HomeMy WebLinkAbout011 Stormwater Report
Engineering Report
Stormwater Design
Hidden Creek Residential Development
Lot 1 Hidden Creek Minor Subdivision
Site Plan
December 2025
Revised February 2026
Submitted to:
City of Bozeman Engineering Department
20 East Olive
Bozeman, MT 59715
Prepared by:
Stahly Engineering and Associates
851 Bridger Drive, Suite 1
Bozeman, MT 59715
(406) 522-9526
Lot 1 Stormwater Plan 1 1/14/2026
Engineering Report
Table of Contents
General Information and Design Criteria
Existing Site Conditions
Storm Drainage Plan Description
Estimation of Runoff
Retention Facilities
Conveyance Capacity
Figures and Tables
Figure 1. Vicinity Map
Table 1 – Storm Runoff Calculations for Retention and Conveyance
Table 2 – Retention Basin Capacity
Table 3 – Roof Drain Conveyance Calculations
Table 4 – Parking Lot Sub-area and Inlet Calculations
Table 5 – Curb and Gutter Conveyance Calculations
Table 6 – Storm Pipe Conveyance Calculations
Table 7 – Drainage Swale Conveyance Calculations
Attachments/References
Exhibit 1 – On-site Drainage Exhibit
C1.3 – Overall Grading Plan
C1.3.1 – Enlarged Grading Plan
C1.3.2 – Enlarged Grading Plan
C1.4 – Overall Drainage Plan
C2.2 – Drainage Details
C2.3 – Stormtech Details
Hydraflow Express Inlet Calculations
Lot 1 Stormwater Plan 2 1/14/2026
11.1 Engineering Report – General Information
This storm drainage report is for the on-site storm drainage for the Hidden Creek
Residential Development located on Lot 1 of the Hidden Creek Minor Subdivision. The
subdivision storm drainage improvements serving Lots 1, 3, and 4 of the Hidden Creek
Minor Subdivision are provided separately with the Hidden Creek Subdivision
Infrastructure.
The Hidden Creek Minor Subdivision consists of approximately 9.8 acres of County
owned property located between Durston Road and Juniper Street, between the Walton
Subdivision and the Legion Villa Apartments. The southern 4 acres of the property is
currently occupied by the Gallatin County Rest Home. The northern 5 acres of the
property is vacant land.
The subdivision will create 4 lots. Lot 1, a large lot in the northern portion of the
property will be designated for an 182-unit affordable housing project (Hidden Creek).
Lot 2 in the southern portion of the property will contain the existing Gallatin County
Rest Home. Lots 3 and 4 are pad sites surrounded by Lot 1, that the County will use for
future projects. Preliminary plans are that Lot 3 could be used for a community daycare
facility and Lot 4 could be gifted to a Community Land Trust for additional affordable
housing.
The Lot 1 site improvements consist of 5 apartment buildings, sidewalks, parking, and
landscaping. The site improvements and storm drainage facilities installed with Lot 1
will be shared with future development on Lots 3 and 4, and provide storm water
mitigation for Lots 1, 3, and 4. This is monumented by the Shared Stormwater
Easement and Agreement that will be filed with the Hidden Creek Minor Subdivision
final plat.
Water and sewer service for the subdivision is be provided by services from the mains
running along the eastern edge of the property in Oak Park Drive and through the rest
home lot installed with the subdivision improvements.
The developer’s contact information is:
Gallatin County
311 West Main Street
Bozeman, MT 59715
Water supply and wastewater treatment will be provided by the City of Bozeman’s
municipal systems. The system owner’s contact information is:
City of Bozeman Public Service Department
PO Box 1230
Bozeman, MT 59771-1230
Lot 1 Stormwater Plan 3 1/14/2026
Figure 1 shows a vicinity map of the Hidden Creek Minor Subdivision.
Figure 1. Vicinity Map, Bozeman, Montana
Existing Site Conditions
The southern 4 acres of the property is currently occupied by the Gallatin County Rest
Home. The northern 5 acres of the property is vacant land. The site slopes generally to
the north and west. Storm runoff from the rest home is currently un-mitigated and flows
to the vacant land to the north. A private irrigation ditch runs along the eastern property
line which serves agricultural property to the east.
A geotechnical investigation was conducted, and the report is provided separately with
the subdivision submittal. In summary, the geotechnical investigation found a variable
depth of fine-grained soils overlying gravel sediments. The depth to gravel varies
between 6 to 7 feet.
Groundwater monitoring was conducted throughout the 2024 season. Groundwater
was not encountered in any monitoring well to depths of approximately 12’. There are
no wetlands on the property.
Lot 1 Stormwater Plan 4 1/14/2026
Storm Drainage Plan Description
The Storm Drainage Plan for the Hidden Creek Subdivision consists of separate
mitigation systems for subdivision streets (public) and lots (private). This report
analyzes the on-site private storm drainage system. The public system was submitted
for review with the Hidden Creek Subdivision Infrastructure application.
Lots 1, 3, and 4 will utilize shared on-site sub-surface retention/infiltration systems
located on Lot 1 that will serve these three lots. The overall site is divided into three
drainage areas: North, Central, and South. Each of these three drainage areas will have
a dedicated subsurface retention system.
Lot 2 will be served by a new retention pond to capture and infiltrate existing runoff from
the rest home on-site and is fully separate from the Lot 1 systems.
