Loading...
HomeMy WebLinkAbout079-A3-EXT ELEV BLDG B_HIGHLAND-A3.4BSCALE :1 Exterior Elevation - West 3/32" = 1'-0"Building B T.O. SLAB 100'-0" B.O. FLR FRAMING 109'-1 1/8" T.O. SUBFLOOR 110'-9 7/8" B.O. FLR FRAMING 119'-11" T.O. SUBFLOOR 121'-7 3/4" B.O. FLR FRAMING 130'-8 7/8" T.O. SUBFLOOR 132'-5 5/8" B.O. ROOF FRAMING 141'-6 3/4" BUILDING HEIGHT 152'-10 3/4" ABCDEFGHIJKLMNOPQ 25.104edinc Job #: 1535 liberty lane suite 110b missoula, montana 59808 phone: 406.540.4437 design + architecture inc THIS SHEET IS INTENDED TO BE PRINTED IN COLOR TO FULLY UNDERSTAND THE INFORMATION BEING PRESENTED. INFORMAL SET:SITE PLAN PACKET #2 - 10/24/20252025 ENCOMPASS DESIGN INC.C A NEW KAMAKA HOUSING DEVELOPMENT:HIGHLANDS APARTMENTSBOZEMAN, MONTANA05/09/25 SITE PLAN PACKET #1:08/01/25 SITE PLAN PACKET #2:10/24/25 A3.4B EXTERIOR ELEVATIONS - BUILDING B FASCIA - METAL: -INSTALL PER STRICT CONFORMANCE W/ MANUF. REQS. -COLOR: TBD FROM MANUFACTURERS FULL COLOR RANGE. -MATCH COLOR: RICH ESPRESSO (STATEMENT COLLECTION) SOFFIT - VENTED METAL: -INSTALL WITH GALVANIZED SCREWS EVENLY SPACED -MATCH COLOR: RICH ESPRESSO (STATEMENT COLLECTION) WINDOW FRAME: -MANUFACTURER - SEE WINDOW SCHEDULE A0.5b -COLOR: WHITE - TO BE CHOSEN BY ARCHITECT FROM MANUFACTURERS FULL COLOR RANGE. DOOR FRAME: -MANUFACTURER - SEE DOOR SCHEDULE A0.5a -COLOR: WHITE - MANUFACTURERS FULL COLOR RANGE. FIBER CEMENT LAP SIDING - 6" TO WEATHER (7 1/4" BOARDS): -INSTALL IN STRICT CONFORMANCE WITH MANUFACTURER'S INSTALLATION INSTRUCTIONS. -COLOR: ARCTIC WHITE (STATEMENT COLLECTION) MATERIAL LEGEND FIBER CEMENT BOARD & BATTEN SIDING 1'-4" O.C.: -INSTALL IN STRICT CONFORMANCE WITH MANUFACTURER'S INSTALLATION INSTRUCTIONS. JAMES HARDIE -COLOR: RICH ESPRESSO (STATEMENT COLLECTION) LAP1 B&B1 FSA SFT WDW DR LAP2 30 YEAR ASPHALT SHINGLES: -INSTALL IN STRICT CONFORMANCE WITH MFR'S INSTALLATION INSTRUCTIONS -COLOR: TBD FROM MANUFACTURERS FULL COLOR RANGE. RF-1 HARDIE PANEL & EZ TRIM (REVERSE BATTENS): -INSTALL IN STRICT CONFORMANCE WITH MANUFACTURER'S INSTALLATION INSTRUCTIONS. -COLOR: AGED PEWTER (STATEMENT COLLECTION) HPEZ FIBER CEMENT LAP SIDING - 6" TO WEATHER (7 1/4" BOARDS): -INSTALL IN STRICT CONFORMANCE WITH MANUFACTURER'S INSTALLATION INSTRUCTIONS. -COLOR: RICH ESPRESSO (STATEMENT COLLECTION) B&B2 WOOD 6" PRE-TREATED WOOD SIDING (7 1/4" BOARDS): -INSTALL IN STRICT CONFORMANCE WITH MANUFACTURER'S INSTALLATION INSTRUCTIONS. -STAIN: TBD BY ARCH FIBER CEMENT BOARD & BATTEN SIDING 1'-4" O.C.: -INSTALL IN STRICT CONFORMANCE WITH MANUFACTURER'S INSTALLATION INSTRUCTIONS. JAMES HARDIE -COLOR: ARCTIC WHITE (STATEMENT COLLECTION) ARCHITECTURAL SCREENING OF EQUIPMENT: -TREATED WOOD SLAT SCREEN WALL -TYP. OF ALL ARCHITECTURAL SCREENING LOCATIONS SCRN THE USE OF 3D IMAGERY PRODUCED BY ENCOMPASS THROUGHOUT THIS PROJECT IS STRICTLY PROHIBITED TO GRAPHIC INTENT. ALL PRINTED IMAGERY IS CAREFULLY REPRODUCED TO BE AS CLOSE TO THE ACTUAL MATERIAL AS POSSIBLE AND COLORS MAY VARY DUE TO PRINTING LIMITATIONS. 