD DRAWINGS ZWL JWF PROFESSIONALENGINEERS &SURVEYORSSTAHLYENGINEERING& ASSOCIATESBLOCK 4 - OFF-SITE IMPROVEMENTS RTR HOLDINGS II, LLCRECORD DRAWINGSJANUARY 26, 2026CIVILSPECIFICATIONS UGEUGEUGEUGEUG E UG E UGE UGE UGE UGE UGE UGE UGE UGE UGE UGE UGE UGE UGE UGE UGE UGE UGE UGE UGE UGE UGE UGE UGE UGE UGE UGE UGE UGE UGE UGE UGE UGE UGE UGE SSSSSSSSSSSSW W W W W W W WWWWWWWW WSSSSSSSSSSSSSSSSSSSSSD SD SD SD SD SD WWWWWSOUTH 11TH AVESTUDENT DRIVESOUTH 14TH AVE W SS SS SS SS SS SS W SDSDSSHCHCHCHCHC HCHCHC SSSSSSSSWWWWWWWWWWWWWWWWWWSDSDSDSDCOMM COMM COMM COMM COMM COMM Y4Y4Y3Y3Y3Y3Y3Y4Y3Y3Y3Y2Y2Y3Y3Y3P3P3P3P3P3P3P3P3P3P3P3P3P3P3SDSDSDSDSDSDSDSDSDSDSDSDSDSDSDSDSDSDSDSDSDSD HCHCP3P3SDSDSDSDSDSDSDSDSD SD SD SD SD SDSD SD SDSD SDSD SD SDSDSDSDSDSDSDSDSDSDSDSD SD SD SD SDUGEUGEUGEY3Y3Y3 Y3P UGE UGEUGEUGEUGE UGEUGEUGEUGEUGEUGEUGEUGEGASGASGASGASGASGASGASGASGASGASGASGASGASGASUGEUGEUGEUGEUGEUGEUGEUGEUGEUGEUGEUGE UGEUGEUGEUGE UGEUGEUGEUGE UGEUGEUGE PPPPPP GASUGEGASCOMMCOMMCOMMCOMMCOMMCOMM COMM COMM UGEUGEUGEUGEWWWWWWWWWWWWWWWWWWWWWWSDSDSDSDSDSDSDSDSDSDSDSDSDSDSDSDSDSDSDSDSDSDSDSDSDSDSDS D S D S DSD SSSSSSSWWARNOLD ST(35' WIDTH - 70' ROW) SOUTH 14TH AVESOUTH 13TH AVE SOUTH 1 2 T H A V EEXISTINGTRAILS (TYP)(47' WIDTH - 70' ROW)CITY PARK 29.64 ACRESPLAT J-605LOT 1, BLOCK 4"PHASE 3"11.89 ACRESPLAT J-695"PROPOSED"JARRETT SUBDIVISION"PROPOSED"JARRETT SUBDIVISIONFUTURE SOUTH13TH AVEUGE UGE UGE UGE UGE UGE UGE UGEUGEGAS GAS GAS GAS GAS GAS GASGAS495949604961 4961496049594959495549584962496349644970496549604966496749684969496249634964 GASGASGASGASGAS GASGA S GA S GAS GAS GAS GAS GAS GAS GAS GAS GAS GAS GAS GAS GAS GAS GAS GAS GAS GAS GAS GAS GAS GAS GAS GAS GAS GAS GAS GAS GAS GAS GAS GASUGEUGEUGEUGEUGEGASGASGASGASGASUGEUGEUGEUGEUGEUGEUGEUGEUGEUGEUGEUGEUGEUGEUGEUGEUGEUGEUGEUGEUGEUGEUGEUGEUGEUGEUGEUGEUGEUGEUGEUGEUGEUGEUGEUGEUGEUGEUGEUGEUGEUGEUGEUGEUGEUGEUGEUGEUGEUGEUGEUGEUGEUGEUGEUGEUGEUGEUGEUGEUGEUGEUGEUGEUGEUGEUGEUGEUGEUGEUGEUGEUGEUGEUGEUGEUGEUGEUGEGASGASGASGASGASGASGASGASGASGASGASGASGASGASGASGASGASGASGASGASGASGASGASGASGASGASGASGASGASGASGASGASGASGASGASGASGASGASGASGASGASGASGASGASUGEUGEUGEUGEUGEUGEUGEUGEUGEUGEUGEUGEUGE GASUGEUGEUGEUGEUGEUGEUGEUGEUGESCALE IN FEETC0.2EXISTINGCONDITIONS PLAN1 7/25/2023 COB INF. SUBMITTAL ZWL CDP 2 9/15/2023 COB INF RC 1 SUBMITTAL ZWL CDP 3 3/6/2024 COORDINATION/BID SET ZWL CDP 5 11/25/2024 COB INF RC 2 SUBMITTAL ZWL CDP 6 7/8/2025 CONSTRUCTION SET ZWL CDP 7 1/26/2026 RECORD DRAWINGS ZWL JWF PROFESSIONALENGINEERS &SURVEYORSSTAHLYENGINEERING& ASSOCIATESBLOCK 4 - OFF-SITE IMPROVEMENTS RTR HOLDINGS II, LLCRECORD DRAWINGSJANUARY 26, 2026 SSSSSSSSSSSSW W W W W W W WWWWWWWW WSSSSSSSSSSSSSSSSSSSSSD SD SD SD SD SD WWWWWSOUTH 11TH AVESTUDENT DRIVESOUTH 14TH AVE W SS SS SS SS SS SS W SDSDSSHCHCHCHCHC HCHCHC SSSSSSSSWWWWWWWWWWWWWWWWWWSDSDSDSDY4Y4Y3Y3Y3Y3Y3Y4Y3Y3Y3Y2Y2Y3Y3Y3P3P3P3P3P3P3P3P3P3P3P3P3P3P3SDSDSDSDSDSDSDSDSDSDSDSDSDSDSDSDSDSDSDSDSDSD HCHCP3P3SDSDSDSDSDSDSDSDSD SD SD SD SD SDSD SD SDSD SDSD SD SDSDSDSDSDSDSDSDSDSDSDSD SD SD SD SDY3Y3Y3 Y3WWWWWWWWWWWWWWWWWWWWWWSDSDSDSDSDSDSDSDSDSDSDSDSDSDSDSDSDSDSDSDSDSDSDSDSDSDSDS D S D S DSD SSSSSSSWWWWWWWWWWWWWWWWWWARNOLD ST(35' WIDTH - 70' ROW) SOUTH 14TH AVESOUTH 13TH AVE SOUTH 1 2 T H A V EEXISTINGTRAILS (TYP)SSSSSSSSSSSSSSSSSSSSSSSSSSSS(47' WIDTH - 70' ROW)ONSITEPROJECTEXTENTSWWWWWWWWWWWWWWWWWWSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSWWWWWWWWSSSSSSSSSSSSSSWWWWWWWWSSSSSSSSSSWFWSCITY PARK 29.64 ACRESPLAT J-605LOT 1, BLOCK 4"PHASE 3"11.89 ACRESPLAT J-695OFF-SITE PROJECT EXTENTSWWSSSSSS"PROPOSED"JARRETT SUBDIVISION"PROPOSED"JARRETT SUBDIVISIONFUTURE SOUTH13TH AVEMAIL LOADINGZONEEV STATIONEV STATIONEV STATIONUNIT1MULTIFAMILYBUILDING 3CLUBHOUSEUNIT 2UNIT4AUNIT3AUNIT3BUNIT4BUNIT4CUNIT6AUNIT6BUNIT9AUNIT9BUNIT10AUNIT10BUNIT11UNIT14AUNIT14BUNIT26UNIT28AUNIT28BUNIT29UNIT24AUNIT24BUNIT25AUNIT25BUNIT15BUNIT15AUNIT18UNIT19AUNIT19BUNIT20AUNIT20BUNIT20CUNIT21UNIT 30UNIT 42DUNIT 42CUNIT 42BUNIT 42AUNIT 41UNIT 40UNIT39AUNIT38BUNIT38AUNIT3 7UNIT34 UNIT 31UNIT8AUNIT8BUNIT7UNIT5MULTI-FAMILYBUILDING 2UNIT12UNIT13AUNIT13BUNIT16UNIT17AUNIT17BUNIT22UNIT23AUNIT23BUNIT32UNIT33AUNIT33BUNIT 35UNIT36AUNIT36BCOVERED PARKING (18)COVERED PARKING (16)COVERED PARKING (18)COVERED PARKINGCOVERED PARKINGCOVERED PARKINGCOVERED PARKINGCOVERED PARKING (22)COVERED PARKING (11)COVERED PARKING (6)MAINT.BLDGUNIT27AUNIT27BUNIT39BMULTIFAMILYBUILDING 1ALLEYSDOS-1ALot 2Lot 1Lot 3Lot 4Lot 5Lot 6Lot 7Lot 8Lot 9Lot 10Lot 11Lot 12Lot 13Lot 43Lot 42Lot 41Lot 40Lot 39Lot 38Lot 37Lot 36Lot 34Lot 35Lot 33Lot 15Lot 14SSREQUIREDPARKLANDPHASE 1OFF-SITE PROJECTEXTENTSSTORMWATER MANAGEMENT FOR LOT 1, BLOCK 4"PHASE 3" IS PROVIDED BY THE OFFSITE STORMWATERBASIN CONSTRUCTED WITH THE SOUTH UNIVERSITYDISTRICT PHASE 2 COMMON SUBDIVISION IMPROVEMENTSLOCATED