Loading...
HomeMy WebLinkAboutAppendix C B25-017-2025-12-23-PERMIT SETDESIGNED BY:QUALITY CHECK:JOB NO.FIELDBOOKDRAWN BY:DATE:B25-017-S00REV DATE REVISION PRINTED 2025-12-24 , BY HAYDEN GALL, I:\2025\BOZ\B25-017 BOZEMAN SR CENTER\06_CADD\STRUCTURAL\B25-017-S00.DWG BOZEMAN SENIOR CENTER BOZEMAN, MT RLTSWMKJP12/23/2025B25-017SHEET.DWGEngineering 234 E. BABCOCK ST., SUITE 3 • BOZEMAN, MONTANA 59715 406.586.0277 • tdhengineering.com NFNSEOISLAIG N E No. 38400 PEMAHURINSCOTT W.NORPMOATEE ANRCILDESNECOVER SHEETS0.0BOZEMAN SENIOR CENTERBOZEMAN, MONTANADEC 2025PROJECT DIRECTORYOWNERCITY OF BOZEMAN121 N ROUSE AVEBOZEMAN, MT 59715P: 406-582-2300Shane Millersmiller@bozeman.netPROJECT ADDRESS807 N TRACY AVE - BOZEMAN, MT 59715STRUCTURAL ENGINEERTD&H ENGINEERING234 E BABCOCK ST, SUITE 3BOZEMAN, MT 59715P: 406-586-0277Scott MahurinScott.Mahurin@tdhengineering.comMECHANICAL AND ELECTRICAL ENGINEERCDSi ENGINEERING7540 CHURCHILL RDMANHATTAN, MT 59741P: 406-282-7082csmit@cdsiengineering.comVICINITY MAPNTSPROJECT LOCATIONAPPLICABLE BUILDING CODES2021INTERNATIONAL EXISTING BUILDING CODE (IEBC)2021INTERNATIONAL ENERGY CONSERVATION CODE (IECC)2021 INTERNATIONAL MECHANICAL CODE (IMC)2021UNIFORM PLUMBING CODE (UPC)2020NATIONAL ELECTRICAL CODE (NEC) 9'-1516"6'-10 58"EXISTINGELEVATOR PITDESIGNED BY:QUALITY CHECK:JOB NO.FIELDBOOKDRAWN BY:DATE:B25-017-S2XREV DATE REVISION PRINTED 2025-12-19 , BY RUTH TUSS, I:\2025\BOZ\B25-017 BOZEMAN SR CENTER\06_CADD\STRUCTURAL\B25-017-S2X.DWG BOZEMAN SENIOR CENTER BOZEMAN, MT RLTSWMKJP12/23/2025B25-017SHEET.DWGEngineering 234 E. BABCOCK ST., SUITE 3 • BOZEMAN, MONTANA 59715 406.586.0277 • tdhengineering.com NFNSEOISLAIG N E No. 38400 PEMAHURINSCOTT W.NORPMOATEE ANRCILDESNEELEVATOR PIT DEMO PLANS2.01ELEVATOR PIT DEMO PLAN08'4'GENERAL NOTES1.VERIFY ALL DIMENSIONS IN FIELD.2.COORDINATE CLEANING AND REPAIR OF ELEVATORPIT SCHEDULE WITH OWNER.DEMOLITION AND CLEANING NOTES1.CONTRACTOR TO THOROUGHLY CLEAN ALL DIRT, DEBRIS, AND OILFROM ELEVATOR PIT.2.HIGH PRESSURE POWER WASH ELEVATOR PIT SLAB AND WALLS TOCSP-3 SURFACE FINISH. CLEAN ALL DEBRIS AND DRY SURFACESAFTER WASHING.3.USE COMMERCIAL CONCRETE CLEANER AS REQUIRED TO FULLYREMOVE OIL FROM CONCRETE.4.CONTRACTOR TO DISASSEMBLE PORTIONS OF THE LADDER ONLY ASREQUIRED FOR CLEANING AND PRODUCT APPLICATION.5.CONTRACTOR TO TAKE ALL NECESSARY MEASURES TO PROTECT THEEXISTING ELEVATOR EQUIPMENT, SUMP AND OTHER MECHANICAL