Loading...
HomeMy WebLinkAbout055 P003 Building 5 Plumbing DetailsALL PIPING WITHIN 18" OF WATER HEATER TO BE COPPER TYPE 'L'. EXPANSION TANK (PET-1) DWH-1 THERMOMETER DRAIN VALVE ASME T&P RELIEF VALVE - ROUTE TYPE 'L' FULL SIZE TO DRAIN RECEPTOR DRAIN PAN WITH SCH. 40 PVC PIPE TO DRAIN RECEPTOR 1" DHW ISOLATION VALVE -TYP T SEISMIC STRAPPING SHALL BE LOCATED AT POINTS WITHIN UPPER 1/3 AND LOWER 1/3 OF WATER HEATER ROUTE TP-1 DISCHARGE DIRECTLY TO DRAIN RECEPTOR DCW LINE FROM VERTICAL MAIN 1" DCW 1" DCW NOTE: REFER TO UPC 2021 SECTION 908.2 FOR ADDITIONAL INFORMATION 2" DRY VENT SIZED FOR BATHROOM GROUP'S TOTAL DRAINAGE FIXTURE UNITS (DFU) DRY-VENTED LAVATORY START OF WET VENT SHALL BE ABOVE THE WEIR OF EACH WET-VENTED FIXTURES TRAPS 2" WET VENT FOR 4 DFU OR LESS AND 3" WET VENT FOR 5 DFU OR MORE WATER CLOSET CONNECTION TO BE DOWNSTREAM OF OTHER FIXTURES OFFSET LAVATORY WET-VENT AND/OR UPSIZE BATH/SHOWER TRAP ARM TO MAINTAIN MAXIMUM TRAP ARM LENGTH LISTED IN THE ABOVE TABLE ONLY ONE WET-VENTED FIXTURE MAY DISCHARGE UPSTREAM OF THE DRY-VENTED LAVATORY TRAP ARM DIA. 1-1/2" 2" MAX LENGTH 3'-6" 5'-0" TRAP PRIMER TAILPIECE - INSTALL PER MANUF. INSTRUCTIONS TRANSITION TO TRAP PRIMER PIPING WHERE CONCEALED SINK / LAVATORY FLOOR DRAIN/SINK FINISHED FLOOR FRAMED WALL PROVIDE TRAP PRIMER CONNECTION ON FLOOR DRAIN/SINK OR PROVIDE TRAP PRIMER ADAPTER PROVIDE PIPE ESCUTCHEON 1/2'' DCW PIPE TO TRAP PRIMER CONNECTION -NO FITTINGS UNDERSLAB INSTALL SLEEVE THRU CONCRETE -SEAL WATERTIGHT PREFABRICATED FLASHING BOOT WITH MEMBRANE COLLAR STAINLESS STEEL CLAMP -TRIM EXCESS TRANSITION TO MINIMUM 3"ø VTR LOCATE TRANSITION MINIMUM 12" BELOW ROOF DECK HOLE THROUGH ROOF DECK APPLY WEATHER SEALANT AT INTERFACE FASTEN FLASHING BOOT TO ROOF ATTIC TRUSS -12" MIN FROM BUILDING TO SEWER MAIN FINISH GRADE RISER PIPE 45 DEGREE ELBOW -TYP CLEAN OUT TO GRADE -SEE CIVIL SITE PLAN TWO-WAY CLEANOUT FITTING SEE SITE CIVIL PLANS FOR INVERT ELEVATION SEE SITE UNDERSLAB PLUMBING PLAN FOR INVERT ELEVATION SINK CLEANOUT 2" SAN 1-1/2" VENT BRING VENT UP AS HIGH AS POSSIBLE HIGH LEVEL OF RIM OF SINK OR COUNTER TOP VENT UP IN WALL WALL 2" SAN INSTALL USING DWV FITTINGS AND SLOPE AT A MINIMUM OF 1/4" PER FOOT. INTERIOR FLOOR CLEANOUTEXTERIOR CLEANOUT (LIGHT TRAFFIC AREA) FINISHED FLOOR PIPE EXTENSION SAME SIZE AS SEWER UP TO 4" DIA. 6" THICK BY 18" SQUARE CONCRETE PAD "CO" TO BE CAST IN COVER GRADE OR PAVING CAST IRON CLEANOUT WITH COVER FOR DUTY REQUIRED LONG SWEEP 1/4 BEND OR COMBINATION WYE & 1/8 BEND. (USE REDUCING TYPE WHERE REQUIRED) BUILDING DRAIN OR SEWER MATERIAL AND SIZE AS SPECIFIEDSEE PLANSCLEANOUT TEE FLOOR LINE CONNECT