HomeMy WebLinkAbout049 E200 - Electrical DetailsSAND BEDDING AND BACKFILL
BY CONTRACTOR
CONDUITS
ASPHALT,
CONCRETE,
LAWN, ETC FINISHED GRADE
12"
6" RED MARKER
TAPE, RUN LENGTH
OF TRENCH
1. IF MULTIPLE CONDUITS SHARE TRENCH, PROVIDE SPACING BETWEEN CONDUITS.
PROVIDE ZIP TIES, AND TIE ALL CONDUITS TOGETHER TO ENSURE STABILITY.
2. BURIAL DEPTH TO BE VERIFIED WITH UTILITIES AND AUTHORITY HAVING JURISDICTION:
ELECTRICAL FEEDERS, COMMUNICATIONS: 24" MINIMUM
UNDERGROUND SECONDARY: 30" MINIMUM
UNDERGROUND PRIMARY: 42" MINIMUM
#
2
SYMBOL USED FOR NOTE CALLOUT.
DETAIL NOTES:
PATCH TO MATCH
EXISTING FINISH
CONDITIONS COMPACTED FILL IN 6" LIFTS
OR PER SPECIFICATIONS
1
18"
30"
#4 BARE COPPER BOND FROM BOLT TO
REBAR WITH EXOTHERMIC WELD OR
COMPRESSION FITTING
BASE COVER TO MATCH POLE WITH STAINLESS SCREWS
SCHEDULE 40PVC
(1") TO HANDHOLE
OR NEXT FIXTURE
AS SHOWN.
NUMBER OF FIXTURE HEADS VARY WITH
TYPE OF FIXTURE SEE FIXTURE SCHEDULE
CONCEALED WELDED STEEL TENON WITH STAINLESS
STEEL BOLTS (ALL WITH POLE)
POLE PER SCHEDULE
NON-SHRINK GROUT UNDER BASE PLATE PACKED TIGHT
AFTER LEVELING
30" MIN
CURB
LENGTH OF ANCHOR BOLTS PER MANUFACTURERS
RECOMMENDATIONS. INSTALL PER FACTORY TEMPLATE.
DOUBLE LUGS WITH FLAT WASHERS AT BASE PLATE.
CLEAN BOLT THREADS AND SURFACES TO PROVIDE
GROUNDING CONTINUITY TO POLE.
#4 REBAR CAGE AT 6"O.C. EACH WAY TOP TO BOTTOM.
INSTALL (3)#4 HORIZONTAL TIES WITHIN TOP 6" OF BASE.
CONTRACTOR MAY USE PRE-CAST POLE BASE.
SUBMIT PRE-CAST DRAWING TO ENGINEER
FOR APPROVAL.
HANDHOLE WITH GROUNDING LUG
RUBBED BASE TO 12" BELOW
GRADE. RUB CORNERS
ROUND AND SIDES SMOOTH
LANDSCAPED SURFACE
FINAL GRADE
6'-0" MINIMUM
24" ROUND FORMED
DETAIL NOTES:
1. INCREASE THE SPECIFIED HEIGHT OF THE POLE BY 2'-0"
TO ENSURE UNIFORM FIXTURE MOUNTIAN HEIGHT
WHERE THE 6" BASE IS USED.
2. PROTECTED AREA IMPLIES THE POLE IS INSTALLED AT
LEAST 30" FROM PARKING OR DRIVE AREAS.
ENERGY CODE COMMISSIONING COMPLIANCE NOTES
SECTION 408 SYSTEM COMMISSIONING
IT SHALL BE THE ELECTRICAL CONTRACTOR'S RESPONSIBILITY TO PROVIDE ALL BELOW NOTED DOCUMENTS WITHIN 90 DAYS OF CERTIFICATE OF
OCCUPANCY:
A. AS-BUILT DRAWINGS- DRAWINGS SHALL INCLUDE THE LOCATION AND PERFORMANCE DATA OF ALL PIECES OF MECHANICAL EQUIPMENT.
B. OPERATING AND MAINTENANCE MANUALS- MANUALS SHALL INCLUDE THE FOLLOWING:
1. SUBMITTAL DATA ON ALL PIECES OF EQUIPMENT REQUIRING MAINTENANCE.
2. MANUFACTURER'S OPERATIONS AND MAINTENANCE DATA ON ALL PIECES OF EQUIPMENT. ROUTINE MAINTENANCE ACTIONS SHALL BE
CLEARLY IDENTIFIED.