IN "CITY PARK 1" OF PLAT J-605STORMWATER MANAGEMENT FOR JARRETT SUBDIVISONIS PROVIDED BY THE OFFSITE STORMWATER BASINCONSTRUCTED WITH THE ALLISON SUBDIVISION PHASE4A, LOT 8, BLOCK 5 OF PLAT J-702SS SS SS SS SS SS SS SS WSCALE IN FEETC1.1PH 3 BLOCK 4OVERALLSUBDIVISIONIMPROVEMENTS1 7/25/2023 COB INF. SUBMITTAL ZWL CDP 2 9/15/2023 COB INF RC 1 SUBMITTAL ZWL CDP 3 3/6/2024 COORDINATION/BID SET ZWL CDP 5 11/25/2024 COB INF RC 2 SUBMITTAL ZWL CDP 6 7/8/2025 CONSTRUCTION SET ZWL CDP 7 1/26/2026 RECORD DRAWINGS ZWL JWF PROFESSIONALENGINEERS &SURVEYORSSTAHLYENGINEERING& ASSOCIATESBLOCK 4 - OFF-SITE IMPROVEMENTS RTR HOLDINGS II, LLCRECORD DRAWINGSJANUARY 26, 2026 UGEUGEUGEUGEUG E UG E UGE UGE UGE UGE UGE UGE UGE UGE UGE UGE UGE UGE UGE UGE UGE UGE UGE UGE UGE UGE UGE UGE UGE UGE UGE UGE UGE UGE UGE UGE UGE UGE UGE UGE SSSSSSSSSSSSW W W W W W W WWWWWWWW WSSSSSSSSSSSSSSSSSSSSSD SD SD SD SD SD WWWWWSOUTH 11TH AVESTUDENT DRIVESOUTH 14TH AVE W SS SS SS SS SS SS W SDSDSSHCHCHCHCHC HCHCHC SSSSSSSSWWWWWWWWWWWWWWWWWWSDSDSDSDCOMM COMM COMM COMM COMM COMM Y4Y4Y3Y3Y3Y3Y3Y4Y3Y3Y3Y2Y2Y3Y3Y3P3P3P3P3P3P3P3P3P3P3P3P3P3P3SDSDSDSDSDSDSDSDSDSDSDSDSDSDSDSDSDSDSDSDSDSD HCHCP3P3SDSDSDSDSDSDSDSDSD SD SD SD SD SDSD SD SDSD SDSD SD SDSDSDSDSDSDSDSDSDSDSDSD SD SD SD SDUGEUGEUGEY3Y3Y3 Y3P UGE UGEUGEUGEUGE UGEUGEUGEUGEUGEUGEUGEUGEGASGASGASGASGASGASGASGASGASGASGASGASGASGASUGEUGEUGEUGEUGEUGEUGEUGEUGEUGEUGEUGE UGEUGEUGEUGE UGEUGEUGEUGE UGEUGEUGE PPPPPP GASUGEGASCOMMCOMMCOMMCOMMCOMMCOMM COMM COMM UGEUGEUGEUGEWWWWWWWWWWWWWWWWWWWWWWSDSDSDSDSDSDSDSDSDSDSDSDSDSDSDSDSDSDSDSDSDSDSDSDSDSDSDS D S D S DSD SSSSSSSWWWWWWWWWWWWWWWWWWARNOLD ST(35' WIDTH - 70' ROW) SOUTH 14TH AVESOUTH 13TH AVE SOUTH 1 2 T H A V EEXISTINGTRAILS (TYP)SSSSSSSSSSSSSSSSSSSSSSSSSSSS(47' WIDTH - 70' ROW)CITY PARK 29.64 ACRESPLAT J-605LOT 1, BLOCK 4"PHASE 3"11.89 ACRESPLAT J-695"PROPOSED"JARRETT SUBDIVISION"PROPOSED"JARRETT SUBDIVISIONFUTURE SOUTH13TH AVEUGE UGE UGE UGE UGE UGE UGE UGEUGEGAS GAS GAS GAS GAS GAS GASGASSS SS SS SS SS SS SS SS GASGASGASGASGAS GASGA S GA S GAS GAS GAS GAS GAS GAS GAS GAS GAS GAS GAS GAS GAS GAS GAS GAS GAS GAS GAS GAS GAS GAS GAS GAS GAS GAS GAS GAS GAS GAS GAS GASUGEUGEUGEUGEUGEGASGASGASGASGASUGEUGEUGEUGEUGEUGEUGEUGEUGEUGEUGEUGEUGEUGEUGEUGEUGEUGEUGEUGEUGEUGEUGEUGEUGEUGEUGEUGEUGEUGEUGEUGEUGEUGEUGEUGEUGEUGEUGEUGEUGEUGEUGEUGEUGEUGEUGEUGEUGEUGEUGEUGEUGEUGEUGEUGEUGEUGEUGEUGEUGEUGEUGEUGEUGEUGEUGEUGEUGEUGEUGEUGEUGEUGEUGEUGEUGEUGEUGEGASGASGASGASGASGASGASGASGASGASGASGASGASGASGASGASGASGASGASGASGASGASGASGASGASGASGASGASGASGASGASGASGASGASGASGASGASGASGASGASGASGASGASGASUGEUGEUGEUGEUGEUGEUGEUGEUGEUGEUGEUGEUGE GASUGEUGEUGEUGEUGEUGEUGEUGEUGEC1.2UTILITY SLEEVINGPLAN1 7/25/2023 COB INF. SUBMITTAL ZWL CDP 2 9/15/2023 COB INF RC 1 SUBMITTAL ZWL CDP 3 3/6/2024 COORDINATION/BID SET ZWL CDP 5 11/25/2024 COB INF RC 2 SUBMITTAL ZWL CDP 6 7/8/2025 CONSTRUCTION SET ZWL CDP 7 1/26/2026 RECORD DRAWINGS ZWL JWF PROFESSIONALENGINEERS &SURVEYORSSTAHLYENGINEERING& ASSOCIATESBLOCK 4 - OFF-SITE IMPROVEMENTS RTR HOLDINGS II, LLCRECORD DRAWINGSJANUARY 26, 2026SCALE IN FEET SSSSSSSSSSSSW W W W W W W WWWWWWWW WSSSSSSSSSSSSSSSSSSSSSD SD SD SD SD SD WWWWWSOUTH 11TH AVESTUDENT DRIVESOUTH 14TH AVE W SS SS SS SS SS SS W SDSDSSHCHCHCHCHC HCHCHC SSSSSSSSWWWWWWWWWWWWWWWWWWSDSDSDSDY4Y4Y3Y3Y3Y3Y3Y4Y3Y3Y3Y2Y2Y3Y3Y3P3P3P3P3P3P3P3P3P3P3P3P3P3P3SDSDSDSDSDSDSDSDSDSDSDSDSDSDSDSDSDSDSDSDSDSD HCHCP3P3SDSDSDSDSDSDSDSDSD SD SD SD SD SDSD SD SDSD SDSD SD SDSDSDSDSDSDSDSDSDSDSDSD SD SD SD SDY3Y3Y3 Y3WWWWWWWWWWWWWWWWWWWWWWSDSDSDSDSDSDSDSDSDSDSDSDSDSDSDSDSDSDSDSDSDSDSDSDSDSDSDS D S D S DSD SSSSSSSWWWWWWWWWWWWWWWWWWARNOLD ST(35' WIDTH - 70' ROW) SOUTH 14TH AVESOUTH 13TH AVE SOUTH 1 2 T H A V EEXISTINGTRAILS (TYP)SSSSSSSSSSSSSSSSSSSSSSSSSSSS(47' WIDTH - 70' ROW)CITY PARK 29.64 ACRESPLAT J-605LOT 1, BLOCK 4"PHASE 3"11.89 ACRESPLAT J-695"PROPOSED"JARRETT SUBDIVISION"PROPOSED"JARRETT SUBDIVISIONFUTURE SOUTH13TH AVESS SS SS SS SS SS SS SS C2.0WATER PLAN1 7/25/2023 COB INF. SUBMITTAL ZWL CDP 2 9/15/2023 COB INF RC 1 SUBMITTAL ZWL CDP 3 3/6/2024 COORDINATION/BID SET ZWL CDP 5 11/25/2024 COB INF RC 2 SUBMITTAL ZWL CDP 6 7/8/2025 CONSTRUCTION SET ZWL CDP 7 1/26/2026 RECORD DRAWINGS ZWL JWF PROFESSIONALENGINEERS &SURVEYORSSTAHLYENGINEERING& ASSOCIATESBLOCK 4 - OFF-SITE IMPROVEMENTS RTR HOLDINGS II, LLCRECORD DRAWINGSJANUARY 26, 2026SCALE IN FEET NOTE: THE DETAILS SHOWN ON THIS PLAN ARE PROVIDED FOREASE OF REFERENCE. OTHER STANDARD DETAILS MAY APPLY.NOTESNOTESNOTESNOTESNOTESNOTESNOTESC2.1WATER DETAILS1 7/25/2023 COB INF. SUBMITTAL ZWL CDP 2 9/15/2023 COB INF RC 1 SUBMITTAL ZWL CDP 3 3/6/2024 COORDINATION/BID SET ZWL CDP 5 11/25/2024 COB INF RC 2 SUBMITTAL ZWL CDP 6 7/8/2025 CONSTRUCTION SET ZWL CDP 7 1/26/2026 RECORD DRAWINGS ZWL JWF PROFESSIONALENGINEERS &SURVEYORSSTAHLYENGINEERING& ASSOCIATESBLOCK 4 - OFF-SITE IMPROVEMENTS RTR HOLDINGS II, LLCRECORD DRAWINGSJANUARY 26, 2026 SS SS SS SSSDSDSDSDSDSDSDWWWWWSOUTH 14TH AVESSSSSSSSSSW W W WSSSSCOMMCOMMCOMMY3SDSDSDSD SDSDSDSDSDSDUGEUGEUGEUGEUGEUGEUGEUGEUGEUGEPGAS WWWWW SOUTH 14TH AVESDSDSDSDSDSDSDSDSDSDSDSDSDSDSDSDSDSDSDSDSDSDSDSDSSSSSSSSWSSSS W SS W SS W SDWW SS W "PROPOSED"SSSSSSSSSSSSSSSSSSSSSSSSSSSSC2.2WATER P&P(S. 14TH AVE)SCALE IN FEET1 7/25/2023 COB INF. SUBMITTAL ZWL CDP 2 9/15/2023 COB INF RC 1 SUBMITTAL ZWL CDP 3 3/6/2024 COORDINATION/BID SET ZWL CDP 5 11/25/2024 COB INF RC 2 SUBMITTAL ZWL CDP 6 7/8/2025 CONSTRUCTION SET ZWL CDP 7 1/26/2026 RECORD DRAWINGS ZWL JWF PROFESSIONALENGINEERS &SURVEYORSSTAHLYENGINEERING& ASSOCIATESBLOCK 4 - OFF-SITE IMPROVEMENTS RTR HOLDINGS II, LLCRECORD DRAWINGSJANUARY 26, 2026 WWWWWWWWWWWWWWW*********WSDSDSDSDSDSDSDSDSDSDSDSDSDSD SD SD SD SD SD SSSSSSSSSSSSSSSSSSSSSSSSSSWSSWWSS SS SS FUTURE SOUTH13TH AVEFUTURE SOUTH15TH AVESDWSS SS W SS W SS W SDSDSDSDSDSS SS SS SS UGEUGEUGEUGEUGEUGEUGEUGEUGEUGEUGEUGEUGEUGEUGEUGEUGEUGEUGEUGEUGEUGEUGEUGEUGEUGEUGEUGEUGEUGEUGEUGEUGEUGEUGEUGEUGEUGEUGEUGEUGEGASGASGASGASGASGASGASGASGASGASGASGASGASGASGASGASGASGASGASGASUGEUGEUGEUGEUGEUGEUGEUGEUGEUGEUGEUGEUGEUGEUGEC2.3WATER P&P(ARNOLD ST -W)SCALE IN FEET1 7/25/2023 COB INF. SUBMITTAL ZWL CDP 2 9/15/2023 COB INF RC 1 SUBMITTAL ZWL CDP 3 3/6/2024 COORDINATION/BID SET ZWL CDP 5 11/25/2024 COB INF RC 2 SUBMITTAL ZWL CDP 6 7/8/2025 CONSTRUCTION SET ZWL CDP 7 1/26/2026 RECORD DRAWINGS ZWL JWF PROFESSIONALENGINEERS &SURVEYORSSTAHLYENGINEERING& ASSOCIATESBLOCK 4 - OFF-SITE IMPROVEMENTS RTR HOLDINGS II, LLCRECORD DRAWINGSJANUARY 26, 2026 UGEUGEUGEUGEUGE UGE UGE UGE UG E UG E UG E UGE UGE UGE UGE UGE UGE UGE UGE UGE UGE UGE UGE WWWWSDSDSDSSSSSSSDWWWWWWWWWWWWWWWWWWWWWARNOLD STSDSDSDSDSDSDSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSWSSSSFUTURE SOUTH13TH AVESDSDSDSDSDSDSDSDWSSSS WSSW SS W SS W SS W SS W SS W SS W SS W SS W SS W SS W SDSDSDSDSDSDSDSDSDSDSDSDSDSDUGE UGE UGE UGE UGE UGE UGE UGE UGE UGE UGE UGE UGEUGEUGEGAS GAS GAS GAS GAS GAS GAS GAS GAS GAS GAS GASGASGASGASGASGASGASGASGASGAS GAS GAS GAS GA S GASGA S GAS GAS GAS GAS GAS GAS GAS GAS GAS GAS GAS GASUGEUGEUGEUGEUGEUGEUGEUGEGASGASGASGASGASGASGASGASGASUGEUGEUGEUGEUGEUGEUGEUGEUGEUGEUGEUGEUGEUGEUGEUGEUGEUGEUGEUGEUGEUGEUGEUGEUGEUGEUGEUGEUGEUGEUGEUGEUGEUGEUGEUGEUGEUGEUGEUGEUGEUGEUGEUGEUGEUGEUGEUGEUGEUGEUGEUGEUGEUGEUGEUGEUGEUGEUGEUGEUGEUGEUGEUGEUGEUGEUGEUGEUGEUGEUGEUGEUGEUGEUGEUGEUGEUGEUGEUGEUGEUGEUGEUGEUGEUGEUGEUGEUGEUGEUGEUGEUGEUGEUGEUGEUGEUGEUGEUGEUGEUGEUGEUGEUGEUGEUGEUGEUGEUGEUGEUGEUGEUGEUGEUGEUGEUGEUGEUGEUGEUGEUGEUGEUGEUGEUGEUGEUGEUGEUGEUGEUGEGASGASGASGASGASGASGASGASGASGASGASGASGASGASGASGASGASGASGASGASGASGASGASGASGASGASGASGASGASGASGASGASGASGASGASGASGASGASGASGASGASGASGASGASGASGASGASGASGASGASGASGASGASGASGASGASGASGASGASGASGASGASGASGASGASGASGASGASGASGASGASGASGASUGEUGE UGEUGEUGEUGEUGEUGEUGEUGEUGEUGEUGEUGEUGEUGEUGEUGEUGEUGEUGEUGEUGEUGEUGEUGEUGEUGEUGEUGEUGEUGEUGEUGEUGEUGEUGEUGE C2.4WATER P&P(ARNOLD ST -E)SCALE IN FEET1 7/25/2023 COB INF. SUBMITTAL ZWL CDP 2 9/15/2023 COB INF RC 1 SUBMITTAL ZWL CDP 3 3/6/2024 COORDINATION/BID SET ZWL CDP 5 11/25/2024 COB INF RC 2 SUBMITTAL ZWL CDP 6 7/8/2025 CONSTRUCTION SET ZWL CDP 7 1/26/2026 RECORD DRAWINGS ZWL JWF PROFESSIONALENGINEERS &SURVEYORSSTAHLYENGINEERING& ASSOCIATESBLOCK 4 - OFF-SITE IMPROVEMENTS RTR HOLDINGS II, LLCRECORD DRAWINGSJANUARY 26, 2026 SSSSSSSSSSSSW W W W W W W WWWWWWWW WSSSSSSSSSSSSSSSSSSSSSD SD SD SD SD SD WWWWWSOUTH 11TH AVESTUDENT DRIVESOUTH 14TH AVE W SS SS SS SS SS SS W SDSDSSHCHCHCHCHC HCHCHC SSSSSSSSWWWWWWWWWWWWWWWWWWSDSDSDSDY4Y4Y3Y3Y3Y3Y3Y4Y3Y3Y3Y2Y2Y3Y3Y3P3P3P3P3P3P3P3P3P3P3P3P3P3P3SDSDSDSDSDSDSDSDSDSDSDSDSDSDSDSDSDSDSDSDSDSD HCHCP3P3SDSDSDSDSDSDSDSDSD SD SD SD SD SDSD SD SDSD SDSD SD SDSDSDSDSDSDSDSDSDSDSDSD SD SD SD SDY3Y3Y3 Y3WWWWWWWWWWWWWWWWWWWWWWSDSDSDSDSDSDSDSDSDSDSDSDSDSDSDSDSDSDSDSDSDSDSDSDSDSDSDS D S D S DSD SSSSSSSWWWWWWWWWWWWWWWWWWARNOLD ST SOUTH 14TH AVESOUTH 13TH AVE SOUTH 1 2 T H A V EEXISTINGTRAILS (TYP)SSSSSSSSSSSSSSSSSSSSSSSSSSSSCITY PARK 29.64 ACRESPLAT J-605LOT 1, BLOCK 4"PHASE 3"11.89 ACRESPLAT J-695"PROPOSED"JARRETT SUBDIVISION"PROPOSED"JARRETT SUBDIVISIONFUTURE SOUTH13TH AVESS SS SS SS SS SS SS SS C3.0SEWER PLAN1 7/25/2023 COB INF. SUBMITTAL ZWL CDP 2 9/15/2023 COB INF RC 1 SUBMITTAL ZWL CDP 3 3/6/2024 COORDINATION/BID SET ZWL CDP 5 11/25/2024 COB INF RC 2 SUBMITTAL ZWL CDP 6 7/8/2025 CONSTRUCTION SET ZWL CDP 7 1/26/2026 RECORD DRAWINGS ZWL JWF PROFESSIONALENGINEERS &SURVEYORSSTAHLYENGINEERING& ASSOCIATESBLOCK 4 - OFF-SITE IMPROVEMENTS RTR HOLDINGS II, LLCRECORD DRAWINGSJANUARY 26, 2026SCALE IN FEET NOTE: THE DETAILS SHOWN ON THIS PLAN ARE PROVIDED FOREASE OF REFERENCE. OTHER STANDARD DETAILS MAY