The on-site stormwater improvements for Lot 1 will also consist of landscape area
drains to collect and infiltrate surface runoff from landscaped areas. No runoff from
parking lots or buildings is directed into landscape areas, so this area is no longer used
for storm drainage mitigation. The landscape drains will provide improved drainage of
landscaped areas immediately following construction until re-establishment of natural
infiltration as vegetation matures and soil drainage naturally recovers.
A drainage swale is provided along the west side of the site to prevent drainage from
landscape areas from running onto adjacent property. This swale also serves as an
overflow if the capacity of the South and Central on-site systems is exceeded by large
rainfall events. The swale has the capacity to carry the 100-year runoff from these
areas without flooding adjacent property.
Maintenance for the on-site shared storm drainage systems will be the responsibility of
the respective Lot owner(s). Full monitoring and maintenance requirements are
described in the Shared Stormwater Easement & Agreement which is provided with the
Hidden Creek Minor Subdivision Final Plat application.
The runoff to the on-site shared storm drainage systems is from three drainage areas
and is analyzed below for conveyance and retention requirements and sizing. The
drainage systems are depicted on the On-site Drainage Exhibit attached to this report
and depicts grading, drainage areas, and retention basins. More detailed information is
included in the civil plans on the Grading and Drainage Plans (C1.3, C1.3.1, C1.3.2,
C1.4) as well as the Drainage and Retention Detail sheets (C2.2 & C2.3).
The site stormwater retention systems are sized to contain the storm runoff from the 25-
year, 2-hour storm, in accordance with City of Bozeman Design Standards.
The retention basins will contain 98% of all rainfall events and significantly reduce
discharges from larger events. The retention basins are in areas that facilitate overflow
to natural water ways to prevent property damage during large rainfall events.
Lot 1 Stormwater Plan 5 1/14/2026
Storm drainage curbs, inlets, and pipes and overflows are sized to convey the peak flow
from a 25-year storm in accordance with City of Bozeman Design Standards.
Estimation of Runoff
Runoff estimates were obtained using City of Bozeman Standards. The amount of
pervious and impervious areas was quantified for each basin to calculate a composite
runoff coefficient. The runoff coefficient used for impervious areas was 0.95 and for
pervious areas was 0.20. Additionally, for the Central and South basins, the area of the
basin planned for future development – those areas in Lot 3 and Lot 4 – were quantified
and assigned a runoff coefficient of 0.70 based on the anticipated development plan. If
the eventual development of these Lots results in a higher runoff coefficient than 0.70,
additional on-site mitigation will be required of the Lot owner(s). The design storm event
is a 25-year, 2-hour storm. The Bozeman IDF (Intensity, Duration, and Frequency)
curves show a rainfall intensity of 0.49 in/hour for the 25-year, 2-hour storm, totaling a
0.98-inch storm event. The rainfall event is the 98th percentile event, meaning 98% of
rainstorms are equal to or less than this amount.
Table 1 – Storm Runoff Calculations for Retention and Conveyance
Basin #North Central South
Area (ac) 1.250 1.589 2.361
Area (sf) 54,442 69,207 102,845
Roof Area (sf) 23,712 17,115 16,348
Hardscape Area (sf) 16,916 29,368 47,614
Total Impervious (sf) (C = 0.95)40,628 46,483 63,962
Pervious (sf) (C = 0.20)13,814 14,716 20,286
Future Site (sf) (C=0.70)0 8,008 18,597
Composite C 0.76 0.76 0.76
Runoff Calculations 25-yr
Time of Concentration (min) 10 10 10
Intensity at Tc (in/hr) 3.48 3.48 3.48
Peak Flow (cfs) (25-yr)3.30 4.21 6.22
Storm Depth (in) (25yr-2hr)0.98 0.98 0.98
Runoff Volume (cf) 3,378 4,304 6,357
Runoff Calculations 100-yr (post retention)
Time of Concentration (min) 20 20 20
Intensity at Tc (in/hr) 2.89 2.89 2.89
Peak Flow (cfs) (25-yr)2.74 3.50 5.16
Retained Volume 3293 4196 6197
Lot 1 Stormwater Plan 6 1/14/2026
Table 1 shows the 25-year storm runoff calculations for each drainage area. This table
also shows the 100-year storm overflow runoff resulting after retention systems are full.
Retention Facilities
Stormwater from these basins will be retained and infiltrated by the three on-site
subsurface stormwater retention systems each of which is located in parts of Lot 1. The
systems are comprised of buried Stormtech chambers which are buried modular
polymer arch shaped structures capable of supporting appropriate traffic loading. The
Stormtech chambers are surrounded on all sides by clean crushed stone reservoir rock
with 30% porosity. The Stormtech chambers and the gravel section contribute to the
overall retention volume capacity as shown in the calculations below in Table 2.
Table 2 – Retention Basin Capacity
Construction details of the retention systems are shown on Plan Sheet C2.3.
