HomeMy WebLinkAbout02 Concept Review Response to COB Comments - MMI JBBREF #CYCLE REVIEWED BY TYPE FILENAME DISCUSSION STATUS
1 1 Addressing
Jenny Connelley
9/11/25 4:52 PM
Comment
The existing building has an address of 112 S Church Ave. Once this is approved,
and the lots are aggregated, then unit addresses would be assigned to the units.
MM has submitted lot aggregation - Application # 25634
112 Church Ave SE COB scheudle letter DRC review on or
after Nov 14
Info Only
2 1 Water and Sewer
DivisionNick Pericich
9/12/25 8:25 AM
Changemark
W/S Water EntryIt's not entirely obvious where the water and fire services will land in the
building, but you should look at the City of Bozeman standard details for these
items. There needs to be adequate space for the 4" domestic water layout and
the water meter and backflow preventer will need to be adequately accessible.
The services cannot travel more than 10' underneath the building. If you have
any questions, feel free to reach out 406-582-3203.
003 - C200-CIVIL SITE PLAN.pdf Confirmed with Shane Brandhorst, COB Fire Marshall, that
fire riser room can be located in rear of building off alley - new fire hydrant proposed on Church Ave (See Civil Utility
Plan). Correspondance with Shane is included in this
submittal. See C500 for update
Info Only
3 1 Solid Waste
Russell Ward
9/15/25 9:47 AM
Changemark
SLD Waste
with the use of a trash room it needs to be written into the covenants that it is managements responsibility to move dumpsters to the tip pad for collection. the
tip pad must be heated must have 50 foot straight approach to tip pad.
012 - A101 - 1ST FLOOR PLAN.pdf Team met with Russ Ward for specifics regarding solid
waste disposal and COB requirements are shown on SP 100
Homeowners covenants will require management to move dumpster to tip pad for collection.
Info Only
4 1 Building DivisionBen Abbey
9/17/25 11:08 AM
ChangemarkState of Montana Amendment to IBC 905.3.1 (ARM 24.301.146)
(21) Subsection 905.3.1, Height, is amended as follows: "Class III standpipe
systems shall be installed throughout buildings where any of the following conditions exist: "1. Four or more stories are above or below grade plane. "2.
Building is 60ft in height or more above grade plane. "3. The floor level of the
lowest story is located more than 30 feet (9144 mm) below the highest level of
fire department vehicle access."
024 - A300 - BUILDING SECTION.pdf In accordance with the IBC Section 905.3.1 Exception 1, Class 1 standpipes are allowed in buildings equipped
throughout with automatic sprinkler systems. The Class 1
manual standpipe system will be designed and installed in accordance with NFPA 14 (2019)
Info Only
Plan Review - Review Comments Report
Project Name: 25533 Church Ave CONR
Workflow Started: 8/21/2025 3:22:12 PM
Report Generated: 10/02/2025 11:20 AM
REVIEW COMMENTS RED response - MMI, BLUE response JBBArch
Plan Review - Review Comments Report
Project Name: 25533 Church Ave CONR
Workflow Started: 8/21/2025 3:22:12 PM
Report Generated: 10/02/2025 11:20 AM
5 1 Building DivisionBen Abbey
9/17/25 11:08 AM
ChangemarkState of Montana Amendment to IBC 903.3.1.2 (ARM 24.301.146)
(20) Subsection 903.3.1.2, NFPA 13R sprinkler systems, is amended as follows:
Automatic sprinkler systems in Group R occupancies shall be permitted to be
installed throughout in accordance with NFPA 13R where the Group R occupancy
meets all of the following conditions: "1. Four stories or fewer above grade
plane. "2. Building is 60ft in height or less above grade plane. "3. The floor level
of the lowest story is 30 feet (9144 mm) or less below the lowest level of fire
department vehicle access. "The number of stories of Group R occupancies constructed in accordance with Sections 510.2 and 510.4 shall be measured from
grade plane."
024 - A300 - BUILDING SECTION.pdf Since the building exceeds four stories, an NFPA 13R system is not permitted in accordance with IBC section
903.3.1.2. The automatic sprinkler system will be designed
and installed in accordance with NFPA 13.