APPLY.NOTESNOTESNOTESNOTESNOTESNOTESC3.1SEWER DETAILS1 7/25/2023 COB INF. SUBMITTAL ZWL CDP 2 9/15/2023 COB INF RC 1 SUBMITTAL ZWL CDP 3 3/6/2024 COORDINATION/BID SET ZWL CDP 5 11/25/2024 COB INF RC 2 SUBMITTAL ZWL CDP 6 7/8/2025 CONSTRUCTION SET ZWL CDP 7 1/26/2026 RECORD DRAWINGS ZWL JWF PROFESSIONALENGINEERS &SURVEYORSSTAHLYENGINEERING& ASSOCIATESBLOCK 4 - OFF-SITE IMPROVEMENTS RTR HOLDINGS II, LLCRECORD DRAWINGSJANUARY 26, 2026 SS SS SS SSSDSDSDSDSDSDSDWWWWWSOUTH 14TH AVESSSSSSSSSSW W W WSSSSCOMMCOMMCOMMY3SDSDSDSD SDSDSDSDSDSD UGEUGEUGEUGEUGEUGEUGEUGEUGEUGE UGEPGAS WWWWW SOUTH 14TH AVESDSDSDSDSDSDSDSDSDSDSDSDSDSDSDSDSDSDSDSDSDSDSDSDSSSSSSSSWSSSS W SS W SS W SDWW SS W SS"PROPOSED"SSSSSSSSSSSSSSSSSSSSSSSSSSSSC3.2SEWER P&P(S. 14TH AVE)SCALE IN FEET1 7/25/2023 COB INF. SUBMITTAL ZWL CDP 2 9/15/2023 COB INF RC 1 SUBMITTAL ZWL CDP 3 3/6/2024 COORDINATION/BID SET ZWL CDP 5 11/25/2024 COB INF RC 2 SUBMITTAL ZWL CDP 6 7/8/2025 CONSTRUCTION SET ZWL CDP 7 1/26/2026 RECORD DRAWINGS ZWL JWF PROFESSIONALENGINEERS &SURVEYORSSTAHLYENGINEERING& ASSOCIATESBLOCK 4 - OFF-SITE IMPROVEMENTS RTR HOLDINGS II, LLCRECORD DRAWINGSJANUARY 26, 2026 WWWWWWWWWWWWWWWWSDSDSDSDSDSDSDSDSDSDSDSDSDSD SD SD SD SD SD SSSSSSSSSSSSSSSSSSSSSSSSSSWSSWWSS SS SS"PROPOSED"JARRETT SUBDIVISIONFUTURE SOUTH13TH AVEFUTURE SOUTH15TH AVESDWSS SS W SS W SS W SDSDSDSDSDSS SS SS SS UGEUGEUGEUGEUGEUGEUGEUGEUGEUGEUGEUGEUGEUGEUGEUGEUGEUGEUGEUGEUGEUGEUGEUGEUGEUGEUGEUGEUGEUGEUGEUGEUGEUGEUGEUGEUGEUGEUGEUGEUGEGASGASGASGASGASGASGASGASGASGASGASGASGASGASGASGASGASGASGASGASUGEUGEUGEUGEUGEUGEUGEUGEUGEUGEUGEUGEUGEUGEUGEC3.3SEWER P&P(ARNOLD ST-W)SCALE IN FEET1 7/25/2023 COB INF. SUBMITTAL ZWL CDP 2 9/15/2023 COB INF RC 1 SUBMITTAL ZWL CDP 3 3/6/2024 COORDINATION/BID SET ZWL CDP 5 11/25/2024 COB INF RC 2 SUBMITTAL ZWL CDP 6 7/8/2025 CONSTRUCTION SET ZWL CDP 7 1/26/2026 RECORD DRAWINGS ZWL JWF PROFESSIONALENGINEERS &SURVEYORSSTAHLYENGINEERING& ASSOCIATESBLOCK 4 - OFF-SITE IMPROVEMENTS RTR HOLDINGS II, LLCRECORD DRAWINGSJANUARY 26, 2026 UGEUGEUGEUGEUGEUGE UGE UGE UG E UG E UG E UGE UGE UGE UGE UGE UGE UGE UGE UGE UGE UGE UGE UGE WWWWWSDSDSDSSSSSSSDWWWWWWWWWWWWWWWWWWWWWARNOLD STSDSDSDSDSDSDSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSWSSSS "PROPOSED"FUTURE SOUTH13TH AVESDSDSDSDSDSDSDSDWSSSS WSSW SS W SS W SS W SS W SS W SS W SS W SS W SS W SS W SDSDSDSDSDSDSDSDSDSDSDSDSDSDUGE UGE UGE UGE UGE UGE UGE UGE UGE UGE UGE UGE UGEUGEUGEGAS GAS GAS GAS GAS GAS GAS GAS GAS GAS GAS GASGASGASGASGASGASGASGASGASGAS GAS GAS GAS GA S GASGA S GAS GAS GAS GAS GAS GAS GAS GAS GAS GAS GAS GAS GASUGEUGEUGEUGEUGEUGEUGEUGEGASGASGASGASGASGASGASGASGASUGEUGEUGEUGEUGEUGEUGEUGEUGEUGEUGEUGEUGEUGEUGEUGEUGEUGEUGEUGEUGEUGEUGEUGEUGEUGEUGEUGEUGEUGEUGEUGEUGEUGEUGEUGEUGEUGEUGEUGEUGEUGEUGEUGEUGEUGEUGEUGEUGEUGEUGEUGEUGEUGEUGEUGEUGEUGEUGEUGEUGEUGEUGEUGEUGEUGEUGEUGEUGEUGEUGEUGEUGEUGEUGEUGEUGEUGEUGEUGEUGEUGEUGEUGEUGEUGEUGEUGEUGEUGEUGEUGEUGEUGEUGEUGEUGEUGEUGEUGEUGEUGEUGEUGEUGEUGEUGEUGEUGEUGEUGEUGEUGEUGEUGEUGEUGEUGEUGEUGEUGEUGEUGEUGEUGEUGEUGEUGEUGEUGEUGEUGEUGEGASGASGASGASGASGASGASGASGASGASGASGASGASGASGASGASGASGASGASGASGASGASGASGASGASGASGASGASGASGASGASGASGASGASGASGASGASGASGASGASGASGASGASGASGASGASGASGASGASGASGASGASGASGASGASGASGASGASGASGASGASGASGASGASGASGASGASGASGASGASGASGASGASUGEUGE UGEUGEUGEUGEUGEUGEUGEUGEUGEUGEUGEUGEUGEUGEUGEUGEUGEUGEUGEUGEUGEUGEUGEUGEUGEUGEUGEUGEUGEUGEUGEUGEUGEUGEUGEUGE C3.4SEWER P&P(ARNOLD ST-E)SCALE IN FEET1 7/25/2023 COB INF. SUBMITTAL ZWL CDP 2 9/15/2023 COB INF RC 1 SUBMITTAL ZWL CDP 3 3/6/2024 COORDINATION/BID SET ZWL CDP 5 11/25/2024 COB INF RC 2 SUBMITTAL ZWL CDP 6 7/8/2025 CONSTRUCTION SET ZWL CDP 7 1/26/2026 RECORD DRAWINGS ZWL JWF PROFESSIONALENGINEERS &SURVEYORSSTAHLYENGINEERING& ASSOCIATESBLOCK 4 - OFF-SITE IMPROVEMENTS RTR HOLDINGS II, LLCRECORD DRAWINGSJANUARY 26, 2026 SSSSSSSSSSSSW W W W W W W WWWWWWWW WSSSSSSSSSSSSSSSSSSSSSD SD SD SD SD SD WWWWWSOUTH 11TH AVESTUDENT DRIVESOUTH 14TH AVE W SS SS SS SS SS SS W SDSDSSHCHCHCHCHC HCHCHC SSSSSSSSWWWWWWWWWWWWWWWWWWSDSDSDSDY4Y4Y3Y3Y3Y3Y3Y4Y3Y3Y3Y2Y2Y3Y3Y3P3P3P3P3P3P3P3P3P3P3P3P3P3P3SDSDSDSDSDSDSDSDSDSDSDSDSDSDSDSDSDSDSDSDSDSD HCHCP3P3SDSDSDSDSDSDSDSDSD SD SD SD SD SDSD SD SDSD SDSD SD SDSDSDSDSDSDSDSDSDSDSDSD SD SD SD SDY3Y3Y3 Y3WWWWWWWWWWWWWWWWWWWWWWSDSDSDSDSDSDSDSDSDSDSDSDSDSDSDSDSDSDSDSDSDSDSDSDSDSDSDS D S D S DSD SSSSSSSWWWWWWWWWWWWWWWWWWARNOLD ST(35' WIDTH - 70' ROW) SOUTH 14TH AVESOUTH 13TH AVE SOUTH 1 2 T H A V EEXISTINGTRAILS (TYP)SSSSSSSSSSSSSSSSSSSSSSSSSSSS(47' WIDTH - 70' ROW)CITY PARK 29.64 ACRESPLAT J-605LOT 1, BLOCK 4"PHASE 3"11.89 ACRESPLAT J-695"PROPOSED"JARRETT SUBDIVISION"PROPOSED"JARRETT SUBDIVISIONFUTURE SOUTH13TH AVESTORMWATER MANAGEMENT FOR LOT 1, BLOCK 4"PHASE 3" IS PROVIDED BY THE OFFSITE STORMWATERBASIN CONSTRUCTED WITH THE SOUTH UNIVERSITYDISTRICT