Loading...
HomeMy WebLinkAbout02 Concept Review Response to COB Comments - MMI JBBREF #CYCLE REVIEWED BY TYPE FILENAME DISCUSSION STATUS 1 1 Addressing Jenny Connelley 9/11/25 4:52 PM Comment The existing building has an address of 112 S Church Ave. Once this is approved, and the lots are aggregated, then unit addresses would be assigned to the units. MM has submitted lot aggregation - Application # 25634 112 Church Ave SE COB scheudle letter DRC review on or after Nov 14 Info Only 2 1 Water and Sewer DivisionNick Pericich 9/12/25 8:25 AM Changemark W/S Water EntryIt's not entirely obvious where the water and fire services will land in the building, but you should look at the City of Bozeman standard details for these items. There needs to be adequate space for the 4" domestic water layout and the water meter and backflow preventer will need to be adequately accessible. The services cannot travel more than 10' underneath the building. If you have any questions, feel free to reach out 406-582-3203. 003 - C200-CIVIL SITE PLAN.pdf Confirmed with Shane Brandhorst, COB Fire Marshall, that fire riser room can be located in rear of building off alley - new fire hydrant proposed on Church Ave (See Civil Utility Plan). Correspondance with Shane is included in this submittal. See C500 for update Info Only 3 1 Solid Waste Russell Ward 9/15/25 9:47 AM Changemark SLD Waste with the use of a trash room it needs to be written into the covenants that it is managements responsibility to move dumpsters to the tip pad for collection. the tip pad must be heated must have 50 foot straight approach to tip pad. 012 - A101 - 1ST FLOOR PLAN.pdf Team met with Russ Ward for specifics regarding solid waste disposal and COB requirements are shown on SP 100 Homeowners covenants will require management to move dumpster to tip pad for collection. Info Only 4 1 Building DivisionBen Abbey 9/17/25 11:08 AM ChangemarkState of Montana Amendment to IBC 905.3.1 (ARM 24.301.146) (21) Subsection 905.3.1, Height, is amended as follows: "Class III standpipe systems shall be installed throughout buildings where any of the following conditions exist: "1. Four or more stories are above or below grade plane. "2. Building is 60ft in height or more above grade plane. "3. The floor level of the lowest story is located more than 30 feet (9144 mm) below the highest level of fire department vehicle access." 024 - A300 - BUILDING SECTION.pdf In accordance with the IBC Section 905.3.1 Exception 1, Class 1 standpipes are allowed in buildings equipped throughout with automatic sprinkler systems. The Class 1 manual standpipe system will be designed and installed in accordance with NFPA 14 (2019) Info Only Plan Review - Review Comments Report Project Name: 25533 Church Ave CONR Workflow Started: 8/21/2025 3:22:12 PM Report Generated: 10/02/2025 11:20 AM REVIEW COMMENTS RED response - MMI, BLUE response JBBArch Plan Review - Review Comments Report Project Name: 25533 Church Ave CONR Workflow Started: 8/21/2025 3:22:12 PM Report Generated: 10/02/2025 11:20 AM 5 1 Building DivisionBen Abbey 9/17/25 11:08 AM ChangemarkState of Montana Amendment to IBC 903.3.1.2 (ARM 24.301.146) (20) Subsection 903.3.1.2, NFPA 13R sprinkler systems, is amended as follows: Automatic sprinkler systems in Group R occupancies shall be permitted to be installed throughout in accordance with NFPA 13R where the Group R occupancy meets all of the following conditions: "1. Four stories or fewer above grade plane. "2. Building is 60ft in height or less above grade plane. "3. The floor level of the lowest story is 30 feet (9144 mm) or less below the lowest level of fire department vehicle access. "The number of stories of Group R occupancies constructed in accordance with Sections 510.2 and 510.4 shall be measured from grade plane." 024 - A300 - BUILDING SECTION.pdf Since the building exceeds four stories, an NFPA 13R system is not permitted in accordance with IBC section 903.3.1.2. The automatic sprinkler system will be designed and installed in accordance with NFPA 13. Info Only 6 1 Stormwater Division Russ Smith 9/17/25 1:54 PM Changemark R Smith Be prepared to detail the stormwater management strategy for the site, using the latest City of Bozeman Design and Construction Standards. This includes: 6.4.1 Stormwater Drainage Report The Stormwater Drainage report shall include background information and supporting data, calculations, and map exhibits of the existing and proposed topography, contributing drainage basins and sub-basins, and drainage features. Both off-site and on-site contributing drainage areas shall be included. The report shall include a narrative describing in detail how the grading and drainage features (grading, storm drains, inlets, swales, permanent erosion protection, detention/retention ponds, water quality treatment features, outlet structures, etc.) will function for the Water Quality storm, the Minor storm, and the Major storm events. The report shall also describe how the proposed drainage plan integrates with previously approved drainage plans for the development as well as subsequent phases of the development. 