Plan Review - Review Comments Report
Project Name: 25251 Highlands Apartments INF
Workflow Started: 5/9/2025 3:09:03 PM
Report Generated: 06/17/2025 09:22 AM
REVIEW COMMENTS
REF # CYCLE REVIEWED BY TYPE FILENAME DISCUSSION STATUS
1 CD Technician
Sam Sagstetter
5/16/25 4:28 PM
Checklist Item
Please provide height measurements on the
elevation drawings.
Responded by: Zack Graham -
5/19/25 11:41 AM
Update elevations have been posed
Resolved
2 CD Technician
Sam Sagstetter
5/16/25 4:28 PM
Checklist Item
Please list the proposed landscape water supply
source, location, and ownership (private or
public) with a brief description of how this water
will be used.
Responded by: Zack Graham -
5/19/25 4:21 PM
Notes added to L103 and L104
Resolved
3 CD Technician
Sam Sagstetter
5/16/25 4:28 PM
Checklist Item
Missing owner signature on Development Review
Application. Please upload the notification letter
with the owner's signature obtained. The
notification letter was sent to the applicant's
email the day the application was submitted.
Please check your spam folder if you do not find
it in your inbox.
Responded by: Zack Graham -
5/19/25 11:41 AM
Application with owner's signature
posted
Resolved
4 1 Solid Waste
Russell Ward
5/21/25 9:35 AM
Changemark
SLD Waste
according to the key #11 would be trash
enclosure locations? if that is so locations are
unacceptable. 1. must have 50 foot straight
approach to front of refuse enclosure. 2. no
parking or raised curbs within the 50 foot
straight approach. 3.need detailed plan for refuse
enclosure. 4. refuse enclosure will need to be
covered.
003 - HIGHLANDS_C100_SITEPLAN-
C100.pdf
The layout of the trash enclosure has
been reworked to provide a 50’
straight approach in front of the
enclosure and no parking or raised
curbs within the 50’ straight
approach (see sheet C100). See
architecture for a detail of the
enclosure.
Info Only
5 1 Addressing
Jenny Connelley
Comment
These can be addressed once approved by
The units will be leased. Info Only
Plan Review - Review Comments Report
Project Name: 25251 Highlands Apartments INF
Workflow Started: 5/9/2025 3:09:03 PM
Report Generated: 06/17/2025 09:22 AM
5/23/25 9:17 AM Engineering and Planning, and you are ready to
apply for building permits. I will need to know
whether the units are to be leased or
condominiumized (declarations recorded) and
bought and sold individually.
6 1 Transportation
Candace Mastel
5/23/25 3:30 PM
Comment
The project should provide at least one bicycle
parking space for each residence. The narrative
says the project plans 149 units. Sheet C101
states that 260 bicycle parking spaces are
provided but without knowing how many interior
spaces are proposed, only 28 are visible on the
exterior of the buildings. 149 bicycle parking
spaces should be provided either outside the
residence's or in a combination of
interior/exterior arrangements. Interior bicycle
storage is ideally easily accessible without having
the bicyclist go through multiple doors or
elevators.
I believe this comment is assuming a
Type C affordable housing incentive
(as we did not specify which
incentive we were intending for the
informal review). This project will
pursue the Type A incentive, so
BMC 38.380.040.C.3.f states that the
bicycle parking standards of Section
380.540.050 are applicable.
380.540.050.A.4 states that bicycle
parking should be at least 10% of the
required automobile parking spaces
without incentives. Without the
Affordable Housing Type A
Incentive, 260 car parking spaces
would be required. Therefore, a
minimum of 26 bicycle spaces are
required. Proposed plans show 28
bicycle parking spaces.