Conveyance Capacity
For the on-site storm drainage systems, runoff is collected separately from the parking
lots and the building roof drains and combined before entering the subsurface retention
systems. For conveyance capacity calculations, the overall drainage areas were further
subdivided into drainage sub-areas for each building and parking lot inlet. This results in
5 building sub-areas and 6 parking lot sub-areas, which are shown on the attached On-
site Drainage Exhibit. The north retention system collects runoff from Buildings 2 and 3
Basin #North Central South
Required Storage (cf) 3,378 4,304 6,357
Chambers
Storage Per Chamber (cf) 109.9 109.9 109.9
Number of Rows 3 3 4
Chambers per Row 6 8 8
Number of Chambers 18 24 32
Total Chamber Storage (cf)1,978 2,638 3,517
Gravel Bed
Length (ft) 48.75 63 63
Width (ft) 28 28 38
Depth (ft) 5.5 5.5 5.5
Total Volume (cf) 7,508 9702 13167
Less Chamber Volume (cf) 1,978 2,638 3,517
Net Gravel Volume (cf) 5,529 7,064 9,650
Porosity (%) 30% 30% 30%
Gravel Storage (cf) 1,659 2,119 2,895
Total System Storage (cf) 3,637 4,757 6,412
Lot 1 Stormwater Plan 7 1/14/2026
and two parking lot sub-areas. The central retention system collects runoff from
Buildings 4 and 1 and two parking lot sub-areas. The south retention system collects
runoff from Building 5 and two parking lot sub-areas. Because of the smaller size of
these sub-areas the time of concentration is 5 minutes. The 5-minute intensity of the
25-year event is 4.76 inches/hour.
The building roof drains are analyzed for conveyance capacity from each building to its
associated retention system. Generally each building has two 6” drains running along
each side of the building conveying half of the building’s runoff. These 6” pipes come
together into 8” pipes and join with drains from other buildings. All of the critical pipe
segments were identified and are shown below in Table 3 along with their respective
25-year runoff peak flow and capacity calculations.
Table 3 – Roof Drain Conveyance Calculations
The parking lot sub-areas were analyzed to determine curb and inlet capacity. The 25-
year storm runoff peak flow and inlet capacity calculations for each parking lot sub-area
are shown in Table 4. The two largest parking lot sub-areas (sub-areas 3 and 5) require
two inlets to capture the sub-area flow without overtopping the curb. Curb inlet capacity
calculations were done with Hydraflow Express and calculation results for each inlet are
provided at the end of the report. All curb inlets have the capacity to carry the 25-year
peak flow without overtopping the curb. Note that the northern curb inlet for the Central
system (curb inlets 3A&3B) is located near a 3” drive over curb, but the 25-year flow for
depth for these two inlets is only 2.20 inches.
Inlet Subarea Basin #Bldg 2 Half Bldg 3 Half Bldg 3 Bldg 2 & 3 Bldg 1 Bldg 4 Half Bldg 4 Bldg 5 Half Bldg 5
Drainage Area (acres) 0.13 0.14 0.28 0.54 0.14 0.12 0.24 0.18 0.37
Drainage Area (sf)5,800 6,000 12,000 23,400 6,303 5,236 10,470 8,034 16,068
Slope (%)
Runoff Coefficients 0.95 0.95 0.95 0.95 0.95 0.95 0.95 0.95 0.95
Frequency Adjustment Factor, Cf 1.1 1.1 1.1 1.1 1.1 1.1 1.1 1.1 1.1
Basin Length (ft)
Time of Concentration (min) 5.0 5.0 5.0 5.0 5.0 5.0 5.0 5.0 5.0
Peak Flow Calculations
Design Storm 25yr 25yr 25yr 25yr 25yr 25yr 25yr 25yr 25yr
Time of Concentration (min) 5.0 5.0 5.0 5.0 5.0 5.0 5.0 5.0 5.0
Intensity at Tc (in/hr) 4.76 4.76 4.76 4.76 4.76 4.76 4.76 4.76 4.76
Peak Runoff Rate at Tc (Q = CIA) (cfs)0.60 0.62 1.25 2.43 0.65 0.54 1.09 0.83 1.67
Storm Drain Pipe Capacity Calculations
Drainage Subarea #Bldg 2 Half Bldg 3 Half Bldg 3 Bldg 2 & 3 Bldg 1 Bldg 4 Half Bldg 4 Bldg 5 Half Bldg 5
Pipe Material PVC PVC PVC PVC PVC PVC PVC PVC PVC
Pipe Size (in)6.00 6.00 8.00 10.00 6.00 6.00 8.00 8.00 8.00
Manning's "n" (PVC) 0.013 0.013 0.013 0.013 0.013 0.013 0.013 0.013 0.013
Area (ft2)0.20 0.20 0.35 0.55 0.20 0.20 0.35 0.35 0.35
Wetted Perimeter (ft) 1.57 1.57 2.09 2.62 1.57 1.57 2.09 2.09 2.09
Hydraulic Radius (ft) 0.13 0.13 0.17 0.21 0.13 0.13 0.17 0.17 0.17
Slope (ft/ft)0.0150 0.0150 0.0150 0.0150 0.0150 0.0150 0.0150 0.0150 0.0200
Full Flow Capacity (cfs) 0.69 0.69 1.48 2.69 0.69 0.69 1.48 1.48 1.71
Velocity (ft/sec) 3.51 3.51 4.25 4.93 3.51 3.51 4.25 4.25 4.91
Contributing Inlet Basin 1 1 1 1 1 1 1 1 1
Stormwater Flow (cfs) 0.60 0.62 1.25 2.43 0.65 0.54 1.09 0.83 1.67
% Capacity 87% 90% 84% 90% 95% 79% 73% 56% 97%
Lot 1 Stormwater Plan 8 1/14/2026
Table 4 Parking Lot Sub-area and Inlet Calculations.
