Loading...
HomeMy WebLinkAbout047 E100 - Electrical Site PlanCCCCCCCCCCCCCCCCCCCCCCCCCCCCCCCCCCCCCCCCCCCCCCCCCJ PL1 PL1 PL1 PL1 PL1 PL1 PL1 PL1 PL1 PL1 BLDG 5 BLDG 4 BLDG 1 BLDG 3BLDG 2 LOT 3 LOT 2 LOT 1 LOT 1 MMC1 HP1 1 2 MMC2 HP2 FACP2 TTB2 2 T2 1 3 MMC3 T3 2 1 3 T1-4 FACP4 1 3 T5 MMC5 HP5 2 1 3 HP1 -1 4 HP3 -2 BL1BL1 PL1 5 5 5 5 5 5 5 5 HP4 MMC4 3 HP3 -1 BL1 BL1 BL1 BL1 BL1 BL1 BL1 BL1 BL1 BL1 BL1 BL1 BL1 BL1 BL1 BL1 BL1 BL1 BL1 BL1 BL1 5 HP3 -3 +9' WP/GFI +9' WP/GFI HP1 -2 HP5 -1 HP1 -3 TTB3 5 TTB4 5 5 TTB5 FACP5 55 FACP1 5 TTB15 5 5 5 FACP3 HP3 5 55 5 5 3 6 0 w e s t a s p e n a v e n u e s a l t l a k e c i t y , u t a h 8 4 1 0 1 8 0 1 5 3 2 4 4 2 2 sheet: title: D C B A D C B A 1 2 3 4 5 1 2 3 4 5 UNLESS A PROFESSIONAL SEAL WITH SIGNATURE AND DATE IS AFFIXED, THIS DOCUMENT IS PRELIMINARY AND IS NOT INTENDED FOR CONSTRUCTION, RECORDING PURPOSES, OR IMPLEMENTATION 601 Euclid Ave. Suite C Helena, Montana 59601 406-531-4745 unitedhousingpartners.com UHP Design LLC 406-224-8220 revisions : p r o j e c t # : d a t e : KEY PLAN project: stamp THE DESIGNS SHOWN AND DESCRIBED HEREIN INCLUDING ALL TECHNICAL DRAWINGS, GRAPHIC REPRESENTATIONS & MODELS THEREOF, ARE PROPRIETARY & CAN NOT BE COPIED, DUPLICATED, OR COMMERCIALLY EXPLOITED IN WHOLE OR IN PART WITHOUT THE SOLE AND EXPRESS WRITTEN PERMISSION FROM METHOD STUDIO INC. Project No.: 24-373 E100 ELECTRICAL SITE PLAN 03/27/2025 Bozeman, MT Hidden Creek Community 1" = 40'-0"1 ELECTRICAL SITE PLAN KEYED NOTES: SYMBOL USED FOR CALLOUT# 1. UNDERGROUND SECONDARY. RE:ONE-LINE DIAGRAM. 2. PAD MOUNTED TRANSFORMER, PAD, AND METER BY UTILITY COMPANY. 3. (1)4" CONDUIT FOR PHONE SERVICE, (1)2" CONDUIT FOR CATV SERVICE AND (1)4" CONDUIT FOR FIBER OPTIC CABLE SERVICE. TO TELEPHONE TERMINAL CABINET FOR EACH BUILDING. COORDINATE INSTALLATIONS REQUIREMENTS WITH UTILITIES. STUB CONDUITS 12" ABOVE FLOOR AT 'TTB' AND STUB CONDUITS TO NEAREST TELEPHONE UTILITY PEDESTAL. COORDINATE UTILITY LOCATION PRIOR TO ROUGH-IN. PROVIDE CONDUIT AS REQUIRED. MARK LOCATION WITH MONUMENT MARKER. PROVIDE PULL-LINE WITH EACH CONDUIT. 4. CONNECTION FOR MONUMENT SIGN. VERIFY EXACT LOCATION AND CONNECTION REQUIREMENTS WITH SIGN SUPPLIER PRIOR TO ROUGH-IN. 5. EXTERIOR BUILDING MOUNTED WALL SCONCE SHOWN FOR REFERENCE. 1 City Comments 07/16/2025 2 City Comments 12/22/2025 2 12/22/2025