Info Only
6 1 Stormwater Division
Russ Smith
9/17/25 1:54 PM
Changemark
R Smith
Be prepared to detail the stormwater management strategy for the site, using
the latest City of Bozeman Design and Construction Standards. This includes:
6.4.1 Stormwater Drainage Report The Stormwater Drainage report shall include
background information and supporting data, calculations, and map exhibits of
the existing and proposed topography, contributing drainage basins and sub-basins, and drainage features. Both off-site and on-site contributing drainage
areas shall be included. The report shall include a narrative describing in detail
how the grading and drainage features (grading, storm drains, inlets, swales,
permanent erosion protection, detention/retention ponds, water quality
treatment features, outlet structures, etc.) will function for the Water Quality storm, the Minor storm, and the Major storm events. The report shall also
describe how the proposed drainage plan integrates with previously approved
drainage plans for the development as well as subsequent phases of the development.
003 - C200-CIVIL SITE PLAN.pdf Stormwater Drainage Report is included in this submittal Info Only
8 1 Engineering
CODY FLAMMOND
9/18/25 1:33 PM
Comment
BMC 38.410.060- The applicant must provide a ten-foot front setback utility
easement along the property's frontage or provide correspondence from the
affected utility companies that the easement is not necessary.
See letter from NWE in the submittal releasing the PUE
along the frontage of the property.
Info Only
9 1 Engineering
CODY FLAMMOND
9/18/25 1:42 PM
Comment
The applicant must submit a drainage design and reporting complying with
Chapter 6 of the City of Bozeman Design and Construction Standards with the site plan application.
Stormwater Drainage Report is included in this submittal Info Only
10 1 Engineering
CODY FLAMMOND9/18/25 1:49 PM
Comment
The applicant must submit water and sewer design reports prepared by a professional engineer for the proposed project. The reports must meet
requirements detailed in the City of Bozeman Design and Construction
Standards.
Water and Sewer Design Reports are included in this
submittal
Info Only
Plan Review - Review Comments Report
Project Name: 25533 Church Ave CONR
Workflow Started: 8/21/2025 3:22:12 PM
Report Generated: 10/02/2025 11:20 AM
11 1 EngineeringCODY FLAMMOND
9/18/25 1:54 PM
CommentBMC 38.410.130. Water Adequacy: The development will need to satisfy the
water adequacy code requirement prior to a future site plan approval. If
sufficient water rights cant be provided to offsets the development's annual
demand then a cash-in-lieu of water rights (CILWR) payment will be required.
The City assesses the CILWR fee at a rate of $6,000 per acre-foot. The fee
determination will take place during the site plan review, however if there are
any questions or if a preliminary review is desired please contact Griffin Nielsen
with the Engineering/Utilities Department directly at gnielsen@bozeman.net or (406) 582-2279. The City encourages the use of groundwater wells to supply
irrigation demands, which in turn will reduce the CILWR fee. Applicant must
obtain a pre-determination from the DNRC demonstrating that a well
groundwater well may be permitted under Montanas exempt appropriation or
that provide the water right documentation if existing prior to finalization of the CILWR fee determination. Finally, the City would like to make the owner aware of
an available CILWR rebate of approximately 20% for residential units if high-
efficiency fixtures (toilets, washers, and shower heads) meeting the City Water Conservation Division standards are installed. The rebate would be released at
occupancy and requires an agreement defining the terms and amount rebate be
finalized and executed prior to final plan approval. If the owner is interested or
has any questions please reach out to Griffin Nielsen.
Understood - We will coordinate with Griffin after he provides the CILWR calculation as a part of the SP review. Info Only
12 1 Fire Department
Scott Mueller
9/19/25 9:38 AM
Comment
FDC/Horn-Strobe shall not be located above landscaping beds and have at
minimum 36 inch clearance horizontally from gas meters and electrical panels.
They shall have landing/sidewalk to public way and not be obstructed with
future growth of vegetation. On future plans show location. Fire Riser Room shall have exterior access with sidewalk to public way and include the Fire Alarm
Control Panel. On future plans show location. Existing tree encroaching into alley
(located off proposed SE corner of structure) would require major trimming or
best removal. This would allow safe deployment of fire department ladder truck
in emergency response. Fire's intent is that both corners of the structure in alley
would have enough space for ladder truck deployment.
FDC/Horn-Strobe to be at the NW corner of the building
along Church Avenue, the FDC is not located above
landscape beds. The Fire Riser room has access off of the
alley see utility plans for additional detail
Info Only
Plan Review - Review Comments Report
Project Name: 25533 Church Ave CONR
Workflow Started: 8/21/2025 3:22:12 PM
Report Generated: 10/02/2025 11:20 AM
13 1 EngineeringCODY FLAMMOND
9/19/25 4:26 PM
CommentBMC 38.220.080.A.2.i (4)The applicant must provide and file with the County
Clerk and Recorder's office executed Waivers of Right to Protest Creation of
Special Improvement Districts (SID’s) on City standard form for the following: a.
