Loading...
HomeMy WebLinkAbout08-Concurrent Construction Existing and OnSite CCON. CCON CONCURRENT CONSTRUCTION FOR ON-SITE INFRASTRUCTURE CONCURRENT CONSTRUCTION PROCEDURE (BMC 38.270.030.C) Whenever any building lots or building sites are created inside the City limits, public infrastructure such as municipal water distribution systems, municipal sanitary sewer collection systems, streets, and stormwater collection, treatment, and detention or retention systems must be provided to the lot or site. If a development is proposed on a site with existing infrastructure and requires public infrastructure extensions or upgrades on site or directly adjacent to the site, an applicant may request to construct the public infrastructure and the building at the same time. This is called concurrent construction. Concurrent construction requires additional review and approval prior to building permit issuance and must be requested at the time of the initial planning entitlement, such as a site plan or master site plan application. For off-site infrastructure and subdivision projects follow form CCOFF requirements and process. CONCURRENT CONSTRUCTION REQUIREMENTS Water mains, sewer mains, stormwater system, and streets must meet all of the following requirements: 1. Any required on-site or directly adjacent extensions of water mains, sewer mains, stormwater system, or streets to be dedicated to the public: • Must be located entirely within publicly held easements or rights-of-way • Must serve only a single lot • Are the subject of an irrevocable offer of dedication to the City upon completion of the project • The development is under the control of a single developer who must retain control of the entire project until final completion • All work is under the supervision of a single general contractor • No subdivision of land is involved 2. The DRC must determine when the standards of this subsection BMC 38.270.030.C.1 are met • The fire department must consider whether adequate fire protection services are available from existing hydrants, and water supply exists to meet needs during construction 3. Approval of the final engineering design, including location and grade, for the infrastructure project must be obtained from the engineering department, and the Montana Department of Environmental Quality when applicable, prior to issuance of any building permit for the development 4. A certificate of occupancy must not be issued until all on-site and off-site water, sewer, stormwater, and street improvements necessary to serve the site are installed and accepted or approved as applicable by the City. 1 Revision Date: May 2025 CCON APPLICATION SET Materials required with the initial site plan application: Initial concurrent construction plan: • A phasing plan labeled “Concurrent Construction Plan” that illustrates and delineates the extent of each phase, the timing of each phase, the proposed timing of the infrastructure installation and building construction (include proposed sequencing of each building and any associated structures such as trash enclosures in each phase if applicable), the proposed timing of other site improvements such as parking areas, pedestrian circulation, and open space. • A phasing plan that illustrates the proposed occupancy for each phase and each building and any associated structures such as trash enclosures that clearly shows how and when the infrastructure will be complete for each phase prior to the occupancy of any building. • All proposed phasing plans must include both on and adjacent off-site improvements: all on-site improvements plus any improvements to streets, sidewalks, and any improvements within the rights-of-way adjacent to the site. All improvements must be accounted for and shown within a proposed phase. • All phasing plans must show all property lines, streets, rights-of-way, site circulation and parking areas, pedestrian facilities, open space areas, buildings and structures, utilities, infrastructure, easements, construction staging, construction fencing, and clearly delineated phasing lines. Materials required following the approval of the planning application and the preliminary concurrent construction approval by the Development Review Committee: 1. Final Concurrent Construction Plan, materials as required above, in final form and revised. 2. City Infrastructure Approval 3. DEQ Infrastructure Approval 4. Written approval by City Fire Marshal 5. Irrevocable Offer of Dedication All materials must be submitted and approved prior to issuance of a building permit. FORMAL ACKNOWLEDGMENT By requesting Concurrent Construction (CCON), the applicant is responsible for understanding and adhering to the Bozeman Municipal Code (BMC Sec. 38.270.030.C) throughout the project development. The applicant understands and accepts the risk in application approval delays if the Concurrent Construction application does not satisfy all requirements of the BMC. The applicant acknowledges that by submitting Concurrent Construction he/she agrees: 2 Revision Date: May 2025 CCON • Improvements will be designed, constructed, and installed according to the standards and criteria as adopted by the City. • Building permits will not be issued until all the required materials in the application set are provided and approved by the Development Review Committee. SIGNATURES This application must be signed by both the applicant(s) and the property owner(s) (if different) before the submittal will be accepted. Applicant Signature: ______________________________________ Date: ____________ Applicant Printed Name: ___________________________________ Owner Signature: ________________________________________ Date: ______________________ Owner Printed Name: ______________________________________ CONTACT US Alfred M. Stiff Professional Building 20 East Olive Street PO Box 1230 Bozeman, MT 59715 phone 406-582-2260 fax 406-582-2263 planning@bozeman.net www.bozeman.net/planning CITY STAFF USE ONLY Check each box once each document is reviewed and approved. Concurrent construction cannot be approved until all documents have been completed and approved. ☐City Infrastructure Approval ☐DEQ Infrastructure Approval ☐Fire ☐Irrevocable Offer of Dedication ☐Concurrent Construction Request ☐Concurrent