HomeMy WebLinkAbout26010 Application Summary 26010
— —------ 01.07.26
Planning Division PLNAPP 17013
Submitted Date:01-05-2026 09:51 AM
Remember to obtain owner signature on this form prior to uploading with the rest of your submittal
PROJECT INFORMATION
Project Name: 1107 S 3rd Addition _
ProjectType(s): Neighborhood Certificate ofAppropriateness NCOA ,
Street Address: 1107 3RD
CAPITOL HILL ADD,S13,T02 S, R05 E, BLOCK 32, Lot 3-
4,ACRES 0.174, N 13'4" LOT 5
Legal Description:
Remodel and addition of existing house including an attached
garage with ADU
Description of Project: _ _
Current Zoning: R-1 Residential Low Density District
Existing Use: Residential _
Proposed Use: Residential
Gross Lot Area: 7562
Number of New Buildings: 0
Type and Number of Dwellings: 1
Building Size (SF): 4234
Non-Residential Building Size(SF): 0
Building Height(ft):
Affordable Housing (Y/N): No
Departure/Deviation Request(Y/N): No
Zoning Verification E�edited (Y/N): No
Wetlands Activity(Y/N): No _
Traffic Study or Waiver: N/A-Application is not a Master Site Plan,Site Plan, ,
Is there a pre-application pertaining to this project?: Subdivision,or Planned Development Zone.
Project Name and Project Number:
PROPERTY OWNER
Company Name: none
Name: Austin Kirchhoff
Full Address: 1107 S 3rd Ave, Bozeman, MT 59715
Email:
Phone:
APPLICANT
Company Name: JP Design+Architecture PLLC
Name: Janet Porter
Full Address: 106 Hereford Dr, Belgrade, Montana 59714
Email:
Phone:
REPRESENTATIVE
Company Name: JP Design+Architecture PLLC
Name: Janet Porter
Full Address: 106 Hereford Dr, Belgrade, Montana 59714
Email:
Phone:
CERTIFICATIONS AND SIGNATURES
Applicant signature is captured electronically at time of application submittal.This application PDF must also be
signed by the property owner(s)for all application types before the submittal will be accepted.The only exception
to this is an informal review application that may be signed by the applicant(s)only.The applicant(s)and property
owner(s)submit this application for review under the terms and provisions of the Bozeman Municipal Code. It is
further indicated that any work undertaken to complete a development approved by the City of Bozeman shall be
in conformance with the requirements of the Bozeman Municipal Code and any special conditions established by
the approval authority. I acknowledge that the City has an Impact Fee Program and impact fees may be assessed
for my project. Further, I agree to grant City personnel and other review agency representative's access to the
subject site during the course of the review process(Section 38.200.050, BMC). I(We)hereby certify that the
above information is true and correct to the best of my(our)knowledge.
Certification of Completion and Compliance-I understand that conditions of approval may be applied to the
application and that I will complywith any conditions of approval or make necessary corrections to the application
materials in order to comply with municipal code provisions.
Statement of Intent to Construct According to the Final Plan -I acknowledge that construction not in
compliance with the approved final plan may result in delays of pccupancy or costs to correct noncompliance.
Property Owner Signature:
Printed Name:
CONTACT US
Alfred M.Stiff Professional Building phone
20 East Olive Street fax
Bozemn, MT 59715
www.bozeman.net/planning