Loading...
HomeMy WebLinkAbout048-A0.0_COVER_HIGHLAND-A0.0bA0.0b PROJECT REQMTS 25.104edinc Job #: 1535 liberty lane suite 110b missoula, montana 59808 phone: 406.540.4437 design + architecture inc THIS SHEET IS INTENDED TO BE PRINTED IN COLOR TO FULLY UNDERSTAND THE INFORMATION BEING PRESENTED. INFORMAL SET:SITE PLAN PACKET #2 - 10/24/20252025 ENCOMPASS DESIGN INC.C A NEW KAMAKA HOUSING DEVELOPMENT:HIGHLANDS APARTMENTSBOZEMAN, MONTANA05/09/25 SITE PLAN PACKET #1:08/01/25 SITE PLAN PACKET #2:10/24/25 GENERAL PROJECT REQUIREMENTS: MONTANA BOARD OF HOUSING QAP DESIGN REQUIREMENTS PROJECT ACCESSIBILITY, PROJECT ADAPTABILITY, PROJECT VISITABILITY, PROJECT LIVEABILITY, UNIT FUNCTIONALITY, DURABILITY, AMENITIES ON SITE, GREEN INITIATIVES & CERTIFICATION BASELINE PROJECT REQUIREMENTS: All Projects must MEET or EXCEED THE ADOPTED State of Montana Building Code Requirements, whether or not the State of Montana building code has been adopted in the Project's jurisdiction. Information herein describing the requirements for New Construction also applies to Acquisition/Rehabilitation projects per the International Existing Building Code; Each requirement applies if existing construction is being replaced or walls are being removed and remodeled. 2026 QUALIFIED ALLOCATION PLAN Words and phrases used in this Design Requirements Appendix have the meaning set forth in the IBC or applicable adopted governing code. If a Project must comply with Section 504 requirements, but any item in Exhibit B exceeds that requirement, the Project must comply with the Exhibit B requirement. In other words, the most stringent requirement shall apply. The developer may request a waiver or exception on any item in the Design Appendix (except where otherwise stated). The request must be in writing and include justifying documentation demonstrating substantial good cause for the requested waiver or exception from the minimum requirements. MBOH staff will consider the request and may in its discretion approve or deny the request. All Design Requirements in this QAP will apply to all current Applications and Projects and to all Projects awarded Credits under a QAP for 2025 or later. PROJECT ACCESSIBILITY REQUIREMENTS: At least 5% of Project total number of Units must be “accessible” as defined in the International Building Code (IBC) AND THE ADOPTED ICC A117.1 as well as the applicable adopted governing code; even when project funding does not require section 504 compliance. Accessible UNITS ONLY: For New Construction this base requirement is to exceed IBC and ICC requirements by defining that 5% of the overall unit count is to be a fully accessible unit not just a Type A design. For Acq/Rehab projects if cabinets are replaced this requirement applies. a.Provide open area under kitchen sink, at the workspace and lavatory locations in the accessible unit. ALL ACCESSIBLE, TYPE A AND TYPE B UNITS MUST: For New Construction this is not required for units not labeled as such, i.e., a standard unit in a building on a non accessible floor does not have to comply. For Rehab projects if water closets are replaced this requirement applies. For Rehab projects if operable parts are not being relocated this requirement does not apply. a.Have water closet flush controls on the open side of the room. b.Design all applicable described operable parts no less than 15” above the finished floor & no greater than 48” above the finished floor, regardless of floor level. PROJECT ADAPTABILITY REQUIREMENTS: Blocking (reinforcement in the wall framing) is required at all bathrooms for future grab bar installation, regardless of the location in the building. For Rehab's, if you are not opening walls to reconstruct units, then this does not apply. 