Loading...
HomeMy WebLinkAbout037 - L1.1 - LANDSCAPE SCHEDULESYMBOLCODEBOTANICAL NAMECOMMON NAMESIZECONTAINERDTNATIVEAREAMATURE HEIGHTMATURE WIDTHPLANT FACTORQTYTREESEX-CEXISTING CONIFEROUS TREE----------1EX-DEXISTING DECIDUOUS TREE----------1DECIDUOUS TREESPEPOPULUS TREMULA 'ERECTA'SWEDISH COLUMNAR ASPEN25 GAL.CONTAINER-NON-NATIVE--40 - 65FT. HT.10 - 15FT. W.0.64TMTILIA MONGOLICAMONGOLIAN LINDEN2.0" CALB&BDTNON-NATIVE--25 - 40FT. HT.15 - 25FT. W.0.31DECIDUOUS SHRUBSAR2AMELANCHIER ALNIFOLIA 'REGENT'REGENT SERVICEBERRY5 GAL.CONTAINERDT-16 SF3 - 6FT. HT.3 - 6FT. W.0.312DL2DIERVILLA LONICERABUSH HONEYSUCKLE5 GAL.CONTAINERDT-13 SF18 - 36IN. HT.1 - 3FT. W.0.316GCRIBES AUREUMGOLDEN CURRANT5 GAL.CONTAINERDTNATIVE20 SF3 - 1FT. HT.3 - 6FT. W.0.16CONIFEROUS SHRUBSJMJUNIPERUS SCOPULORUM 'MEDORA'MEDORA JUNIPER10 GAL.CONTAINERDTNATIVE13 SF6 - 10FT. HT.1 - 3FT. W.0.16ORNAMENTAL GRASSESDGDESCHAMPSIA CESPITOSA 'GOLDSTAUB'GOLD DUST TUFTED HAIR GRASS1 GAL.CONTAINERDT-2 SF18 - 36IN. HT.1 - 3FT. W.0.37PVPANICUM VIRGATUM 'SHENANDOAH'SHENANDOAH SWITCH GRASS1 GAL.CONTAINERDTNATIVE9 SF18 - 36IN. HT.1 - 3FT. W.0.314PLANT SCHEDULE SITE LANDSCAPEDESIGNED BY:QUALITY CHECK:JOB NO.FIELDBOOKDRAWN BY:DATE:G25-160 L1.XREV DATE REVISION PRINTED 2026-01-14, BY ALY ROSS, I:\2025\GTF\25-160 112 S CHURCH AVE BZM\06_CADD\LANDSCAPE\G25-160 L1.X.DWG THE DEPOT ON CHURCH BOZEMAN, MT LANDSCAPE SCHEDULE AND NOTES AMRAMRJCC12-05-2525-160SHEETL1.11 1/14/26 CITY OF BOZEMAN REVIEW .DWGPAGE SETUP 2023_TDH_22X34_AS_11X17_L Engineering tdhengineering.com L1.1 PLANT SCHEDULE AND NOTES SOIL PREPARATION AND AMENDMENTREQUIREMENTSCRITERIAQUALITYREQUIREMENTSLANDSCAPED AREAS MUST HAVE A MINIMUM TOPSOIL DEPTH OF 6 INCHES THROUGHOUTTHE ENTIRE PLANTING AREAIMPLEMENTED METHOD USED TO MEETTHE TOPSOIL QUALITY REQUIREMENT:a) AMEND EXISTING TOPSOIL AT A RATE OF 4CUBIC YARDS OF COMPOST/1000 SQUARE FEET.COMPOST MUST MEET THE STATE OFMONTANA'S COMPOST REQUIREMENT FOR SOILAMENDMENT (ADMIN. RULE MONT. 17.50.1716).COMPOST MUST BE SPREAD AND MIXED EVENLYINTO THE TOP 6 INCHES OF TOPSOILREMOVE STONES THAT ARE, AT MINIMUM, LARGER THAN 2 INCHES, STICKS, ROOTS,CONSTRUCTION DEBRIS, AND OTHER EXTRANEOUS MATTER, AND LEGALLY DISPOSE OFTHEM OFF THE PROPERTYCOMPLIANCE WITH THE FOLLOWINGPRACTICES IS REQUIRED:a) DO NOT APPLY MATERIAL OR SCARIFY IFSOIL IS FROZEN, MUDDY, OR EXCESSIVELY