Loading...
HomeMy WebLinkAboutSDP-18 - IRRIGATION PLAN & SCHEDULE - ROOFTOP543.1321EDCBAF6(1)2''PBWSITE DEVELOPMENT PLAN - THE NORTHERN - 2025-PROJMSTR-0000XXX - 2025-SDP-0000XXXSITE DEVELOPMENT PLANREMAINDER PORTION LOT 20, LOTS 19-16, & WEST 9' OF LOT 15 OF TRACY'S SECOND ADD.CITY OF BOZEMAN, GALLATIN COUNTY MONTANALOCATED AT 621 W MENDENHALL STTHE NORTHERNLANDSCAPE PLANSCALE: 1 " = 10' - 0"1N20'10'5'0'POINT OF CONNECTION #2 - 3/4" (ROOF TOP)PEAK FLOW REQUIREMENT: 10 GPM. REQUIRED STATIC PRESSURE: 71 PSICONTRACTOR SHALL TIE INTO BUILDING SERVICE UPSTREAM OF DOMESTIC BACKFLOW PREVENTERAND ANY PRESSURE REDUCING DEVICES IN THE ROOF TOP WATER ROOM (RE: PLUMBING). INSTALLONE LINE SIZE ISOLATION BALL VALVE AND EXTEND 3/4'' TYPE K HARD COPPER TO IRRIGATIONBACKFLOW PREVENTER LOCATION. INSTALL ONE 3/4'' INTERIOR MODEL REDUCED PRESSUREBACKFLOW PREVENTER AND PRESSURE REDUCING VALVE (IF REQUIRED) WITH AIR GAP DRAINPLUMBED TO BUILDING FLOOR DRAIN, PER MANUFACTURER'S RECOMMENDATIONS. RUN 1'' TYPE KHARD COPPER ALONG THE INSIDE OF THE EXTERIOR WALL AND STUB OUT THROUGH THE EXTERIORWALL. RUN 1'' TYPE K HARD COPPER TO WATER STORAGE TANK. ADAPT TO PVC AND INSTALL ONEFLOAT VALVE INTO STORAGE TANK. FINAL STORAGE TANK, PUMPS ASSEMBLY AND CONTROLLERLOCATION SHALL BE APPROVED BY OWNER OR OWNER'S REPRESENTATIVE PRIOR TO INSTALLATION.WORK SHALL CONFORM TO LOCAL CODE. FEES, PERMITS AND INSPECTIONS ASSOCIATED WITHWORK ARE TO BE OBTAINED AND PAID FOR BY CONTRACTOR.CONTROLLER LOCATION "B" (ROOF TOP)WALL MOUNT ONE CONTROLLER (REFER TO SCHEDULE FOR MODEL & STATION COUNT), REMOTEREADY, AT INDICATED LOCATION. 120 VOLT POWER IS AVAILABLE WITHIN 20 LF.+/- OF CONTROLLERLOCATION FROM BUILDING, BY OTHERS RE=ELECTRICAL. ELECTRICAL WIRE/CONDUIT AND POWERCONNECTION TO CONTROLLER IS BY CONTRACTOR WITH WORK CONFORMING TO LOCAL CODES.LOCATE MASTER VALVE WIRES WITH SPARES AND CONNECT 2 OF THE WIRES FROM THE MASTERVALVE TO THE DATA RETRIEVAL BOARD IN ASSOCIATED CONTROLLER. FINAL CONTROLLERLOCATION SHALL BE APPROVED BY OWNER OR OWNER'S REPRESENTATIVE PRIOR TO INSTALLATION.MOUNT ONE WEATHER SENSOR ON BUILDING WHERE THERE IS 20 FT. OF CLEARANCE FROM ANYOVERHANG OR OBSTRUCTING FEATURE. INSTALL WEATHER SENSOR RECEIVER IN CONTROLLERENCLOSURE. CONNECT SENSOR RECEIVER WIRES TO IRRIGATION CONTROLLER SENSOR PORT.FINAL WEATHER SENSOR LOCATION SHALL BE APPROVED BY OWNER OR OWNER'S REPRESENTATIVEPRIOR TO INSTALLATION. ALL CONTROL WIRING WITHIN BUILDING