PHASE 2 COMMON SUBDIVISION IMPROVEMENTSLOCATED IN "CITY PARK 1" OF PLAT J-605STORMWATER MANAGEMENT FOR JARRETT SUBDIVISONIS PROVIDED BY THE OFFSITE STORMWATER BASINCONSTRUCTED WITH THE ALLISON SUBDIVISION PHASE4A, LOT 8, BLOCK 5 OF PLAT J-702SS SS SS SS SS SS SS SS4960 49604955497049654960C4.0GRADING ANDDRAINAGE PLAN1 7/25/2023 COB INF. SUBMITTAL ZWL CDP 2 9/15/2023 COB INF RC 1 SUBMITTAL ZWL CDP 3 3/6/2024 COORDINATION/BID SET ZWL CDP 5 11/25/2024 COB INF RC 2 SUBMITTAL ZWL CDP 6 7/8/2025 CONSTRUCTION SET ZWL CDP 7 1/26/2026 RECORD DRAWINGS ZWL JWF PROFESSIONALENGINEERS &SURVEYORSSTAHLYENGINEERING& ASSOCIATESBLOCK 4 - OFF-SITE IMPROVEMENTS RTR HOLDINGS II, LLCRECORD DRAWINGSJANUARY 26, 2026SCALE IN FEET GENERAL STORMWATER SYSTEM NOTESNOTESNOTESNOTESNOTESFLOW SPLITTING STORM MANHOLEC4.1DRAINAGEDETAILS1 7/25/2023 COB INF. SUBMITTAL ZWL CDP 2 9/15/2023 COB INF RC 1 SUBMITTAL ZWL CDP 3 3/6/2024 COORDINATION/BID SET ZWL CDP 5 11/25/2024 COB INF RC 2 SUBMITTAL ZWL CDP 6 7/8/2025 CONSTRUCTION SET ZWL CDP 7 1/26/2026 RECORD DRAWINGS ZWL JWF PROFESSIONALENGINEERS &SURVEYORSSTAHLYENGINEERING& ASSOCIATESBLOCK 4 - OFF-SITE IMPROVEMENTS RTR HOLDINGS II, LLCRECORD DRAWINGSJANUARY 26, 2026 SS SS SS SSSDSDSDSDSDSDSDWWWWWSOUTH 14TH AVESSSSSSSSSSW W W WSSSSCOMMCOMMCOMMY3VISION TRIANGLE (TYP)SD SD SD SD SDSDSDSDSDSDUGEUGEUGEUGEUGEUGEUGEUGEUGEUGEPGAS WWWWW SOUTH 14TH AVESDSDSDSDSDSDSDSDSDSDSDSDSDSDSDSDSDSDSDSDSDSDSDSDSSSSSSSS(47' WIDTH - 70' ROW)WSSSDW "PROPOSED"SSSSSSSSSSSSSSSSSSSSSSSSSSSSC4.2STREET ANDSTORM P&P(S. 14TH AVE)SCALE IN FEET1 7/25/2023 COB INF. SUBMITTAL ZWL CDP 2 9/15/2023 COB INF RC 1 SUBMITTAL ZWL CDP 3 3/6/2024 COORDINATION/BID SET ZWL CDP 5 11/25/2024 COB INF RC 2 SUBMITTAL ZWL CDP 6 7/8/2025 CONSTRUCTION SET ZWL CDP 7 1/26/2026 RECORD DRAWINGS ZWL JWF PROFESSIONALENGINEERS &SURVEYORSSTAHLYENGINEERING& ASSOCIATESBLOCK 4 - OFF-SITE IMPROVEMENTS RTR HOLDINGS II, LLCRECORD DRAWINGSJANUARY 26, 2026 WWWWWWWWWWWWWWW**********WSDSDSDSDSDSDSDSDSDSDSDSDSDSD SD SD SD SSSSSSSSSSSSSSSSSSSSSSSSSSWW"PROPOSED"FUTURE SOUTH13TH AVEFUTURE SOUTH15TH AVESDSDSDSDSDSDSS SS SS UGEUGEUGEUGEUGEUGEUGEUGEUGEUGEUGEUGEUGEUGEUGEUGEUGEUGEUGEUGEUGEUGEUGEUGEUGEUGEUGEUGEUGEUGEUGEUGEUGEUGEUGEUGEUGEUGEUGEUGEUGEUGEUGEGASGASGASGASGASGASGASGASGASGASGASGASGASGASGASGASGASGASGASGASGASUGEUGEUGEUGEUGEUGEUGEUGEUGEUGEUGEUGEUGEUGEUGEC4.3STREET ANDSTORM P&P(ARNOLD ST-W)SCALE IN FEET1 7/25/2023 COB INF. SUBMITTAL ZWL CDP 2 9/15/2023 COB INF RC 1 SUBMITTAL ZWL CDP 3 3/6/2024 COORDINATION/BID SET ZWL CDP 5 11/25/2024 COB INF RC 2 SUBMITTAL ZWL CDP 6 7/8/2025 CONSTRUCTION SET ZWL CDP 7 1/26/2026 RECORD DRAWINGS ZWL JWF PROFESSIONALENGINEERS &SURVEYORSSTAHLYENGINEERING& ASSOCIATESBLOCK 4 - OFF-SITE IMPROVEMENTS RTR HOLDINGS II, LLCRECORD DRAWINGSJANUARY 26, 2026 UGEUGEUGEUGEUGEUGE UGE UGE UG E UG E UG E UGE UGE UGE UGE UGE UGE UGE UGE UGE UGE UGE UGE WWWWWSDSDSDSSSSSSSDWWWWWWWWWWWWWWWWWWWWWARNOLD ST(35' WIDTH - 70' ROW)SDSDSDSDSDSDSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSW"PROPOSED"FUTURE SOUTH13TH AVESDSDSDSDSDSDSDSDSDSDSDSDSDSDSDSDSDSDSDSDSDSDUGE UGE UGE UGE UGE UGE UGE UGE UGE UGE UGE UGE UGEUGEUGEGAS GAS GAS GAS GAS GAS GAS GAS GAS GAS GAS GASGASGASGASGASGASGASGASGASGAS GAS GAS GASGA S GASGA S GAS GAS GAS GAS GAS GAS GAS GAS GAS GAS GAS GASUGEUGEUGEUGEUGEUGEUGEUGEGASGASGASGASGASGASGASGASGASUGEUGEUGEUGEUGEUGEUGEUGEUGEUGEUGEUGEUGEUGEUGEUGEUGEUGEUGEUGEUGEUGEUGEUGEUGEUGEUGEUGEUGEUGEUGEUGEUGEUGEUGEUGEUGEUGEUGEUGEUGEUGEUGEUGEUGEUGEUGEUGEUGEUGEUGEUGEUGEUGEUGEUGEUGEUGEUGEUGEUGEUGEUGEUGEUGEUGEUGEUGEUGEUGEUGEUGEUGEUGEUGEUGEUGEUGEUGEUGEUGEUGEUGEUGEUGEUGEUGEUGEUGEUGEUGEUGEUGEUGEUGEUGEUGEUGEUGEUGEUGEUGEUGEUGEUGEUGEUGEUGEUGEUGEUGEUGEUGEUGEUGEUGEUGEUGEUGEUGEUGEUGEUGEUGEUGEUGEUGEUGEUGEUGEUGEUGEUGEGASGASGASGASGASGASGASGASGASGASGASGASGASGASGASGASGASGASGASGASGASGASGASGASGASGASGASGASGASGASGASGASGASGASGASGASGASGASGASGASGASGASGASGASGASGASGASGASGASGASGASGASGASGASGASGASGASGASGASGASGASGASGASGASGASGASGASGASGASGASGASGASGASUGEUGE UGEUGEUGEUGEUGEUGEUGEUGEUGEUGEUGEUGEUGEUGEUGEUGEUGEUGEUGEUGEUGEUGEUGEUGEUGEUGEUGEUGEUGEUGEUGEUGEUGEUGEUGEUGE C4.4STREET ANDSTORM P&P(ARNOLD ST-E)SCALE IN FEET1 7/25/2023 COB INF. SUBMITTAL ZWL CDP 2 9/15/2023 COB INF RC 1 SUBMITTAL ZWL CDP 3 3/6/2024 COORDINATION/BID SET ZWL CDP 5 11/25/2024 COB INF RC 2 SUBMITTAL ZWL CDP 6 7/8/2025 CONSTRUCTION SET ZWL CDP 7 1/26/2026 RECORD DRAWINGS ZWL JWF PROFESSIONALENGINEERS &SURVEYORSSTAHLYENGINEERING& ASSOCIATESBLOCK 4 - OFF-SITE IMPROVEMENTS RTR HOLDINGS II, LLCRECORD DRAWINGSJANUARY 26, 2026 SSSSSSSSSSSSW W W W W W W WWWWWWWW WSSSSSSSSSSSSSSSSSSSSSD SD SD SD SD SD WWWWWSOUTH 11TH AVESTUDENT DRIVESOUTH 14TH AVE W SS SS SS SS SS SS W SDSDSSHCHCHCHCHC HCHCHC SSSSSSSSWWWWWWWWWWWWWWWWWWSDSDSDSDY4Y4Y3Y3Y3Y3Y3Y4Y3Y3Y3Y2Y2Y3Y3Y3P3P3P3P3P3P3P3P3P3P3P3P3P3P3SDSDSDSDSDSDSDSDSDSDSDSDSDSDSDSDSDSDSDSDSDSD