Curb capacity was also analyzed for each sub-area. Table 5 shows the capacity of the
most limiting curb, just to the south of Building 1. This curb coincides with the parking
lot sub-area (sub-area 5) having the largest flow, 4.72 cfs. The curb and gutter has a
conveyance capacity of 12.63 cfs which is more than twice the largest sub-area 25-year
peak flow of 4.72 cfs.
Table 5 – Curb and Gutter Conveyance Calculations
Inlet Sub-areas 1 2 3 3 4 5 5 6
Basin-Inlet# North-1 North-2 Central-3A&3B Central-4 South-5A&5B South-6
Drainage Area (acres) 0.195 0.224 0.542 0.526 1.273 0.454
Drainage Area (sf) 8494 9741 23602 22894 55473 19761
Slope (%) 2.1 2.1 1.9 1.9 1.85 1.85
Total Impervious (sf) (C = 0.95)8040 9230 21950 14750 29740 16780
Pervious (sf) (C = 0.20)454 511 1652 1280 6093 2981
Future Site (sf) (C=0.70)0 0 0 6864 19640 0
Composite C 0.910 0.911 0.90 0.83 0.78 0.84
Peak Flow Calculations
Design Storm 25yr 25yr 25yr 25yr 25yr 25yr
Frequency Adjustment Factor, Cf 1.1 1.1 1.1 1.1 1.1 1.1
Basin Length (ft) 140 140 290 330 355 255
Time of Concentration (min)* 5.0 5.0 5.0 5.0 5.0 5.0
Intensity at Tc (Figure I-2 pg. 29) (in/hr) 4.76 4.76 4.76 4.76 4.76 4.76
Peak Runoff Rate at Tc (Q = CIA) (cfs) 0.84 0.97 2.31 2.08 4.72 1.81
Inlet Capacity Calculations
Inlet Type Combination Combination Combination Grate Combination Combination Combination Combination
Location Sag Sag Sag Sag Sag Sag Sag Sag
Length (ft) 3 3 3 3 3 3 3 3
Throat ht (in) 5.00 5.00 5.00 5.00 5.00 5.00 5.00 5.00
Open Area (sft) 2.10 2.10 2.10 1.00 2.10 2.10 2.10 2.10
Grate Width (ft) 1.5 1.5 1.5 1.5 1.5 1.5 1.5 1.5
Grate Length (ft) 3 3 3 1.5 3 3 3 3
Local Depression (in) 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
Slope, Sw (ft/ft) 0.04 0.04 0.04 0.04 0.04 0.04 0.04 0.04
Slope, Sw (ft/ft) 0.03 0.03 0.03 0.03 0.03 0.03 0.03 0.03
Gutter Depression (in) 0.18 0.18 0.18 0.18 0.18 0.18 0.18 0.18
Width (ft) 1.50 1.50 1.50 1.50 1.50 1.50 1.50 1.50
Slope(%)0.50 0.50 0.50 0.50 0.50 0.50 0.50 0.50
n-value 0.013 0.013 0.013 0.013 0.013 0.013 0.013 0.013
Captured Flow (cfs) 0.84 0.97 1.25 1.50 2.08 2.36 2.36 1.81
Height Over Inlet (in) 1.92 2.07 2.29 2.29 3.21 3.46 3.46 2.96
*Inlet capacity calculations were performed using Hydraflow
Express. Output reports of these calculations are attached
Right-side Slope X:1 0.06
Left-side Slope X:1 67.00
Channel Bottom Width (ft) 0
Flow Depth (ft) 0.350
Flow Area (ft^2) 4.108
Wetted Perimeter (ft) 23.803
Width (ft) 23.472
Hydraulic Radius (ft) 0.173
Manning's Roughness 0.013
Slope (ft/ft) 0.008
Average Velocity (ft/sec) 3.07
Flow (ft^3/sec)12.63
Curb and Gutter Capacity Calcs
Lot 1 Stormwater Plan 9 1/14/2026
After determining the sub-area flow rates from the building rooftops and parking lot
inlets, the pipe capacity downstream of the curb inlets to the subsurface retention
systems was analyzed. Some pipes receive flow from more than one inlet and a couple
of pipes also convey building roof drain runoff. Table 6 shows the pipe flow
downstream of each inlet by adding the applicable runoff data from Table 3 (roof drains)
and Table 4 (parking lots). All pipes have the capacity to transmit the 25-year peak
runoff flow.
Table 6 – Storm Pipe Conveyance Calculations
A drainage swale is provided along the west side of the site to prevent drainage from
landscape areas from running onto adjacent property. This swale also serves as an
overflow if the capacity of the South and Central on-site systems is exceeded by large
(>25-year) rainfall events. The ditch is 10-feet wide, 1-foot deep, grass channel with a
triangular cross-section and a capacity of 13.15 cfs at a flow depth of 1-foot.