Construction Plan Concurrent Construction Request: ☐ APPROVED ☐DENIED Signature_______________________________________ Date____________________________ Printed Name ________________________________________ 3 Revision Date: May 2025 Rocky Mountain Flats Concurrent Construction Narrative The following narrative and enclosed exhibits are intended to explain, first, why concurrent construction is believed to be a realistic option for this project and, second, how the project construction would be phased to accommodate concurrent construction. BMC38.270.030.C.1 outlines the requirements for “completion time for site development” in the City of Bozeman in regards to the completion of the public improvements that may be necessary to serve the project. Section C explains that in order to for building permits to be issued on a given project, either subsection (a) of Section C.1 needs to be satisfied, or both subsections (b) and (c) need to be satisfied. The following narrative lists the requirements of subsection C.1 and provides responses indicating how both subsections (b) and (c) are being met: 1. Provision of municipal central water distribution, municipal sanitary sewer collection systems, streets, and stormwater systems means that the criteria in either subsection a or subsections b and c are met as follows: a. Water, sewer, stormwater, and street services are installed and accepted by the city with service stubs being extended into the site, with such stubs being of adequate size to provide water and sewer service to the proposed development without modification to publicly owned infrastructure; or The requirements of this subsection are not met. This development will require street extensions and water and sanitary sewer main extensions onto the project site in order to serve the proposed building and extend the city street and utility grid. b. The water mains, sewer mains, stormwater system, and streets to be extended to provide service to the development are: located within a publicly dedicated right-of-way or easement; constructed to city standards; physically adjacent to the site proposed for construction; installed and accepted by the city; and adequate in capacity to provide necessary service to the proposed development; and This provision is met. Four existing streets (Fowler Lane, Edgerton Avenue, Gabriel Avenue, and Meah Lane) and their associated water, sewer, and storm mains need to be extended into and across the site to both serve the proposed development and extend the city street / utility grid. All of these streets are currently within public right-of-way or easements and are stubbed to the subject property boundary. Therefore, the required public improvements that are necessary to serve the project will be confined to the project site or the street right-of-way directly adjacent to the project site. No oƯ-site extensions of streets or utilities are proposed to serve the project, Furthermore, during initial project review, the city did not identify any oƯ- site streets or utilities that will need to be upsized to serve the project. c. Water mains, sewer mains, stormwater system, and streets must meet all of the following requirements: 1) Any required on-site or oƯ-site extensions of water mains, sewer mains, stormwater system, or streets to be dedicated to the public: must be located entirely within publicly held easements or rights-of-way; must serve only a single lot; are the subject of an irrevocable oƯer of dedication to the city upon completion of the project; the development is under the control of a single developer who must retain control of the entire project until final completion; all work is under the supervision of a single general contractor; and no subdivision of land is involved; - This provision is met. All required public street and utility extensions will be within public street and utility easements that will be dedicated to the city prior to site plan approval. - Since this property is a single lot and no subdivision is proposed, the required utility extensions will serve only a single lot. - An irrevocable oƯer of dedication of the public improvements to the city, can be provided, if necessary. - The development is under control of a single developer who will also be the general contractor for the entire project. - No subdivision is proposed. 2) The DRC must determine when the standards of this subsection C.1 are met. The fire department must consider whether adequate fire protection services are available from existing hydrants, and water supply exists to meet needs during construction. If adequate fire protection does not exist then concurrent infrastructure and development construction may not occur. Based on evaluation by the fire department, simultaneous construction of infrastructure to be dedicated to the public and private development construction may be permitted only within a defined portion of the site; Understood. The following background is provided for consideration regarding access and fire protection. Currently the site can be accessed from Fowler Lane to the west, Edgerton Avenue and Gabriel Avenue to the north, and Meah Lane / 31st Avenue to the east, providing existing access opportunities from 4 public streets on 3 sides of the property during construction. There are also operable fire hydrants along the property boundary at each of these streets, providing 4 operable fire hydrants in the vicinity of the site. Furthermore, each of the proposed buildings is within 100’ of at least one of these existing hydrants. The enclosed Exhibit 1 outlines the existing access and hydrant locations in relation to the proposed buildings. The goal of the applicant is to be able to proceed with foundation work on the proposed buildings while the on-site water main extensions are being constructed. Then, once the on- site water mains and associated hydrants are operable, vertical construction on the buildings could begin. The following concurrent construction plan outlines a method to maintain gravel access throughout the project site so that water main installation can take place concurrently with the foundation work while maintaining adequate emergency access. The possibility of proceeding with construction of the on-site