36” wide doors and cased or drywall openings intended for user passage are required at all Units and all Common Area doors at all levels of a Project regardless of the location in the building. The exceptions are linen, storage, clothes closets not greater than 24” deep max, and pantries not designed for user pass through. For Rehab's, if you are not opening walls to reconstruct units, then this does not apply. Lever door hardware with push button locking (other than dwelling unit entry or patio/deck door where deadbolt is allowed) required at all Units regardless of the location in the building. This includes all types of closet doors except bi-pass doors. For Rehab's, if you are not replacing door hardware, then this does not apply. TYPE B SPECIFIC REQUIREMENTS Type “B” Units are limited to the ground floor only when there is no elevator. If an elevator is present, then all Units on all levels accessed by the elevator are to be type “B”. Ensure all Units labeled as a type “B” have the ability to add a strobe along with the horn to a Unit by modifying the device if a reasonable accommodation is requested. Removeable cabinets are required at all type “B” Units. This is to ensure the adaptability of the kitchen in the future if a reasonable accommodation is requested. Removeable cabinets can be achieved per the Fair Housing Act Design Manual detail graphic on how to install the base cabinet. The countertop and sink or lavatory must remain in place and flooring and wall protection must be present when the cabinet is removed in order to qualify as removeable. For New Construction, the locations of the removeable cabinets are the kitchen sink, the kitchen workspace and the bathroom lavatory. For Rehab this applies only if the cabinets are being replaced. Electrical panel: the operable parts must be at a max 48” above the finished floor in all type “B”, “accessible” or type “A” Units per code in accordance with all applicable codes. PROJECT VISITABLE REQUIREMENTS: No step entry required at all building entries, patio and decks, unless project complies with site impracticality per the International Building Code determination which must be verified by Architect. PROJECT LIVEABLILITY REQUIREMENTS: WINDOWS Egress windows are required in all bedrooms. Historic preservation projects may allow operable windows, only if dimensionally the width and height cannot meet code. For Rehab's, egress is required only if windows are being replaced, is feasible to achieve within the existing opening in the wall and if allowed through the State Historic Preservation Office review. ENERGY SAVING MEASURES The following are required in all Units: 1)Energy star appliances: Only if New Construction or Acq/Rehab projects are providing and or replacing they must meet this requirement. Meaning Dishwasher's are not required but if provided it does need to be energy star certified. ·dishwasher, refrigerator/freezer, clothes washer, range hood ·energy star ceiling fans - living rooms only ·energy star bathroom exhaust fans 2)Energy conservation: For Acq/Rehab projects this applies only if replacing. ·LED exterior lighting 3)Water conservation: For New Construction when providing. For Acq/Rehab projects this applies only if replacing. §Water flow saving devices: kitchen faucets=1.5gpm, shower heads=1.5gpm, other faucets=1.0gpm §Water closet = 1.28 gpf §Rain sensing landscape irrigation system or equivalent §Water efficient landscaping entire project 4)On site Recycling - as a way to save energy from a waste and transportation perspective ·On-site recycling of construction materials during construction for cardboard and wood at a minimum. Only required if jurisdiction the project is located in offers this service. HEALTHY INTERIOR ENVIRONMENT The following healthy interior measures are required when providing or replacing: LOW VOC PAINTS, STAINS, ADHESIVES & SEALANTS INTERIOR ONLY Interior paints, coatings & primers must have a VOC content less than or equal to the thresholds provided by the most recent version of SCAQMD 1113 available at time of product specification for all interior paints, coatings and primers. VOC emissions verified as compliant with CDPH Standard Method for all wall finish paints. All wallpaper used must be phthalate free. Interior adhesives and sealants must have a VOC content less than or equal to the thresholds