The 100-year peak flow after on-site retention is shown for each drainage basin is
shown on Table 1. This was calculated based on the on-site retention system capturing
the short-duration high-intensity portion of the 100-year storm. The on-site retention
system can capture events up to the 100-year, 20-minute storm. Table 1 shows that the
volume of this storm is slightly less than the 25-year, 2-hour storm. Thus, the peak flow
that overflows the on-site retention systems is based on 100-year storm durations of 20-
minutes or larger. The combined overflow from the south and central basis is 8.66 cfs
which is significantly less than the drainage swale capacity of 13.15 cfs. calculated in
Table 7.
Drainage Subarea #1 2 3 4 5 6
Downstream of Basin-Inlet# North-1 North-2 Central-3A&3B Central-4 South-5A&5B South-6
Pipe Flows
Building Roof Drains N/A 2&3 N/A N/A N/A Bldg 5
Roof Drain Flow 0 2.43 0 0 0 1.67
Upstream Pipes N/A Inlet 1 N/A N/A N/A N/A
Upstream Pipe Flow 0 0.84 0 0 0 0
Downstream pipe flow 0.84 4.24 2.31 2.08 4.72 3.48
Pipe Material PVC PVC PVC PVC PVC PVC
Pipe Size (in)15.00 15.00 15.00 15.00 15.00 15.00
Manning's "n" (PVC) 0.013 0.013 0.013 0.013 0.013 0.013
Area (ft2)1.23 1.23 1.23 1.23 1.23 1.23
Wetted Perimeter (ft) 3.93 3.93 3.93 3.93 3.93 3.93
Hydraulic Radius (ft) 0.31 0.31 0.31 0.31 0.31 0.31
Slope (ft/ft)0.0100 0.0100 0.0100 0.0100 0.0100 0.0100
Full Flow Capacity (cfs) 6.48 6.48 6.48 6.48 6.48 6.48
Full Flow Velocity (ft/sec) 5.28 5.28 5.28 5.28 5.28 5.28
Stormwater Flow (cfs) 0.84 4.24 2.31 2.08 4.72 3.48
% Capacity 13% 66% 36% 32% 73% 54%
Velocity (ft/sec) 0.69 3.46 1.89 1.70 3.85 2.83
Lot 1 Stormwater Plan 10 1/14/2026
Table 7 – Drainage Swale Conveyance Calculations
Overflows from the north basin will flow over the plaza space located between Buildings
2 and 3. This plaza is approximately 20-feet wide and at least 15” below the lowest
adjacent building floor. The 100-year post-retention flow of 2.74 cfs can be conveyed
with a flow depth of less than 2 inches. Any large event (>25-year) overflow can safely
pass through this space without damaging adjacent buildings.
Storm Water System Maintenance
Maintenance for the on-site shared storm drainage systems will be the responsibility of
the respective Lot owners. Full monitoring and maintenance requirements are described
in the Shared Stormwater Easement & Agreement which is provided with the Hidden
Creek Minor Subdivision Final Plat application.
Right-side Slope X:1 5.00
Left-side Slope X:1 5.00
Channel Bottom Width (ft) 0
Flow Depth (ft) 1.000
Flow Area (ft^2) 5.000
Wetted Perimeter (ft) 10.198
Width (ft) 10.000
Hydraulic Radius (ft) 0.490
Manning's Roughness 0.040
Slope (ft/ft) 0.013
Average Velocity (ft/sec) 2.63
Flow (ft^3/sec)13.15
West Side Swale Capacity Calc's
SSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSW[][][][]Tract BCOS 24399.824 acNorth 14thAvenueLot 10Lot 11Lot 12Lot 13Lot 14Lot 15Lot 16Lot 17Lot 18Lot 19ALot 20ALot 21Lot 22Lot 9Lot 8Lot 7HomesteadSubdivisionLot 23JUNIPER STREETSSWWWW WWWWWWW WWW COMMCOMMCOMMCOMMCOMMCOMMW W W W W W W W W W W W W W W W W W W W W W W
WW W
CCCCCCCCCCCCCCCCCCCCCCCCCCCSD
SDSDSDSDCCCCCCCCCCCCCCCSDSDSDSDSDSDSDSDSDSDSDSDSDSDSDSDSD SD SD SD
SD SD SDSDSDSDSDSDSDSDSDSDSDSDSDSDSDSDSDSDSD SD SD SD SD SD SD SDSDSDSDSDSDSDSDSDSDSDSDSDSDSDSDSDSDSD SD SD SD SDSDSDSDSDSDSDSDSDSDSDSDSDSDSDSDCCCCCCCWWWWWWWWWW