infrastructure concurrently with the proposed buildings was discussed with the Fire Marshal. He explained that, in addition to the 4 existing public accesses and hydrants, gravel access roads through the site would also need to be maintained throughout construction between these existing hydrants and the proposed buildings. He was however, of the opinion that the 4 existing fire hydrants could be suƯicient for emergency activities during foundation work. During discussion with the city engineering department, it was noted that water pressure in this area of the city is generally low, and the existing hydrants may not provide suƯicient pressure and capacity to support firefighting activities during vertical building construction. It should be noted, however, that these same hydrants were recently installed with the BuƯalo Run development to the north of the project site and were deemed to be suƯicient to allow for concurrent construction of the multi-story apartment buildings associated with that project. The buildings proposed with the Rocky Mountain Flats project are, admittedly, substantially larger than those constructed with the development to the north, which is why it is understandable that on-site hydrants would need to be operational prior to the start of vertical construction. However, it is believed that the existing hydrants would be suƯicient for firefighting activities during foundation work. 3) Approval of the final engineering design, including location and grade, for the infrastructure project must be obtained from the engineering department, and the Montana Department of Environmental Quality when applicable, prior to issuance of any building permit for the development; and This is understood and this provision will be met. The infrastructure improvements submittal for the public improvements is under review at the city engineering department and will be sent to DEQ for review once approved by the city. 4) A certificate of occupancy must not be issued until all on-site and oƯ-site water, sewer, stormwater, and street improvements necessary to serve the site are installed and accepted or approved as applicable by the city. This is understood. Rocky Mountain Flats Concurrent Construction Plan Phase 1  PRIOR TO PHASE 1 INITIATION: a. Receive site plan approval. b. Receive Infrastructure Approval from COB and DEQ and complete pre- construction meeting.  Install roadway sediment control and traƯic control at both existing driveways on the west side of the site from Fowler Lane.  Install erosion control along the perimeter of the site.  Demo structures and septic system.  Re-align ditch on west side of Fowler Lane and complete diversion from east ditch into west ditch. Phase 2  PRIOR TO INITIATION OF PHASE 2: a. Receive Building Permit Approval / Issuance  Strip topsoil and prep road subgrades to provide gravel access roads along proposed street sections for site access.  CONSTRUCTION ACCESS TO SITE TO COME FROM FOWLER LANE. GRAVEL ACCESS IS TO BE MAINTAINED TO EXISTING EDGERTON AVE, GABRIEL AVE AND MEAH LANE STREET STUBS AND ASSOCIATED FIRE HYDRANTS FOR EMERGENCY USE.  Install storm ponds on northern property boundaries for runoƯ control during construction.  Install water and sewer main in Fowler Lane.  Contractor to Phase Fowler utility work so access to the site from Fowler Lane for construction and emergency vehicles is maintained at all times. Utilize existing driveways as temporary construction entrances as necessary to maintain access to site during Fowler utility work.  Restore Fowler Lane to county gravel standard and open to public until paving occurs.  Strip topsoil from building B and C footprints and parking lots and prep parking lot gravel subgrades to create stabilized construction staging areas.  Once gravel access roads are provided across site, begin foundation work on Buildings B and C.  NO VERTICAL BUILDING CONSTRUCTION TO BEGIN UNTIL ON-SITE WATER MAINS AND ASSOCIATED FIRE HYDRANTS ARE OPERABLE. Phase 3  Install water main across site in future Meah Lane.  Contractor to Phase water main work in future Meah Lane so gravel access to each building for construction and emergency vehicles is maintained at all times.  Once Fowler utility work is completed and reliable site access can be provided from Fowler, strip topsoil from building A footprint and parking lot and prep parking lot to gravel subgrade to create construction staging area.  Begin foundation work on Building A.  NO VERTICAL BUILDING CONSTRUCTION TO BEGIN UNTIL ON-SITE WATER MAINS AND ASSOCIATED FIRE HYDRANTS ARE OPERABLE. Phase 4  Complete water main with installation of water main in Edgerton Ave and Gabriel Ave.  Once water main installation is complete, charge, chlorinate, flush, and pressure test all water main in coordination with City Water Department.  Hold walkthrough with city water department and turn on water main for emergency use during construction.  NO VERTICAL BUILDING CONSTRUCTION TO BEGIN UNTIL ON-SITE WATER MAINS AND ASSOCIATED FIRE HYDRANTS ARE OPERABLE. Phase 5  Begin vertical building construction.  Install remaining utilities in proposed streets and parking lots as necessary to begin prepping streets and site with gravel for curb and gutter.  Utilities installed in this phase to include: sanitary sewer, storm sewer and associated systems, utility sleeves, utility culverts, underground power and gas.  Prep streets and parking lots with gravel subbase and base courses.  Contractor to phase work so gravel access to each building is maintained at all times. Phase 6  Hold pre-pave walkthrough with city engineering, roads, water & sewer departments.  Complete curbing, paving and concrete flatwork for street and site improvements.  Continue vertical construction on buildings. Phase 7  Complete remaining site and street improvements such as signage, striping and street lighting.  Complete exterior building shells. Continue interior construction.  Hold Final Walkthrough with city engineering, roads, water & sewer departments. Submit infrastructure as-built & close-out package.  Open streets & turn over public utilities to City. Phase 8  Complete finish grading and landscaping around buildings, park, and open space areas.  