HomeMy WebLinkAbout001 - SP000 - COVER PAGEDOOR TAG
WINDOW TAG
DETAIL
REVISION DELTA
BUILDING SECTION1
A101
SIM
A1011 SIM
1i
AA
#
ELEVATIONA101
1 Ref
1Ref
1 Ref
1Ref
PARKING REQUIREMENT CALCULATIONSPARKING REQUIREMENT CALCULATIONS
FLOOR LEVELFLOOR LEVELUSE TYPEUSE TYPESQUARE FOOTAGESQUARE FOOTAGE
BASEMENT
GROUND LEVEL
LEVEL 2
LEVEL 3
LEVEL 4
LEVEL 5
LEVEL 6
TOTALTOTAL
STORAGE
PARKING
RESIDENTIAL
RESIDENTIAL
RESIDENTIAL
RESIDENTIAL
RESIDENTIAL
RETAIL
OFFICE
7,332 S.F.
7,176 S.F.
4,543 S.F.
1,663 S.F.
4,021 S.F.
9,101 S.F.
6,302 S.F.
4,159 S.F.
1,630 S.F.
B-3 REDUCTIONB-3 REDUCTION
(3,000 S.F. EXEMPT)(3,000 S.F. EXEMPT)
NUMBER OF NUMBER OF
RESIDENCE UNITSRESIDENCE UNITSPARKING FACTORPARKING FACTORREQUIRED REQUIRED
SPACESSPACES
PERCENTAGE PERCENTAGE
REDUCTIONSREDUCTIONS
---------------
2 DWELLING UNITS
3 DWELLING UNITS
4 DWELLING UNITS
2 DWELLING UNITS
1 DWELLING UNIT
---
1 SPACE / 300 S.F.
1 SPACE / UNIT
1 SPACE / 250 S.F.1,021 S.F.
---
---
---
---
---
---
---
---
---
---
5 SPACES
2 SPACES
1 SPACE / UNIT
1 SPACE / UNIT
1 SPACE / UNIT
1 SPACE / UNIT
3 SPACES
4 SPACES
2 SPACES
1 SPACE
4 SPACES
------
40% REDUCTION
---
20% REDUCTION
---
---
---
---
OTHER ALLOWABLE REDUCTIONSOTHER ALLOWABLE REDUCTIONS
ON-STREET PARKING SPACES
REQUIRED SPACES REQUIRED SPACES
AFTER REDUCTIONSAFTER REDUCTIONS
0
0
3
2
4
3
4
2
1
1919
COVERED BIKE PARKING SPACE REDUCTION (10% REDUCTION OF REQUIRED SPACES MAX.)
2 SPACES
1 SPACE
1616TOTAL REQUIRED AFTER REDUCTIONSTOTAL REQUIRED AFTER REDUCTIONS
1818TOTAL PROVIDED ON-SITETOTAL PROVIDED ON-SITE
TOTAL NUMBER OF SPACES REQUIRED (10% OF AUTO SPACES REQUIRED & MIN. OF 2)
TOTAL PROPOSED IN BUILDING (COVERED)
2
1616TOTAL PROVIDED ON-SITETOTAL PROVIDED ON-SITE
BIKE PARKING REQUIREMENTSBIKE PARKING REQUIREMENTS
TOTAL PROPOSED OUTSIDE BUILDING (UN-COVERED)
14
2
1414SURPLUS (COVERED SPACES)SURPLUS (COVERED SPACES)
REQUIRED OPEN SPACE CALCULATIONSREQUIRED OPEN SPACE CALCULATIONS
USE TYPEUSE TYPE NUMBER OF NUMBER OF
UNITSUNITS FACTORFACTOR
1 BEDROOM UNIT
PROVIDED OPEN SPACEPROVIDED OPEN SPACE
PRIVATE BALCONIES (50% CAP)
SHARED ROOFTOP TERRACE
(100% CAP)
3 100 S.F.
REQUIRED OPEN REQUIRED OPEN
SPACESPACE
300 S.F.
2-4 BEDROOM UNIT 9 150 S.F.1,350 S.F.
1,650 S.F.TOTAL REQUIRED
TOTAL ON-SITETOTAL ON-SITE TOTAL QUALIFYINGTOTAL QUALIFYING
5,401 S.F.825 S.F.
1,254 S.F.1,254 S.F.
2,079 S.F.TOTAL PROVIDED
PROJECT SITEPROJECT SITE
B-3B-3 N. CHURCH AVE. N. CHURCH AVE.E. BABCOCK ST.E. BABCOCK ST. N. WALLACE AVE. N. WALLACE AVE. N. BOZEMAN AVE. N. BOZEMAN AVE.E. OLIVE ST.E. OLIVE ST.E. OLIVE ST.E. OLIVE ST.