UGE UGE UGECOMMCOMMCOMM
SSSSSSSSSSSSSSSSSSSSGAS GAS
YD
X X X X X X X X X X X X[][][][][][][][][][][][][][][][][][][][][][][][][][][][][][][][][][][][][][][][][][]OAK PARK DRIVEUGEUGEUGEUGEUGEUGEUGEUGEUGEUGEUGEUGEUGEUGEUGEUGEUGEUGEUGEUGEUGEUGEUGEUGEUGEUGEUGEUGEUGEUGEUGEUGEUGEUGEUGEUGEUGEUGEUGEUGEUGEUGEUGEUGEUGEUGEUGEUGEUGEUGEUGEUGEUGEUGEUGEUGEUGEUGEUGEUGEUGEUGEUGEUGEUGEUGE COMMCOMMLOT 15.165 ac4.589 ac (net)LOT 30.184 acLOT 40.427 acBUILDING 5BUILDING 1BUILDING 4BUILDING 2BUILDING 3SD SD SD SD SD SDSDSDSDSDSDSDSDSDSDSDSDSDSDSDSDSDNEW 30' x<<
<<<<<<<<<<<<<<<<<<<<<<<<<<<<<<<<<<<<<<<<<477247734774477547764777477847794780<<<<<<<<<<<<<<<<<<<<<<<<<<<<<<<<4781477147824783CB#5B 24"X36" CURB INLETTBC = 4777.22RIM=4776.6415" INV IN (W)=4771.4615" INV OUT (S) = 4771.46SUMP=4770.71CB#6 24"X36" CURB INLETTBC=4777.39RIM=4776.8115" INV OUT=4771.918" INV IN=4772.49SUMP=4771.16LANDSCAPE DRAIN (TYP)LANDSCAPE DRAIN (TYP)UGEUGEUGEUGEUGEUGE UGE UGE UGE
UGE
UGE UGE
UGE UGE4772COMM<SSSSSSSSSD SD SD SD SD SD SD SD SD SD SD SD SD SD SDSDSDSDSDSDSDSDSDSDSDSDSDSDSDSDSDSDooo***************************************************COMM COMM COMMCOMMCOMMCOMMCOMMCOMMCOMMCOMMCOMMCOMMCOMMCOMMCOMMCOMMCOMMCOMMCOMMCOMMCOMMCOMMCOMMCOMMCOMMCOMMCOMMCOMMCOMMCOMMCOMMCOMMCOMMCOMMCOMMCOMMCOMMCOMMCOMMCOMMCOMMCOMMCOMMCOMMCOMMCOMMCOMMCOMMCOMMCOMMCOMMCOMMCOMMCOMMCOMMCOMMCOMMCOMM4775477647774778477947804779478047814778477947754776477747744775477447724773
47714778477947774778
47734774
4775477647724773<<<<<<<<<<<<<<SDSDSDSDSDSDSDSDSDSDSDSDSDSDSDSDSDSDSDSDSD SD SD SD
SDSDSDSDSDSDSDSDSDSDSDSDSDSDSDSDSDSDSDSD SD SD SD
SD 478247814783<SDSDSDSDLANDSCAPE DRAIN (TYP)LANDSCAPE DRAIN (TYP)CB#4 24"X36" CURB INLETTBC=4774.35RIM = 4773.7715" INV OUT (E) = 4768.44SUMP=4767.69CB#3B 24"X36" CURB INLETTBC=4774.03RIM=4773.4515" INV IN (E)=4768.6615" INV OUT (S)=4768.66SUMP=4767.91SDMH-NORTHRIM=4772.9915" INV OUT (W)=4768.4915" INV IN (N)=4767.2224" INV OUT (W)=4766.72SUMP= 4764.72CB#1 24"x36" CURB INLETTBC=4773.43RIM=4772.8515" INV OUT (E)=4767.52SUMP=4766.77CB#2 24"X36" CURB INLETTBC=4773.26RIM=4772.6815" INV IN (W)=4767.3110" INV IN (NE)=4767.7315" INV OUT (S)=4767.31SUMP=4766.56SDMH-CENTRAL #2RIM=4774.926" INV IN (E)=4769.108" INV IN (SE)=4769.1024" INV. OUT (N)=4767.77SUMP=4765.77SDMH-SOUTHRIM = 4777.0415" INV IN (NW)=4771.2715" INV IN (SW)=4771.2715" INV OUT (S)=4772.5424" INV OUT (E)=4770.77SUMP= 4768.77SDMH-CENTRAL #1RIM = 4774.0415" INV IN (N) = 4768.2715" INV IN (W) = 4768.2715" INV OUT (E)=4769.5424" INV OUT (S) = 4767.77SUMP=4765.7715" HP PIPE @1.00% (TYP)15" HP PIPE @1.00% (TYP)15" HP PIPE @1.00% (TYP)8" SDR35 PVC ROOFDRAIN @ 2.00%6" SDR35 PVC ROOFDRAIN @ 1.50%8" SDR35 PVC ROOFDRAIN @ 1.50%10" SDR35 PVC ROOFDRAIN @ 1.50%15" HP PIPE @1.00% (TYP)8" SDR35 PVC ROOFDRAIN @ 1.50%6" SDR35 PVC ROOFDRAIN @ 1.50% ALONGSIDES OF BUILDING6" SDR35 PVC ROOFDRAIN @ 1.50% ALONGSIDES OF BUILDING6" SDR35 PVC ROOFDRAIN @ 1.50% ALONGSIDES OF BUILDING6" SDR35 PVC ROOFDRAIN @ 1.50% ALONGSIDES OF BUILDING8" SDR35 PVC ROOF DRAIN@ 1.50% DOWNSTREAMFROM HERESTREET STORMWATER RETENTION SYSTEMSEE INFRASTRUCTURE PLANSPATIO DRAINS (4)SD SDPATIO DRAINS (2)***<<<<<<<<<<<<<<<<<<<<<4782[][][][][][][][][][][][][][][][][][][][][][][][][][][][][][]CB#3A -24" DIA AREA INLETRIM=4773.4915" INV OUT (W)= 4768.72SUMP=4767.97CB#5A 24"X36" CURB INLETTBC = 4777.19RIM=4776.6115" INV OUT (E) = 4771.48SUMP=4770.736" SDR35 PVC ROOFDRAIN @ 1.50% ALONGSIDES OF BUILDING909 OAK PARK DRIVE905 OAK PARK DRIVE863 OAK PARK DRIVE847 OAK PARK DRIVE775 OAK PARK DRIVE841 OAK PARK DRIVE801 OAK PARK DRIVE805 OAK PARK DRIVEOFF-SITE IMPROVEMENTS