Remove perimeter erosion control measures once adjacent landscaping is complete and site is stabilized.  Consolidate construction activity and staging areas to building parking lots.  Continue internal building construction.  Submit engineer and architects certification letters of completion of site improvements.  Turn over buildings for occupancy on individual basis as they are completed and the surrounding landscaping and site improvements associated with each building are completed. o Phase 8A  Receive Certificate of Occupancy for Building C.  Building C parking lot and adjacent open space areas are open.  All city streets are open.  Constructions activity and staging areas for Buildings A and B are limited to the parking lots of those buildings.  See sheet CC8A in the Concurrent Construction set for interim parking and open space calculations and phase boundaries. o Phase 8B  Receive Certificate of Occupancy for Building B.  Building C and B parking lots and adjacent open space areas are open.  All city streets are open.  Constructions activity and staging areas for Building A is limited to the parking lots of Building A.  See sheet CC8B in the Concurrent Construction set for interim parking and open space calculations and phase boundaries. o Phase 8C  Receive Certificate of Occupancy for Building A.  All buildings, parking lots, and landscape areas on site are now completed and open.  All city streets are open. XXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXOHPOHPOHPOHPOHPOHPOHPOHPOHPOHPOHPOHPOHPOHPOHPOHPOHPOHPT ELEC T OHPOHPOHPOHPOHPOHPOHPOHPOHPOHPOHPOHPOHPOHPOHPOHPOHPOHPOHPOHPOHPOHPOHPOHPOHPOHPOHPOHPOHPOHPOHP16''W16''W8''W 8''W 8''W 8''W 8''W 8''W 8''SS8''W8''W 8''W 8''W 8''W8''W8''W8''W8''W8''SSXXXXXX X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X XXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXX<><>SSGASGASGASGASGASUGPUGPUGPUGPUGPUGPGASGASCOMMCOMMCOMMCOMMUGPUGPUGP OHP OHP OHP OHP OHP OHP W VW VW V HYDW V W VW VW VW VW VHYDH YDHYD 15''SS15''SS15''SS15''SS15''SS15''SSUGPUGPUGPUGP UGP UGP UGPUGPUGPUGPUGPUGPUGPUGPUGPUGPUGPUGPUGPUGPUGPUGPUGPUGPUGPUGPUGPUGPUGP UGPUGPUGP UGP UGP UGP UGP UGP UGP UGP UGPUGPUGPSTSWR SWR SWR SWR SWR SWR SWR SWRSWRSWRSWRSWRSWRSWRSWRSWRSWR SWRSWRSWRSWR SWR SWR SWR SWR SWR COFOWLER LANEEDGERTON AVEGABRIEL AVEMEAH LANE S 31ST AVECC1 CONCURRENT CONSTRUCTION PHASE 1 24.115edinc Job #: 1535 liberty lane suite 110b missoula, montana 59808 phone: 406.540.4437 AN AFFORDABLE HOUSING DEVELOPMENT:ROCKY MOUNTAIN FLATSBOZEMAN, MONTANA749-01Alpine Job #:714 STONERIDGE DRIVE, STE 3BOZEMAN, MT 59718Phone: 406.586.5599CONCURRENT CONST. SET: 09/05/2025 REV. # 2 0 50'100' SCALE 1" = 50' N X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X XXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXINSTALL SWPPP BMP'S DEMO EX. SEPTIC SYSTEM DEMO EX. STRUCTURES & ASPHALT DRIVEWAYS INSTALL STABILIZED CONSTRUCTION ENTRANCES (EITHER MAINTAIN EX. ASPHALT APPROACHES OR DEMO AND INSTALL VEHICLE TRACK PADS UTILITY PROVIDER TO DISCONTINUE AND REMOVE EX. UTILITY SERVICE STUBS (GAS, POWER, COMMS) TO EX. RESIDENCES RE-ALIGN WESTERN DITCH ACROSS PROJECT FRONTAGE DIVERT EAST DITCH INTO CULVERT UNDER FOWLER LANE XXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXOHPOHPOHPOHPOHPOHPOHPOHPOHPOHPOHPOHPOHPOHPOHPOHPOHPOHPT OHPOHPOHPOHPOHPOHPOHPOHPOHPOHPOHPOHPOHPOHPOHPOHPOHPOHPOHPOHPOHPOHPOHPOHPOHPOHPOHPOHPOHPOHPOHP16''W16''W8''W 8''W 8''W 8''W 8''W 8''W 8''SS8''W8''W 8''W 8''W 8''W8''W8''W8''W8''W8''SSXXXXXX X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X XXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXX<><>SSW VW VW V HYDW V W VW VW VW VW VHYDH YDHYD 15''SS15''SS15''SS15''SS15''SS15''SSUGPUGPUGPUGP UGP UGP UGPUGPUGPUGPUGPUGPUGPUGPUGPUGPUGPUGPUGPUGPUGPUGPUGPUGPUGPUGPUGPUGPUGP UGPUGPUGP UGP UGP UGP UGP UGP UGP UGP UGPUGPUGPSTFOWLER LANEEDGERTON AVEGABRIEL AVEMEAH LANE S 31ST AVECC2 CONCURRENT CONSTRUCTION PHASE 2 24.115edinc Job #: 1535 liberty lane suite 110b missoula, montana 59808 phone: 406.540.4437 AN AFFORDABLE HOUSING DEVELOPMENT:ROCKY MOUNTAIN FLATSBOZEMAN, MONTANA749-01Alpine Job #:714 STONERIDGE DRIVE, STE 3BOZEMAN, MT 59718Phone: 406.586.5599CONCURRENT CONST. SET: 09/05/2025 REV. # 2 0 50'100' SCALE 1" = 50' N 8''W16''W16''W16''W16''WW VW V15''SS15''SS15''SS15''SS15''SSXX X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X XXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXSOIL STOCKPILE AREA SS GASGASGASGASGASBUILDING B BUILDING C CIVIL CONTRACTOR STAGING AREA (LOCATION SUBJECT TO CHANGE) STRIP ROAD SECTIONS AND PREP TO GRAVEL SURFACE FOR CONSTRUCTION & EMERGENCY ACCESS STABILIZED CONSTRUCTION ENTRANCES AT ALL STREET CONNECTIONS. CONSTRUCTION TRAFFIC TO PROJECT SITE TO COME FROM FOWLER LANE. SECONDARY ENTRANCES TO EDGERTON, GABRIEL, AND MEAH LANE ARE FOR EMERGENCY ACCESS ONLY GRADE STORM PONDS FOR STORMWATER RETENTION DURING CONSTRUCTION GRADE TEMPORARY GRAVEL ENTRANCE FROM FOWLER CONSTRUCTION ENTRANCES TO ALLOW FOR MAINTAINED ACCESS FROM FOWLER LANE DURING UTILITY WORK DEMO FOWLER ASPHALT IN FRONT OF PROPERTY, FILL EASTERN FOWLER DITCHES ACROSS PROPERTY AND INSTALL WATER & SEWER UTILITIES IN FOWLER LANE. RESTORE FOWLER LANE TO A COUNTY GRAVEL STANDARD AND MAINTAIN UNTIL PAVING OCCURS. CONTRACTOR TO PHASE FOWLER UTILITY WORK IN THIS SCOPE SO THAT ACCESS TO THE SITE FROM FOWLER LANE FOR CONSTRUCTION AND EMERGENCY VEHICLES IS MAINTAINED AT ALL TIMES BEGIN EXCAVATION AND FOUNDATION WORK FOR BUILDINGS B AND C. NO VERTICAL CONSTRUCTION TO BEGIN UNTIL INTERNAL WATER MAINS AND HYDRANTS ARE CONSTRUCTED AND OPERABLE STRIP TOPSOIL FROM FUTURE PARKING AREA AND USE STABILIZED GRAVEL PAD FOR STAGING, PARKING, MATERIAL STORAGE STRIP TOPSOIL FROM FUTURE PARKING AREA AND USE STABILIZED GRAVEL PAD FOR STAGING, PARKING, MATERIAL STORAGE MAINTAIN ACCESS TO EX. HYDRANTS CONSTRUCTION ENTRANCE MAINTAIN ACCESS TO EX. HYDRANTS MAINTAIN ACCESS TO EX. HYDRANTS REV 2 REV 2 REV 2 XXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXOHPOHPOHPOHPOHPOHPOHPOHPOHPOHPOHPOHPOHPOHPOHPOHPOHPOHPT OHPOHPOHPOHPOHPOHPOHPOHPOHPOHPOHPOHPOHPOHPOHPOHPOHPOHPOHPOHPOHPOHPOHPOHPOHPOHPOHPOHPOHPOHPOHP16''W16''W8''W 8''W 8''W 8''W 8''W 8''W 8''SS8''W8''W 8''W 8''W 8''W8''W8''W8''W8''W8''SSXXXXXX X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X XXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXX<><>SSW