Info Only
7 1 Engineering
Simon Lindley
5/28/25 11:55
AM
Library Comment
BMC 38.410.130. Water Adequacy: The
development will need to satisfy the water
adequacy code requirement prior to a future site
plan approval. If sufficient water rights cant be
provided to offsets the development's annual
demand then a cash-in-lieu of water rights
(CILWR) payment will be required. The City
assesses the CILWR fee at a rate of $6,000 per
acre-foot. The fee determination will take place
during the site plan review, however if there are
any questions or if a preliminary review is desired
Noted. A groundwater well for
irrigation is not proposed. CILWR
fee has been calculated and is being
submitted with the site plan
application for review by the
department.
Info Only
Plan Review - Review Comments Report
Project Name: 25251 Highlands Apartments INF
Workflow Started: 5/9/2025 3:09:03 PM
Report Generated: 06/17/2025 09:22 AM
please contact Griffin Nielsen with the
Engineering/Utilities Department directly at
gnielsen@bozeman.net or (406) 582-2279. The
City encourages the use of groundwater wells to
supply irrigation demands, which in turn will
reduce the CILWR fee. Applicant must obtain a
pre-determination from the DNRC
demonstrating that a well groundwater well may
be permitted under Montanas exempt
appropriation or that provide the water right
documentation if existing prior to finalization of
the CILWR fee determination. Finally, the City
would like to make the owner aware of an
available CILWR rebate of approximately 20% for
residential units if high-efficiency fixtures (toilets,
washers, and shower heads) meeting the City
Water Conservation Division standards are
installed. The rebate would be released at
occupancy and requires an agreement defining
the terms and amount rebate be finalized and
executed prior to final plan approval. If the owner
is interested or has any questions please reach
out to Griffin Nielsen.
8 1 Engineering
Simon Lindley
5/28/25 11:56
AM
Library Comment
BMC 38.220.080 A. 2.g. - The applicant must
submit a peak hour trip generation value to the
City to determine whether a traffic impact study
is required, or if a waiver would be applicable.
The City needs to confirm whether the proposed
trip generation was accounted for in the
subdivision traffic impact study.
Noted. See attached concurrence
memo showing that traffic
generation is less than planned by the
original traffic impact study prepared
for the subdivision.
Info Only
9 1 Engineering
Simon Lindley
5/28/25 12:07
PM
Comment
The applicant is advised the updated Engineering
Design and Construction Standards were
officially approved and are effective, as of
Noted Info Only
Plan Review - Review Comments Report
Project Name: 25251 Highlands Apartments INF
Workflow Started: 5/9/2025 3:09:03 PM
Report Generated: 06/17/2025 09:22 AM
January 13, 2025. This project is in the concept
stage and must utilize the new standards. Please
see the Engineering Infrastructure Review
webpage.
10 1 Engineering
Simon Lindley
5/28/25 12:08
PM
Comment
The City needs to verify the water, sewer,
stormwater and traffic demands were accounted
for with the subdivision review and are in
compliance with the updated engineering design
standards (for the on-site construction). If the
proposed site plan is higher density than the
approved subdivision design reports, the
subdivision design reports will need to be
updated. With the site plan review, please
provide updated memos or design reports
certified by a professional engineer.
Noted. See attached concurrence
memo showing that traffic
generation, water demand, and sewer
demand is less than or equal to what
was anticipated for the overall
subdivision. A site-specific
stormwater report (attached) has
been prepared and coordinated with
the stormwater design assumptions
for the overall subdivision.
Info Only
11 1 Engineering
Simon Lindley
5/28/25 12:14
PM
Comment
Please reference chapter 3 of the updated
Engineering Design and Construction Standards
for the design report requirements for the site
plan review. Please reference chapter 6.4 for the
stormwater drainage plan requirements.