HCHCP3P3SDSDSDSDSDSDSDSDSD SD SD SD SD SDSD SD SDSD SDSD SD SDSDSDSDSDSDSDSDSDSDSDSD SD SD SD SDY3Y3Y3 Y3WWWWWWWWWWWWWWWWWWWWWWSDSDSDSDSDSDSDSDSDSDSDSDSDSDSDSDSDSDSDSDSDSDSDSDSDSDSDS D S D S DSD SSSSSSSWWWWWWWWWWWWWWWWWWARNOLD ST(35' WIDTH - 70' ROW) SOUTH 14TH AVESOUTH 13TH AVE SOUTH 1 2 T H A V EEXISTINGTRAILS (TYP)SSSSSSSSSSSSSSSSSSSSSSSSSSSS(47' WIDTH - 70' ROW)CITY PARK 29.64 ACRESPLAT J-605LOT 1, BLOCK 4"PHASE 3"11.89 ACRESPLAT J-695"PROPOSED"JARRETT SUBDIVISION"PROPOSED"JARRETT SUBDIVISIONFUTURE SOUTH13TH AVESS SS SS SS SS SS SS SSSEE SHEET C5.1SEE SHEET C5.1SEE SHEET C5.1SEE SHEET C5.1SEE SHEET C5.1C5.0OVERALLINTERSECTIONPLAN1 7/25/2023 COB INF. SUBMITTAL ZWL CDP 2 9/15/2023 COB INF RC 1 SUBMITTAL ZWL CDP 3 3/6/2024 COORDINATION/BID SET ZWL CDP 5 11/25/2024 COB INF RC 2 SUBMITTAL ZWL CDP 6 7/8/2025 CONSTRUCTION SET ZWL CDP 7 1/26/2026 RECORD DRAWINGS ZWL JWF PROFESSIONALENGINEERS &SURVEYORSSTAHLYENGINEERING& ASSOCIATESBLOCK 4 - OFF-SITE IMPROVEMENTS RTR HOLDINGS II, LLCRECORD DRAWINGSJANUARY 26, 2026SCALE IN FEET SDSDSDSDSDSD SD SD SD SD SD SD SD SDARNOLD STS. 14TH AVESDSDSDSDSDSDSDSDSDSDSDSDSDSDS. 14TH AVE STUDENT DRIVESDSDSDSDSDSDSDSDSDSDSDSD SDARNOLD STS. 13TH AVE SDSDSDSDSDARNOLD STS. 12TH AVE SDSDSDSDSDSDSDSDSDSDSDSDSDSDSDSDSDSDSDSDARNOLD STSDSDSDSDSDSDSDSDSDSDC5.1ENLARGEDINTERSECTIONDETAILSSCALE IN FEET1 7/25/2023 COB INF. SUBMITTAL ZWL CDP 2 9/15/2023 COB INF RC 1 SUBMITTAL ZWL CDP 3 3/6/2024 COORDINATION/BID SET ZWL CDP 5 11/25/2024 COB INF RC 2 SUBMITTAL ZWL CDP 6 7/8/2025 CONSTRUCTION SET ZWL CDP 7 1/26/2026 RECORD DRAWINGS ZWL JWF PROFESSIONALENGINEERS &SURVEYORSSTAHLYENGINEERING& ASSOCIATESBLOCK 4 - OFF-SITE IMPROVEMENTS RTR HOLDINGS II, LLCRECORD DRAWINGSJANUARY 26, 2026 SOUTH 14TH AVENUETYPICAL SECTIONARNOLD STREETTYPICAL SECTIONC5.2STREET SECTIONS1 7/25/2023 COB INF. SUBMITTAL ZWL CDP 2 9/15/2023 COB INF RC 1 SUBMITTAL ZWL CDP 3 3/6/2024 COORDINATION/BID SET ZWL CDP 5 11/25/2024 COB INF RC 2 SUBMITTAL ZWL CDP 6 7/8/2025 CONSTRUCTION SET ZWL CDP 7 1/26/2026 RECORD DRAWINGS ZWL JWF PROFESSIONALENGINEERS &SURVEYORSSTAHLYENGINEERING& ASSOCIATESBLOCK 4 - OFF-SITE IMPROVEMENTS RTR HOLDINGS II, LLCRECORD DRAWINGSJANUARY 26, 2026 NOTESNOTESUTILITY SLEEVE DETAIL12" TYP.TYP. PAVEMENTSECTION (24")RAMP CONSTRUCTION NOTESRAMP DETAIL FORSIDEWALK PERPENDICULAR TO CURBNOTE: THE DETAILS SHOWN ON THIS PLAN ARE PROVIDED FOREASE OF REFERENCE. OTHER STANDARD DETAILS MAY APPLY.C5.3STREET DETAILS1 7/25/2023 COB INF. SUBMITTAL ZWL CDP 2 9/15/2023 COB INF RC 1 SUBMITTAL ZWL CDP 3 3/6/2024 COORDINATION/BID SET ZWL CDP 5 11/25/2024 COB INF RC 2 SUBMITTAL ZWL CDP 6 7/8/2025 CONSTRUCTION SET ZWL CDP 7 1/26/2026 RECORD DRAWINGS ZWL JWF PROFESSIONALENGINEERS &SURVEYORSSTAHLYENGINEERING& ASSOCIATESBLOCK 4 - OFF-SITE IMPROVEMENTS RTR HOLDINGS II, LLCRECORD DRAWINGSJANUARY 26, 2026 TYPICAL CONCRETE SIDEWALK SECTIONNOTE: THE DETAILS SHOWN ON THIS PLAN ARE PROVIDED FOREASE OF REFERENCE. OTHER STANDARD DETAILS MAY APPLY.TYPICAL PAVEMENT SECTIONSNOTESSIDEWALK WIDTHROAD COURSE THICKNESSTENSAR TX-190LC5.4STREET DETAILS1 7/25/2023 COB INF. SUBMITTAL ZWL CDP 2 9/15/2023 COB INF RC 1 SUBMITTAL ZWL CDP 3 3/6/2024 COORDINATION/BID SET ZWL CDP 5 11/25/2024 COB INF RC 2 SUBMITTAL ZWL CDP 6 7/8/2025 CONSTRUCTION SET ZWL CDP 7 1/26/2026 RECORD DRAWINGS ZWL JWF PROFESSIONALENGINEERS &SURVEYORSSTAHLYENGINEERING& ASSOCIATESBLOCK 4 - OFF-SITE IMPROVEMENTS RTR HOLDINGS II, LLCRECORD DRAWINGSJANUARY 26, 2026 STOPSt NameAHEADNOPARKINGANYTIMENOPARKINGANYTIMEBIKE ROUTESTUDENT DRIVEARNOLD ST(35' WIDTH - 70' ROW) SOUTH 14TH AVESOUTH 13TH AVE SOUTH 1 2 T H A V E(47' WIDTH - 70' ROW)LOT 1, BLOCK 4"PHASE 3"11.89 ACRESPLAT J-695FUTURE SOUTH13TH AVENOTESSIGNING NOTES:STRIPING/MARKING NOTES:TYPICAL STOP/YEILD BAR AND CROSSWALK MARKING DETAILTYPICAL BIKE LANE MARKING DETAILSCALE IN FEETC6.0SIGNAGE ANDSTRIPING PLAN1 7/25/2023 COB INF. SUBMITTAL ZWL CDP 2 9/15/2023 COB INF RC 1 SUBMITTAL ZWL CDP 3 3/6/2024 COORDINATION/BID SET ZWL CDP 5 11/25/2024 COB INF RC 2 SUBMITTAL ZWL CDP 6 7/8/2025 CONSTRUCTION SET ZWL CDP 7 1/26/2026 RECORD DRAWINGS ZWL JWF PROFESSIONALENGINEERS &SURVEYORSSTAHLYENGINEERING& ASSOCIATESBLOCK 4 - OFF-SITE IMPROVEMENTS RTR HOLDINGS II, LLCRECORD DRAWINGSJANUARY 26, 2026 JACKSON, RENFRO & ASSOCIATES, INC.SUD BLOCK 4COTTAGES OF BOZEMEMANBOZEMAN, MONTANArOBERT C. rENFRO, PE bobby@jraee.com (D) 205.536.7114 (P) 205.995.1078 E / E C T R I C A / E N * I N E E R I N * & ' E S I * N 9I//A*E STREET S8ITE BIR0IN*+A0, A/ABA0A REVISIONS DESIGNED DRAWN PROJECT NUMBER CHECKED 222200 RCR RCR RCR NO.DATE DESCRIPTION SHEET TITLE ISSUE DATE 04/19/2024 SEQUENCE OF 6 SHEET NO. © 2023 JACKSON, RENFRO & ASSCOCIATES, INC. E101 ELECTRICAL LEGEND, NOTES & DETAILS 1 CONTRACTOR SHALL VISIT THE SITE OF THE WORK PRIOR TO SUBMITTING BID TO EXAMINE CAREFULLY LOCAL CONDITIONS AND DIFFICULTIES TO BE ENCOUNTERED. ANY DISCREPANCY BETWEEN PLANS AND EXISTING CONDITIONS SHALL IMMEDIATELY BE CALLED TO THE ATTENTION OF THE ARCHITECT. 