003 - C200-CIVIL SITE PLAN.pdf Stormwater Drainage Report is included in this submittal Info Only 8 1 Engineering CODY FLAMMOND 9/18/25 1:33 PM Comment BMC 38.410.060- The applicant must provide a ten-foot front setback utility easement along the property's frontage or provide correspondence from the affected utility companies that the easement is not necessary. See letter from NWE in the submittal releasing the PUE along the frontage of the property. Info Only 9 1 Engineering CODY FLAMMOND 9/18/25 1:42 PM Comment The applicant must submit a drainage design and reporting complying with Chapter 6 of the City of Bozeman Design and Construction Standards with the site plan application. Stormwater Drainage Report is included in this submittal Info Only 10 1 Engineering CODY FLAMMOND9/18/25 1:49 PM Comment The applicant must submit water and sewer design reports prepared by a professional engineer for the proposed project. The reports must meet requirements detailed in the City of Bozeman Design and Construction Standards. Water and Sewer Design Reports are included in this submittal Info Only Plan Review - Review Comments Report Project Name: 25533 Church Ave CONR Workflow Started: 8/21/2025 3:22:12 PM Report Generated: 10/02/2025 11:20 AM 11 1 EngineeringCODY FLAMMOND 9/18/25 1:54 PM CommentBMC 38.410.130. Water Adequacy: The development will need to satisfy the water adequacy code requirement prior to a future site plan approval. If sufficient water rights cant be provided to offsets the development's annual demand then a cash-in-lieu of water rights (CILWR) payment will be required. The City assesses the CILWR fee at a rate of $6,000 per acre-foot. The fee determination will take place during the site plan review, however if there are any questions or if a preliminary review is desired please contact Griffin Nielsen with the Engineering/Utilities Department directly at gnielsen@bozeman.net or (406) 582-2279. The City encourages the use of groundwater wells to supply irrigation demands, which in turn will reduce the CILWR fee. Applicant must obtain a pre-determination from the DNRC demonstrating that a well groundwater well may be permitted under Montanas exempt appropriation or that provide the water right documentation if existing prior to finalization of the CILWR fee determination. Finally, the City would like to make the owner aware of an available CILWR rebate of approximately 20% for residential units if high- efficiency fixtures (toilets, washers, and shower heads) meeting the City Water Conservation Division standards are installed. The rebate would be released at occupancy and requires an agreement defining the terms and amount rebate be finalized and executed prior to final plan approval. If the owner is interested or has any questions please reach out to Griffin Nielsen. Understood - We will coordinate with Griffin after he provides the CILWR calculation as a part of the SP review. Info Only 12 1 Fire Department Scott Mueller 9/19/25 9:38 AM Comment FDC/Horn-Strobe shall not be located above landscaping beds and have at minimum 36 inch clearance horizontally from gas meters and electrical panels. They shall have landing/sidewalk to public way and not be obstructed with future growth of vegetation. On future plans show location. Fire Riser Room shall have exterior access with sidewalk to public way and include the Fire Alarm Control Panel. On future plans show location. Existing tree encroaching into alley (located off proposed SE corner of structure) would require major trimming or best removal. This would allow safe deployment of fire department ladder truck in emergency response. Fire's intent is that both corners of the structure in alley would have enough space for ladder truck deployment. FDC/Horn-Strobe to be at the NW corner of the building along Church Avenue, the FDC is not located above landscape beds. The Fire Riser room has access off of the alley see utility plans for additional detail Info Only Plan Review - Review Comments Report Project Name: 25533 Church Ave CONR Workflow Started: 8/21/2025 3:22:12 PM Report Generated: 10/02/2025 11:20 AM 13 1 EngineeringCODY FLAMMOND 9/19/25 4:26 PM CommentBMC 