E. MAIN ST.E. MAIN ST.
E. MENDENHALL ST.E. MENDENHALL ST. S. LINDLEY PL. S. LINDLEY PL.E. CURTISS ST.E. CURTISS ST.
B-3 B-3
ZONINGZONING
R-2 R-2
ZONINGZONING
PLIPLI
ZONING ZONING S. CHURCH AVE. S. CHURCH AVE. S. WALLACE AVE. S. WALLACE AVE. S. BOZEMAN AVE. S. BOZEMAN AVE.ST
A
TE OF M O N TANALICENS E D ARCHIT
E
CTJILLIAN BBERTELLI7270BOZEMAN, MT
DATE ISSUED
SITE PLAN
REVIEW
SHEET NUMBER
SHEET NAME
REV. DESCRIPTION DATE
Checked By:
Drawn By:
Project Number:
PROJECT PHASEJBBArchJILLIAN BOWERS BERTELLIARCHITECT140 E. Main Street, Suite GBozeman, MontanaPhone: 406.600.675512.05.2025
SP000
COVER PAGE
JBB
MN
01THE DEPOT ON CHURCH112 South Church Avenue Parcel 1&2Block ARouse's Second AdditionBozeman, MT 59715GRAPHIC SYMBOLS
ARCHITECT
JBB ARCH.
JILLIAN BOWERS-BERTELLI
CIVIL/SURVEYING
THE DEPOT ON CHURCHTHE DEPOT ON CHURCH
CODE COMPLIANCE
IBC 2021
IMC 2021
IFGC 2021
IECC 2021
ICC A117.1-2017
BMC
NEW CONSTRUCTION OF A 6 STORY MIXED USE BUILDING WITH OFFICE, RETAIL AND RESIDENTAL.
PROJECT DESCRIPTION
SHEET INDEX
MORRISON-MAIERLE
FIRE PROTECTION ENGINEER
OWNER
WAM DEV. GROUP
LEGAL DESCRIPTION:LEGAL DESCRIPTION:
PARCELS 1 & 2 OF LOT 1, BLOCK A, ROUSE'S SECOND
ADDITION (SE 1/4 SECTION 7 TOWNSHIP. 02 S. R. 06 E. OF
P.M.M.)
PARCEL ID:PARCEL ID: 00-0020-2297
LOT ZONING:LOT ZONING: B-3 (DOWNTOWN BUSINESS DISTRICT)
FLUM:FLUM: TRADITIONAL CORE
MAX. ALLOWABLE BUILDING HEIGHT:MAX. ALLOWABLE BUILDING HEIGHT: 70'-0"
PROPOSED BUILDING HEIGHT:PROPOSED BUILDING HEIGHT: 70'-0"
FIRE SPRINKLERS:FIRE SPRINKLERS: YES
LOT AREA (GROSS):LOT AREA (GROSS): (PARCELS 1 + 2) = 0.31 ACRES /
13,315 SQ FT
TOTAL BUILDING FOOTPRINT (GROSS):TOTAL BUILDING FOOTPRINT (GROSS): 11,076 SQ FT
LOT COVERAGE PERCENTAGE:LOT COVERAGE PERCENTAGE: 11,076 / 13,315 = 83%
TOTAL BUILDING AREA:TOTAL BUILDING AREA: 61,350 SQ FT
FLOOR AREA RATIO (F.A.R.):FLOOR AREA RATIO (F.A.R.):
61,350 SF / 13,315 SF = 4.6
TOTAL PARKING AND CIRCULATION AREA:TOTAL PARKING AND CIRCULATION AREA: 0 S.F. (PARKING IS
ENCLOSED INSIDE THE BUILDING)
TOTAL LANDSCAPED AREA:TOTAL LANDSCAPED AREA: 751 S.F. / 67% OF PARCEL
TOTAL GROSS S.F. PER USE TYPE:TOTAL GROSS S.F. PER USE TYPE:
TOTAL RETAIL USE:TOTAL RETAIL USE: 1,723 S.F.
TOTAL OFFICE USE:TOTAL OFFICE USE: 4,083 S.F.
TOTAL RESIDENTIAL DWELLING UNITS:TOTAL RESIDENTIAL DWELLING UNITS: 26,568 S.F.
PROPERTY DESCRIPTION
PROJECT ADDRESS:
112 S. CHURCH AVENUE
PARCEL 1 & 2 OF LOT 1, BLOCK A ROUSE'S SECOND ADDITION
BOZEMAN, MONTANA 59715
LANDSCAPE ARCHITECT
TD&H ENGINEERING
GENERAL CONTRACTOR
DOVETAIL CONSTRUCTION INC.