3. NAME AND ADDRESS AND PHONE NUMBER OF OF AT LEAST ONE (1) SERVICE PROVIDED.
4. LIGHTING CONTROL SYSTEMS MAINTENANCE AND CALIBRATION INFORMATION INCLUDING WIRING DIAGRAMS, EQUIPMENT AND SYSTEM
SCHEMATICS, AND CONTROL SEQUENCES OF OPERATIONS. DESIRED OR FIELD DETERMINED SETPOINTS SHALL BE PERMANENTLY
RECORDED ON CONTROL DRAWINGS AT ALL CONTROL DEVICES, OR FOR DIGITAL CONTROL SYSTEMS, IN THE SYSTEM PROGRAMMING
INSTRUCTIONS.
5. A NARRATIVE ON HOW EACH LIGHTING SYSTEM IN INTENDED TO OPERATE, INCLUDING RECOMMENDED SETPOINTS.
C. LIGHTING SYSTEM FUNCTIONAL TESTING REQUIREMENTS
FUNCTIONAL TESTING - ALL AUTOMATIC LIGHTING CONTROL SYSTEM SHALL BE FULLY TESTED TO ENSURE THE CONTROL HARDWARE AND
SOFTWARE ARE CALIBRATED, ADJUSTED, P[ROGRAMMED, AND IN PROPER WORKING CONDITION IN ACCORDANCE WITH THE CONSTRUCTION
DOCUMENTS AND MANUFACTURER'S INSTALLATION INSTRUCTIONS.
WHERE OCCUPANT SENSORS, TIME SWITCHES, PROGRAMMABLE CONTROLS, PHOTOSENSORS OR DAYLIGHTING CONTROLS ARE INSTALLED, THE
FOLLOWING PROCEDURES SHALL BE PREFORMED:
1. CONFIRM THAT THE PLACEMENT, SENSITIVITY AND TIME-OUT ADJUSTMENTS FOR OCCUPANT SENSORS YIELD ACCEPTABLE PERFORMANCE.
2. CONFIRM THAT THE TIME SWITCHES AND PROGRAMMABLE SCHEDULE CONTROLS ARE PROGRAMMED TO TURN THE LIGHTS OFF.
3. CONFIRM THAT THE PLACEMENT AND SENSITIVITY ADJUSTMENTS FOR PHOTOSENSOR CONTROLS REDUCE ELECTRIC LIGHT BASED ON THE
AMOUNT OF USABLE DAYLIGHT IN THE SPACE AS SPECIFIED.
D. FINAL LIGHTING SYSTEM FUNCTIONAL REPORT- A REPORT OF TEST PROCEDURES AND RESULTS IDENTIFIED AS THE "FINAL LIGHTING CONTROL
REPORT" SHALL BE DELIVERED TO THE BUILDING OWNER. THE REPORT SHALL INCLUDE THE FOLLOWING:
1. LIST OF FUNCTIONAL TESTS USED DURING THE COMMISSIONING PROCESS ON EACH PIECE OF EQUIPMENT.
2. RESULTS OF ALL FUNCTIONAL TESTS ON ALL PIECES OF EQUIPMENT.
3. LIST OF DEFICIENCIES FOUND AND CORRESPONDING CORRECTIVE MEASURES EITHER IMPLEMENTED OR PROPOSED ON EACH PIECE OF
EQUIPMENT.
4. LIST OF EQUIPMENT NOT ABLE TO BE FUNCTIONALLY TESTED DUE TO CURRENT CLIMATE CONDITIONS. THESE PIECES OF EQUIPMENT WILL
FUNCTIONALLY TESTED ONCE CLIMATE CHANGES ALLOW.
sheet:
title:
D
C
B
A
D
C
B
A
1 2 3 4 5
1 2 3 4 5
UNLESS A PROFESSIONAL SEAL WITH SIGNATURE AND
DATE IS AFFIXED, THIS DOCUMENT IS PRELIMINARY AND IS
NOT INTENDED FOR CONSTRUCTION, RECORDING
PURPOSES, OR IMPLEMENTATION
601 Euclid Ave. Suite C
Helena, Montana
59601
406-531-4745
unitedhousingpartners.com
UHP Design LLC
406-224-8220
revisions :
p r o j e c t # :
d a t e :
KEY PLAN
project:
stamp
THE DESIGNS SHOWN AND DESCRIBED HEREIN INCLUDING
ALL TECHNICAL DRAWINGS, GRAPHIC REPRESENTATIONS &
MODELS THEREOF, ARE PROPRIETARY & CAN NOT BE
COPIED, DUPLICATED, OR COMMERCIALLY EXPLOITED IN
WHOLE OR IN PART WITHOUT THE SOLE AND EXPRESS
WRITTEN PERMISSION FROM METHOD STUDIO INC.