Noted Info Only
12 1 Engineering
Simon Lindley
5/28/25 12:30
PM
Comment
City of Bozeman Design and Construction
Standards - Storm Drainage Design 6.8.1 -
Runoff control facilities shall be sized with
adequate volume to limit post-development
runoff rates for the full range of potential storms
(2-year through 100-year) to pre-development
levels. Full retention of post-development runoff
from the major storm (100-year, 24-hour) shall
be required where no viable receiving
conveyance channel or drainage system is
available. 6.6.3: Acceptable runoff calculation
methods and their applications are summarized
Noted. Info Only
Plan Review - Review Comments Report
Project Name: 25251 Highlands Apartments INF
Workflow Started: 5/9/2025 3:09:03 PM
Report Generated: 06/17/2025 09:22 AM
in Table 6.6.1. 6.9.1: The applicant must include a
storm drainage plan with post-construction
storm water management controls that are
designed to infiltrate, evapotranspire, and/or
capture for reuse the post-construction runoff
generated from the first 0.5 inches of rainfall
from a 24-hour storm preceded by 48 hours of
no measurable precipitation. 6.8.3.C - Infiltration
basins shall be capable of completely draining
the design stormwater runoff volume, plus the
runoff treatment volume (RTV) for combination
facilities, within 72-hours after cessation of the
storm.
13 1 Engineering
Simon Lindley
5/28/25 12:32
PM
Comment
City of Bozeman Design and Construction
Standards Chapter 6 Attachment D - Prior to final
site plan approval, please provide a copy of the
acknowledgement of stormwater facilities
maintenance requirements signed by the owner.
Noted. Info Only
14 1 Engineering
Simon Lindley
5/28/25 1:57 PM
Comment
City of Bozeman Design and Construction
Standards - Stormwater Drainage Report 6.4.1:
Please provide a drainage map showing existing
and proposed contours. - General Requirements
6.3.f: Off-site runoff from the developed property
shall perpetuate pre-development drainage
patterns. - BMC 38.550.050.M.1 - The finish grade
of all landscaped areas may not exceed a slope
of 25 percent grade. It is unclear how the
proposed development will connect with the
existing topography along the northern property
line, specifically the slope of the proposed
grading in the utility easement.
Noted. See stormwater report. Info Only
15 1 Engineering
Simon Lindley
Comment
City of Bozeman Design and Construction
Noted. Option B is being pursued. A
minimum 2’ separation between the
Info Only
Plan Review - Review Comments Report
Project Name: 25251 Highlands Apartments INF
Workflow Started: 5/9/2025 3:09:03 PM
Report Generated: 06/17/2025 09:22 AM
5/28/25 2:02 PM Standards Chapter 6.8.3.A.d - The depth of
historic, seasonal high groundwater must be at
least 2 feet below the bottom of the basin to
allow for infiltration of stormwater runoff.
Drainage option A does not appear to meet this
requirement. Additionally, planning does not
allow for a departure or variance from the
parking lot tree requirement. Please see
comments from planning. Engineering supports
a design that minimizes the required fill while still
meeting all the standards. The applicant is
advised to consider expanding the landscaping
in the parking lot to allow for bioretention cells
and the required trees (modifying option A). An
example in Bozeman would be the Cannery
District at Rouse and Oak. The applicant should
consider utilizing LID design practices, storing
the major storm in the parking lot (6.8.2), or
evaluating downstream conveyance channels or
drainage systems if applicable.
bottom of the infiltration and the
seasonally high groundwater is being
maintained. See attached stormwater
report.
16 1 Engineering
Simon Lindley
5/28/25 2:02 PM
Library Comment
BMC 38.220.080.A.1.d - Construction Routes: For
all developments, a construction route map must
be provided showing how materials and heavy
equipment will travel to and from the site. The
route must avoid, where possible, local or minor
collector streets or streets where construction
traffic would disrupt neighborhood residential
character or pose a threat to public health and
safety.
Noted. See sheet C030 –
Construction Route Map
Info Only
17 1 Engineering
Simon Lindley
5/28/25 2:11 PM
Comment
City of Bozeman Fire Service Line Standards -
Plans, specifications, and submittals for fire
service lines must be submitted by the
professional engineer to the City Engineering
Noted Info Only
Plan Review - Review Comments Report
Project Name: 25251 Highlands Apartments INF
Workflow Started: 5/9/2025 3:09:03 PM
Report Generated: 06/17/2025 09:22 AM
Department through the engineering Project Dox
Portal for infrastructure/fire service line review.
