Loading...
HomeMy WebLinkAbout088.2-EPS1.1-ELECTRICAL PLAN -STREETW V W V W VW V W V W VW V W V SS SS W VHY DHY D H YDHY DW VW VW V SS SS ST W V W V W V W V W VW V ST WBO HY D W VW VW V HY DW V W VW VW VW VW VHY DH YDHYD T P T P T P T P T P T P T P COCOCOBUILDING "A" BUILDING "B" BUILDING "C" EF E30 E30 E30 E30 E30 E31 EXISTING LIGHT (E) EF EF EDGERTON AVENUEGABRIEL AVENUEMEAH LANE MEAH LANE MEAH LANE FOWLER LANEFOWLER LANENOTE: FOWLER LANE IS A MINOR ARTERIAL, PER CITY OF BOZEMAN PUBLISHED STANDARDS. CALCULATIONS ARE DESIGNED AS SUCH. M HH HHHH HH HH HH 12 2 2 2 2 2 2 HHHH HH HH HH 2 222 3 3 3 3 3 #8CU IN 2"C #8CU IN 2"C #8CU IN 2"C #8CU IN 2"C #10CU IN 2"C #10CU IN 2"C #10CU IN 2"C #8CU IN 2"C#8CU IN 2"C#8CU IN 2"C #8CU IN 2"C LM-1,3 LM-1,3 LM-2,4 LM-2,4 LM-2,4 LM-2,4 4 HH 2 HH 2 3 E30 LM-2,4 HHE30 LM-2,4 2 3 #10CU IN 2"C A. CONFIRM ALL REQUIREMENTS WITH LOCAL ELECTRICAL UTILITY FOR TRANSFORMER PADS, CONDUITS, & LOCATIONS PRIOR TO WORK STARTING. B. SITE AREA SHALL BE PROPERLY PREPARED TO PREVENT SKEWING OR SETTLING OF ELECTRICAL GEAR ONCE SET. C. CONCRETE PAD BY EC PER UTILITY COMPANY STANDARDS. KEY NOTES:# (1) 3" C.O. PER UTILITY REQUIREMENTS (2) 4" C.O. 5' FROM PAD A A CB PANEL LM COMBINATION METER/LIGHTING CONTROL CABINET. MILBANK MANUFACTURING. PROVIDE WITH INTEGRAL LOAD CENTER, LIGHTING CONTACTOR, TIMECLOCK AND PHOTOCELL. REFER TO CITY OF BOZEMAN DESIGN STANDARDS. edinc Job #:24.115AN AFFORDABLE HOUSING DEVELOPMENT:172 Timberwolf PkwyKalispell, MT 59901(406) 752-22162025 ENCOMPASS DESIGN INC.C BUILDING PERMIT REVIEW SET: 08/13/2025 EPS1.1 ELECTRICAL PLAN - STREETBOZEMAN, MONTANAROCKY MOUNTAIN FLATSN SCALE: 1" = 50'-0" ELECTRICAL PLAN -STREET1 A. IT IS ABSOLUTELY NECESSARY FOR ALL TRADES INVOLVED TO COORDINATE WITH EACH OTHER AND VERIFY THAT THERE ARE NO CONFLICTS IN LOCATION OF DUCTS, CONDUITS, DIFFUSERS, BOXES, AND OTHER ITEMS THROUGHOUT THIS PROJECT BEFORE FINAL PLACEMENT OF MATERIALS. B. INSTALL ALL HANDHOLES, POLEBASES AND CONDUIT PER THE CITY OF BOZEMAN DESIGN STANDARDS. C. ALL ELECTRICAL RACEWAYS ROUTED ON THE SITE SHALL HAVE A MINIMUM OF 24”OF CLEAN, PROPERLY COMPACTED COVER LOCATED OVER THEM. D. EC TO PROVIDE A CIRCUIT CONSISTING OF #10'S THROUGH OUT IN 1" PVC FOR ALL SITE BASED POWER CONSUMING DEVICES: LIGHTS, SIGNS, ETC, UNO. CONNECT CIRCUIT TO APPROPRIATE BUILDING NOTED PANEL BOARD. E. LINES SHOWN ON THE PLAN BETWEEN ELECTRICAL BASED DEVICES REPRESENT THE PROPOSED ROUTING PATH FOR RACEWAYS. EC TO SELECT BEST PATH WHEN ROUTING FOR THE LEAST IMPACT ON SITE. F. COORDINATE ALL POLE LIGHT LOCATIONS WITH CIVIL DRAWINGS, UTILITY MAPS AND GRADING PLANS, INCLUDING ANY/ALL CONTRACTUAL CLARIFICATIONS OR CHANGES. LIGHTING FIXTURES ON SITE PLANS ARE SHOWN IN SCHEMATIC FORM AND ARE NOT TO SCALE. VERIFY FINISH GRADE HEIGHT PRIOR TO SETTING BASES. POLE LIGHT LOCATIONS ARE BASED ON ACCURATE LIGHTING CALCULATIONS, BUT MAY NEED TO BE SHIFTED SLIGHTLY TO PROPERLY ALIGN THE FIXTURES AESTHETICALLY AND TO AVOID ENCROACHMENT ON TRAVEL LANES, PARKING SPOTS, CURBS, SIDEWALKS, OVERHEAD UTILITY LINES, ETC. G. EC SHALL REVIEW A FULL SET OF CIVIL PLANS AND COORDINATE WITH THE CIVIL CONTRACTOR TO IDENTIFY ALL