VW VW V HYDW V W VW VW VW VW VHYDH YDHYD 15''SS15''SS15''SS15''SS15''SS15''SSUGPUGPUGPUGP UGP UGP UGPUGPUGPUGPUGPUGPUGPUGPUGPUGPUGPUGPUGPUGPUGPUGPUGPUGPUGPUGPUGPUGPUGP UGPUGPUGP UGP UGP UGP UGP UGP UGP UGP UGPUGPUGPSTFOWLER LANEEDGERTON AVEGABRIEL AVEMEAH LANE S 31ST AVEW V W VW V W V HY DHYD HY DW VW V W VW V8''W 8''W 8''W 8''W 8''W 8''W 8''W 8''W 8''W 8''W 8''W 8''W 8''W 8''W 8''W 8''W 8''W 8''W CC3 CONCURRENT CONSTRUCTION PHASE 3 24.115edinc Job #: 1535 liberty lane suite 110b missoula, montana 59808 phone: 406.540.4437 AN AFFORDABLE HOUSING DEVELOPMENT:ROCKY MOUNTAIN FLATSBOZEMAN, MONTANA749-01Alpine Job #:714 STONERIDGE DRIVE, STE 3BOZEMAN, MT 59718Phone: 406.586.5599CONCURRENT CONST. SET: 09/05/2025 REV. # 2 0 50'100' SCALE 1" = 50' N16''W16''W16''W16''WW V15''SS15''SS15''SS15''SS15''SS8''W W V CIVIL CONTRACTOR STAGING AREA (LOCATION SUBJECT TO CHANGE)8''WXX X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X XXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXSOIL STOCKPILE AREA W V SSW VW V W V W V W VW VW V W V W V W V GASGASGASGASGASBUILDING B BUILDING CBUILDING A INSTALL WATER IN MEAH LANE. CONTRACTOR TO PHASE MEAH LANE UTILITY WORK SO THAT GRAVEL ACCESS TO EACH BUILDING FOR CONSTRUCTION AND EMERGENCY VEHICLES IS MAINTAINED AT ALL TIMES STRIP TOPSOIL FROM FUTURE PARKING AREA AND USE STABILIZED GRAVEL PAD FOR STAGING, PARKING, MATERIAL STORAGE BEGIN EXCAVATION AND FOUNDATION WORK FOR BUILDING A. NO VERTICAL CONSTRUCTION TO BEGIN UNTIL INTERNAL WATER MAINS AND HYDRANTS ARE CONSTRUCTED AND OPERABLE W VW VCONSTRUCTION ENTRANCE EMERGENCY ACCESS ENTRANCE EMERGENCY ACCESS ENTRANCE EMERGENCY ACCESS ENTRANCE CONTINUE FOUNDATION WORK FOR BUILDINGS B AND C. NO VERTICAL CONSTRUCTION TO BEGIN UNTIL INTERNAL WATER MAINS AND HYDRANTS ARE CONSTRUCTED AND OPERABLE MAINTAIN ACCESS TO EX. HYDRANTS MAINTAIN ACCESS TO EX. HYDRANTS MAINTAIN ACCESS TO EX. HYDRANTS REV 2 REV 2 REV 2 XXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXOHPOHPOHPOHPOHPOHPOHPOHPOHPOHPOHPOHPOHPOHPOHPOHPOHPOHPT OHPOHPOHPOHPOHPOHPOHPOHPOHPOHPOHPOHPOHPOHPOHPOHPOHPOHPOHPOHPOHPOHPOHPOHPOHPOHPOHPOHPOHPOHPOHP16''W16''W8''W 8''W 8''W 8''W 8''W 8''W 8''SS8''W8''W 8''W 8''W 8''W8''W8''W8''W8''W8''SSXXXXXX X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X XXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXX<><>SSW VW VW V HYDW V W VW VW VW VW VHYDH YDHYD 15''SS15''SS15''SS15''SS15''SS15''SSUGPUGPUGPUGP UGP UGP UGPUGPUGPUGPUGPUGPUGPUGPUGPUGPUGPUGPUGPUGPUGPUGPUGPUGPUGPUGPUGPUGPUGP UGPUGPUGP UGP UGP UGP UGP UGP UGP UGP UGPUGPUGPSTFOWLER LANEEDGERTON AVEGABRIEL AVEMEAH LANE S 31ST AVE8''W8''W8''W8''W8''W8''W8''W8''WW VW V W VHYDW VSS W V W V W V W V HY D8''WCC4 CONCURRENT CONSTRUCTION PHASE 4 24.115edinc Job #: 1535 liberty lane suite 110b missoula, montana 59808 phone: 406.540.4437 AN AFFORDABLE HOUSING DEVELOPMENT:ROCKY MOUNTAIN FLATSBOZEMAN, MONTANA749-01Alpine Job #:714 STONERIDGE DRIVE, STE 3BOZEMAN, MT 59718Phone: 406.586.5599CONCURRENT CONST. SET: 09/05/2025 REV. # 2 0 50'100' SCALE 1" = 50' N16''W16''W16''W16''WW V15''SS15''SS15''SS15''SS15''SS8''W W VX X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X XXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXHYD HY DW V W V W VW VHY DW V W V W V W V 8''W 8''W 8''W 8''W 8''W 8''W 8''W 8''W 8''W 8''W 8''W 8''W 8''W 8''W 8''W 8''W 8''W 8''W SOIL STOCKPILE AREA CIVIL CONTRACTOR STAGING AREA (LOCATION SUBJECT TO CHANGE)GASGASGASGASGASBUILDING B BUILDING CBUILDING A MAINTAIN GRAVEL ACCESS TO EACH BUILDING FROM MEAH LANE FOR CONSTRUCTION AND EMERGENCY VEHICLES AT ALL TIMES CONTINUE FOUNDATION WORK FOR BUILDING A. NO VERTICAL CONSTRUCTION TO BEGIN UNTIL INTERNAL WATER MAINS AND HYDRANTS ARE CONSTRUCTED AND OPERABLE CONSTRUCTION ENTRANCE EMERGENCY ACCESS ENTRANCE CONTINUE FOUNDATION WORK FOR BUILDINGS B AND C. NO VERTICAL CONSTRUCTION TO BEGIN UNTIL INTERNAL WATER MAINS AND HYDRANTS ARE CONSTRUCTED AND OPERABLE INSTALL WATER MAIN & SERVICES IN EDGERTON RIGHT-OF-WAY INSTALL WATER MAIN & SERVICES IN GABRIEL RIGHT-OF-WAY CHARGE AND COMPLETE TESTING ON ALL WATER MAIN, SERVICES, AND HYDRANTS. HOLD WALK THROUGH WITH CITY WATER DEPT AND TURN ON MAIN FOR EMERGENCY USE DURING CONSTRUCTION. MAINTAIN ACCESS TO EX. HYDRANTS MAINTAIN ACCESS TO EX. HYDRANTS MAINTAIN ACCESS TO EX. HYDRANTS REV 2 REV 2 REV 2 XXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXOHPOHPOHPOHPOHPOHPOHPOHPOHPOHPOHPOHPOHPOHPOHPOHPOHPOHPT OHPOHPOHPOHPOHPOHPOHPOHPOHPOHPOHPOHPOHPOHPOHPOHPOHPOHPOHPOHPOHPOHPOHPOHPOHPOHPOHPOHPOHPOHPOHP16''W16''W8''W 8''W 8''W 8''W 8''W 8''W 8''SS8''W8''W 8''W 8''W 8''W8''W8''W8''W8''W8''SSXXXXXX X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X XXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXX<><>SSW VW VW V HYDW V W VW VW VW VW VHYDH YDHYD 15''SS15''SS15''SS15''SS15''SS15''SSUGPUGPUGPUGP UGP UGP UGPUGPUGPUGPUGPUGPUGPUGPUGPUGPUGPUGPUGPUGPUGPUGPUGPUGPUGPUGPUGPUGPUGP UGPUGPUGP UGP UGP UGP UGP UGP UGP UGP UGPUGPUGPSTFOWLER LANEEDGERTON AVEGABRIEL AVEMEAH LANE S 31ST AVE8''SS8''SS8''SS8''SS8''SS8''W8''W8''W8''W8''W8''W8''W8''W8''W8''SS8''SS8''SS8''SS8''SSW VSSHYDW VSS SS ST ST STSTST S T STST ST STSTSTW V W V W V W V HY D8''WCC5 CONCURRENT CONSTRUCTION PHASE 5 24.115edinc Job #: 1535 liberty lane suite 110b missoula, montana 59808 phone: 406.540.4437 AN AFFORDABLE HOUSING DEVELOPMENT:ROCKY MOUNTAIN FLATSBOZEMAN, MONTANA749-01Alpine Job #:714 STONERIDGE DRIVE, STE 3BOZEMAN, MT 59718Phone: 406.586.5599CONCURRENT CONST. SET: 09/05/2025 REV. # 2 0 50'100' SCALE 1" = 50' N ST 16''W16''W16''W16''WW V15''SS15''SS15''SS15''SS15''SSSTSTSTSTSTST8''W W VX X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X XXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXHYD HY DW V W V W VW VHY DW V W V W V W V 8''W 8''W 8''W 8''W 8''W 8''W 8''W 8''W 8''W 8''W 8''W 8''W 8''W 8''W 8''W 8''W 8''W 8''W SOIL STOCKPILE AREA CIVIL CONTRACTOR STAGING AREA (LOCATION SUBJECT TO CHANGE)W VW V SS SS STST STST ST ELECELECELECELECGASGASGASGASELECELECELEC GASGASGASGASGASGASGASGASGASGASGASBUILDING B BUILDING CBUILDING A ONCE ON-SITE WATER MAIN IS OPERATIONAL, VERTICAL CONSTRUCTION CAN BEGIN ON ALL BUILDINGS. INSTALL REMAINING UTILITIES NECESSARY TO BEGIN PREPPING STREETS AND PARKING LOTS WITH GRAVEL FOR CURB AND GUTTER (SANITARY SEWER, STORM SEWER, STORM SYSTEMS, UTILITY