provided by the most recent version of SCAQMD 1168 available at time of product specification for all interior adhesives and sealants. SMOKE FREE LIVING For all Projects, the Owner (and any Management Company) must establish and implement a written policy that prohibits smoking in the Units and the indoor Common Areas of the Project, including a non-smoking clause in the lease for every Project Unit. The Owner (and any Management Company) rather than MBOH will be responsible to establish, implement and enforce such written policy and lease clause. The Owner and Management Company also must make educational materials on tobacco treatment programs, including the phone number for the Montana Tobacco Quit Line, available to all tenants of the Project. The Montana Tobacco Use Prevention Program Smokefree Housing Project can provide educational materials and smokefree signage to property owners and managers free of charge, as requested. If smoking is allowed outside on the Project property, it is recommended that the written smoking policy require that smoking be restricted to areas no closer than 25 feet from all building entrances and exits.The written policy must provide appropriate exceptions for bona fide cultural or religious practices. PASSIVE RADON SYSTEM At minimum all Projects require a passive radon system. The developer is required to provide compliance documentation from an accredited professional Radon Mitigation Specialist. LEAD BASED PAINT Must comply with HUD's “Requirements for Notification, Evaluation and Reduction of Lead-Based Paint Hazards in Federally Owned Residential Property and Housing Receiving Federal Assistance,” known as the Lead Safe Housing Rule, 24 CFR Part 35. Developer must provide MBOH with documentation from a certified professional Abatement Contractor of Project compliance with the Lead Safe Housing Rule. ASBESTOS Must comply with 'Level of Environmental' review as outlined in HUD's adopted policies for Rehabilitation, and any applicable Jurisdictional Requirements. Montana Department of Environmental Quality (DEQ) administers the following: National Emissions Standards for Hazardous Air Pollutants (NESHAP) 40 CFR Part 61, subparts A (General Provisions) and M (National Emission Standard for Asbestos) Administrative Rules of Montana (ARM) Title 17, Chapter 74, Subchapter 3 (Asbestos Control) Montana Code Annotated (MCA), Title 75, Chapter 2, Part 5 (Asbestos Control) The most restrictive requirement applies. Developer must provide documentation from an accredited professional Abatement Contractor Project compliance with the applicable regulations. UNIT FUNCTIONALITY The following are required of all Units: 1.One linen closet in a common area (not in a bedroom) a.No greater than 24” in depth clear; minimum of 24” wide door b.3 shelves minimum c.This can be combined in a Coat Closet 2.One pantry cabinet or closet a.No greater than 24” in depth; minimum of 24” wide door or opening b.3 shelves minimum 3.Accessible common laundry for entire building which includes clothes washers & clothes dryers (or any combination of the following) a.One clothes washer & one clothes dryer per every 8 Units in a Project & must be on an accessible route (these can be coin operated machines); or b.Washer and dryer hookups in each Unit, must construct a closet with a depth of a minimum 36” deep clear inside (appliance specification must be verified), using a 6'-0” wide door opening for side by side applications and where allowed by code, stackable units will use the same depth as noted above with a 3'-0” wide door opening DURABILITY The following are required of all Units: 1.Flooring Hard surfaces must be a minimum of 12 millimeter wear layer (0.3 mm). All hard surface flooring must be floor score certified for air quality. Carpet must be a minimum of 26 ounces (face weight). Must be green label plus certified for all carpet related flooring. No exceptions will be considered for flooring. 