The site plan must reach adequacy prior to fire
service line review. The applicant is advised the
Engineering Division has started charging for
infrastructure and fire line reviews. Please see the
engineering webpage for the fee schedule.
18 1 Engineering
Simon Lindley
5/28/25 2:19 PM
Comment
BMC 38.410.060 - Easements: The applicant is
advised to coordinate the shared access
easement alignment with the subdivision
developer prior to final plat. If a shared access
easement already exists, the shared access
easement must be released and a new easement
must be recorded prior to final site plan
approval.
Noted. This easement needs to be
recorded as planned with the
preliminary plat in order to satisfy an
emergency vehicle turnaround. This
will be vacated and re-recorded with
the project in the new location.
Info Only
19 1 Fire Department
Scott Mueller
6/4/25 10:57 AM
Comment
As proposed, site plan and buildings are
acceptable but will require the following:
Specifically for access to fire riser room and FDC,
FDC/Horn-Strobe shall not be located above
landscaping beds. They shall have
landing/sidewalk to public way and not be
obstructed with future growth of vegetation. Fire
Riser Room shall have exterior access with
sidewalk to public way and include the Fire Alarm
Control Panel.
Noted. A sidewalk to riser rooms has
been added. See sheet C100.
Info Only
20 1 Forestry Division
Alex Nordquest
6/9/25 10:13 AM
Changemark
Forestry Changemark note #01
No trees within 10' of any signage; no trees
within Street Vision Triangles and please mark all
SVT's on the Landscape Plan. Recommend a
minimum of at least two different species for
boulevard trees. All trees must be mulched with
wood chip material, 3' dia. and 3-4" in depth.
023-LandscapePlan-L101.pdf Noted Info Only
Plan Review - Review Comments Report
Project Name: 25251 Highlands Apartments INF
Workflow Started: 5/9/2025 3:09:03 PM
Report Generated: 06/17/2025 09:22 AM
21 1 Community
Housing
David Fine
6/10/25 9:13 AM
Comment
We advise the applicant to review the Affordable
Housing Ordinance 38.380, BMC, as if may relate
to this project. If the applicant uses the AHO,
they should review the requirement in the AHO
for a pre-application public meeting, so that the
noticing period and requirements do not delay
the submission of their site plan. Please discuss
the process and documentation for a pre-
application meeting with your development
review coordinator. Use of the AHO will require
the submission of an Affordable Housing Plan
with a future site plan application.
Noted. Type A incentive is being
utilized for a parking reduction.
Info Only
22 1 Planning
Bailey Minnich
6/11/25 4:15 PM
Comment
Responses to Applicant Informal Questions: 1.a.
It is the responsibility of the applicant to
determine the Type (A, B or C) and incentives
required or applicable to their project, and
include those requests within the submitted
Affordable Housing Plan (AHP). However, per the
table shown on sheet 003-Highlands_C100_Site
Plan, the application already states it would be
requesting an incentive for reduced parking
allocation. 1.b. The Affordable Housing Plan
(AHP) is reviewed by the Economic Development
City staff during the site plan review, so in
essence, it is reviewed concurrently. However,
under BMC 38.380.030.F, the applicant is
required to complete the pre-application
community meeting prior to submittal of the
formal site plan application. As identified in
section F.9, the site plan application is not
complete unless it includes the required
documentation of the community meeting. The
overall AHP process does not run concurrently
with the formal application submittal. 2. The
1. Noted
2. Noted. Refer to sheet C105
for Open Space Plan.
3. Noted. Type A incentive
will be utilized.
