Loading...
HomeMy WebLinkAbout049 - L2.4 - BALCONY IRRIGATION PLANSDNUPDNUPD1-30.241"D2-30.121"D3-30.241"FLOOR 3 POCVALVE SCHEDULEDNUPDNUPFLOOR 4 POCD1-40.361"D2-40.781"D3-40.361"D4-40.31"D5-40.121"D6-40.481"D7-40.241"NUMBERMODELSIZETYPEGPMVALVE SCHEDULENUMBERMODELSIZETYPEGPMVALVE SCHEDULEDESIGNED BY:QUALITY CHECK:JOB NO.FIELDBOOKDRAWN BY:DATE:G25-160 L2.XREV DATE REVISION THE DEPOT ON CHURCH BOZEMAN, MT BALCONY IRRIGATION PLANS AMRAMRJCC12-05-2525-160SHEETL2.4.DWGEngineering tdhengineering.com L2.4A 3RD FLOOR BALCONY IRRIGATION PLAN L2.4B 4TH FLOOR BALCONY IRRIGATION PLAN