1. REMOVE ALL EXISTING ELECTRICAL EQUIPMENT AND WIRING MADE OBSOLETE BY THIS RENOVATION AND DISPOSE OF AS DIRECTED BY THE ARCHITECT. 2. EXISTING PANEL DIRECTORY CARDS MODIFIED BY THIS RENOVATION SHALL BE RETYPED TO INDICATE CONNECTED CIRCUITS. 3. THIS CONTRACTOR SHALL FURNISH ALL MATERIALS AND LABOR NECESSARY TO EXTEND CIRCUITS AND MAKE RECONNECTIONS TO ANY ACTIVE ELECTRICAL DEVICES ON WHICH THE BRANCH CIRCUIT IS INTERRUPTED BY THIS ALTERATION. CARE SHALL BE TAKEN TO INSURE THAT EXISTING PANEL AND FEEDER RATINGS ARE NOT EXCEEDED. 4. ALL EQUIPMENT SHALL BE GROUNDED AND BONDED IN ACCORDANCE WITH NEC.5. ALL WORK SHALL BE DONE IN STRICT ACCORDANCE WITH ALL REQUIREMENTS OF ANY LOCAL APPLICABLE CODES OR ORDINANCES, PUBLIC UTILITY COMPANIES, STATE CODE, NATIONAL ELECTRICAL SAFETY CODE AND THE LATEST EDITION OF THE NATIONAL ELECTRICAL CODE WITH THE INTERIM AMENDMENTS THERETO. 6. ALL MATERIALS SHALL CONFORM TO THE LATEST ISSUE OF ALL APPLICABLE STANDARDS AS ESTABLISHED BY EEI, NEMA, IEEE, ASTM, IPCEA, NATIONAL BOARD OF FIRE UNDERWRITERS AND UNDERWRITERS LABORATORIES, INC. 7. CONTRACTOR SHALL FURNISH ARCHITECT WITH A CERTIFICATE OF FINAL INSPECTION FROM THE INSPECTING AUTHORITY. 8. THE COST OF ALL PERMITS AND INSPECTION FEES SHALL BE INCLUDED IN THE CONTRACT PRICE.9. RIGID STEEL CONDUIT SHALL BE GALVANIZED OR SHERARDIZED, FITTINGS SHALL BE CAST FERROUS MATERIAL WITH A CADMIUM OR ZINC PLATED FINISH. 10. 11.EXCEPT AS NOTED OTHERWISE ON THE DRAWINGS, ALL POWER WIRING SHALL BE INSTALLED IN CONDUIT AS FOLLOWS: A.NON-METALLIC CONDUIT (SCHEDULE 80 RIGID PVC) SHALL BE USED FOR BRANCH CIRCUITS AND FEEDERS WHERE BELOW GRADE, OR IN CONCRETE SLAB ON GRADE. 12 WIRE AND CABLE SHALL BE COPPER AND CONFORM TO THE FOLLOWING: 1.NEC TYPE RHW/RHH - NO. 12 AND NO. 10 - SOLID 2.NEC TYPE RHW/RHH-USE - NO. 8 AND LARGER - STRANDED ELECTRICAL CONTRACTOR SHALL SUBMIT TO ARCHITECT FOR APPROVAL COMPLETE CATALOG DATA AND SIX (6) COPIES OF MANUFACTURER'S SHOP DRAWINGS SHOWING GENERAL ARRANGEMENT AND DETAIL CONSTRUCTION FOR ALL ELECTRICAL APPARATUS EXCEPT CONDUIT, FITTINGS AND WIRE BEFORE PURCHASE AND INSTALLATION. 13. THIS CONTRACTOR SHALL LEAVE ENTIRE ELECTRICAL SYSTEM INSTALLED BY HIM UNDER THIS CONTRACT IN PROPER WORKING ORDER AND SHALL REPLACE WITHOUT ADDITIONAL CHARGE ALL WORK OR MATERIALS WHICH MAY DEVELOP DEFECTS WITHIN A PERIOD OF ONE (1) YEAR FROM DATE OF FINAL ACCEPTANCE BY THE ARCHITECT. 14. 15.ALL ELECTRICAL WORK SHALL BE INSTALLED IN ACCORDANCE WITH CITY OF BOZEMAN LIGHTING STANDARDS - REVISION MARCH 2020. CONTRACTOR SHALL DOWNLOAD STANDARDS FROM CITY OF BOZEMAN MUNICIPAL WEBSITE. ALL REQUIREMENTS INDICATED IN THESE STANDARDS ARE A PART OF THE CONTRACT DOCUMENTS. GENERAL ELECTRICAL NOTES FIXTURE OUTLET - POLE LIGHT FIXTURE - QUANTITY AND ORIENTATION(S) OF LUMINAIRES AS INDICATED ON PLANS. ELECTRICAL PULL BOX - SEE FIGURES 2 AND 3 THIS SHEET. BRANCH/FEEDER CIRCUIT - CONCEALED IN WALLS OR CEILING. BRANCH/FEEDER CIRCUIT - EXPOSED ON WALLS OR CEILING. BRANCH/FEEDER CIRCUIT - CONCEALED IN FLOOR SLAB OR DIRT FILL. BRANCH/FEEDER CIRCUIT - HOMERUN - CAN BE USED WITH OTHER BRANCH/FEEDER TYPES. BRANCH/FEEDER CIRCUIT MODIFIERS: : 2#12 & 1#12G UNLESS NOTED OTHERWISE. : 3#12 & 1#12G, ETC. UNLESS NOTED OTHERWISE (TICK MARKS INDICATE CONDUCTOR QUANTITY NOT INCLUDING GROUND WIRE). : 2#10 & 1#10G UNLESS NOTED OTHERWISE (NUMBER INDICATES WIRE AWG). SIZE CONDUIT PER N.E.C. UNLESS INDICATED OTHERWISE. 10 LIGHTING PANEL - SURFACE MOUNTED. DETAIL DESIGNATOR - "A" INDICATED DETAIL MARK - "E-1" INDICATED SHEET NUMBER WHERE DETAIL IS LOCATED (TYPICAL). GENERAL ABBREVIATIONS: EX EXISTING TO REMAIN. XR EXISTING TO BE REMOVED - REMOVE ALL ASSOCIATED ELECTRICAL EQUIPMENT, DEVICES, CONDUIT AND WIRING CONNECTIONS TO OTHER ELECTRICAL ITEMS UNLESS SHOWN OTHERWISE. XRL EXISTING TO BE RELOCATED - REMOVE ALL ASSOCIATED ELECTRICAL EQUIPMENT, DEVICES, CONDUIT AND WIRING AT EXISTING LOCATION. RELOCATE ITEM TO NEW LOCATION SHOWN ON ELECTRICAL PLANS. EXTEND AND RECONNECT EXISTING CONDUIT, WIRING, ETC. TO NEW LOCATION AS REQUIRED UNLESS SHOWN OTHERWISE. XRP EXISTING TO BE REPLACED - EXTEND AND RECONNECT EXISTING CONDUIT AND WIRING TO REPLACED ITEM. TYPICAL CIRCUITRY DESIGNATIONS: 2 SETS OF 4#3/0 & 1#3G - 2 1/2"C CONDUIT SIZE. GROUND CONDUCTOR WIRE GAUGE. QUANTITY OF GROUND CONDUCTORS (PER SET) PHASE/NEUTRAL CONDUCTOR WIRE GAUGE. QUANTITY OF PHASE/NEUTRAL CONDUCTORS (PER SET). QUANTITY OF PARALLEL SETS OF THE PHASE/NEUTRAL