WETb) PROTECT AREAS OF IN-PLACE SOIL FROMADDITIONAL COMPACTION, DISTURBANCE, ANDCONTAMINATION DURINGCONSTRUCTIONEXEMPTIONS:a) THE BUILDING FOOTPRINT AND ALL AREASWITHIN 5 FEET OF THE ACTUAL BUILDING AREEXEMPT FROM THE TOPSOIL REQUIREMENTb) ON ENGINEERED SLOPES, ONLY AMENDEDPLANTING HOLES MUST MEET THE TOPSOILREQUIREMENTc) ROOFTOP GARDENS EXCLUDED1.COORDINATE WITH ARCHITECTURE/ENGINEERING PLANS TO BECOME THOROUGHLY FAMILIAR WITH GRADING, SURFACE, AND UNDERGROUND CONDITIONS AND UTILITIES.2.ALL GRADES, DIMENSIONS AND EXISTING CONDITIONS SHALL BE VERIFIED BY THE CONTRACTOR ON-SITE BEFORE CONSTRUCTION BEGINS. BRING ANY DISCREPANCIES TO THE ATTENTION OF THE OWNER'S REPRESENTATIVE PRIOR TOCOMMENCING WORK.3.CONTRACTOR IS RESPONSIBLE FOR TOPSOIL FILL AND LANDSCAPE GRADING. SEE CIVIL FOR ADDITIONAL SITE GRADING. SEE SOIL PREPARATION AND AMENDMENT REQUIREMENTS, THIS SHEET FOR TOPSOIL REQUIREMENTS.4.ONE CONTRACTOR SHALL BE RESPONSIBLE FOR THE COORDINATION OF BOTH THE PLANTING AND IRRIGATION INSTALLATION, UNLESS OTHERWISE APPROVED BY OWNER'S REPRESENTATIVE.5.COORDINATE WITH OTHER CONTRACTORS, AS NECESSARY, REGARDING LOCATION AND TIMING OF INSTALLATION OF PLANT MATERIALS.6.PLANT MATERIALS SHALL BE FURNISHED IN THE QUANTITIES AND/OR SPACING AS SHOWN OR NOTED. IN CASE OF DISCREPANCIES BETWEEN THE PLAN AND THE PLANT SCHEDULE, THE PLAN SHALL DICTATE.7.PLANT MATERIALS ARE DRAWN AT OR NEAR THEIR MATURE SIZE. UTILIZE THE CENTER POINT OF THE SYMBOL TO DETERMINE PROPER PLANT LAYOUT AND PLACEMENT, PLANT TREES WITHIN 5-FEET OF LOCATION SHOWN ON PLANS,PLANT SHRUBS WITHIN 1-FOOT OF LOCATION SHOWN ON PLANS, UNLESS OTHERWISE APPROVED BY OWNER'S REPRESENTATIVE.8.ALL PLANTS ARE TO MEET OR EXCEED 'AMERICAN STANDARDS FOR NURSERY STOCK,' CURRENT EDITION, BY THE AMERICAN NURSERY & LANDSCAPE ASSOCIATION. ALL PLANTS SHALL BE NURSERY-GROWN UNLESS OTHERWISE NOTED.9.ALL SHRUB BEDS TO BE MULCHED WITH MEDICINE MOUNTAIN RED ROCK MULCH AS SHOWN ON PLANS AND PER DETAILS, 3" MINIMUM DEPTH.10.COORDINATE THE PLANTING WITH IRRIGATION SYSTEM. THE OWNER IS NOT RESPONSIBLE FOR DAMAGE CAUSED BY OTHER TRADES WHILE COMPLETING THIS WORK.11.ALL SUBSTITUTIONS AND PLAN CHANGES MUST BE APPROVED BY THE OWNER'S REPRESENTATIVE. NO SUBSTITUTIONS SHALL BE MADE WITHOUT WRITTEN CONSENT OF THE OWNER'S REPRESENTATIVE.12. NO TREE SHALL BE PLANTED CLOSER THAN THREE FEET TO THE