UNDERGROUND, EXISTING AND PROPOSED UTILITIES TO BE ROUTED ON THE SITE. EC SHALL VERIFY ALL UTILITY ROUTING PRIOR TO ANY DIGGING OR TRENCHING ON THE SITE. THE EC SHALL HAVE COORDINATION MEETINGS WITH ALL ELECTRICAL BASED UTILITIES TO INSURE ALL PARTIES ARE IN AGREEANCE WITH PROJECT NEEDS AND SUPPORT ITEMS TO PROVIDE A FULLY FUNCTIONAL PROJECT. KEY NOTES:# 1. PROVIDE MILBANK COMBINATION METER/LIGHTING CONTROL PEDESTAL WITH INTEGRAL BREAKERS, CONTACTOR, TIMECLOCK AND PHOTOCELL CONTROL. REFER TO CITY STANDARD DETAILS FIGURE 7A. 2. PROVIDE HANDHOLE AND GROUND ROD AND INSTALL PER CITY DETAILS FIGURE 2 AND FIGURE 3. 3. PROVIDE #10CU IN 1"C. BETWEEN HANDHOLE AND LIGHT POLE. 4. COORDINATE WITH UTILITY TO PROVIDE (1) 3"C.O. TO NEAREST TRANSFORMER FOR SERVICE. SCALE: 12" = 1'-0" ELECTRICAL ONE LINE -STREET LIGHTING2 Notes: Total Est. Demand:2 A Total Conn.:2 A Total Est. Demand:500 VA Total Conn. Load:400 VA Lighting 400 VA 125.00% 500 VA Load Classification Connected Load Demand Factor Estimated Demand Panel Totals Legend: Total Amps:2 A 2 A Total Load:200 VA 200 VA 7 0 0 1 20 A -- SPARE 8 5 SPARE -- 20 A 2 0 0 1 20 A -- SPARE 6 3 50 150 4 1 LTG - FOWLER Lighting 20 A 2 50 150 2 20 A Lighting LTG - MEAH 2 CKT Circuit Description Load Classification Trip Poles A B Poles Trip Load Classification Circuit Description CKT MILBANK MANUFACTURING. PROVIDE INTEGRAL METER/LOADCENTER WITH MAIN DISCONNECT. PROVIDE INTEGRAL LIGHTING CONTACTOR TO ACCOMODATE LIGHTING CIRCUITS. PROGRAM TIMECLOCK/PHOTOCELL CONTROL PER CITY REQUIREMENTS. Notes: Enclosure: MCB Rating:200 A Mounting: Wires:3 Mains Rating:200 A Supply From: Phases:1 Mains Type:MCB Location: Volts:120/208 Single A.F.C.:UTILITY Branch Panel: LM 1. 2. 3. 4. PRIOR SUBMITTAL NOT REQUIRED. ALL ALTERNATE FIXTURE SHOP DRAWINGS WILL BE REVIEWED AFTER THE PROJECT IS AWARDED. PRIOR SUBMITTAL IS REQUIRED. ALTERNATE FIXTURE IS NOT ACCEPTED FOR SUBSTITUTIONS. VERIFY FINISH WITH ARCHITECT PRIOR TO ORDERING, -PROVIDE FINISH PER CITY OF BOZEMAN REQUIREMENTS. A. B. ALL LUMINAIRES SHALL BE TESTED AND LISTED BY A NATIONALLY RECOGNIZED TESTING LABORATORY (NRTL) SUCH AS UL OR ETL. ALL LUMINAIRES SHALL HAVE DESIGN LIGHTS CONSORTIUM (DLC) CERTIFICATION AND/OR ENERGY STAR RATING. THE ELECTRICAL CONTRACTOR SHALL VERIFY ALL CEILING TYPES AND PROVIDE ALL MOUNTING, FIRE-RATED, AND IC-RATED ACCESSORIES AS NOTES: GENERAL NOTES: STREET LUMINAIRE SCHEDULE TYPE LAMPS LOAD (W) OUTPUT (LM, NOMINAL)EFFICACY CCT (K)DESCRIPTION MFR CATALOG NO. OR SERIES FINISH MOUNTING VOLTAGE NOTES (E) LED 0 W NA NA NA EXISTING LIGHT NA NA NA NA 208 V NA E30 LED 30 W 3,238 112 2,700 SINGLE HEAD LED POLE MOUNTED STREET LIGHT ON A 25' POLE WITH 6' ARM. PROVIDE CONCRETE BASE PER CITY OF BOZEMAN DESIGN STANDARDS. LUMEC RFS-30W16LED2-7K-G2-R2M TBD POLE/ 25' 208 V 2,4 E31 LED 40 W 4,138 109 2,700 SINGLE HEAD LED POLE MOUNTED STREET LIGHT ON A 30' POLE WITH 10' ARM. ARM. PROVIDE CONCRETE BASE PER CITY OF BOZEMAN DESIGN STANDARDS. LUMEC RFS-35W16LED2-7K-G2-R2M TBD POLE/ 30' 208 V 2,4 EF LED 0 W TBD TBD TBD FUTURE LIGHT TBD TBD TBD TBD 208 V TBD ELECTRICAL STREET PLAN GENERAL NOTES Meah Ave Utility Transformer Pedestal NEMA 3R