CONDUCTORS, GROUND CONDUCTOR AND CONDUIT SPECIFIED. GENERAL ELECTRICAL LEGEND STREET LIGHTING WAS INSPECTED BY STAHLY ENGINEERING RECORD DRAWINGS JACKSON, RENFRO & ASSOCIATES, INC.SUD BLOCK 4COTTAGES OF BOZEMEMANBOZEMAN, MONTANArOBERT C. rENFRO, PE bobby@jraee.com (D) 205.536.7114 (P) 205.995.1078 E / E C T R I C A / E N * I N E E R I N * & ' E S I * N 9I//A*E STREET S8ITE BIR0IN*+A0, A/ABA0A REVISIONS DESIGNED DRAWN PROJECT NUMBER CHECKED 222200 RCR RCR RCR NO.DATE DESCRIPTION SHEET TITLE ISSUE DATE 04/19/2024 SEQUENCE OF 6 SHEET NO. © 2023 JACKSON, RENFRO & ASSCOCIATES, INC. E201 OVERALL SITE ELECTRICAL PLAN - PUBLIC STREETS 2SOUTH 11TH AVESOUTH 14TH AVEHC HC HCHCHCHCCOMMCOMMCOMMCOMMCOMMCOMMCOMMCOMMCOMMCOMMCOMMCOMMCOMMCOMMCOMMCOMMCOMMCOMMCOMMCOMCOMMCOMMCOMMUGEUGEUGEUGEUGEUGEUGEUGEUGEUGEUGEUGEUGEUGEPUGEUGEUGEUGEUGEUGEUGEUGEUGEUGEUGEUGEUGEUGEUGEUGEUGEUGEUGEUGEUGEEUGEUGEUGEUGEUGEUGEUGEUGEUGEUGEUGEUGEUGEUGEUGEUGEUGEUGEUGEUGEUGEUGEUGEUGEUGEGASGASGASGASGASGASGASGASGASGASGASGASGASGASGASGASGASGASGASGASGASGASGASGASGASGASGASGASGASGASGASGASGASGASGASGASGASGASGASGASGASGASGASGASGASGASGASGASGASGASGASGASGASUGEUGEUGEUGEUGEUGEUGEUGEUGEUGEUGEUGEUGEUGEUGEUGEUGEUGEUGEUGEUGEUGEUGEUGEUGEUGEUGEUGEUGEUGEUGEUGEUGEUGEUGEUGEUGEUGEUGEUGEUGEUGEUGEUGE UGE UGE UGE UGE UGE UGE UGE UGE UGEUGEUGE UGEUGE UGE UGEUGEUGEUGEUGEUGEUGE UGE UGE UGE UGE UGEUGEUGEUGEUGEUGEUGEUGEUGEUUGE UGE UGE UGE UGE UGE UGE UGE UGE UGEUGEUGEUGEUGE UGEUGEUGEUGEUGEUGEUGEUGEUGEUGEP PPPPP GAS GAS GAS GAS UGE UGE UGE UGE UGE GASGASGASGASGASGASGASGASGASCOMM COMM COMM COMM COMM COMM COMM COMM COMM COMM COMM COMM COMM COMM COMM COMM COMM COMM COMM COMMCOMMCOMMCOMMCOMMCOMMCOMMCOMMCOMMCOMMCOMMCOMMCOMMUGEUGEUGEUGEUGEUGEUGEUGEUGEUGEWWWWWWSOUTH 13TH AVESOUTH 12TH AVEWWSTREET LIGHTING WAS INSPECTED BY STAHLY ENGINEERING RECORD DRAWINGS JACKSON, RENFRO & ASSOCIATES, INC.SUD BLOCK 4COTTAGES OF BOZEMEMANBOZEMAN, MONTANArOBERT C. rENFRO, PE bobby@jraee.com (D) 205.536.7114 (P) 205.995.1078 E / E C T R I C A / E N * I N E E R I N * & ' E S I * N 9I//A*E STREET S8ITE BIR0IN*+A0, A/ABA0A REVISIONS DESIGNED DRAWN PROJECT NUMBER CHECKED 222200 RCR RCR RCR NO.DATE DESCRIPTION SHEET TITLE ISSUE DATE 04/19/2024 SEQUENCE OF 6 SHEET NO. © 2023 JACKSON, RENFRO & ASSCOCIATES, INC. E202 LARGE SCALE SITE ELECTRICAL PLANS - PUBLIC STREETS 3 T STREET LIGHTING WAS INSPECTED BY STAHLY ENGINEERING RECORD DRAWINGS JACKSON, RENFRO & ASSOCIATES, INC.SUD BLOCK 4COTTAGES OF BOZEMEMANBOZEMAN, MONTANArOBERT C. rENFRO, PE bobby@jraee.com (D) 205.536.7114 (P) 205.995.1078 E / E C T R I C A / E N * I N E E R I N * & ' E S I * N 9I//A*E STREET S8ITE BIR0IN*+A0, A/ABA0A REVISIONS DESIGNED DRAWN PROJECT NUMBER CHECKED 222200 RCR RCR RCR NO.DATE DESCRIPTION SHEET TITLE ISSUE DATE 04/19/2024 SEQUENCE OF 6 SHEET NO. © 2023 JACKSON, RENFRO & ASSCOCIATES, INC. E301 OVERALL SITE PHOTOMETRIC PLAN - PUBLIC STREETS 4COMMCOMMCOMMCOMMCOMMCOMCOMMCOMMCOMMUGEUGEUGEUGEUGEUGEUGEUGEUGEUGEUGEUGEUGEUGEPUGEUGEUGEUGEUGEUGEUGEUGEUGEUGEUGEUGEUGEUGEUGEUGEUGEUGEUGEUGEUGEUGEUGEUGEUGEUGEUGEUGEUGEUGEUGEUGEUGEUGEGASGASGASGASGASGASGASGASGASGASGASGASGASGASGASGASGASGASGASGASGASGASGASGASGASGASGASGASGASGASGASGASGASGASGASGASGASGASGASGASGASGASGASGASGASGASUGEUGEUGEUGEUGEUGEUGEUGEUGEUGEUGEUGEUGEUGEUGEUGEUGEUGEUGEUGEUGEUGEUGEUGEUGEUGEUGEUGEUGEUGEUGEUGEUGEUGEUGEUGEUGEUGEUGEUGEUGEUGEUGEUGEUGEUGEUGEUGEUGEUGEUGEUGEUGEUGEPPPPP GAS GAS GAS GAS UGE UGE UGE UGE UGE GASGASGASGASGASGASGASGASGASCOMM COMM COMM COMM COMM COMM COMM COMM COMM COMM COMM COMM COMM COMM COMM COMM COMM COMM COMM COMMCOMMCOMCOMMCOMMCOMMUGEUGEWWWWWSOUSOWWSTREET LIGHTING WAS INSPECTED BY STAHLY ENGINEERING RECORD DRAWINGS JACKSON, RENFRO & ASSOCIATES, INC.SUD BLOCK 4COTTAGES OF BOZEMEMANBOZEMAN, MONTANArOBERT C. rENFRO, PE bobby@jraee.com (D) 205.536.7114 (P) 205.995.1078 E / E C T R I C A / E N * I N E E R I N * & ' E S I * N 9I//A*E STREET S8ITE BIR0IN*+A0, A/ABA0A REVISIONS DESIGNED DRAWN PROJECT NUMBER CHECKED 222200 RCR RCR RCR NO.DATE DESCRIPTION SHEET TITLE ISSUE DATE 04/19/2024 SEQUENCE OF 6 SHEET NO. © 2023 JACKSON, RENFRO & ASSCOCIATES, INC. E302 LARGE SCALE SITE PHOTOMETRIC PLANS - PUBLIC STREETS 5 T STREET LIGHTING WAS INSPECTED BY STAHLY ENGINEERING RECORD DRAWINGS JACKSON, RENFRO & ASSOCIATES, INC.SUD BLOCK 4COTTAGES OF BOZEMEMANBOZEMAN, MONTANArOBERT C. rENFRO, PE bobby@jraee.com (D) 205.536.7114 (P) 205.995.1078 E / E C T R I C A / E N * I N E E R I N * & ' E S I * N 9I//A*E STREET S8ITE BIR0IN*+A0, A/ABA0A REVISIONS DESIGNED DRAWN PROJECT NUMBER CHECKED 222200 RCR RCR RCR NO.DATE DESCRIPTION SHEET TITLE ISSUE DATE 04/19/2024 SEQUENCE OF 6 SHEET NO. © 2023 JACKSON, RENFRO & ASSCOCIATES, INC. E303 PUBLIC STREETS LIGHT FIXTURE CUT SHEETS 6 STREET LIGHTING WAS INSPECTED BY STAHLY ENGINEERING RECORD DRAWINGS