Project No.: 24-373
E200
ELECTRICAL
DETAILS &
SCHEDULES
03/27/2025
Bozeman, MT
Hidden Creek
Community
NTS1SITE TRENCHING DETAIL
NTS2SITE LIGHTING POLE BASE DETAIL
LIGHTING FIXTURE SCHEDULE
TYPE MARK DESCRIPTION MOUNTING WATTAGE LAMP MANUFACTURER MODEL OR EQUAL BY NOTES
BL1 8" DIAMETER BOLLARD FIXTURE DARK BRONZE COLOR BOLLARD 30.5 LED, 2487
LUMENS, 4000K
LSI MRB-LED-25L-ACR-S-UNV-DIM-40-BRZ 1
PL1 EXTERIOR POLE LIGHT WITH TYPE T3M DISTRIBUTION POLE MOUNTED
+20'-0" AFF
51 LED, 7287
LUMENS, 3000K
LITHONIA DSX1 LED-P1-30K-80CRI-T3M-MVOLT-SPA-DDBXD WITH POLE SSS-20'-4C-DM19AS-VD-DDBXD 1
LIGHTING FIXTURE SCHEDULE NOTES
1 SUBSTITUTIONS WILL BE ALLOWED IF SUBMITTED PRIOR TO BID DATE BY THE GREATER OF 7 BUSINESS DAYS OR THE TIME PERIOD SPECIFIED BY DIVISION 1 SPECIFICATIONS, AND IF DEEMED EQUAL BY THE ENGINEER. THE CONTRACTOR IS RESPONSIBLE FOR ENSURING SUBSTITUTED FIXTURES
MEET OR EXCEED THE SPECIFICATIONS OF THE FIXTURES SPECIFIED.
2 FIXTURE TO MATCH CITY STANDARDS AND THE CORRESPONDING FIXTURE ON THE OTHER SIDE OF THE ROAD/PATH.
Legend:
Total Amps:15 A 7 A 0 A
Total Load:1738 VA 720 VA 0 VA
29 Spare 20 A 1 0 VA 0 VA 1 20 A Spare 30
27 Spare 20 A 1 0 VA 0 VA 1 20 A Spare 28
25 Spare 20 A 1 0 VA 0 VA 1 20 A Spare 26
23 Spare 20 A 1 0 VA 0 VA 1 20 A Spare 24
21 Spare 20 A 1 0 VA 0 VA 1 20 A Spare 22
19 Spare 20 A 1 0 VA 0 VA 1 20 A Spare 20
17 Spare 20 A 1 0 VA 0 VA 1 20 A Spare 18
15 Spare 20 A 1 0 VA 0 VA 1 20 A Spare 16
13 Spare 20 A 1 0 VA 0 VA 1 20 A Spare 14
11 Spare 20 A 1 0 VA 0 VA 1 20 A Spare 12
9 Spare 20 A 1 0 VA 0 VA 1 20 A Spare 10
7 Spare 20 A 1 0 VA 0 VA 1 20 A Spare 8
5 Spare 20 A 1 0 VA 0 VA 1 20 A Spare 6
3 Lighting 20 A 1 720 VA 0 VA 1 20 A Spare 4
1 LTG-PARKING LOT 20 A 1 658 VA 1080 VA 1 20 A LTG-SITE PEDESTRIAN 2
CKT Circuit Description
CKT
Note Trip Poles A B C Poles Trip
CKT
Note Circuit Description CKT
PANEL IS PART OF SEPARATE BUILDING PACKAGE
Notes:
Enclosure:NEMA 3R MCB Rating:
Mounting:Surface Wires:4 Mains Rating:100 A
Supply From: Phases:3 Mains Type:
Location: Volts:120/208 Wye A.I.C. Rating:
Branch Panel: HP1
1 City Comments 07/16/2025
2 City Comments 12/22/2025
2
Legend:
Total Amps:8 A 0 A 0 A
Total Load:960 VA 0 VA 0 VA
41 Spare 20 A 1 0 VA 0 VA 1 20 A Spare 42
39 Spare 20 A 1 0 VA 0 VA 1 20 A Spare 40
37 Spare 20 A 1 0 VA 0 VA 1 20 A Spare 38
35 Spare 20 A 1 0 VA 0 VA 1 20 A Spare 36