ARCHITECTURE
SHEETNUMBER SHEET NAME
SP000 COVER PAGE
SP001 NEIGHBORHOOD CONTEXT
SP002 CONTEXT STREET ELEVATIONS
SP100 SITE CONTEXT PLAN
SP101 ENLARGED SITE PLAN
SP102 OPEN SPACE CALCULATIONS
SP200 BASEMENT FLOOR PLAN
SP201 1ST FLOOR PLAN
SP202 2ND FLOOR PLAN
SP203 3RD FLOOR PLAN
SP204 4TH FLOOR PLAN
SP205 5TH FLOOR PLAN
SP206 6TH FLOOR PLAN
SP207 ROOFTOP PLAN
SP220 BUILDING STEPBACK AND BALCONYDIAGRAM
SP300 PROPOSED WEST & EAST ELEVATIONS
SP302 PROPOSED SOUTH ELEVATION
SP310 PROPOSED WEST & EAST ELEVATIONS -RENDERED
SP311 PROPOSED NORTH ELEVATION -RENDERED
SP312 PROPOSED SOUTH ELEVATION -RENDERED
CIVIL
SHEETNUMBER SHEET NAME
C000 GENERAL NOTES
C100 EXISTING TOPOGRAPHY
C101 DEMOLITION PLAN
C102 DEMOLITION PLAN
C200 EROSION CONTROL ANDCONSTRUCTION STAGING PLAN
C300 SITE PLAN
C400 GRADING & DRAINAGE PLAN
C500 UTILITY PLAN
C600 DETAILS
C601 EROSION CONTROL DETAILS
VICINITY MAP LANDSCAPE
SHEETNUMBER SHEET NAME
L1.0 LANDSCAPE PLAN, NOTES AND
SCHEDULE
L1.1 LANDSCAPE SCHEDULE AND NOTES
L1.2 LANDSCAPE SITE PLAN
L1.3 BALCONY LANDSCAPE PLANS
L1.4 BALCONY LANDSCAPE PLANS
L1.5 BALCONY AND ROOFTOP LANDSCAPEPLANS
L1.6 ROOFTOP LANSCAPE PLAN & MATERIALSCHEDULE
L1.7 LANDSCAPE DETAILS
L1.8 LANDSCAPE DETAILS
L2.0 IRRIGATION PLAN, NOTES & SCHEDULE
L2.1 IRRIGATION SCHEDULES
L2.2 IRRIGATION SITE PLAN
L2.3 BALCONY IRRIGATION PLANS
L2.4 BALCONY IRRIGATION PLANS
L2.5 BALCONY AND ROOFTOP IRRIGATIONPLANS
L2.6 ROOFTOP IRRIGATION PLAN
L2.7 IRRIGATION DETAILS
ELECTRICAL
SHEETNUMBER SHEET NAME
E100 ELECTRICAL PHOTOMETRIC PLAN
E101 EXTERIOR LIGHTING CUTSHEETS
E102 EXTERIOR LIGHTING CUTSHEETS
E103 EXTERIOR LIGHTING CUTSHEETS
140 E. MAIN ST. SUITE G
BOZEMAN, MT 59715
2880 TECHNOLOGY BLVD.
BOZEMAN, MONTANA 59718
T 406.587.0721
40 E. MAIN STREET SUITE G
BOZEMAN, MT
T. 406.600.6755
234 E. BABCOCK ST. #3
BOZEMAN, MONTANA 59715
T. 406.586.0277
2415 W. MAIN ST. SUITE 1
BOZEMAN, MONTANA 59718
T 406.585.8858
MORRISON-MAIERLE
2880 TECHNOLOGY BLVD.
BOZEMAN, MONTANA 59718
T 406.587.0721
COMPLIANCE WITH ADA ACCESSIBLITY REQUIREMENTS IS REQUIRED IN
ALL BUILDING COMMON AREAS.
THERE ARE NO ROCK OUTCROPPINGS OR OTHER TOPOLOGICAL
FEATURES PRESENT ON SITE
THERE ARE NOT HISTORICAL, CULTURURAL OR ARCHEOLOGICAL
RESOURCES PRESENT ON SITE.
THERE ARE NO WETLANDS ON SITE
SEE CIVIL FOR FLOODPLAIN INFORMATION AT THE PROJECT SITE
THERE ARE NOT UNIQUE NATURAL FEATURES, VEGETATIVE COVER OR
WILDLIFE ON THE PROJECT SITE.
GENERAL NOTES
1.
2.
3.
4.
5.
6.
NEC 2020
UPC 2021
INT. POOL AND SPA CODE 2021
IFC 2021
ARM RULE 24.301.6 ELEVATORS
24.301.7 BOILER SAFETY
1
1
1
1
1
1 SP REVIEW - REV. 1 1/14/2026
1