4. Trees will be provided.
5. Noted.
Info Only
Plan Review - Review Comments Report
Project Name: 25251 Highlands Apartments INF
Workflow Started: 5/9/2025 3:09:03 PM
Report Generated: 06/17/2025 09:22 AM
residential open space required under BMC
38.520.060 is not the same as the required
Parkland dedication under BMC 38.420.020,
completed through application #22311 for the
preliminary plat subdivision. Each individual site
plan will still be required to comply with the
necessary open space standards per BMC
38.520.060 for either residential or commercial
uses. 3. As previously stated in my answer to
question 1.a, the included table on the site plan
is requesting the use of the reduced parking
incentive with the AHP. If the application does
not request this incentive, then the minimum
parking spaces is determined by the overall
number of bedrooms in each unit as outlined in
BMC 38.540.050.A.1. 4.a. The requirement for
trees within the parking lot is located under
section BMC 38.550.050.B Parking lot
landscaping. No departure is available to this
code section, and staff would not support a
variance to this code provision as the hardship is
being created by the applicant through site
design. One idea from staff was to potentially
make the landscaped islands larger to
accommodate both the bioretention and the
required tree, however this would potentially
require the removal of some proposed parking
spaces or a reconfiguration of the proposed
parking. 5. Staff discussed the proposed project
with senior management. Staff will support the
submittal of the site plan application prior to the
recording of the final plat application, but the SP
will not be granted adequacy until final plat has
been recorded. This is because the site plan is an
entitlement onto the underlying land which
would not have a separate legal description until
Plan Review - Review Comments Report
Project Name: 25251 Highlands Apartments INF
Workflow Started: 5/9/2025 3:09:03 PM
Report Generated: 06/17/2025 09:22 AM
the final plat is granted. Senior management will
also not allow the submittal of building permits
prior to final plat recording for the same reasons.
The submittal of building permits prior to the
approval of the site plan would be determined at
a later time when the SP is closer to completion
(what is known as Concurrent Review).
23 1 Planning
Bailey Minnich
6/11/25 4:15 PM
Comment
Master Site Plan 22381 has received preliminary
approval, however there are multiple conditions
and code provisions which must be met prior to
Final MSP and submittal of a Site Plan (SP)
application. Please review the preliminary
approval letter and staff report for MSP 22381
for additional information.
Noted Info Only
24 1 Planning
Bailey Minnich
6/11/25 4:15 PM
Comment
BMC 38.310.060.A.3 Supplemental use provisions
for the REMU district, Uses required and limited.
Non-residential uses must not exceed 30 percent
of the total gross building square footage of all
uses within the master planned area unless
otherwise allowed in this section, through a
master site plan review. As specified during the
MSP 22381, the non-residential tracking table
from Appendix X of MSP must be updated and
included with each site plan application. Please
submit the updated table with the formal site
plan application for review.
The tracking table has been updated
and is included with the site plan
application.
Info Only
25 1 Planning
Bailey Minnich
6/11/25 4:15 PM
Comment
Submitted narrative states the project would
contain 149 residential units, but the table on the
submitted site plan sheet states only 146
dwelling units proposed. Please make sure the
application is consistent for the total amount of
proposed units.
149 units total. Info Only
Plan Review - Review Comments Report
Project Name: 25251 Highlands Apartments INF
Workflow Started: 5/9/2025 3:09:03 PM
Report Generated: 06/17/2025 09:22 AM
26 1 Planning
Bailey Minnich
6/11/25 4:16 PM
Comment
BMC 38.320.040 Form and Intensity standards for
REMU district. Please review the table of form
and intensity standards to review for compliance.
Using the property acreage and impervious
amount on the submitted site plan, the project
appears to be slightly over the maximum amount
of 75% impervious coverage allowed.
Noted. See departure request to
increase impervious area from 75%
to 77%.
