Loading...
HomeMy WebLinkAbout013.1 SP004 - Landscape & Open SpaceOAK PARK DRIVEBUILDING 4 BUILDING 1 BUILDING 3BUILDING 2 B A C D E F SP004 7 SP004 6 SP004 4 SP004 3 SP004 2 PHASE 1 BUILDING 5 PHASE 1 PHASE 1 PHASE 1 PHASE 1PHASE 2 PHASE 2 PHASE 2 PHASE 2 PHASE 3 PHASE 3 PHASE 328' NARROWEST DIM 21' OVERHEAD STRING LIGHTS ANCHORED SEATING TRELLISES47'19'16'82'TRELLISES A405 122' 62'17'14'15' 27'16'19'9'42'BENCH WITH BACKPATHWAY LIGHTING PRIVACY BUFFER 17'92' TRASH CAN PARKING BUFFER LANDSCAPING PATHWAY LIGHTING PRIVACY LANDSCAPING BENCH24'130'109'18'FENCE PATHWAY LIGHTINGBENCH PICNIC TABLE & TRASH CAN PATHWAY LIGHTING PRIVACY LANDSCAPING METER SCREENINGPRIVACY LANDSCAPING 24'16'91'17'40'TO BE COMPLETED WITH PHASE 1202'BUILDING 2BUILDING 3BUILDING 5 BUILDING 4 BUILDING 1BUILDING 2BUILDING 3BUILDING 5 BUILDING 4 BUILDING 1BUILDING 2BUILDING 3BUILDING 5 BUILDING 4 BUILDING 1BUILDING 2BUILDING 3BUILDING 5 BUILDING 4 BUILDING 1BUILDING 2BUILDING 3BUILDING 5 BUILDING 4 BUILDING 1 3 6 0 w e s t a s p e n a v e n u e s a l t l a k e c i t y , u t a h 8 4 1 0 1 8 0 1 5 3 2 4 4 2 2 sheet: title: D C B A D C B A 1 2 3 4 5 1 2 3 4 5 UNLESS A PROFESSIONAL SEAL WITH SIGNATURE AND DATE IS AFFIXED, THIS DOCUMENT IS PRELIMINARY AND IS NOT INTENDED FOR CONSTRUCTION, RECORDING PURPOSES, OR IMPLEMENTATION 601 Euclid Ave Suite C Helena, MT 59601 406-531-4745 unitedhousingpartners.com UHP Design LLC 406-224-8220 revisions : p r o j e c t # : d a t e : KEY PLAN project: stamp THE DESIGNS SHOWN AND DESCRIBED HEREIN INCLUDING ALL TECHNICAL DRAWINGS, GRAPHIC REPRESENTATIONS & MODELS THEREOF, ARE PROPRIETARY & CAN NOT BE COPIED, DUPLICATED, OR COMMERCIALLY EXPLOITED IN WHOLE OR IN PART WITHOUT THE SOLE AND EXPRESS WRITTEN PERMISSION FROM METHOD STUDIO INC. SP004 LANDSCAPE & OPEN SPACE PERMIT REV 02/04/26 xxx Lot 1 Hidden Creek Minor Hidden Creek Community 1" = 40'-0" LANDSCAPE DIAGRAM1 1" = 20'-0" OPEN SPACE A2 1" = 20'-0" OPEN SPACE B3 1" = 20'-0" OPEN SPACE C4 1" = 20'-0" OPEN SPACE D6 1" = 20'-0" OPEN SPACE E7 21' X 82' = 1,722 SF 9'x62'= 558, 22'x14'=308, 27'x17'=459, 19'x16'=304, 15'x42'= 630; 2,259 SF TOTAL 17'X92'= 1,564 SF 24'X130'=3120; 18'X109'=1962; 5,082 SF TOTAL OPEN SPACE E: (PHASE 1)24'X91'= 2184; (PHASE 2)16X91'=1456; 3640 SF TOTAL OPEN SPACE F: 17'X202'= 3434 SF OPEN SPACE A: 1722 SF OPEN SPACE B: 1188 SF OPEN SPACE B INTERIOR: 1071 SF OPEN SPACE C: 1564 SF OPEN SPACE D: 5082 SF OPEN SPACE E: 3640 SF OPEN SPACE F: 3434 SF OPEN SPACE PROVIDED: 19,671 SF TOTAL PRIVATE PATIO BLDG 3: 423 SF PRIVATE PATIO BLDG 2: 360 SF PRIVATE PATIO BLDG 4: 360 SF PRIVATE PATIO BLDG 1: 252 SF PRIVATE PATIO BLDG 5: 575 SF *SEE FLOOR PLANS FOR PATIO INFO OPEN SPACE REQD: 18,320 SF TOTAL BLDG 3: (18*100)+(16*150) = 4200-(4200*.2) = 3,360 SF BLDG 2: (18*100)+(18*150) = 4500-(4500*.2) = 3,600 SF BLDG 4: (24*100)+(12*150) = 4200-(4200*.2) = 3,360 SF BLDG 1: (24*100) = 2400-(2400*.2) = 1,920 SF BLDG 5: (4*100)+(48*150) = 7600-(7600*.2) = 6,080 SF *20% REDUCTION ALLOWED PER 38.320.030.A3 PHASE 1:BLDGS 3,2 COMPLETE -6960 OPEN SPACE REQD OPEN SPACE A, B, PART E, PRIVATE PATIO BLDG 3, 2 = 7243 SF PROVIDED PHASE 2:BLDGS 4,1 COMPLETE -12,240 OPEN SPACE REQD OPEN SPACE FROM PHASE 1 + OPEN SPACE C, D, PRIVATE PATIO BLDG 4,1 = 14,501 PROVIDED PHASE 3:BLDG 5 COMPLETE -18,320 OPEN SPACE REQD OPEN SPACE FROM PHASE 1, PHASE 2 + OPEN SPACE E, F, PRIVATE PATIO BLDG 5 = 19,966 PROVIDED OPEN SPACE BY PHASE