SLEEVES AND CULVERTS, UNDERGROUND ELECTRIC AND GAS, ETC.) MAINTAIN GRAVEL ACCESS TO EACH BUILDING FROM MEAH LANE FOR CONSTRUCTION AND EMERGENCY VEHICLES AT ALL TIMES CONSTRUCTION ENTRANCE EMERGENCY ACCESS ENTRANCE EMERGENCY ACCESS ENTRANCE EMERGENCY ACCESS ENTRANCE PREP STREETS AND PARKING LOTS WITH GRAVEL BASE COURSES MAINTAIN ACCESS TO EX. HYDRANTS MAINTAIN ACCESS TO EX. HYDRANTS MAINTAIN ACCESS TO EX. HYDRANTS OPERABLE HYDRANTS FOR INTERIM FIRE PROTECTION DURING CONSTRUCTION (TYP.) OPERABLE HYDRANTS FOR INTERIM FIRE PROTECTION DURING CONSTRUCTION (TYP.) OPERABLE HYDRANTS FOR INTERIM FIRE PROTECTION DURING CONSTRUCTION (TYP.) GRADE IN GRAVEL FIRE LANES FOR EMERGENCY ACCESS DURING VERTICAL CONSTRUCTION GRADE IN GRAVEL FIRE LANES FOR EMERGENCY ACCESS DURING VERTICAL CONSTRUCTIONREV 2 REV 2 REV 2 REV 2 REV 2 REV 2 STSTSTSTSTST8''SS8''SS8''SS8''SS8''SS8''W8''W8''W8''W8''W8''W8''W 8''W 8''W 8''W 8''W 8''W 8''W 8''W 8''W 8''W 8''W 8''W 8''W 8''W 8''W 8''W 8''W 8''W 8''W 8''W8''W8''W8''W8''W16''W16''W16''W16''W8''SS8''SS8''SS8''SS8''SSW V W V W VW V W VW VW V W V SS SS W V HY DHYD HYDHY DW VW VW V SS SS SS ST ST STSTST STS T ST ST STSTSTW V W V W V W V W VW V ST 15''SS15''SS15''SS15''SS15''SSWBO HYDGASGASGASGASGASGASOSW W V WBOWBO WBO WBO WBO WBO W VW VWBO WBO XXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXOHPOHPOHPOHPOHPOHPOHPOHPOHPOHPOHPOHPOHPOHPOHPOHPOHPOHPT OHPOHPOHPOHPOHPOHPOHPOHPOHPOHPOHPOHPOHPOHPOHPOHPOHPOHPOHPOHPOHPOHPOHPOHPOHPOHPOHPOHPOHPOHPOHP16''W16''W8''W 8''W 8''W 8''W 8''W 8''W 8''SS8''W8''W 8''W 8''W 8''W8''W8''W8''W8''W8''SSXXXXXX X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X XXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXX<><>SSW VW VW V HYDW V W VW VW VW VW VHYDH YDHYD 15''SS15''SS15''SS15''SS15''SS15''SSUGPUGPUGPUGP UGP UGP UGPUGPUGPUGPUGPUGPUGPUGPUGPUGPUGPUGPUGPUGPUGPUGPUGPUGPUGPUGPUGPUGPUGP UGPUGPUGP UGP UGP UGP UGP UGP UGP UGP UGPUGPUGPSTCO STSTSTSTCO CO ST DSDSDS DS DS DS DS DS DS DS DS DS DS DS DSDSDS DS DS DS DS DS DS DS DS DS DS DS DS DS DS DS DS DS ST ST ST ST ST ST ST ST ST ST STSTFOWLER LANEEDGERTON AVEGABRIEL AVEMEAH LANE S 31ST AVE8''SS8''SS8''SS8''SS8''SS8''W8''W8''W8''W8''W8''W8''W8''W8''W8''SS8''SS8''SS8''SS8''SSW VSSHYDW VSS SS ST W V W V W V W V HYD8''WCC6 CONCURRENT CONSTRUCTION PHASE 6 24.115edinc Job #: 1535 liberty lane suite 110b missoula, montana 59808 phone: 406.540.4437 AN AFFORDABLE HOUSING DEVELOPMENT:ROCKY MOUNTAIN FLATSBOZEMAN, MONTANA749-01Alpine Job #:714 STONERIDGE DRIVE, STE 3BOZEMAN, MT 59718Phone: 406.586.5599CONCURRENT CONST. SET: 09/05/2025 REV. # 2 0 50'100' SCALE 1" = 50' N ST 16''W16''W16''W16''WW V15''SS15''SS15''SS15''SS15''SS8''W W V HYD HY D W V W V W VW VHY DW V W V W V W V 8''W 8''W 8''W 8''W 8''W 8''W 8''W 8''W 8''W 8''W 8''W 8''W 8''W 8''W 8''W 8''W 8''W 8''W SOIL STOCKPILE AREA CIVIL CONTRACTOR STAGING AREA (LOCATION SUBJECT TO CHANGE)W VW V SS SS ELECELECELECELECGASGASGASGASELECELECELEC X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X XXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXGASGASGASGASGASGASBUILDING B BUILDING CBUILDING A COMPLETE CURB, PAVING, AND CONCRETE FLATWORK FOR STREET AND SITE IMPROVEMENTS. PHASE PAVING AND CONCRETE WORK SO EMERGENCY ACCESS TO EACH BUILDING CAN BE MAINTAINED AT ALL TIMES CONTINUE VERTICAL CONSTRUCTION ON ALL BUILDINGS. CONSTRUCTION ENTRANCE EMERGENCY ACCESS ENTRANCE EMERGENCY ACCESS ENTRANCE EMERGENCY ACCESS ENTRANCE OPERABLE HYDRANTS FOR INTERIM FIRE PROTECTION DURING CONSTRUCTION (TYP.) OPERABLE HYDRANTS FOR INTERIM FIRE PROTECTION DURING CONSTRUCTION (TYP.) OPERABLE HYDRANTS FOR INTERIM FIRE PROTECTION DURING CONSTRUCTION (TYP.) COMPLETE FIRE LANES COMPLETE FIRE LANES MAINTAIN ACCESS TO EX. HYDRANTS MAINTAIN ACCESS TO EX. HYDRANTS MAINTAIN ACCESS TO EX. HYDRANTS REV 2 REV 2 REV 2 REV 2 REV 2 REV 2 STSTSTSTSTSTELECELEC ELEC ELEC ELEC ELEC ELEC ELEC ELEC ELEC ELEC ELEC ELEC ELEC ELEC ELEC ELEC ELEC ELEC ELEC 8''SS8''SS8''SS8''SS8''SS8''SS8''SS8''SS8''SS8''SSW V W V W VW V W VW VW V W V SS SS W V HY DHYD HYDHY DW VW VW V SS SS SS ST ST STSTST STS T ST ST STSTSTW V W V W V W V W VW V ST 15''SS15''SS15''SS15''SS15''SSWBO HYDGASGASGASGASGASGASOSW W V WBOWBO WBO WBO WBO WBO W VW V ELEC WBO WBO XXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXOHPOHPOHPOHPOHPOHPOHPOHPOHPOHPOHPOHPOHPOHPOHPOHPOHPOHPT OHPOHPOHPOHPOHPOHPOHPOHPOHPOHPOHPOHPOHPOHPOHPOHPOHPOHPOHPOHPOHPOHPOHPOHPOHPOHPOHPOHPOHPOHPOHP16''W16''W8''W 8''W 8''W 8''W 8''W 8''W 8''SS8''W8''W 8''W 8''W 8''W8''W8''W8''W8''W8''SSXXXXXX X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X XXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXX<><>SSW VW VW V HYDW V W VW VW VW VW VHYDH YDHYD 15''SS15''SS15''SS15''SS15''SS15''SSUGPUGPUGPUGP UGP UGP UGPUGPUGPUGPUGPUGPUGPUGPUGPUGPUGPUGPUGPUGPUGPUGPUGPUGPUGPUGPUGPUGPUGP UGPUGPUGP UGP UGP UGP UGP UGP UGP UGP UGPUGPUGPSTELECELECELECELECGASGASGASGASELECELECCO ELEC STSTSTSTCO CO ST DSDSDS DS DS DS DS DS DS DS DS DS DS DS DSDSDS DS DS DS DS DS DS DS DS DS DS DS DS DS DS DS DS DS ST ST ST ST ST ST ST ST ST ST STSTFOWLER LANEEDGERTON AVEGABRIEL AVEMEAH LANE S 31ST AVE8''SS8''SS8''SS8''SS8''SS8''W8''W8''W8''W8''W8''W8''W8''W8''W8''SS8''SS8''SS8''SS8''SSW VSSHYDSSSS ST W V W V W V W V HYD8''WCC7 CONCURRENT CONSTRUCTION PHASE 7 24.115edinc Job #: 1535 liberty lane suite 110b missoula, montana 59808 phone: 406.540.4437 AN AFFORDABLE HOUSING DEVELOPMENT:ROCKY MOUNTAIN FLATSBOZEMAN, MONTANA749-01Alpine Job #:714 STONERIDGE DRIVE, STE 3BOZEMAN, MT 59718Phone: 406.586.5599CONCURRENT CONST. SET: 09/05/2025 REV. # 2 0 50'100' SCALE 1" = 50' N ST 16''W16''W16''W16''WW V15''SS15''SS15''SS15''SS15''SS8''W W V X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X XXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXHYD HY DW V W V W VW VHY DW V W V W V W V 8''W 8''W 8''W 8''W 8''W 8''W 8''W 8''W 8''W 8''W 8''W 8''W 8''W 8''W 8''W 8''W 8''W 8''W W VW V SS SS ST ELECELECELECELECGASGASGASGASELECELECELECGAS GASGASGASGASGASBUILDING B BUILDING CBUILDING A CONTINUE VERTICAL CONSTRUCTION ON ALL BUILDINGS. CONSTRUCTION ENTRANCE EMERGENCY ACCESS ENTRANCE EMERGENCY ACCESS ENTRANCE COMPLETE SIGNAGE, STRIPING, AND LIGHTING IMPROVEMENTS FOR STREET AND SITE IMPROVEMENTS. SOIL STOCKPILE AREA EMERGENCY ACCESS ENTRANCE OPERABLE HYDRANTS FOR INTERIM FIRE PROTECTION DURING