Info Only
27 1 Planning
Bailey Minnich
6/11/25 4:16 PM
Comment
BMC 38.320.040 Form and Intensity standards for
REMU district. Please review the required
setbacks for new buildings. REMU has a variable
front setback of 10-feet minimum and 15-feet
maximum. The submitted site plan shows a 17-
foot setback along Remington Way for building
A and 19-foot setback along S 23rd Ave for
building B.
Noted. See revised plan meeting
these requirements.
Info Only
28 1 Planning
Bailey Minnich
6/11/25 4:17 PM
Comment
The MSP stated all public street frontages will
have a Mixed block frontage. The applicant must
respond in the narrative and drawings to the
Mixed block frontage (BMC 38.510.030.D) and
subsequent option for either Storefront (BMC
38.510.030.B) or Landscaped (BMC 38.510.030.C)
block frontage along Remington Way, S 23r Ave,
and S 25th Ave including building placement,
building entrances, façade transparency, weather
protection, parking location, landscaping, and
sidewalk width. The included table on the
submitted site plan identifies the project is
potentially choosing Landscaped, but that needs
to be confirmed in the narrative and all
appropriate standards met.
Noted. See narrative. Info Only
29 1 Planning
Bailey Minnich
Comment
BMC 38.510.030.J Block Frontage Standards,
Noted Info Only
Plan Review - Review Comments Report
Project Name: 25251 Highlands Apartments INF
Workflow Started: 5/9/2025 3:09:03 PM
Report Generated: 06/17/2025 09:22 AM
6/11/25 4:17 PM Special residential block frontage along
sidewalks and internal pathways. Please review
this section as the project is proposing ground-
level residential units adjacent to sidewalks and
the parking lot.
30 1 Planning
Bailey Minnich
6/11/25 4:17 PM
Comment
BMC 38.520.060.B. Usable residential open space.
All multi-household development, including
multi-household portions of mixed-use
development, must provide minimum usable
open space equal to 100 square feet per dwelling
unit for studio and one bedroom dwellings and
150 square feet per dwelling unit for dwellings
with two or more bedrooms. The required open
space may be provided in a combination of ways
per this code section. Please revise the proposed
application to include the required amount of
residential open space per the number of
proposed dwelling units.
Noted. See open space plan on sheet
C105.
Info Only
31 1 Planning
Bailey Minnich
6/11/25 4:17 PM
Comment
BMC 38.520.070. Location and design of service
areas and mechanical equipment. The applicant
must provide adequate service area and
mechanical equipment screening that meets the
requirements of this section with the formal
submittal. This includes any ground, roof top, or
wall mounted mechanical equipment, utility
meters, and solid waste enclosures.
Noted Info Only
32 1 Planning
Bailey Minnich
6/11/25 4:17 PM
Comment
BMC 38.520.070.B.3 Location of ground related
service areas and mechanical equipment. Service
areas must not be visible from the sidewalk and
adjacent properties. Where the review authority
finds that the only option for locating a service
area is an area visible from a public right-of-way,
Noted. See architecture for trash
enclosure details.
Info Only
Plan Review - Review Comments Report
Project Name: 25251 Highlands Apartments INF
Workflow Started: 5/9/2025 3:09:03 PM
Report Generated: 06/17/2025 09:22 AM
internal pathway or pedestrian area, or from an
adjacent property, the area must be screened
with structural and landscaping screening
measures provided in subsection C below and
division 38.550. The proposed trash enclosures
shown on the site plan are visible from the
surrounding sidewalks and buildings, and must
be screened as required in subsection C of this
section. Please provide applicable screening per
BMC 38.520.070.C with the formal application
submittal.
33 1 Planning
Bailey Minnich
6/11/25 4:17 PM
Comment
BMC 38.530.060.C.2.a Metal Siding. Metal siding
must be a minimum of 24-gauge thickness. Re-
purposed metal siding is exempt from minimum
thickness requirements provided its material
integrity is intact. Please provide additional
information with the formal submittal
documenting the proposed metal siding shown
on the elevations complies with this requirement
as it currently states the siding would be 26
gauge which is thinner.