2.Cabinets Cabinets are required at a minimum to comply with Architectural Woodwork Institute standards at the economy grade level. Must have no added formaldehyde. Must contain cabinet fronts made from solid wood. Must have front stiles pocket-drilled and assembled with screws for rugged durability. Side and back panels must be made from 3/8" vinyl covered particleboard minimum. AMENITIES ON SITE FAMILY HOUSING One on-site play area required. Play structure must have fall protection. One bench is required within the play area. If another public option is available within a reasonable distance (generally within a block), MBOH staff may in its discretion waive this this requirement. WAIVER SENIOR HOUSING Covered outdoor seating is required and a Common Area room for library space or seating area. PARKING The parking plan that is required by local code is the minimum requirement. Any type of parking that is being charged for and is excluded from basis will not be considered. GREEN INITIATIVES: Developer must choose and comply with one option as a discretionary additional requirement for the development. ENERGY CONSERVATION CHOOSE 1 OF THE FOLLOWING 3 FOR NEW CONSTRUCTION PROJECTS 1.Building envelope components exceeding the adopted International Energy Conservation Code (IECC); includes windows, doors, insulation values in roof and walls and crawlspace, basement or slab on grade. Each must be 5% over the applicable IECC value. 2.Energy Star Certification per the applicable Energy Star Homes Program Revision and Implementation Timeline (see energystar.gov) 3.Enterprise Green Communities certification per the applicable Enterprise Green Communities Criteria based on project timeline (see greencommunitiesonline.org) CHOOSE 1 OF THE FOLLOWING 2 FOR REHABILITATION PROJECTS BLOWER DOOR Owner/Developer to hire a qualified energy consultant to perform Blower Door testing and to certify 50% of the total number of dwelling units in the existing building or buildings comply with the adopted State of Montana IECC level of Air Changes per Hour (ACH) at the time the project is awarded. The Developer or Builder must notify MBOH at least one week in advance of the date and time that tests will be performed and MBOH staff must be permitted to attend and observe such testing. Proof of such testing must be submitted to MBOH to qualify for issuance of Form 8609(s), in the form of a report that identifies the building and the unit number on the site. The Owner must provide that report to the Architect to remedy the findings if any occur that do not meet the ACH or are higher than the adopted ACH. The Owner and Architect upon signing the certification at the end of the project will be certifying that the work is completed and complies with the ACH. INFRARED Owner/Developer to hire a qualified energy consultant to perform Infrared tests on 50% of the total number of dwelling units in the existing building or buildings before and after the construction. At the time of testing there must be a 20 degree temperature difference from outdoors to inside the Unit. MBOH shall be notified and invited to attend one week in advance of the tests. While you need to test 50% of the dwelling units total on the site, you also need a representative sampling of the Common Areas as applicable to only one building on the site, ie Community Building or Space if it is attached to an existing dwelling unit building or a Common Laundry room if it is attached to an existing dwelling unit building. If any of the common areas are in their own buildings, they are not required to be tested. The Before and After Test Result Reports shall be submitted to MBOH within 30 days after the tests. The reports shall indicate the imaging and call out the finding that needs repair to ensure the envelope is properly insulated and sealed. The Owner must provide that report to the Architect to remedy the finding. The Owner and Architect upon signing the certification at the end of the project will be certifying that the work is completed and fixed. CERTIFICATION Upon Project completion, the architect and the Owner must each certify the Project