Intersection improvements to Church Avenue and Babcock Street including
lighting, signalization/channelization, paving, curb/gutter, sidewalk, and storm
drainage. The document filed must specify that in the event an SID is not utilized
for the completion of these improvements, the developer agrees to participate in
an alternate financing method for the completion of the improvements on a fair share, proportionate basis as determined by square footage of property, taxable
valuation of the property, traffic contribution from the development, or a
combination thereof. The applicant must provide a copy of the recorded SID
waiver prior to final site plan approval.
Draft SID is provided for City Comment - this will be signed and recorded upon approval of the draft by the city Info Only
14 1 Transportation
Candace Mastel
9/22/25 1:29 PM
Comment
BMC 38.540.050.A.5: Provide bicycle parking per this section. Show bicycle
parking clearly on site plan and provide call out for type of bicycle rack
proposed. It is suggested that bicycle parking be provided interior to the building for residents and exterior to the building for short-term use by
residents, visitors, and patrons of any non-residential uses.
Covered Bike parking included inside of parking garage -
Front Church Ave sidewalk updated to include COB
approved bike parking details. Bike repair and wash are
located close to bike parking to encourage multi-modal urban modes of transportation.
Info Only
15 1 Planning
Susana Montana
9/23/25 10:36 AM
Changemark
these are still applicable
003 - Church Notes Pre Application
Response.pdf
Lot Aggregation in process, Floodplain
Permit - being done concurrently
Infrastructure Review - not required
Info Only
16 1 Planning
Susana Montana9/23/25 10:39 AM
Changemark
yes, very good
003 - Church Notes Pre Application
Response.pdf
Awning screening diagram moved to sheet SP 220 Info Only
17 1 PlanningSusana Montana
9/23/25 11:14 AM
Changemarkincorrect calculations
The auto parking calculations box is showing 15 dwelling units rather than the
13 shown here.
003 - Church Notes Pre Application Response.pdf Updated Parking calculations - See Cover Sheet, SP000 for parking calculation chart Info Only
18 1 Planning
Susana Montana
9/23/25 11:15 AM
Changemark
Table 38.540.050-2
List the square footage of the residential and non-residential spaces.
003 - Church Notes Pre Application
Response.pdf
Non Residential and Residential square footages are listed
on Cover Sheet, SP000 - and all plans have accurate square
footages for each space
Info Only
19 1 Planning
Susana Montana
9/23/25 11:29 AM
Changemark
Community Commercial Mixed Use FLUM
003 - Church Notes Pre Application
Response.pdf
Confirmed with the COB that FLUM designation is
Traditonal Core
Info Only
20 1 PlanningSusana Montana
9/23/25 11:29 AM
Changemarksouth side ground floor mechanical equipment
Do any of the garage vents face south toward the house next door?
003 - Church Notes Pre Application Response.pdf Elevations show electrical meters and vents facing the alley. A narrative explaining preliminary mechanical, electrical,
plumbing and fire protection is included in documents,
MEPF design narrative in documents folder
Info Only
Plan Review - Review Comments Report
Project Name: 25533 Church Ave CONR
Workflow Started: 8/21/2025 3:22:12 PM
Report Generated: 10/02/2025 11:20 AM
21 1 PlanningSusana Montana
9/23/25 11:32 AM
Changemarkfor all reductions, show the square footage and percentages
Show the square footage of the residential and non-residential spaces; do the
math and show the percentages that demonstrate that the project qualifies for
these reductions.
006 - A003 - SITE PLAN.pdf Parking calculations have been coordinated and updated see Cover Sheet SP 000 for updates Info Only
22 1 Planning
Susana Montana
9/23/25 11:32 AM
Changemark
this is showing 15 dwelling units, not 13.
006 - A003 - SITE PLAN.pdf Parking calculations have been cooridated and updated,
see Cover Sheet SP000
Info Only
23 1 Planning
Susana Montana
9/23/25 11:35 AM
Changemark
yes
003 - Church Notes Pre Application
Response.pdf
Future Land Use Map designation is Traditional Core Info Only
24 1 Planning
Susana Montana
9/23/25 11:36 AM
Changemark
re-calculate based on 13 dwelling units.
005 - Church Ave Trip Generation
Estimate.pdf
Traffic Impact Survey is included in submittal Info Only
25 1 Planning
Susana Montana
9/23/25 11:44 AM
Changemark
revise parking calculations
show correct number of dwellings; show square footage of each of the uses and
percentages of the whole if seeking reductions in parking per38.540.