ANALYZED SEPARATELY
CENTRAL BASIN
1.589 ACRES
COMPOSITE C = 0.76
SOUTH BASIN
2.361 ACRES
COMPOSITE C = 0.76
NORTH BASIN
1.250 ACRES
COMPOSITE C = 0.76
NORTH INLET 1 SUB-BASIN
0.195 ACRES
COMPOSITE C = 0.91
NORTH INLET 2 SUB-BASIN
0.224 ACRES
COMPOSITE C = 0.91
CENTRAL INLET 4 SUB-BASIN
0.526 ACRES
COMPOSITE C = 0.83
SOUTH INLETS 5A&5B SUB-BASIN
0.1.273 ACRES
COMPOSITE C = 0.78
SOUTH INLET 6 SUB-BASIN
0.454 ACRES
COMPOSITE C = 0.84CENTRAL INLETS 3A&3B SUB-BASIN0.542 ACRESCOMPOSITE C = 0.90BUILDING 2 SUB-BASIN
0.270 ACRES
COMPOSITE C = 0.95
BUILDING 3 SUB-BASIN
0.316 ACRES
COMPOSITE C = 0.95
BUILDING 4 SUB-BASIN0.245 ACRESCOMPOSITE C = 0.95BUILDING 1 SUB-BASIN0.148 ACRESCOMPOSITE C = 0.95BUILDING 5 SUB-BASIN0.382 ACRESCOMPOSITE C = 0.95EX. 1C:\Users\cpool\FileCloud\Vault\PROJECTS\3668-UHP_Design_LLC\-00325_Hidden_Creek_Civil\DWG\Exhibits\EX 1 - ON-SITE DRAINAGE EXHIBIT.dwg, C1.4 - OVERALL DRAINAGE PLAN, Plotted: Feb 09, 2026 - 2:23pm, cpool00 30'60'
SCALE IN FEET
111/21/2025COB INF SUBMITTAL RC1CDPZWL212/23/2025COB SITE PLAN RC2CDPZWL312/23/2025COB INF SUBMITTAL RC2CDPZWL412/23/2025MDEQ SUBMITTALCDPZWL51/15/2026COB INF SUBMITTAL RC3CDPZWL61/22/2026COB INF SUBMITTAL RC4CDPZWLPROFESSIONALENGINEERS &SURVEYORS
STAHLYENGINEERING& ASSOCIATES
HIDDEN CREEKDEVELOPMENTUNITED HOUSINGPARTNERS, LLCBOZEMAN, MTGREAT FALLS
Phone:(406)604-4644
CODY
Phone:(307)509-5541
851 BRIDGER DR. STE 1BOZEMAN, MT 59715
Phone:(406)522-9526
BILLINGS
Phone:(406)601-4055
HELENA
Phone:(406)442-8594
72/04/2026BUILDING PERMITCDPZWLON-SITEDRAINAGEEXHIBIT
Inlet ReportHydraflow Express Extension for Autodesk® Civil 3D® by Autodesk, Inc. Wednesday, Jan 14 2026<Name>Combination InletLocation = SagCurb Length (ft) = 3.00Throat Height (in) = 5.00Grate Area (sqft) = 2.10Grate Width (ft) = 1.50Grate Length (ft) = 3.00GutterSlope, Sw (ft/ft) = 0.040Slope, Sx (ft/ft) = 0.030Local Depr (in) = -0-Gutter Width (ft) = 1.50Gutter Slope (%) = -0-Gutter n-value = -0-CalculationsCompute by: Known QQ (cfs) = 0.84Highlighted
Q Total (cfs) = 0.84
Q Capt (cfs) = 0.84
Q Bypass (cfs) = -0-Depth at Inlet (in) = 1.92Efficiency (%) = 100Gutter Spread (ft) = 4.82Gutter Vel (ft/s) = -0-
Bypass Spread (ft) = -0-
Bypass Depth (in) = -0-
INLET - NORTH 1
Inlet ReportHydraflow Express Extension for Autodesk® Civil 3D® by Autodesk, Inc. Wednesday, Jan 14 2026<Name>Combination InletLocation = SagCurb Length (ft) = 3.00Throat Height (in) = 5.00Grate Area (sqft) = 2.10Grate Width (ft) = 1.50Grate Length (ft) = 3.00GutterSlope, Sw (ft/ft) = 0.040Slope, Sx (ft/ft) = 0.030Local Depr (in) = -0-Gutter Width (ft) = 1.50Gutter Slope (%) = -0-Gutter n-value = -0-CalculationsCompute by: Known QQ (cfs) = 0.97Highlighted
Q Total (cfs) = 0.97
Q Capt (cfs) = 0.97
Q Bypass (cfs) = -0-Depth at Inlet (in) = 2.07Efficiency (%) = 100Gutter Spread (ft) = 5.26Gutter Vel (ft/s) = -0-
Bypass Spread (ft) = -0-
Bypass Depth (in) = -0-
INLET - NORTH 2