TO WASTE LINE STAINLESS STEEL WALL COVER AND SCREW WALL EXTEND WASTE OR VENT LINE WHERE INDICATED 12" MIN.EXISTING 18" X 18" X 24" DEEP SUMP ELEVATOR PIT SUMP PUMP SHALL BE 3000 GPH (50 GPM) AND CONTROLLED VIA INTEGRAL FLOAT SWITCH TO PROVIDE OPERATION WITHOUT HUMAN INTERVENTION. OIL SENSOR CONTROL SYSTEM -MOUNT ON DISCHARGE PIPE 1-1/2" DISCHARGE PIPE WITH CHECK VALVE AND ISOLATION VALVE (LOCKED OPEN) SUMP PUMP CONTROL PANEL -CONNECT TO EXISTING GFI OUTLET - WIRE PER MANUF. INSTALL INSTRUCTIONS DISCHARGE INTO TOP OF ABOVE GRADE SANITARY PIPE WITH SANITARY WYE 4'-0" MIN.1/2"ø DCW SUPPLY WALL INSTALL SLEEVE THRU CONCRETE -SEAL WATERTIGHT 1/2'' DCW PIPE TO TRAP PRIMER CONNECTION -NO FITTINGS UNDERSLAB PROVIDE TRAP PRIMER CONNECTION ON FLOOR DRAIN/SINK OR PROVIDE TRAP PRIMER ADAPTER FLOOR DRAIN/SINK FINISHED FLOOR BALL VALVE TRAP PRIMER -SECURE TO WALL PER SPECIFICATIONSUNION -PROVIDE WYE SPLITTER WHERE REQUIRED P 3"ø DCW W P REDUCED PRESSURE BACKFLOW PREVENTOR -PIPE AIR GAP TO FLOOR SINK -TYP ISOLATION VALVE -TYP PRESSURE GAUGE -TYP PRESSURE REDUCING VALVE -SET TO 60 PSI -TYP WATER METER (BY UTILITY) -TYP STRAINER TO BUILDING SEE UNDERSLAB PLAN -TYP REDUCER 2' MAX1' MINOS&Y VALVE WITH STEM PARALLEL TO FLOOR W P 4"ø DCW 2"ø IRR BUILDING 2BUILDING 3BUILDING 5 BUILDING 4 BUILDING 1 sheet: title: D C B A D C B A 1 2 3 4 5 1 2 3 4 5 UNLESS A PROFESSIONAL SEAL WITH SIGNATURE AND DATE IS AFFIXED, THIS DOCUMENT IS PRELIMINARY AND IS NOT INTENDED FOR CONSTRUCTION, RECORDING PURPOSES, OR IMPLEMENTATION 601 Euclid Ave. Suite C Helena, Montana 59601 406-531-4745 unitedhousingpartners.com UHP Design LLC 406-224-8220 revisions : p r o j e c t # : d a t e : KEY PLAN project: stamp THE DESIGNS SHOWN AND DESCRIBED HEREIN INCLUDING ALL TECHNICAL DRAWINGS, GRAPHIC REPRESENTATIONS & MODELS THEREOF, ARE PROPRIETARY & CAN NOT BE COPIED, DUPLICATED, OR COMMERCIALLY EXPLOITED IN WHOLE OR IN PART WITHOUT THE SOLE AND EXPRESS WRITTEN PERMISSION FROM METHOD STUDIO INC. m-m.net 2880 Technology Blvd W, Bozeman, MT 59718 (406) 587-0721 P003 PLUMBING DETAILS 100% CD SET 2025.11.26 25.0275 ADDRESS: BOZEMAN, MT Hidden Creek Building 5 N.T.S.1 WATER HEATER SCHEMATIC (DWH-1) N.T.S.2 HORIZONTAL BATHROOM GROUP VENTING DETAIL N.T.S.6 TAILPIECE TRAP PRIMER DETAIL (TP-2) N.T.S.11 VENT THRU ROOF DETAIL N.T.S.3 BUILDING SEWER SERVICE DETAIL N.T.S.7 PENINSULA FIXTURE VENTING DETAIL N.T.S.8 SEWER LINE CLEANOUT DETAIL N.T.S.9 SEWER LINE CLEANOUT THRU WALL DETAIL N.T.S.10 ELEVATOR SUMP PUMP DETAIL N.T.S.5 TRAP PRIMER DETAIL (TP-1) N.T.S.4 WATER SERVICE ENTRANCE IS SEFORP LANO E N G INEERO N TM ANA LICENS E D DYLAN R. JUNJAK No. 76054 PE