002 - Church Ave Design Narrative.pdf Narrative has been revised to show accurate dwelling units
and parking numbers
Info Only
26 1 Planning
Susana Montana
9/23/25 11:44 AM
Changemark
signs require a separate sign and building permit application.
002 - Church Ave Design Narrative.pdf Signage calculations have been included on W elevation,
sheet SP 300, a separate sign permit application will be
submitted with building permit submission
Info Only
27 1 Planning
Susana Montana
9/23/25 11:44 AM
Changemark
see Russ Ward comments on trash removal
002 - Church Ave Design Narrative.pdf Incorporated heated tip pad on site plan off of alley, see SP
101 and clearances noted
Info Only
28 1 Planning
Susana Montana
9/23/25 11:44 AM
Changemark
Downtown Streetscape Design standards
002 - Church Ave Design Narrative.pdf Revised design to adpot these standards Info Only
29 1 Planning
Susana Montana
9/23/25 11:44 AM
Changemark
see August 2025 Bozeman Downtown Design and Construction Standards
document
002 - Church Ave Design Narrative.pdf Revised design to adopt these standards Info Only
30 1 Planning
Susana Montana
9/23/25 11:48 AM
Changemark
provide new calculation box:
Show total gross area of retail, office, garage, residential and common open
space for the building.
009 - A006 - AREA PLANS.pdf See Cover Sheet SP000 Info Only
31 1 Planning
Susana Montana
9/23/25 11:52 AM
Changemark
exterior mechanical equipment shielded?
Where are the electric meters and other mechanical equipment located and how
are they screened from view?
022 - A203 - EAST ELEVATION.pdf Mechanical compressor units on the roof, Screeing
provided as part of elevator penthouse material and
construction. See SP 207 for roof plan and SP 302 for
elevation. Electrical meters on alley elevation SP 300
Info Only
Plan Review - Review Comments Report
Project Name: 25533 Church Ave CONR
Workflow Started: 8/21/2025 3:22:12 PM
Report Generated: 10/02/2025 11:20 AM
32 1 PlanningSusana Montana
9/23/25 11:54 AM
Changemarkexterior mechanical equipment
You have a five foot side setback and mechanical equipment such as meters, AC
vents and the like cannot lie within the setback. Please do not place noisy
equipment on the south side of the building at the ground floor or second level
to disturb your neighbor.
020 - A201 - SOUTH ELEVATION.pdf Mechanical compressor units on the roof, Screeing provided as part of elevator penthouse material and
construction. See SP 207 for roof plan and SP 302 for
elevation. Electrical meters on alley elevation SP 300 See
MEPF narrative for more detailed information
Info Only
33 1 Planning
Susana Montana
9/23/25 11:59 AM
Changemark
38.350.050.D.2.c
024 - A300 - BUILDING SECTION.pdf See sheet SP 220, Stepback and Elevator Penthouse
Diagram for calcualtion
Info Only
34 1 Planning
Susana Montana
9/23/25 12:03 PM
Changemark
Be specific
If you are showing context, cite the address, name of project, building height
proposed or approved for all these examples.
005 - A002 - CONTEXT STREET
ELEVATIONS.pdf
See revised street context, sheet SP002 Info Only
35 1 Planning
Susana Montana
9/23/25 12:03 PM
Changemark
label the height of your project
005 - A002 - CONTEXT STREET
ELEVATIONS.pdf
See revised street context, SP002 Info Only
36 1 Planning
Susana Montana
9/23/25 12:03 PM
Changemark
name of building, address and building height
005 - A002 - CONTEXT STREET
ELEVATIONS.pdf
Height information for trees and buildings collected using
drone technology on public sidewalk or alley
Info Only
37 1 Planning
Susana Montana
9/23/25 12:03 PM
Changemark
label the street
005 - A002 - CONTEXT STREET
ELEVATIONS.pdf
See revised street context Info Only
38 1 Planning
Susana Montana
9/23/25 12:03 PM
Changemark
is this the bowling alley? If so, why is this labeled the South context section?
005 - A002 - CONTEXT STREET
ELEVATIONS.pdf
See revised site context, with South Context Section on
sheet SP002, now shown as a site section for greater clarity
Info Only
39 1 Planning
Susana Montana
9/23/25 12:03 PM
Changemark
potential?
What is the address of this site?