33 Spare 20 A 1 0 VA 0 VA 1 20 A Spare 34
31 Spare 20 A 1 0 VA 0 VA 1 20 A Spare 32
29 Spare 20 A 1 0 VA 0 VA 1 20 A Spare 30
27 Spare 20 A 1 0 VA 0 VA 1 20 A Spare 28
25 Spare 20 A 1 0 VA 0 VA 1 20 A Spare 26
23 Spare 20 A 1 0 VA 0 VA 1 20 A Spare 24
21 Spare 20 A 1 0 VA 0 VA 1 20 A Spare 22
19 Spare 20 A 1 0 VA 0 VA 1 20 A Spare 20
17 Spare 20 A 1 0 VA 0 VA 1 20 A Spare 18
15 Spare 20 A 1 0 VA 0 VA 1 20 A Spare 16
13 Spare 20 A 1 0 VA 0 VA 1 20 A Spare 14
11 Spare 20 A 1 0 VA 0 VA 1 20 A Spare 12
9 Spare 20 A 1 0 VA 0 VA 1 20 A Spare 10
7 Spare 20 A 1 0 VA 0 VA 1 20 A Spare 8
5 Spare 20 A 1 0 VA 0 VA 1 20 A Spare 6
3 Spare 20 A 1 0 VA 0 VA 1 20 A Spare 4
1 BOLLARD LIGHTING 20 A 1 960 VA 0 VA 1 20 A Spare 2
CKT Circuit Description
CKT
Note Trip Poles A B C Poles Trip
CKT
Note Circuit Description CKT
PANEL IS PART OF SEPARATE BUILDING PACKAGE
Notes:
Enclosure:Type 1 MCB Rating:
Mounting:Surface Wires:4 Mains Rating:100 A
Supply From: Phases:3 Mains Type:
Location: Volts:120/208 Wye A.I.C. Rating:
Branch Panel: HP5
Legend:
Total Amps:8 A 3 A 0 A
Total Load:876 VA 360 VA 0 VA
41 Spare 20 A 1 0 VA 0 VA 1 20 A Spare 42
39 Spare 20 A 1 0 VA 0 VA 1 20 A Spare 40
37 Spare 20 A 1 0 VA 0 VA 1 20 A Spare 38
35 Spare 20 A 1 0 VA 0 VA 1 20 A Spare 36
33 Spare 20 A 1 0 VA 0 VA 1 20 A Spare 34
31 Spare 20 A 1 0 VA 0 VA 1 20 A Spare 32
29 Spare 20 A 1 0 VA 0 VA 1 20 A Spare 30
27 Spare 20 A 1 0 VA 0 VA 1 20 A Spare 28
25 Spare 20 A 1 0 VA 0 VA 1 20 A Spare 26
23 Spare 20 A 1 0 VA 0 VA 1 20 A Spare 24
21 Spare 20 A 1 0 VA 0 VA 1 20 A Spare 22
19 Spare 20 A 1 0 VA 0 VA 1 20 A Spare 20
17 Spare 20 A 1 0 VA 0 VA 1 20 A Spare 18
15 Spare 20 A 1 0 VA 0 VA 1 20 A Spare 16
13 Spare 20 A 1 0 VA 0 VA 1 20 A Spare 14
11 Spare 20 A 1 0 VA 0 VA 1 20 A Spare 12
9 Spare 20 A 1 0 VA 0 VA 1 20 A Spare 10
7 Spare 20 A 1 0 VA 0 VA 1 20 A Spare 8
5 Spare 20 A 1 0 VA 0 VA 1 20 A Spare 6
3 REC-FUTURE LIGHTING 20 A 1 360 VA 0 VA 1 20 A Spare 4
1 LTG-PARKING LOT 20 A 1 376 VA 500 VA 1 20 A MONUMENT SIGN 2
CKT Circuit Description
CKT
Note Trip Poles A B C Poles Trip
CKT
Note Circuit Description CKT
PANEL IS PART OF SEPARATE BUILDING PACKAGE
Notes:
Enclosure:NEMA 3R MCB Rating:
Mounting:Surface Wires:4 Mains Rating:100 A
Supply From: Phases:3 Mains Type:
Location: Volts:120/208 Wye A.I.C. Rating:
Branch Panel: HP3
12/22/2025