CONSTRUCTION (TYP.) OPERABLE HYDRANTS FOR INTERIM FIRE PROTECTION DURING CONSTRUCTION (TYP.) OPERABLE HYDRANTS FOR INTERIM FIRE PROTECTION DURING CONSTRUCTION (TYP.) MAINTAIN ACCESS TO EX. HYDRANTS MAINTAIN ACCESS TO EX. HYDRANTS MAINTAIN ACCESS TO EX. HYDRANTS REV 2 REV 2 REV 2 REV 2 REV 2 REV 2 STSTSTSTSTSTELECELEC ELEC ELEC ELEC ELEC ELEC ELEC ELEC ELEC ELEC ELEC ELEC ELEC ELEC ELEC ELEC ELEC ELEC ELEC 8''SS8''SS8''SS8''SS8''SS8''W8''W8''W8''W8''W8''W8''W 8''W 8''W 8''W 8''W 8''W 8''W 8''W 8''W 8''W 8''W 8''W 8''W 8''W 8''W 8''W 8''W 8''W 8''W 8''W8''W8''W8''W8''W16''W16''W16''W16''W8''SS8''SS8''SS8''SS8''SSW V W V W VW V W VW VW V W V SS SS W V HY DHYD HYDHY DW VW VW V SS SS SS ST ST STSTST STS T ST ST STSTSTW V W V W V W V W VW V ST 15''SS15''SS15''SS15''SS15''SSWBO HYDGASGASGASGASGASGASOSW W V WBOWBO WBO WBO WBO WBO W VW V ELEC WBO WBO XXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXOHPOHPOHPOHPOHPOHPOHPOHPOHPOHPOHPOHPOHPOHPOHPOHPOHPOHPT OHPOHPOHPOHPOHPOHPOHPOHPOHPOHPOHPOHPOHPOHPOHPOHPOHPOHPOHPOHPOHPOHPOHPOHPOHPOHPOHPOHPOHPOHPOHP16''W16''W8''W 8''W 8''W 8''W 8''W 8''W 8''SS8''W8''W 8''W 8''W 8''W8''W8''W8''W8''W8''SSXXXXXX X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X XXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXX<><>SSW VW VW V HYDW V W VW VW VW VW VHYDH YDHYD 15''SS15''SS15''SS15''SS15''SS15''SSUGPUGPUGPUGP UGP UGP UGPUGPUGPUGPUGPUGPUGPUGPUGPUGPUGPUGPUGPUGPUGPUGPUGPUGPUGPUGPUGPUGPUGP UGPUGPUGP UGP UGP UGP UGP UGP UGP UGP UGPUGPUGPSTELECELECELECELECGASGASGASGASELECELECCO ELEC STSTSTSTCO CO ST DSDSDS DS DS DS DS DS DS DS DS DS DS DS DSDSDS DS DS DS DS DS DS DS DS DS DS DS DS DS DS DS DS DS ST ST ST ST ST ST ST ST ST ST STSTFOWLER LANEEDGERTON AVEGABRIEL AVEMEAH LANE S 31ST AVE8''SS8''SS8''SS8''SS8''SS8''W8''W8''W8''W8''SS8''SS8''SS8''SS8''SSSS SS SS ST W V W V W V W V 8''WCC8 CONCURRENT CONSTRUCTION PHASE 8 24.115edinc Job #: 1535 liberty lane suite 110b missoula, montana 59808 phone: 406.540.4437 AN AFFORDABLE HOUSING DEVELOPMENT:ROCKY MOUNTAIN FLATSBOZEMAN, MONTANA749-01Alpine Job #:714 STONERIDGE DRIVE, STE 3BOZEMAN, MT 59718Phone: 406.586.5599CONCURRENT CONST. SET: 09/05/2025 REV. # 2 0 50'100' SCALE 1" = 50' N ST 16''W16''W16''W16''WW V15''SS15''SS15''SS15''SS15''SS8''W W V X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X XXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXHYD W V W V W VW VW V W V W V W V 8''W 8''W 8''W 8''W 8''W 8''W 8''W 8''W 8''W 8''W 8''W 8''W 8''W 8''W 8''W 8''W 8''W 8''W W V SS SS ELECELECELECELECGASGASGASGASELECELECELECGAS GASGASGASGASGASBUILDING B BUILDING CBUILDING A COMPLETE LANDSCAPING AROUND BUILDINGS AND IN OPEN SPACE AND PARK AREAS COMPLETE FINAL WALKTHROUGH. SUBMIT AS-BUILTS & INFRASTRUCTURE CLOSE-OUT PACKAGE. OPEN STREETS LIMIT CONSTRUCTION STAGING AREAS TO BUILDING PARKING LOTS WHILE BUILDINGS ARE COMPLETED REMOVE PERIMETER EROSION CONTROL MEASURES ONCE ADJACENT LANDSCAPING IS STABILIZED. CONTINUE INTERNAL CONSTRUCTION (FINISH WORK) ON BUILDINGS. APPLY FOR OCCUPANCY ON INDIVIDUAL BUILDINGS AS THEY ARE COMPLETED AND THE SURROUNDING LANDSCAPING AND SITE IMPROVEMENTS ARE COMPLETED REV 2 STSTSTSTSTSTELECELEC ELEC ELEC ELEC ELEC ELEC ELEC ELEC ELEC ELEC ELEC ELEC ELEC ELEC ELEC ELEC ELEC ELEC ELEC 8''SS8''SS8''SS8''SS8''SS8''W8''W8''W8''W8''W8''W8''W 8''W 8''W 8''W 8''W 8''W 8''W 8''W 8''W 8''W 8''W 8''W 8''W 8''W 8''W 8''W 8''W 8''W 8''W 8''W8''W8''W8''W8''W16''W16''W16''W16''W8''SS8''SS8''SS8''SS8''SSW V W V W VW V W VW VW V W V SS SS W V HY DHYD HYDHY DW VW VW V SS SS SS ST ST STSTST STS T ST ST STSTSTW V W V W V W V W VW V ST 15''SS15''SS15''SS15''SS15''SSWBO HYDGASGASGASGASGASGASOSW W V WBOWBO WBO WBO WBO WBO W VW V ELEC WBO WBO XXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXOHPOHPOHPOHPOHPOHPOHPOHPOHPOHPOHPOHPOHPOHPOHPOHPOHPOHPT OHPOHPOHPOHPOHPOHPOHPOHPOHPOHPOHPOHPOHPOHPOHPOHPOHPOHPOHPOHPOHPOHPOHPOHPOHPOHPOHPOHPOHPOHPOHP16''W16''W8''W 8''W 8''W 8''W 8''W 8''W 8''SS8''W8''W 8''W 8''W 8''W8''W8''W8''W8''W8''SSXXXXXX X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X XXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXX<><>SSW VW VW V HYDW V W VW VW VW VW VHYDH YDHYD 15''SS15''SS15''SS15''SS15''SS15''SSUGPUGPUGPUGP UGP UGP UGPUGPUGPUGPUGPUGPUGPUGPUGPUGPUGPUGPUGPUGPUGPUGPUGPUGPUGPUGPUGPUGPUGP UGPUGPUGP UGP UGP UGP UGP UGP UGP UGP UGPUGPUGPSTELECELECELECELECGASGASGASGASELECELECCO ELEC STSTSTSTCO CO ST DSDSDS DS DS DS DS DS DS DS DS DS DS DS DSDSDS DS DS DS DS DS DS DS DS DS DS DS DS DS DS DS DS DS ST ST ST ST ST ST ST ST ST ST STSTFOWLER LANEEDGERTON AVEGABRIEL AVEMEAH LANE S 31ST AVE8''SS8''SS8''SS8''SS8''SS8''W8''W8''W8''W8''SS8''SS8''SS8''SS8''SSSS SS SS ST W V W V W V W V 8''WCC8A CONCURRENT CONSTRUCTION PHASE 8A 24.115edinc Job #: 1535 liberty lane suite 110b missoula, montana 59808 phone: 406.540.4437 AN AFFORDABLE HOUSING DEVELOPMENT:ROCKY MOUNTAIN FLATSBOZEMAN, MONTANA749-01Alpine Job #:714 STONERIDGE DRIVE, STE 3BOZEMAN, MT 59718Phone: 406.586.5599CONCURRENT CONST. SET: 09/05/2025 REV. # 2 0 50'100' SCALE 1" = 50' N ST 16''W16''W16''W16''WW V15''SS15''SS15''SS15''SS15''SS8''W W V HYD W V W V W VW VW V W V W V W V 8''W 8''W 8''W 8''W 8''W 8''W 8''W 8''W 8''W 8''W 8''W 8''W 8''W 8''W 8''W 8''W 8''W 8''W W V SS SS ELECELECELECELECGASGASGASGASELECELECELECGAS GASGASGASGASGASBUILDING B BUILDING C (OCCUPIED)BUILDING A CONTINUE INTERNAL CONSTRUCTION (FINISH WORK) ON BUILDINGS A & B. LIMIT CONSTRUCTION STAGING AREAS TO BUILDING PARKING LOTS WHILE BUILDINGS ARE COMPLETED 56 SPACES (6 ADA, 26 COMPACT) 52 BIKE PARKING ALL STREET PARKING AVAILABLE FENCED STAGING AREA FOR FINISH WORK ON BUILDING B PHASED OCCUPANCY REQUIREMENTS BUILDINGS W/ OCCUPANCY: BUILDING C (111 UNITS) PARKING REQUIRED PARKING: 111 UNITS x 0.75 SPACES / UNIT = 84 SPACES PROVIDED PARKING: 56 ON-SITE (6 ADA, 26 COMPACT) 47 STREET SPACES 103 TOTAL OPEN SPACE REQUIRED: 100 SF / 1 BR UNIT x (7) 1 BR UNITS = 700 SF 150 SF / 2+ BR UNIT x (104) 2+ BR UNITS = 15,600 SF TOTAL = 16,300 SF PROVIDED: AREA 4 OPEN SPACE = 3,968 SF AREA 5 OPEN SPACE = 7,243 SF AREA 6 OPEN SPACE = 10,062 SF PRIVATE PATIOS / DECKS = 76 SF x 111 = 8,436 SF TOTAL = 29,709 SF OPEN SPACE 6 COMPLETE: 10,062 SF FENCED STAGING AREA FOR FINISH WORK ON BUILDING A OPEN SPACE 4 COMPLETE: 3,968 SF OPEN SPACE 5 COMPLETE: 7,243 SF ALL RIGHT-OF-WAY IMPROVEMENTS