38.220.080.A.2.i (4)The applicant must provide and file with the County Clerk and Recorder's office executed Waivers of Right to Protest Creation of Special Improvement Districts (SID’s) on City standard form for the following: a. Intersection improvements to Church Avenue and Babcock Street including lighting, signalization/channelization, paving, curb/gutter, sidewalk, and storm drainage. The document filed must specify that in the event an SID is not utilized for the completion of these improvements, the developer agrees to participate in an alternate financing method for the completion of the improvements on a fair share, proportionate basis as determined by square footage of property, taxable valuation of the property, traffic contribution from the development, or a combination thereof. The applicant must provide a copy of the recorded SID waiver prior to final site plan approval. Draft SID is provided for City Comment - this will be signed and recorded upon approval of the draft by the city Info Only 14 1 Transportation Candace Mastel 9/22/25 1:29 PM Comment BMC 38.540.050.A.5: Provide bicycle parking per this section. Show bicycle parking clearly on site plan and provide call out for type of bicycle rack proposed. It is suggested that bicycle parking be provided interior to the building for residents and exterior to the building for short-term use by residents, visitors, and patrons of any non-residential uses. Covered Bike parking included inside of parking garage - Front Church Ave sidewalk updated to include COB approved bike parking details. Bike repair and wash are located close to bike parking to encourage multi-modal urban modes of transportation. Info Only 15 1 Planning Susana Montana 9/23/25 10:36 AM Changemark these are still applicable 003 - Church Notes Pre Application Response.pdf Lot Aggregation in process, Floodplain Permit - being done concurrently Infrastructure Review - not required Info Only 16 1 Planning Susana Montana9/23/25 10:39 AM Changemark yes, very good 003 - Church Notes Pre Application Response.pdf Awning screening diagram moved to sheet SP 220 Info Only 17 1 PlanningSusana Montana 9/23/25 11:14 AM Changemarkincorrect calculations The auto parking calculations box is showing 15 dwelling units rather than the 13 shown here. 003 - Church Notes Pre Application Response.pdf Updated Parking calculations - See Cover Sheet, SP000 for parking calculation chart Info Only 18 1 Planning Susana Montana 9/23/25 11:15 AM Changemark Table 38.540.050-2 List the square footage of the residential and non-residential spaces. 003 - Church Notes Pre Application Response.pdf Non Residential and Residential square footages are listed on Cover Sheet, SP000 - and all plans have accurate square footages for each space Info Only 19 1 Planning Susana Montana 9/23/25 11:29 AM Changemark Community Commercial Mixed Use FLUM 003 - Church Notes Pre Application Response.pdf Confirmed with the COB that FLUM designation is Traditonal Core Info Only 20 1 PlanningSusana Montana 9/23/25 11:29 AM Changemarksouth side ground floor mechanical equipment Do any of the garage vents face south toward the house next door? 003 - Church Notes Pre Application Response.pdf Elevations show electrical meters and vents facing the alley. A narrative explaining preliminary mechanical, electrical, plumbing and fire protection is included in documents, MEPF design narrative in documents folder Info Only Plan Review - Review Comments Report Project Name: 25533 Church Ave CONR Workflow Started: 8/21/2025 3:22:12 PM Report Generated: 10/02/2025 11:20 AM 21 1 PlanningSusana Montana 9/23/25 11:32 AM Changemarkfor all reductions, show the square footage and percentages Show the square footage of the residential and non-residential spaces; do the math and show the percentages that demonstrate that the project qualifies for these reductions. 006 - A003 - SITE PLAN.pdf Parking calculations have been coordinated and updated see Cover Sheet SP 000 for updates Info Only 22 1 Planning Susana Montana 9/23/25 11:32 AM Changemark this is showing 15 dwelling units, not 13. 006 - A003 - SITE PLAN.pdf Parking calculations have been cooridated and updated, see Cover Sheet SP000 Info Only 23 1 Planning Susana Montana 9/23/25 11:35 AM Changemark yes 003 - Church Notes Pre Application Response.pdf Future Land Use Map designation is Traditional Core Info Only 24 1 Planning Susana Montana 9/23/25 11:36 AM Changemark re-calculate based on 13 dwelling units. 005 - Church Ave Trip Generation Estimate.pdf Traffic Impact Survey is included in submittal Info Only 25 1 Planning Susana Montana 9/23/25 11:44 AM Changemark revise parking calculations show correct number of dwellings; show square footage of each of the uses and percentages of the whole if seeking reductions in parking per38.540. 