005 - A002 - CONTEXT STREET
ELEVATIONS.pdf
See revised Site Context Elevations with address detail Question
Plan Review - Review Comments Report
Project Name: 25533 Church Ave CONR
Workflow Started: 8/21/2025 3:22:12 PM
Report Generated: 10/02/2025 11:20 AM
40 1 EngineeringCODY FLAMMOND
9/24/25 2:20 PM
CommentBMC 38.600.130 - The applicant must show and provide the following
information with the future application. 1. Georeferenced boundaries. Except
where not available, the regulated flood hazard area boundaries in BMC section
38.600.110 shall be determined by using the official geographic information
system georeferenced boundary data provided by FEMA 2. Delineated
boundaries. The exact location of the regulated flood hazard area boundary shall
be delineated where the base flood elevation intersects natural ground. Except
as provided in subsection B.1 of this section, the boundaries of the regulatory floodway shall be determined from the official flood insurance rate maps and
floodway data tables in the flood insurance study. The applicant has shown the
georeferenced FEMA floodway boundary on the provided concept exhibit.
However, a detailed site-specific delineated boundary is required to determine
the exact location of the regulated flood hazard boundary as it relates to the subject property. The applicant is advised that the subject property is adjacent to
the Church Avenue Split, which is a mapped floodway, and has specific
regulatory base flood elevations. The delineated floodplain boundary must account for the Flood Insurance Study flood profile across the entire length of
the property. Please update the projects exhibit to show the delineated base
flood elevation (BFE) boundary. The subject property is located between Church
Ave Split Cross Section A and B, so the intervening BFE intersection point will
need to be determined from the Church Ave Split Flood profile. The applicant will need to provide supporting documentation and how the elevation was
determined (i.e. FIS and Floodplain profiles showing the calculations) and
certified by A professional engineer's or surveyor within their respective areas of expertise. The applicant is advised per BMC 38.600.270.D.6; if the site-specific
delineation determines any part of the building is in the floodplain, then the
building must meet FEMA compliance. Residential building structures shall be
elevated so that the lowest floor is at least two feet above the base flood
elevation. Based on the information provided, there is inadequate information to
Floodplain permint will be submitted concurrently. Vanessa with MMI has been coordinating directly with Lance on the
implications of the BFE through the site, see
communciation attached.
Info Only
41 1 Engineering
CODY FLAMMOND
9/24/25 4:09 PM
Comment
Significant improvements to the alley may be required including paving from the
existing pavement at the northern boundary of the property south to Olive
Street.
Project proposes to pave the alley - Concurrent
Construction application included
Info Only
42 1 Water Conservation
Division
Eric Neustrup
9/25/25 8:35 AM
Comment
On June 15th, 2024, Ordinance 2155 and Resolution 5586 were adopted by the
Bozeman City Commission as well as the associated City of Bozeman Landscape
and Irrigation Performance and Design Standards Manual. Projects not deemed "adequate” by June 15, 2024 are now subject to these new code requirements.
To familiarize yourself with these requirements please visit
https://www.bozeman.net/departments/utilities/water-conservation/new-
development-standards-3620.
Please see planting and irrigation plans provided by TD&H
Engineers
Info Only
Plan Review - Review Comments Report
Project Name: 25533 Church Ave CONR
Workflow Started: 8/21/2025 3:22:12 PM
Report Generated: 10/02/2025 11:20 AM
43 1 EngineeringCODY FLAMMOND
9/25/25 8:57 AM
CommentThe overhead electric in the alley may need to be buried for fire access and long
term maintenance of the alley.
Construction application has been submitted to NWE in order to get the process started to get buried power
underground.
Info Only
44 1 Engineering
CODY FLAMMOND
9/25/25 8:58 AM
Comment
The water and sewer services appear to be less than 10 feet from the proposed
trees. A minimum of ten feet of separation must be maintained between the services and trees.
Front boulevard trees moved to accommodate utility lines Info Only
45 1 Engineering
CODY FLAMMOND
9/29/25 12:42 PM
Comment
The applicant must provide a traffic impact study with the site plan application. A scoping letter has been provided in the City Documents and Staff Reports folder.
Please see Traffic Impact Study included in documents
folder
Info Only
46 1 Parks Department
Ross Knapper
10/1/25 8:24 AM
Comment
Project is located in B-3 zone; CILP will be accepted. Please include a parkland
tracking table on the site plan cover sheet showing the CILP required. A sample
table can be found in the city documents folder. Please revise the total number
of proposed residential units in the table accordingly.
Please see Parkland Calculations table on cover sheet,
SP000
Info Only