Loading...
HomeMy WebLinkAbout050 - L2.5 - BALCONY IRRIGATION PLANSDNUPDNUPFLOOR 5 POCD1-50.61"D2-50.31"D3-50.31"D4-50.121"D6-50.121"D5-50.61"DNUPDN1655 SFDWELLING UNIT 12147175 SFSTAIR 212769 SFELEV. 210969 SFELEV. 1108181 SFSTAIR 1105475 SFCORRIDOR148110 SFSTORAGE14989 SFTRASH ROOM15059 SFMECH10721 SFROOFTOP STORAGE038FLOOR 6 POCD1-61.271"D2-60.781"D3-60.121"D4-60.121"NUMBERMODELSIZETYPEGPMVALVE SCHEDULENUMBERMODELSIZETYPEGPMVALVE SCHEDULEDESIGNED BY:QUALITY CHECK:JOB NO.FIELDBOOKDRAWN BY:DATE:G25-160 L2.XREV DATE REVISION THE DEPOT ON CHURCH BOZEMAN, MT BALCONY AND ROOFTOP IRRIGATION PLANS AMRAMRJCC12-05-2525-160SHEETL2.5.DWGEngineering tdhengineering.com L2.5A 5TH FLOOR BALCONY IRRIGATION PLAN L2.5B 6TH FLOOR BALCONY AND ROOFTOP LANDSCAPE PLAN