002 - Church Ave Design Narrative.pdf Narrative has been revised to show accurate dwelling units and parking numbers Info Only 26 1 Planning Susana Montana 9/23/25 11:44 AM Changemark signs require a separate sign and building permit application. 002 - Church Ave Design Narrative.pdf Signage calculations have been included on W elevation, sheet SP 300, a separate sign permit application will be submitted with building permit submission Info Only 27 1 Planning Susana Montana 9/23/25 11:44 AM Changemark see Russ Ward comments on trash removal 002 - Church Ave Design Narrative.pdf Incorporated heated tip pad on site plan off of alley, see SP 101 and clearances noted Info Only 28 1 Planning Susana Montana 9/23/25 11:44 AM Changemark Downtown Streetscape Design standards 002 - Church Ave Design Narrative.pdf Revised design to adpot these standards Info Only 29 1 Planning Susana Montana 9/23/25 11:44 AM Changemark see August 2025 Bozeman Downtown Design and Construction Standards document 002 - Church Ave Design Narrative.pdf Revised design to adopt these standards Info Only 30 1 Planning Susana Montana 9/23/25 11:48 AM Changemark provide new calculation box: Show total gross area of retail, office, garage, residential and common open space for the building. 009 - A006 - AREA PLANS.pdf See Cover Sheet SP000 Info Only 31 1 Planning Susana Montana 9/23/25 11:52 AM Changemark exterior mechanical equipment shielded? Where are the electric meters and other mechanical equipment located and how are they screened from view? 022 - A203 - EAST ELEVATION.pdf Mechanical compressor units on the roof, Screeing provided as part of elevator penthouse material and construction. See SP 207 for roof plan and SP 302 for elevation. Electrical meters on alley elevation SP 300 Info Only Plan Review - Review Comments Report Project Name: 25533 Church Ave CONR Workflow Started: 8/21/2025 3:22:12 PM Report Generated: 10/02/2025 11:20 AM 32 1 PlanningSusana Montana 9/23/25 11:54 AM Changemarkexterior mechanical equipment You have a five foot side setback and mechanical equipment such as meters, AC vents and the like cannot lie within the setback. Please do not place noisy equipment on the south side of the building at the ground floor or second level to disturb your neighbor. 020 - A201 - SOUTH ELEVATION.pdf Mechanical compressor units on the roof, Screeing provided as part of elevator penthouse material and construction. See SP 207 for roof plan and SP 302 for elevation. Electrical meters on alley elevation SP 300 See MEPF narrative for more detailed information Info Only 33 1 Planning Susana Montana 9/23/25 11:59 AM Changemark 38.350.050.D.2.c 024 - A300 - BUILDING SECTION.pdf See sheet SP 220, Stepback and Elevator Penthouse Diagram for calcualtion Info Only 34 1 Planning Susana Montana 9/23/25 12:03 PM Changemark Be specific If you are showing context, cite the address, name of project, building height proposed or approved for all these examples. 005 - A002 - CONTEXT STREET ELEVATIONS.pdf See revised street context, sheet SP002 Info Only 35 1 Planning Susana Montana 9/23/25 12:03 PM Changemark label the height of your project 005 - A002 - CONTEXT STREET ELEVATIONS.pdf See revised street context, SP002 Info Only 36 1 Planning Susana Montana 9/23/25 12:03 PM Changemark name of building, address and building height 005 - A002 - CONTEXT STREET ELEVATIONS.pdf Height information for trees and buildings collected using drone technology on public sidewalk or alley Info Only 37 1 Planning Susana Montana 9/23/25 12:03 PM Changemark label the street 005 - A002 - CONTEXT STREET ELEVATIONS.pdf See revised street context Info Only 38 1 Planning Susana Montana 9/23/25 12:03 PM Changemark is this the bowling alley? If so, why is this labeled the South context section? 005 - A002 - CONTEXT STREET ELEVATIONS.pdf See revised site context, with South Context Section on sheet SP002, now shown as a site section for greater clarity Info Only 39 1 Planning Susana Montana 9/23/25 12:03 PM Changemark potential? What is the address of this site? 005 - A002 - CONTEXT STREET ELEVATIONS.pdf See revised Site Context Elevations with address detail Question Plan Review - Review Comments Report Project Name: 25533 Church Ave CONR Workflow Started: 8/21/2025 3:22:12 PM Report Generated: 10/02/2025 11:20 AM 40 1 EngineeringCODY FLAMMOND 9/24/25 2:20 PM CommentBMC 38.600.130 - The applicant must show and provide the following information with the future application. 