Loading...
HomeMy WebLinkAbout009 - SP202 - 2ND FLOOR PLANA A S S 22 77 C C 11 55 OPEN TO LOBBY BELOW BALCONYBALCONY SP3001 SP301 1 B B BEDROOM 1 BATH 1 CLOSET 1 P.R. LIBRARY PRIMARY BEDROOM PRIMARY BATH PRIMARY CLOSET ENTRY MECH / STORAGE / UTILITY LAUNDRY PANTRY KITCHEN LIVING ROOM BALCONY / SUNROOM LIVING ROOM KITCHENPANTRYENTRY PRIMARY CLOSET PRIMARY BEDROOM P. BATH P.R. LIBRARY CLOSET 1 BEDROOM 1 BATH 1 LAUNDRY MECH / UTILITY W D WD 44 33 66 D D E E F F G G H H I I J J K K L L M M N N P P Q Q R R BALCONYSP3002 SP302 1 3891 SF OFFICE 205 2194 SF DWELLING UNIT 2 204 2120 SF DWELLING UNIT 1 203 208 SF STAIR 1 105 946 SF CORRIDOR 200 110 SF STORAGE 201 59 SF MECH 107 27 SF MECH 135 175 SF STAIR 2 127 89 SF TRASH RM. 202 69 SF ELEV. 1 108 69 SF ELEV. 2 109 PROPERTY LINE SP31021 SP311 1 SP312 1 1 11 11 11 11 ST A TE OF M O N TANALICENS E D ARCHIT E CTJILLIAN BBERTELLI7270BOZEMAN, MT DATE ISSUED SITE PLAN REVIEW SHEET NUMBER SHEET NAME REV. DESCRIPTION DATE Checked By: Drawn By: Project Number: PROJECT PHASEJBBArchJILLIAN BOWERS BERTELLIARCHITECT140 E. Main Street, Suite GBozeman, MontanaPhone: 406.600.675512.05.2025 SP202 2ND FLOORPLAN Checker Author -THE DEPOT ON CHURCH112 South Church Avenue Parcel 1&2Block ARouse's Second AdditionBozeman, MT 59715 1/8" = 1'-0"SP202 12ND FLOOR PLAN