Loading...
HomeMy WebLinkAbout05--NCOA Checklist 1 | Page THE CORNER HOUSE 824 S 8TH AVE BOZEMAN, MT 59715 NOVEMBER 7, 2023 NCOA Checklist (November 2021 version) Responses 1. Create & submit a Planning application using the ProjectDox portal. Complete and signed Development Form has been included in submission. 2. Digital files separated into the required categories: Documents and Drawings. 3. The required naming protocol has been fulfilled. 4. Demolition is being proposed, please see attached DEM submittal. 5. The existing structure was built in 1900-1909. Please see 06-Historic Survey performed by Metcalf Archeology 6. The required property record form is included in the submittal. Please see 06-Historic Survey performed by Metcalf Archeology 7. The required project narrative is included in the submittal. 8. Historical information is included in the submittal. 9. One current picture of each elevation of each structure planned to be demolished is included in the submittal. 10. The existing conditions site plan is included in the submittal, reference the Topographic Survey in Drawings. 11. The site plan is included in the submittal, reference A1.1 Architectural Site Plan in the Drawings. 12. Front, rear and side elevations of all buildings, structures, fences and walls are included in the submittal. All elevations are shown from Right of Way. 13. The building elevations detailing proposed exterior materials have been labeled on the proposed elevations, reference A6.1 Building Elevations, A6.2 Building Elevations in the Drawings. 14. Internal and external elements of the existing structure have not been included because the existing structure is proposed to be demolished in its entirety. 15. The required streetscape study of the new infill dwelling/structure is included in the submittal. 16. For any non-conforming structure, an analysis of demolition to determine whether the threshold for loss of protected non-conforming status per Section 38.280.040.B BMC has been met or surpassed. 2 | Page 17. Proposed windows, doors, exterior lighting or other detailed alternations are included in the submittal, reference A7.0 Building Material Finishes in the Drawings. 18. Floor plans showing floor layout including square footage and proposed use for each room and area with the building have been included in the submittal, reference A2.5 Level 1 Floor Plan, A2.6 Level 2 Floor Plan, and A2.7 Level 3 Floor Plan. 19. The required parking plan and calculation for all uses for the proposed changes, reference A1.1 Architectural Site Plan in the Drawings. 20. A schedule for the proposed changes to the property is included in the submittal. No phasing is anticipated currently.