SHALL BE INSTALLED IN EMTCONDUIT.B22B13949 W. Colfax Ave, Suite 260 Lakewood, Colorado 80401o: 303.980.5327 www.hydrosystemskdi.comIrrigation Consulting & Water ManagementCALL 3 BUSINESS DAYS IN ADVANCE BEFORE YOUDIG, GRADE, OR EXCAVATE FOR THE MARKING OFUNDERGROUND MEMBER UTILITIES.RKnow what's below. Call before you dig.SDP-19 IRRIGATION PLAN &SCHEDULE - ROOFTOP19 OF 28CONTRACTOR TO INSTALL 4" PVC SEWER &DRAIN PIPE FROM BUILDING DOWN SPOUTS,CONNECT TO STORAGE TANK WITH 4"ADAPTER. CONTRACTOR WILL BERESPONSIBLE TO WATER PROOF SEAL HOLEAROUND PIPE INTO PLASTIC STORAGE TANK.COORDINATE DOWN SPOUT LOCATIONS WITHGENERAL CONTRACTOR.4" OVER FLOW PIPE, PVC SEWER & DRAIN PIPEAND FITTINGS FROM STORAGE TANK TO ROOFDRAIN. CONTRACTOR WILL BE RESPONSIBLETO WATER PROOF AND SEAL HOLE AROUNDPIPE INTO PLASTIC STORAGE TANK.1" COPPER FILL PIPING FROM 1"BUILDING CONNECTION, TRANSITION TO1" RIGID SCH. 40 PIPE INTO TANK,ADAPT TO 3/4" FLOAT SWITCHASSEMBLY. ADJUST SO WATER IS 12INCHES FROM TOP OF TANK.EXTEND 1" COPPER PIPE FROM CONTROLVALVE ABOVE WATERPROOF ROOFING TOFIRST PLANTER. CONVERT TO 1" PVC ASMAINLINE PIPING FROM PLANTER TO PLANTER(WITHIN PEDESTAL DECK AREA), ONCE INPLANTER COVER TO DRIP TUBING.GARDEN BOXES TO BE WATERED USINGPOTABLE HOSE BIB OFF BUILDING.SLEEVE DRIP TUBING INTO PLANTERUNDER CONCRETE SLAB.IRRIGATION SCHEDULE - ROOF TOPSYMBOLMANUFACTURERMODEL NO.DESCRIPTIONDETAIL NO.HUNTERPRO-C - 4 STATION MODELELECTRIC CONTROLLER2 & 5HUNTERSOLAR SYNC - WSS-SENWEATHER SENSOR DEVICE6FEBCO860U WITH WATTS 223-HP PRV (IF REQ.)RP BACKFLOW PREVENTER1 (RE: PLUMBINGPLANS)TYPE K COPPERHARD COPPER PIPE1 & 5HUNTERICZ-101-LF-40 WITH NIBCO BALL VALVEDRIP VALVE ASSEMBLY5CLASS 200 BEPVC LATERALN/STOROBLUE STRIPEPOLY DRIP TUBING -34" MIN. WIDTH3N/SRAIN BIRDXBCV - XERI-BUG WITH CHECK VALVEDRIP EMITTERS3HUNTER / NIBCOECO-ID-12 WITH NIBCO BALL VALVEDRIP LINE BLOW-OUT STUB ANDINDICATOR HEAD4AWGPMCONTROL VALVE SIZECONTROLLER & STATION NO.1" RIGID COPPER PIPING TO FIRSTPLANTER AREA. SECURE TO ROOFINGUSING ONLY APPROVED PIPINGBRACKETS, COORDINATE WITH ROOFINGCONTRACTOR.1.PRIOR TO COMMENCING ANY WORK, THE APPLICANT MUST CONTACT THE WATER CONSERVATIONDIVISION TO SCHEDULE A PREINSTALLATION MEETING.GENERAL NOTESDIRECTORYIRRIGATION SCHEDULE & NOTES -STREET LEVEL IR-1IRRIGATION PLAN - STREET LEVEL IR-2IRRIGATION DETAILS - STREET LEVEL IR-3-IR-4IRRIGATION PLAN & SCHEDULE- ROOFTOP IR-5IRRIGATION DETAILS &NOTES - ROOFTOP IR-6 - IR-718 OF 2718