1. Georeferenced boundaries. Except where not available, the regulated flood hazard area boundaries in BMC section 38.600.110 shall be determined by using the official geographic information system georeferenced boundary data provided by FEMA 2. Delineated boundaries. The exact location of the regulated flood hazard area boundary shall be delineated where the base flood elevation intersects natural ground. Except as provided in subsection B.1 of this section, the boundaries of the regulatory floodway shall be determined from the official flood insurance rate maps and floodway data tables in the flood insurance study. The applicant has shown the georeferenced FEMA floodway boundary on the provided concept exhibit. However, a detailed site-specific delineated boundary is required to determine the exact location of the regulated flood hazard boundary as it relates to the subject property. The applicant is advised that the subject property is adjacent to the Church Avenue Split, which is a mapped floodway, and has specific regulatory base flood elevations. The delineated floodplain boundary must account for the Flood Insurance Study flood profile across the entire length of the property. Please update the projects exhibit to show the delineated base flood elevation (BFE) boundary. The subject property is located between Church Ave Split Cross Section A and B, so the intervening BFE intersection point will need to be determined from the Church Ave Split Flood profile. The applicant will need to provide supporting documentation and how the elevation was determined (i.e. FIS and Floodplain profiles showing the calculations) and certified by A professional engineer's or surveyor within their respective areas of expertise. The applicant is advised per BMC 38.600.270.D.6; if the site-specific delineation determines any part of the building is in the floodplain, then the building must meet FEMA compliance. Residential building structures shall be elevated so that the lowest floor is at least two feet above the base flood elevation. Based on the information provided, there is inadequate information to Floodplain permint will be submitted concurrently. Vanessa with MMI has been coordinating directly with Lance on the implications of the BFE through the site, see communciation attached. Info Only 41 1 Engineering CODY FLAMMOND 9/24/25 4:09 PM Comment Significant improvements to the alley may be required including paving from the existing pavement at the northern boundary of the property south to Olive Street. Project proposes to pave the alley - Concurrent Construction application included Info Only 42 1 Water Conservation Division Eric Neustrup 9/25/25 8:35 AM Comment On June 15th, 2024, Ordinance 2155 and Resolution 5586 were adopted by the Bozeman City Commission as well as the associated City of Bozeman Landscape and Irrigation Performance and Design Standards Manual. Projects not deemed "adequate” by June 15, 2024 are now subject to these new code requirements. To familiarize yourself with these requirements please visit https://www.bozeman.net/departments/utilities/water-conservation/new- development-standards-3620. Please see planting and irrigation plans provided by TD&H Engineers Info Only Plan Review - Review Comments Report Project Name: 25533 Church Ave CONR Workflow Started: 8/21/2025 3:22:12 PM Report Generated: 10/02/2025 11:20 AM 43 1 EngineeringCODY FLAMMOND 9/25/25 8:57 AM CommentThe overhead electric in the alley may need to be buried for fire access and long term maintenance of the alley. Construction application has been submitted to NWE in order to get the process started to get buried power underground. Info Only 44 1 Engineering CODY FLAMMOND 9/25/25 8:58 AM Comment The water and sewer services appear to be less than 10 feet from the proposed trees. A minimum of ten feet of separation must be maintained between the services and trees. Front boulevard trees moved to accommodate utility lines Info Only 45 1 Engineering CODY FLAMMOND 9/29/25 12:42 PM Comment The applicant must provide a traffic impact study with the site plan application. A scoping letter has been provided in the City Documents and Staff Reports folder. Please see Traffic Impact Study included in documents folder Info Only 46 1 Parks Department Ross Knapper 10/1/25 8:24 AM Comment Project is located in B-3 zone; CILP will be accepted. Please include a parkland tracking table on the site plan cover sheet showing the CILP required. A sample table can be found in the city documents folder. Please revise the total number of proposed residential units in the table accordingly. Please see Parkland Calculations table on cover sheet, SP000 Info Only