Inlet ReportHydraflow Express Extension for Autodesk® Civil 3D® by Autodesk, Inc. Wednesday, Jan 14 2026<Name>Combination InletLocation = SagCurb Length (ft) = 3.00Throat Height (in) = 5.00Grate Area (sqft) = 2.10Grate Width (ft) = 1.50Grate Length (ft) = 3.00GutterSlope, Sw (ft/ft) = 0.030Slope, Sx (ft/ft) = 0.030Local Depr (in) = -0-Gutter Width (ft) = 1.50Gutter Slope (%) = -0-Gutter n-value = -0-CalculationsCompute by: Known QQ (cfs) = 1.25Highlighted
Q Total (cfs) = 1.25
Q Capt (cfs) = 1.25
Q Bypass (cfs) = -0-Depth at Inlet (in) = 2.30Efficiency (%) = 100Gutter Spread (ft) = 6.38Gutter Vel (ft/s) = -0-
Bypass Spread (ft) = -0-
Bypass Depth (in) = -0-
INLET - CENTRAL 3A
Inlet ReportHydraflow Express Extension for Autodesk® Civil 3D® by Autodesk, Inc. Wednesday, Jan 14 2026<Name>Drop Grate InletLocation = SagCurb Length (ft) = -0-Throat Height (in) = -0-Grate Area (sqft) = 1.00Grate Width (ft) = 1.50Grate Length (ft) = 1.50GutterSlope, Sw (ft/ft) = 0.030Slope, Sx (ft/ft) = 0.030Local Depr (in) = -0-Gutter Width (ft) = 1.50Gutter Slope (%) = -0-Gutter n-value = -0-CalculationsCompute by: Known QQ (cfs) = 1.50Highlighted
Q Total (cfs) = 1.50
Q Capt (cfs) = 1.50
Q Bypass (cfs) = -0-Depth at Inlet (in) = 2.29Efficiency (%) = 100Gutter Spread (ft) = 14.21Gutter Vel (ft/s) = -0-
Bypass Spread (ft) = -0-
Bypass Depth (in) = -0-
INLET - CENTRAL 3B
Inlet ReportHydraflow Express Extension for Autodesk® Civil 3D® by Autodesk, Inc. Wednesday, Jan 14 2026<Name>Combination InletLocation = SagCurb Length (ft) = 3.00Throat Height (in) = 5.00Grate Area (sqft) = 2.10Grate Width (ft) = 1.50Grate Length (ft) = 3.00GutterSlope, Sw (ft/ft) = 0.040Slope, Sx (ft/ft) = 0.030Local Depr (in) = -0-Gutter Width (ft) = 1.50Gutter Slope (%) = -0-Gutter n-value = -0-CalculationsCompute by: Known QQ (cfs) = 2.08Highlighted
Q Total (cfs) = 2.08
Q Capt (cfs) = 2.08
Q Bypass (cfs) = -0-Depth at Inlet (in) = 3.21Efficiency (%) = 100Gutter Spread (ft) = 8.41Gutter Vel (ft/s) = 0.74
Bypass Spread (ft) = -0-
Bypass Depth (in) = -0-
INLET - CENTRAL 4
Inlet ReportHydraflow Express Extension for Autodesk® Civil 3D® by Autodesk, Inc. Wednesday, Jan 14 2026<Name>Combination InletLocation = SagCurb Length (ft) = 3.00Throat Height (in) = 5.00Grate Area (sqft) = 2.10Grate Width (ft) = 1.50Grate Length (ft) = 3.00GutterSlope, Sw (ft/ft) = 0.040Slope, Sx (ft/ft) = 0.030Local Depr (in) = -0-Gutter Width (ft) = 1.50Gutter Slope (%) = -0-Gutter n-value = -0-CalculationsCompute by: Known QQ (cfs) = 2.36Highlighted
Q Total (cfs) = 2.36
Q Capt (cfs) = 2.36
Q Bypass (cfs) = -0-Depth at Inlet (in) = 3.46Efficiency (%) = 100Gutter Spread (ft) = 9.10Gutter Vel (ft/s) = 0.74
Bypass Spread (ft) = -0-
Bypass Depth (in) = -0-
INLET - SOUTH 5A & 5B
Inlet ReportHydraflow Express Extension for Autodesk® Civil 3D® by Autodesk, Inc. Wednesday, Jan 14 2026<Name>Combination InletLocation = SagCurb Length (ft) = 3.00Throat Height (in) = 5.00Grate Area (sqft) = 2.10Grate Width (ft) = 1.50Grate Length (ft) = 3.00GutterSlope, Sw (ft/ft) = 0.040Slope, Sx (ft/ft) = 0.030Local Depr (in) = -0-Gutter Width (ft) = 1.50Gutter Slope (%) = -0-Gutter n-value = -0-CalculationsCompute by: Known QQ (cfs) = 1.81Highlighted
Q Total (cfs) = 1.81
Q Capt (cfs) = 1.81
Q Bypass (cfs) = -0-Depth at Inlet (in) = 2.96Efficiency (%) = 100Gutter Spread (ft) = 7.71Gutter Vel (ft/s) = 0.74
Bypass Spread (ft) = -0-
Bypass Depth (in) = -0-
INLET - SOUTH 6