by providing their signature on their letterhead per the MBOH Architect Certification within the Uniform Application that indicates all mandatory and discretionary work is completed and installed. If the Owner has hired a third party, that party must certify BLOWER DOOR TESTING TBD. END PROJECT GROSS AREA = 181,828 TOTAL GROSS SFHIGHLANDS UNIT MIX 149 UNITS OF AFFORDABLE HOUSING UNIT MIX TOTAL ·(39) 3 BEDROOM / 2 BATH UNITS ·(72) 2 BEDROOM / 2 BATH UNITS ·(38) 1 BEDROOM / 1 BATH UNITS TOTAL = 149 DWELLING UNITS *** (8) TYPE ACC, (141) TYPE B 80 UNITS OF AFFORDABLE HOUSING UNIT MIX TOTAL ·(23) 3 BEDROOM / 2 BATH UNITS ·(33) 2 BEDROOM / 2 BATH UNITS ·(24) 1 BEDROOM / 1 BATH UNITS TOTAL = 80 DWELLING UNITS *** (4) TYPE "ACC" & (76) TYPE B BLDG HAS (1) ELEVATOR PROJECT:BLDG A: 69 UNITS OF AFFORDABLE HOUSING UNIT MIX TOTAL ·(16) 3 BEDROOM / 2 BATH UNITS ·(39) 2 BEDROOM / 2 BATH UNITS ·(14) 1 BEDROOM / 1 BATH UNITS TOTAL = 69 DWELLING UNITS *** (4) TYPE "ACC" & (65) TYPE "B" BLDG HAS (1) ELEVATOR BLDG B: UNIT NOMENCLATURE - SAMPLE (U2-2 "B") UNIT BEDROOM COUNT BATH COUNT UNIT TYPE "U""2""2""A" UNIT TYPE NOMENCLATURE ACCESSIBLE UNIT TYPE A UNIT TYPE B UNIT TYPE STANDARD TYPE AUDIO VISUAL "ACC" "A" "B""S""AV" FULLY ACCESSIBLE PER ANSI PER ANSI WHEN NO ELEVATOR HEARING AND SERVING ABOVE GRADE FLOORS VISUALLY IMPAIRED HIGHLANDS UNIT MIX - BLDG A PER FLOOR 20 UNITS OF AFFORDABLE HOUSING UNIT MIX TOTAL ·(6) 3 BEDROOM / 2 BATH UNITS ·(8) 2 BEDROOM / 2 BATH UNITS ·(6) 1 BEDROOM / 1 BATH UNITS ·20 UNITS BLDG A: LEVEL 1 20 UNITS OF AFFORDABLE HOUSING UNIT MIX TOTAL ·(6) 3 BEDROOM / 2 BATH UNITS ·(8) 2 BEDROOM / 2 BATH UNITS ·(6) 1 BEDROOM / 1 BATH UNITS ·20 UNITS BLDG A: LEVEL 2 20 UNITS OF AFFORDABLE HOUSING UNIT MIX TOTAL ·(6) 3 BEDROOM / 2 BATH UNITS ·(8) 2 BEDROOM / 2 BATH UNITS ·(6) 1 BEDROOM / 1 BATH UNITS ·20 UNITS BLDG A: LEVEL 3 20 UNITS OF AFFORDABLE HOUSING UNIT MIX TOTAL ·(5) 3 BEDROOM / 2 BATH UNITS ·(9) 2 BEDROOM / 2 BATH UNITS ·(6) 1 BEDROOM / 1 BATH UNITS ·20 UNITS BLDG A: LEVEL 4 HIGHLANDS GROSS AREA - BLDG A PER FLOOR BLDG A: LEVEL 1 = 24,822 BLDG A: LEVEL 2 = 23,716 BLDG A: LEVEL 3 = 23,716 BLDG A: LEVEL 4 = 23,716 TOTAL GROSS BLDG A = 95,970 HIGHLANDS UNIT MIX - BLDG B PER FLOOR 15 UNITS OF AFFORDABLE HOUSING UNIT MIX TOTAL ·(5) 3 BEDROOM / 2 BATH UNITS ·(8) 2 BEDROOM / 2 BATH UNITS ·(2) 1 BEDROOM / 1 BATH UNITS ·15 UNITS BLDG B: LEVEL 1 18 UNITS OF AFFORDABLE HOUSING UNIT MIX TOTAL ·(5) 3 BEDROOM / 2 BATH UNITS ·(9) 2 BEDROOM / 2 BATH UNITS ·(4) 1 BEDROOM / 1 BATH UNITS ·18 UNITS BLDG B: LEVEL 2 BLDG B: LEVEL 3 18 UNITS OF AFFORDABLE HOUSING UNIT MIX TOTAL ·(2) 3 BEDROOM / 2 BATH UNITS ·(12) 2 BEDROOM / 2 BATH UNITS ·(4) 1 BEDROOM / 1 BATH UNITS ·18 UNITS BLDG B: LEVEL 4 18 UNITS OF AFFORDABLE HOUSING UNIT MIX TOTAL ·(4) 3 BEDROOM / 2 BATH UNITS ·(10) 2 BEDROOM / 2 BATH UNITS ·(4) 1 BEDROOM / 1 BATH UNITS ·18 UNITS HIGHLANDS UNIT MIX 149 UNITS OF AFFORDABLE HOUSING UNIT MIX TOTAL ·(39) 3 BEDROOM / 2 BATH UNITS ·(72) 2 BEDROOM / 2 BATH UNITS ·(38) 1 BEDROOM / 1 BATH UNITS TOTAL = 149 DWELLING UNITS *** (8) TYPE ACC, (141) TYPE B 80 UNITS OF AFFORDABLE HOUSING UNIT MIX TOTAL ·(23) 3 BEDROOM / 2 BATH UNITS ·(33) 2 BEDROOM / 2 BATH UNITS ·(24) 1 BEDROOM / 1 BATH UNITS TOTAL = 80 DWELLING UNITS *** (4) TYPE "ACC" & (76) TYPE B BLDG HAS (1) ELEVATOR PROJECT:BLDG A: 69 UNITS OF AFFORDABLE HOUSING UNIT MIX TOTAL ·(16) 3 BEDROOM / 2 BATH UNITS ·(39) 2 BEDROOM / 2 BATH UNITS ·(14) 1 BEDROOM / 1 BATH UNITS TOTAL = 69 DWELLING UNITS *** (4) TYPE "ACC" & (65) TYPE "B" BLDG HAS (1) ELEVATOR BLDG B: UNIT NOMENCLATURE - SAMPLE (U2-2 "B") UNIT BEDROOM COUNT BATH COUNT UNIT TYPE "U""2""2""A" UNIT TYPE NOMENCLATURE ACCESSIBLE UNIT TYPE A UNIT TYPE B UNIT TYPE STANDARD TYPE AUDIO VISUAL "ACC" "A" "B""S""AV" FULLY ACCESSIBLE PER ANSI PER ANSI WHEN NO ELEVATOR HEARING AND SERVING ABOVE GRADE FLOORS VISUALLY IMPAIRED HIGHLANDS GROSS AREA - BLDG B PER FLOOR BLDG B: LEVEL 1 = 21,355 BLDG B: LEVEL 2 = 21,521 BLDG B: LEVEL 3 = 21,521 BLDG B: LEVEL 4 = 21,521 TOTAL GROSS BLDG B = 85,918 BUILDING B BUILDING A