COMPLETE AND OPEN PHASE 8A PHASE 8A PHASE 8APHASE 8APHASE 8A PHASE 8A PHASE 8A PHASE 8ALIMIT OF AREAS THAT ARE OPEN TO THE PUBLIC IN PHASE 8A STSTSTSTSTSTELECELEC ELEC ELEC ELEC ELEC ELEC ELEC ELEC ELEC ELEC ELEC ELEC ELEC ELEC ELEC ELEC ELEC ELEC ELEC 8''SS8''SS8''SS8''SS8''SS8''W8''W8''W8''W8''W8''W8''W 8''W 8''W 8''W 8''W 8''W 8''W 8''W 8''W 8''W 8''W 8''W 8''W 8''W 8''W 8''W 8''W 8''W 8''W 8''W8''W8''W8''W8''W16''W16''W16''W16''W8''SS8''SS8''SS8''SS8''SSW V W V W VW V W VW VW V W V SS SS W V HY DHYD HYDHY DW VW VW V SS SS SS ST ST STSTST STS T ST ST STSTSTW V W V W V W V W VW V ST 15''SS15''SS15''SS15''SS15''SSWBO HYDGASGASGASGASGASGASOSW W V WBOWBO WBO WBO WBO WBO W VW V ELEC WBO WBO XXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXOHPOHPOHPOHPOHPOHPOHPOHPOHPOHPOHPOHPOHPOHPOHPOHPOHPOHPT OHPOHPOHPOHPOHPOHPOHPOHPOHPOHPOHPOHPOHPOHPOHPOHPOHPOHPOHPOHPOHPOHPOHPOHPOHPOHPOHPOHPOHPOHPOHP16''W16''W8''W 8''W 8''W 8''W 8''W 8''W 8''SS8''W8''W 8''W 8''W 8''W8''W8''W8''W8''W8''SSXXXXXX X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X XXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXX<><>SSW VW VW V HYDW V W VW VW VW VW VHYDH YDHYD 15''SS15''SS15''SS15''SS15''SS15''SSUGPUGPUGPUGP UGP UGP UGPUGPUGPUGPUGPUGPUGPUGPUGPUGPUGPUGPUGPUGPUGPUGPUGPUGPUGPUGPUGPUGPUGP UGPUGPUGP UGP UGP UGP UGP UGP UGP UGP UGPUGPUGPSTELECELECELECELECGASGASGASGASELECELECCO ELEC STSTSTSTCO CO ST DSDSDS DS DS DS DS DS DS DS DS DS DS DS DSDSDS DS DS DS DS DS DS DS DS DS DS DS DS DS DS DS DS DS ST ST ST ST ST ST ST ST ST ST STSTFOWLER LANEEDGERTON AVEGABRIEL AVEMEAH LANE S 31ST AVE8''SS8''SS8''SS8''SS8''SS8''W8''W8''W8''W8''SS8''SS8''SS8''SS8''SSSS SS SS ST W V W V W V W V 8''WCC8B CONCURRENT CONSTRUCTION PHASE 8B 24.115edinc Job #: 1535 liberty lane suite 110b missoula, montana 59808 phone: 406.540.4437 AN AFFORDABLE HOUSING DEVELOPMENT:ROCKY MOUNTAIN FLATSBOZEMAN, MONTANA749-01Alpine Job #:714 STONERIDGE DRIVE, STE 3BOZEMAN, MT 59718Phone: 406.586.5599CONCURRENT CONST. SET: 09/05/2025 REV. # 2 0 50'100' SCALE 1" = 50' N ST 16''W16''W16''W16''WW V15''SS15''SS15''SS15''SS15''SS8''W W V HYD W V W V W VW VW V W V W V W V 8''W 8''W 8''W 8''W 8''W 8''W 8''W 8''W 8''W 8''W 8''W 8''W 8''W 8''W 8''W 8''W 8''W 8''W W V SS SS ELECELECELECELECGASGASGASGASELECELECELECGAS GASGASGASGASGASBUILDING B (OCCUPIED) BUILDING C (OCCUPIED)BUILDING A CONTINUE INTERNAL CONSTRUCTION (FINISH WORK) ON BUILDING A. ALL STREET PARKING AVAILABLE OPEN SPACE 6 COMPLETE: 10,062 SF OPEN SPACE 4 COMPLETE: 3,968 SF OPEN SPACE 3 COMPLETE: 1,301 SF OPEN SPACE 5 COMPLETE: 7,243 SF ALL RIGHT-OF-WAY IMPROVEMENTS COMPLETE AND OPEN PHASED OCCUPANCY REQUIREMENTS BUILDINGS W/ OCCUPANCY: BUILDING B & C (185 UNITS) PARKING REQUIRED PARKING: 185 UNITS x 0.75 SPACES / UNIT = 139 SPACES PROVIDED PARKING: 137 ON-SITE (10 ADA, 42 COMPACT) 47 STREET SPACES 184 TOTAL OPEN SPACE REQUIRED: 100 SF / 1 BR UNIT x (13) 1 BR UNITS = 1,300 SF 150 SF / 2+ BR UNIT x (172) 2+ BR UNITS = 25,800 SF TOTAL = 27,100 SF PROVIDED: AREA 3 OPEN SPACE = 1,301 SF AREA 4 OPEN SPACE = 3,968 SF AREA 5 OPEN SPACE = 7,243 SF AREA 6 OPEN SPACE = 10,062 SF BLDG B INDOOR REC ROOM = 676 SF BLDG B COMMON OUTDOOR PATIO = 360 SF PRIVATE PATIOS / DECKS = 76 SF x 185 = 14,060 SF TOTAL = 37,670 SF PHASE 8B PHASE 8BPHASE 8BPHASE 8B PHASE 8B PHASE 8B LIMIT OF AREAS THAT ARE OPEN TO THE PUBLIC IN PHASE 8B FENCED STAGING AREA FOR FINISH WORK ON BUILDING A 81 SPACES (4 ADA, 16 COMPACT) 48 BIKE PARKING STSTSTSTSTSTELECELEC ELEC ELEC ELEC ELEC ELEC ELEC ELEC ELEC ELEC ELEC ELEC ELEC ELEC ELEC ELEC ELEC ELEC ELEC 8''SS8''SS8''SS8''SS8''SS8''W8''W8''W8''W8''W8''W8''W 8''W 8''W 8''W 8''W 8''W 8''W 8''W 8''W 8''W 8''W 8''W 8''W 8''W 8''W 8''W 8''W 8''W 8''W 8''W8''W8''W8''W8''W16''W16''W16''W16''W8''SS8''SS8''SS8''SS8''SSW V W V W VW V W VW VW V W V SS SS W V HY DHYD HYDHY DW VW VW V SS SS SS ST ST STSTST STS T ST ST STSTSTW V W V W V W V W VW V ST 15''SS15''SS15''SS15''SS15''SSWBO HYDGASGASGASGASGASGASOSW W V WBOWBO WBO WBO WBO WBO W VW V ELEC WBO WBO XXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXOHPOHPOHPOHPOHPOHPOHPOHPOHPOHPOHPOHPOHPOHPOHPOHPOHPOHPT OHPOHPOHPOHPOHPOHPOHPOHPOHPOHPOHPOHPOHPOHPOHPOHPOHPOHPOHPOHPOHPOHPOHPOHPOHPOHPOHPOHPOHPOHPOHP16''W16''W8''W 8''W 8''W 8''W 8''W 8''W 8''SS8''W8''W 8''W 8''W 8''W8''W8''W8''W8''W8''SSXXXXXX X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X XXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXX<><>SSW VW VW V HYDW V W VW VW VW VW VHYDH YDHYD 15''SS15''SS15''SS15''SS15''SS15''SSUGPUGPUGPUGP UGP UGP UGPUGPUGPUGPUGPUGPUGPUGPUGPUGPUGPUGPUGPUGPUGPUGPUGPUGPUGPUGPUGPUGPUGP UGPUGPUGP UGP UGP UGP UGP UGP UGP UGP UGPUGPUGPSTELECELECELECELECGASGASGASGASELECELECCO ELEC STSTSTSTCO CO ST DSDSDS DS DS DS DS DS DS DS DS DS DS DS DSDSDS DS DS DS DS DS DS DS DS DS DS DS DS DS DS DS DS DS ST ST ST ST ST ST ST ST ST ST STSTFOWLER LANEEDGERTON AVEGABRIEL AVEMEAH LANE S 31ST AVE8''SS8''SS8''SS8''SS8''SS8''W8''W8''W8''W8''SS8''SS8''SS8''SS8''SSSS SS SS ST W V W V W V W V 8''WCC8C CONCURRENT CONSTRUCTION PHASE 8C 24.115edinc Job #: 1535 liberty lane suite 110b missoula, montana 59808 phone: 406.540.4437 AN AFFORDABLE HOUSING DEVELOPMENT:ROCKY MOUNTAIN FLATSBOZEMAN, MONTANA749-01Alpine Job #:714 STONERIDGE DRIVE, STE 3BOZEMAN, MT 59718Phone: 406.586.5599CONCURRENT CONST. SET: 09/05/2025 REV. # 2 0 50'100' SCALE 1" = 50' N ST 16''W16''W16''W16''WW V15''SS15''SS15''SS15''SS15''SS8''W W V HYD W V W V W VW VW V W V W V W V 8''W 8''W 8''W 8''W 8''W 8''W 8''W 8''W 8''W 8''W 8''W 8''W 8''W 8''W 8''W 8''W 8''W 8''W W V SS SS ELECELECELECELECGASGASGASGASELECELECELECGAS GASGASGASGASGASBUILDING B (OCCUPIED) BUILDING C (OCCUPIED) BUILDING A (OCCUPIED) ALL STREET PARKING AVAILABLE OPEN SPACE 6 COMPLETE: 10,062 SF OPEN SPACE 4 COMPLETE: 3,968 SF OPEN SPACE 3 COMPLETE: 1,301 SF OPEN SPACE 5 COMPLETE: 7,243 SF ALL RIGHT-OF-WAY IMPROVEMENTS COMPLETE AND OPEN PHASED OCCUPANCY REQUIREMENTS BUILDINGS W/ OCCUPANCY: BUILDING A, B, & C (296 UNITS) ALL SITE AND PUBLIC IMPROVEMENTS COMPLETE PARKING ALL SITE PARKING COMPLETE & OPEN. SEE SITE PLAN SHEETS FOR PARKING CALCULATIONS. OPEN SPACE ALL OPEN SPACE AREAS COMPLETE & OPEN. SEE SITE PLAN SHEETS FOR OPEN SPACE CALCULATIONS. OPEN SPACE 1 COMPLETE: 3,834 SF OPEN SPACE 2 COMPLETE: 1,860 SFALL SITE IMPROVEMENTS COMPLETE AND OPEN