ANDELECTRICAL COMPONENTS DURING CLEANING AND SURFACEPREPARATION. ELEVATORPIT REPAIRSDESIGNED BY:QUALITY CHECK:JOB NO.FIELDBOOKDRAWN BY:DATE:B25-017-S2XREV DATE REVISION PRINTED 2025-12-19 , BY RUTH TUSS, I:\2025\BOZ\B25-017 BOZEMAN SR CENTER\06_CADD\STRUCTURAL\B25-017-S2X.DWG BOZEMAN SENIOR CENTER BOZEMAN, MT RLTSWMKJP12/23/2025B25-017SHEET.DWGEngineering 234 E. BABCOCK ST., SUITE 3 • BOZEMAN, MONTANA 59715 406.586.0277 • tdhengineering.com NFNSEOISLAIG N E No. 38400 PEMAHURINSCOTT W.NORPMOATEE ANRCILDESNEELEVATOR PIT REPAIR PLANS2.11ELEVATOR PIT REPAIR PLAN08'4'ELEVATOR PIT REPAIRS1.APPLY XYPEX CONCENTRATE TO ELEVATOR PIT FLOOR, WALLS ANDWITHIN SUMP BASIN. FOLLOW ALL MANUFACTURER RECOMMENDATIONSFOR PRODUCT APPLICATION.2.IF CRACKS ARE DISCOVERED GREATER THAN 1/64TH OF AN INCH,USE SIKASET PLUG TO SEAL THE SURFACE OF THE CRACK, THENINJECT SIKAFLIX HH+ IN THE CRACK. FOR THE PURPOSE OF BIDDING,INCLUDE 15 LINEAR FEET OF CRACK REPAIR AS PART OF PROJECTBASE BID. EXISTINGELEVATOR·REPLACE JACK & PISTON·REPLACE ELECTRONIC CONTROLS(INCLUDES NEW MAGNETIC FLOOR LEVELERS)·REPLACE OVERSPEED VALVE·INSTALL DOUBLE LAYER 58 TYPE-X GWB ATROOF SCREEN AREADESIGNED BY:QUALITY CHECK:JOB NO.FIELDBOOKDRAWN BY:DATE:B25-017-S2XREV DATE REVISION PRINTED 2025-12-19 , BY RUTH TUSS, I:\2025\BOZ\B25-017 BOZEMAN SR CENTER\06_CADD\STRUCTURAL\B25-017-S2X.DWG BOZEMAN SENIOR CENTER BOZEMAN, MT RLTSWMKJP12/23/2025B25-017SHEET.DWGEngineering 234 E. BABCOCK ST., SUITE 3 • BOZEMAN, MONTANA 59715 406.586.0277 • tdhengineering.com NFNSEOISLAIG N E No. 38400 PEMAHURINSCOTT W.NORPMOATEE ANRCILDESNEELEVATOR REPAIR PLANS2.21ELEVATOR PIT REPAIR PLAN08'4'ELEVATOR REPAIRS1.OTIS ELEVATOR IS BASIS OF DESIGN2.NEW CONTROLS TO INCLUDE:·NEW POWER UNIT·NEW MICROPROCESSOR·NEW SOLID-STATE STARTER·UPGRADE EMERGENCY OPERATION TO CURRENT CODE·NEW PIT STOP SWITCH·NEW HOISTWAY ACCESS SWITCHES AS PRESCRIBED BY CODE·NEW TOP OF CAR INSPECTION STATION·NEW CAR OPERATING PANEL FIXTURES·NEW ADA PHONE INTEGRAL WITH COP·NEW DIGITAL CAR POSITION INDICATOR IN COP·NEW BRAILLE ON COP AND ENTRANCES·NEW ADA COMPLIANT FLOOR PASSING CHIME·NEW 6 VOLT EMERGENCY LIGHTING SYSTEM·NEW HALL STATION BUTTON FIXTURES·NEW IN CAR LATERNS TO INDICATE DIRECTION OF TRAVEL·NEW CLOSED LOOP DOOR OPERATOR·REFURBISH INTERLOCKS·NEW CODE COMPLIANT DOOR RESTRICTORS·NEW DOOR DETECTOR·NEW TRAVELING CABELS, HOISTWAY WIRE AND SIGNAGE·NEW CODE COMPLIANT TOEGUARDS AS NEEDED