BACK OF CURB OR EDING EQUIVALENT13. NO TREE SHALL BE PLANTED CLOSER THAN 10' FROM ANY CITY UTILITY LINES14. ALL STREET TREE SPECIES TO BE APPROVED BY CITY FORESTER PRIOR TO INSTALL.15. A 3' DIAM. MULCH RING IS TO BE PROVIDED FOR ALL TREES, MULCH WITH CLEAN BARK MULCH. NO EDGING OR WEED BARRIER REQUIRED, SEE DETAILS.16. IN BOULEVARD AREAS, FINAL GRADE OF ROCK OR WOOD MULCH TO BE BELOW TOP OF CURB TO PREVENT MIGRATION OF MATERIALS ONTO HARDSCAPE.17. A PRE-INSTALLATION MEETING MUST BE SCHEDULED PRIOR TO COMMENCING ANY WORK THAT INCLUDES ALL CONTRACTORS RESPONSIBLE18. FOR THE INSTALLATION OF THE LANDSCAPE AND IRRIGATION SYSTEMS19. ANY WORK OR MATERIAL WHICH IN THE OPINION OF THE OWNER'S REPRESENTATIVE DOES NOT MEET THE REQUIREMENTS OF THE PLANS WILL BE CAUSE FOR REJECTION. ALL REJECTED WORK AND MATERIALS SHALL BE IMMEDIATELYREMOVED, DISPOSED AND REPLACED BY THE CONTRACTOR AT NO ADDITIONAL COST TO THE OWNER.20. BEGIN MAINTENANCE AFTER EACH PLANT HAS BEEN INSTALLED AND CONTINUE UNTIL FINAL ACCEPTANCE BY THE OWNER'S REPRESENTATIVE. MAINTENANCE INCLUDES WATERING, PRUNING, WEEDING, MULCHING, REPLACEMENT OF SICKOR DEAD PLANTS AND ANY OTHER CARE NECESSARY FOR THE PROPER GROWTH OF THE PLANT STOCK.21. DURING THE COURSE OF THIS WORK, REMOVE EXCESS WASTE MATERIAL DAILY FROM THE SITE AND UPON COMPLETION OF ALL WORK. ENSURE ALL PLANT MATERIAL TO HAVE TOPSOIL @2X THE DIAMETER OF THE ROOT BALL.22. TO THE MAXIMUM EXTENT FEASIBLE, TOPSOIL THAT IS REMOVED DURING CONSTRUCTION ACTIVITIES SHALL BE CONSERVED FOR LATER USE. 23. PRIOR TO INSTALLATION OF PLANT MATERIALS, AREAS THAT HAVE BEEN COMPACTED OR DISTURBED BY CONSTRUCTION ACTIVITY SHALL BE THOROUGHLY LOOSENED. SOIL SHALL BE AMENDED PER TABLE SHEET L1.1.24. UPON COMPLETION OF ALL LANDSCAPING, A SUBSTANTIAL COMPLETION WALK-THROUGH OF THE WORK WILL BE HELD. THE CONTRACTOR SHALL NOTIFY THE OWNER'S REPRESENTATIVE FOR SCHEDULING THE WALK-THROUGH AT LEASTSEVEN (7) DAYS PRIOR TO THE ANTICIPATED DATE.25.WARRANTY ALL PLANT STOCK AND WORKMANSHIP FOR 12 MONTHS FROM THE DATE OF FINAL ACCEPTANCE. REPLACEMENT PLANTS SHALL BE WARRANTED FOR AN ADDITIONAL 90 DAYS.LANDSCAPE AND PLANTING NOTESNOTES:1. PLANTS IN LEGEND NOT SHOWN TO SCALE.2. SEE SHEET L1.3 FOR ROOFTOP PLANTING SCHEDULE2. SEE SHEET L1.7 AND L1.8 FOR LANDSCAPE DETAILS.4. SEE CIVIL & ARCHITECTURAL PLANS FOR ADDITIONAL LEGEND ITEMS.