HomeMy WebLinkAbout029 SP020 - Color & Material PaletteEXTERIOR MATERIALS
SIDING MATERIAL: ENGINEERED WOOD SIDING - BOARD & BATTEN TYPICAL
EXTERIOR CHIMNEY MATERIAL: ENGINEERED WOOD SIDING - SHAKES
ROOFING MATERIAL: ASPHALT SHINGLE TYPICAL (BLACK)
FLOOR MATERIAL: COMPOSITE DECKINGCOLOR TO MATCH WOOD-TONE SIDING
EXTERIOR COLORS
BLACK
WHITE
BLUE
GREY
WOOD TONE
CANOPY/AWNING ROOFING: STANDING SEAM METAL (BLACK)
OPENINGS
COMMON ENTRIES: ALUMINUM STOREFRONT -BLACK
UNIT ENTRIES:STEEL DOORS UNIT PATIO DOORS:FULL LITE STEEL DOORS
UNIT WINDOWS:VINYLDOUBLE PANELOW-ESLIDER OR SINGLE HUNG
BALCONY
RAILING: HSS FRAME W/STEEL BAR PICKETSPOWDER COATED BLACK
ANGLED PICKETS: BASIS OF DESIGN
VERTICAL PICKETS: DEDUCTIVE ALTERNATE
MECHANICAL UNITS
TRIM TO MATCH SIDING
PACKAGED TERMINAL AIR CONDITIONING UNITS (PTAC) COLOR TO BE WHITE OR MATCH SIDING
ONE PER UNIT
SEE LANDSCAPING FOR SCREENING
SEE BUILDING ELEVATIONS FOR LOCATIONS
IMAGE BELOW: EXAMPLE OF EXTERIOR INSTALLATION
TRASH ENCLOSURE
STEEL FRAME WITH ENGINEERED WOOD SIDINGCOLOR TO BE GREY
DESIGNED TO MEET CITY OF BOZEMAN REQUIREMENTS
SEE SITE PLAN FOR LOCATIONS
SEE LANDSCAPING FOR SCREENING
IMAGE BELOW: EXAMPLE OF TRASH ENCLOSURE
CANOPY/AWNINGS
SEE DETAILS A2 AND A3 ON THE ATTACHED SHEET A522 FOR RAILING INFORMATION
SEE DETAILS A3, B1 AND B4 ON THE ATTACHED SHEET AS501
FOR TRASH ENCLOSURE DESIGN
SEE DETAILS ON THE ATTACHED SHEET A514 FOR CANOPY INFORMATION BUILDING 2BUILDING 3BUILDING 5
BUILDING 4
BUILDING 1BUILDING 2BUILDING 3BUILDING 5
BUILDING 4
BUILDING 1BUILDING 2BUILDING 3BUILDING 5
BUILDING 4
BUILDING 1BUILDING 2BUILDING 3BUILDING 5
BUILDING 4
BUILDING 1BUILDING 2BUILDING 3BUILDING 5
BUILDING 4
BUILDING 1
3 6 0 w e s t a s p e n a v e n u es a l t l a k e c i t y , u t a h 8 4 1 0 18 0 1 5 3 2 4 4 2 2
sheet:
title:
D
C
B
A
D
C
B
A
123 4 5
123 4 5
UNLESS A PROFESSIONAL SEAL WITH SIGNATURE AND DATE IS AFFIXED, THIS DOCUMENT IS PRELIMINARY AND IS NOT INTENDED FOR CONSTRUCTION, RECORDING PURPOSES, OR IMPLEMENTATION
601 Euclid Ave Suite CHelena, MT 59601
406-531-4745
unitedhousingpartners.com
UHP Design LLC
406-224-8220
revisions :
p r o j e c t # :
d a t e :
KEY PLAN
project:
stamp
THE DESIGNS SHOWN AND DESCRIBED HEREIN INCLUDING ALL TECHNICAL DRAWINGS, GRAPHIC REPRESENTATIONS & MODELS THEREOF, ARE PROPRIETARY & CAN NOT BE COPIED, DUPLICATED, OR COMMERCIALLY EXPLOITED IN WHOLE OR IN PART WITHOUT THE SOLE AND EXPRESS WRITTEN PERMISSION FROM METHOD STUDIO INC.
SP020
COLOR &
MATERIAL
PALETTE
Site Plan RC#2
12/23/25
xxx
Bozeman, MT
Hidden Creek
Community
THIS SHEET SATISFIES REQUIREMENTS OF SITE PLAN SUBMITTAL REQUIREMENTS: BUILDING DESIGN & SIGNAGE 89. SEE ADDITIONAL SP SHEETS & CIVIL FOR ADDN INFORMATION