3D DISCLAIMER = *G.C. TO VERIFY ALL PAINT/STAIN LOCATIONS WITH OWNER & ARCHITECT TO BE SELECTED BY OWNER. LOCATIONS - FIBER CEMENT SIDING, TRIM, AND ALL VENTS WITHIN SIDING PAINT & STAIN SCHEDULE PAINT SCHEME 1 P-1 = TO BE SELECTED BY OWNER. LOCATIONS - FIBER CEMENT SIDING, TRIM, AND ALL VENTS WITHIN SIDING P-2 = TO BE SELECTED BY OWNER. LOCATIONS - FIBER CEMENT SIDING, TRIM, AND ALL VENTS WITHIN SIDING P-3 =TO BE SELECTED BY OWNER. LOCATIONS - WOOD @ UNIT DECKSSTN-1 GENERAL NOTES - EXTERIOR ELEVATIONS A.ALL EXPOSED EXTERIOR WOOD IS TO BE STAINED. VERIFY COLOR OF STAIN W/ ARCHITECT. B.ALL SIDING COLOR TRANSITIONS TO OCCUR AT INTERIOR CORNERS. PROVIDE COLORED SHOP DRAWING ELEVATIONS - WHETHER PAINT OR PREFINISHED - TO ARCHITECT FOR APPROVAL PRIOR TO ORDERING MATERIALS. C.PROVIDE CONCRETE SPLASH BLOCK AT EACH DOWNSPOUT, U.N.O. VERIFY COLOR WITH ARCHITECT. SEE ROOF PLANS. D.ALL PLUMBING & MECH VENTS TO BE PAINTED. COLOR TO BE SELECTED BY ARCHITECT. E.ALL WINDOWS LATCHES / LOCKS ARE REQUIRED TO BE WITHIN ADA REACH RANGE OF 48” AND IF NOT MANUFACTURER NEEDS TO PROVIDE REACH RANGE LOCK COVER AS ATTACHED OR SIMILAR WITH OTHER MANUFACTURERS. SUBMITTAL REQUIRED FOR APPROVAL. G.C. TO VERIFY HEIGHTS. KEYED NOTES - EXTERIOR ELEVATIONS 1.COVERED ENTRY PATIO 2.METAL AWNING - SEE EXTERIOR DETAILS 2/A8.3b 3.PAINTED TRIM AT MATERIAL TRANSITION. 4.PAINTED WINDOW / DOOR TRIM. SEE DETAILS ON A8.1. 5.PAINTED METAL DOWNSPOUT. SEE 1/A8.2 6.PAINTED METAL GUTTER. SEE 3/A8.3a 7.WOOD BRACKET SUPPORTING EXTENDED ROOF OVERHANG STRUCTURE - SEE 1/A8.3b X SEE A0.0a FOR ALTERNATE NOTES. ALTERNATE NOTE SEE OVERALL BUILDING PLANS FOR WINDOWS AND DOORS. SEE WINDOW SCHEDULE AND DOOR SCHEDULE ON A0.5. SEE ENLARGED PLANS FOR UNIT DOORS. X WINDOW & DOOR TYPES & SCHEDULE SEE A8.2 FOR SIDING DETAILS SIDING DETAILS SEE A8.1 FOR WINDOW & DOOR DETAILS WINDOW & DOOR DETAILS ALL ROOF, WALL, AND FLOOR VENTILATION PENETRATIONS ARE NOT SHOWN FOR CLARITY PURPOSES. VENTILATION PENETRATIONS Building B T.O. SLAB 100'-0" B.O. FLR FRAMING 109'-1 1/8" T.O. SUBFLOOR 110'-9 7/8" B.O. FLR FRAMING 119'-11" T.O. SUBFLOOR 121'-7 3/4" B.O. FLR FRAMING 130'-8 7/8" T.O. SUBFLOOR 132'-5 5/8" B.O. ROOF FRAMING 141'-6 3/4" BUILDING HEIGHT 152'-10 3/4" SCALE :2 Exterior Elevation - West Angle 3/32" = 1'-0" ABCDEFGHIJKLMNOPQ B&B 1 B&B 1 B&B 1 B&B 1 B&B 1 B&B 2 B&B 1 B&B 1 B&B 1B&B 1 B&B 1 B&B 2B&B 1B&B 1 LAP 2 LAP 2 LAP 1 LAP 1 LAP 2 LAP 2 LAP 2 LAP 2 HPEZ HPEZ LAP 2 RF-1 RF-1 RF-1 RF-1 RF-1 RF-1 RF-1 RF-1 RF-1 RF-1 RF-1 RF-1 RF-1 A B AC CB AC CB AC CB A AC CB AC CB AC CB D D D D D D D D D D D D D D D D D D D D D D D D D I D D D D E E E E E E E E G G G G G G G G N C109 C110 C101 C102 D D D SCRN WOOD FSA FSA FSA FSA FSA FSA FSA FSA FSA FSA FSA 12 3125