Loading...
HomeMy WebLinkAbout009 Water and Sewer Memo 714 Stoneridge Drive · Suite 3 · Bozeman, MT 59718 · (406) 586-5599 · www.alpinesurveying.net Page 1 April 25, 2025 City of Bozeman Engineering Department 20 E. Olive Street Bozeman, MT 59715 RE: Water & Sewer Demand Memo Lot 1&2, Block 9 of Blackwood Groves Subdivision Phase 3A, S25, T02S, R05E, Bozeman, MT To Whom it May Concern, The intent of this memo is to outline the anticipated water and sanitary sewer demands for the proposed Multifamily project on Lots 1 & 2, Block 9 of Blackwood Groves Subdivision, Phase 3A. The 1.4-acre site is located along the Alley (Arbor Way) in Block 9 and is currently zoned REMU. The project site is currently undeveloped and is bounded by city park to the west and Arbor Way (alley) to the east and north. An 8” sanitary sewer main runs through the Alley from Cambridge Drive and provides service to these lots. 4” sewer service stubs were installed with the subdivision improvements into each lot and these will be extended to provide service connections to each of the proposed buildings. (2) 4” DIP water service stubs were extended into the southern lot from Victoria Street with the subdivision improvements. These service stubs will be extended into the southern building as fire and domestic water services. Similarly, an 8” water main was stubbed into the northern lot from Cambridge Drive with the subdivision improvements. (2) 2” domestic water services and (2) 4” DIP fire services will be tapped off of this existing water main stub to provide service to the northern buildings. The fire marshal has also requested that a fire hydrant be installed on the alley as part of the site improvements. Therefore, a hydrant is proposed in the open space tract on the northeast corner of the alley. 714 Stoneridge Drive · Suite 3 · Bozeman, MT 59718 · (406) 586-5599 · www.alpinesurveying.net Page 2 Sanitary Sewer Demand There are several ways to estimate Sanitary Sewer flows, including standards set forth by the Montana DEQ Circular 2, Montana DEQ Circular 4, and the COB DSSP. However, the projected wastewater flows in this memo are calculated using the values provided in the City of Bozeman Wastewater Collection Facilities Plan Update Final – 2015. This document provides an updated estimate of 2.17 persons per dwelling unit within the City of Bozeman Planning Area, which differs slightly from the 2.11 person/du estimate outlined in the COB DSSP. The facilities plan update also provides an updated wastewater generation estimate of 64.4 gallons per day per capita based on extensive research of the existing system instead of the 89 gpcd estimate outlined in the COB DSSP. The peaking factor is based on the Harmon Formula and an infiltration rate of 150 gallons per acre per day was also applied to the project, both as outlined in the COB DSSP. Based on these criteria, the estimated demands from the proposed project are included in the table below. It should also be noted that the Sanitary Sewer Design Report submitted with the Blackwood Groves preliminary plat estimated 49 total dwelling units for this block (Block 9). Aside from the two lots making up the proposed project site, there are also 19 single-family and townhome lots in the block. So, by removing the 19 single-family dwellings from the original 49 dwelling unit estimate, it can be assumed that the two lots making up the project site were planned for 30 dwelling units (49-19 = 30). Therefore, our proposed sewer demand for 30 dwelling units was accounted for in the subdivision infrastructure design. Peak Sanitary Sewer Demand Calculation Dwelling Units Population Average Day Flow (GPD) Average Day Flow (GPM) Peaking Factor Peak Hour Flow (GPM) Infiltration (GPM) Design Flow Rate (GPM) Design Flow Rate (cfs) Per Building 10 22 1,416.8 0.98 4.37 4.28 0.00 4.28 0.0095 Total 30 66 4,250.4 2.95 4.29 12.66 0.15 12.81 0.0285 1.4 Acres 150 Gal./Acre/Day 0.15 GPM 4" PVC Pipe Capacity Pipe Size (in) Flow Depth - d (in) Slope (ft/ft) Manning's n Flow (CFS) 4 3 0.02 0.012 0.27 Total Lot Area Infiltration Rate Total Infiltration 714 Stoneridge Drive · Suite 3 · Bozeman, MT 59718 · (406) 586-5599 · www.alpinesurveying.net Page 3 Water Demand In order to be consistent with the sanitary sewer estimates, the water demand calculations for the proposed project were computed using 2.17 people per dwelling unit, based on Section 2.3.5 of the 2015 City of Bozeman Wastewater Collection Facilities Plan Update. Per the COB Design Standards and Specifications Policy (COB DSSP), a water demand of 170 gallons per capita per day is to be used when calculating water demand. As outlined in the COB DSSP, peaking factors of 2.3 and 3.0 were used to calculate Maximum Day and Peak Hour Demand, respectively. The below table provides the estimated water demands based on be above assumptions. Please feel free to contact me with any questions at (406) 586-5599, or by email at ecote@alpinesurveying.net. Sincerely, Ethan Cote, P.E 60593 Type Dwelling Units Population Average Day (GPM) Max Day (GPM) Peak Hour (GPM) Residential 30 66 7.79 17.92 23.38 Peak Water Demand Calculations