Noted Info Only
34 1 Planning
Bailey Minnich
6/11/25 4:18 PM
Comment
BMC 38.530.060.D. Cementitious wall board
paneling/siding. Where cement board
paneling/siding is the dominant siding material,
the design must integrate a mix of colors and/or
textures that are articulated consistent with
windows, balconies, and modulated building
surfaces and are balanced with façade details
that add visual interest from the ground level
and adjacent buildings. Please review the
building materials code section to make sure all
proposed materials comply with required
standards.
Noted Info Only
Plan Review - Review Comments Report
Project Name: 25251 Highlands Apartments INF
Workflow Started: 5/9/2025 3:09:03 PM
Report Generated: 06/17/2025 09:22 AM
35 1 Planning
Bailey Minnich
6/11/25 4:18 PM
Comment
BMC 38.530.070.C. Blank Wall Treatments.
Untreated blank walls visible from a public street,
pedestrian-oriented space, common usable open
space, or pedestrian pathway are prohibited.
Blank wall is further defined in BMC 38.700.030
as a ground floor wall or portion of a ground
floor wall that does not include a transparent
window or door. The proposed buildings appear
to have areas that meet the definition of blank
wall on both ends. Please review this code
provision and make appropriate changes to the
proposed building elevations based on the
described treatment methods.
Noted Info Only
36 1 Planning
Bailey Minnich
6/11/25 4:18 PM
Comment
BMC 38.550.050. Mandatory landscaping
provisions. The formal submittal must include a
compliant landscaping plan that meets the
requirements of this section, including the use of
drought tolerant species, screening, parking lot
landscaping, street frontage landscaping, and
irrigation. Landscape plans must include the
information required by section 38.220.100.
Noted Info Only
37 1 Planning
Bailey Minnich
6/11/25 4:18 PM
Comment
BMC 38.550.050.B.2. Parking lot landscaping. All
surface parking lots on the building site must be
landscaped in accordance with this subsection.
Please provide a landscaping plan with the
formal submittal identifying the required parking
lot screening, canopy trees, and parking lot
landscape area as the proposed parking lot will
contain more than 15 parking spaces.
Noted. See landscape plans. Info Only
38 1 Planning
Bailey Minnich
6/11/25 4:18 PM
Comment
BMC 38.570.040. Site Lighting. The formal
submittal must include lighting sheets that
Noted Info Only
Plan Review - Review Comments Report
Project Name: 25251 Highlands Apartments INF
Workflow Started: 5/9/2025 3:09:03 PM
Report Generated: 06/17/2025 09:22 AM
provide adequate fixture details and photometric
data necessary to review for site lighting,
entrance lighting, full cut-off, and building
mounted lighting.
39 1 Engineering
Simon Lindley
6/13/25 1:12 PM
Comment
Completion of Subdivision Infrastructure: The
applicant is advised the final plat must be
recorded to establish the development lot prior
to adequacy of this site plan. The subdivision
developer and site developer appear to be
separate entities so the subdivision infrastructure
must be completed prior to building permit
approval for this site. City staff conducted a pre-
pave inspection for the public streets within
Aaker phase 1 on June 3, 2025.
Noted Info Only
40 1 Parks
Department
Ross Knapper
6/16/25 11:28
AM
Comment
Park and Recreation requirements provided by
underlying subdivision for development up to
REMU max of 12 DU. No additional park and
recreation requirements for subsequent
development proposal.
Noted Info Only
41 1 Northwestern
Energy
Matt Tilstra
6/16/25 4:35 PM
Changemark
NWE Transformers
Please note: transformers must be 10ft away
from a building with combustible sides and 5ft if
it has non-combustible sides. Also, the electric
primary serving the transformer needs to be
located in a private utility easement.
006 -
HIGHLANDS_C300_UTILITYPLAN-
C300.pdf
Noted. Transformers have been
moved to 10’ from buildings. See
sheet C303.
Info Only