HomeMy WebLinkAboutSDP-15 - IRRIGATION PLAN - STREET LEVEL543.1321EDCBAF6AWFSDR1"A1(1)2''(1)2''EMT(1)2''(1)2''1''3ASITE DEVELOPMENT PLAN - THE NORTHERN - 2025-PROJMSTR-0000XXX - 2025-SDP-0000XXXSITE DEVELOPMENT PLANREMAINDER PORTION LOT 20, LOTS 19-16, & WEST 9' OF LOT 15 OF TRACY'S SECOND ADD.CITY OF BOZEMAN, GALLATIN COUNTY MONTANALOCATED AT 621 W MENDENHALL STTHE NORTHERNN 7 T H A V EW MENDENHALL STPROPOSED BUILDINGIRRIGATION PLANS&ALE
1N20'10'5'0'PROPERTY LINEALLEYPROPERTYLINEPROPERTY LINEGREEN WALLRAMP DOWNRAMP DOWNPOINT OF CONNECTION #1 - 3/4" (STREET LEVEL)PEAK FLOW REQUIREMENT: 10 GPM. REQUIRED STATIC PRESSURE: 71 PSICONTRACTOR SHALL TIE ONTO BUILDING SERVICE UPSTREAM OF DOMESTIC BACKFLOW PREVENTERAND ANY PRESSURE REDUCING DEVICES IN THE WATER ENTRY ROOM. INSTALL ONE LINE SIZEISOLATION BALL VALVE AND EXTEND 3/4'' TYPE K HARD COPPER TO IRRIGATION BACKFLOWPREVENTER LOCATION. INSTALL ONE 3/4'' INTERIOR MODEL REDUCED PRESSURE BACKFLOWPREVENTER AND PRESSURE REDUCING VALVE (IF REQUIRED) WITH AIR GAP DRAIN PLUMBED TOBUILDING FLOOR DRAIN, PER MANUFACTURER'S RECOMMENDATIONS, ONE IRRIGATION, FLOWSENSOR, ONE MASTER VALVE AND ONE LINE SIZE BOILER DRAIN. RUN 1'' TYPE K HARD COPPERALONG THE INSIDE OF THE EXTERIOR WALL AND STUB OUT THROUGH THE EXTERIOR WALL AT AMINIMUM DEPTH OF 18'' UNDER SLAB AS SHOWN. CONTRACTOR IS RESPONSIBLE FOR WATERPROOFSEALING ALL FOUNDATION PENETRATION. TRANSITION TO PVC PIPING A MINIMUM OF 24'' PAST ANYPLANNED HARD OR PAVED SURFACE. INSTALL ONE GATE VALVE, ONE MANUAL DRAIN VALVE, ONEQUICK COUPLER VALVE, AND EXTEND PVC MAINLINE AS SHOWN. EXTEND 4 UFUL14# WIRE (TWOORANGE AND TWO BLUE) AND CONNECT 2 OF THE WIRES FROM THE MASTER VALVE TO THE DATARETRIEVAL BOARD IN ASSOCIATED CONTROLLER. SEE DETAIL SHEET FOR REQUIRED PIPE LENGTHSUPSTREAM AND DOWNSTREAM OF FLOW SENSING UNIT. FINAL CONTROLLER LOCATION SHALL BEAPPROVED BY OWNER OR OWNER'S REPRESENTATIVE PRIOR TO INSTALLATION. ALL CONTROLWIRING WITHIN BUILDING SHALL BE INSTALLED IN EMT CONDUIT. NO COPPER TUBING SHALL BEVISIBLE ON BUILDING EXTERIOR. COORDINATE WORK WITH PLUMBING CONTRACTOR. WORK SHALLCONFORM TO LOCAL CODE. FEES, PERMITS AND INSPECTIONS ASSOCIATED WITH WORK ARE TO BEOBTAINED AND PAID FOR BY CONTRACTOR. FINAL BACKFLOW PREVENTER LOCATION SHALL BEREVIEWED AND APPROVED BY CONSULTANT PRIOR TO INSTALLATION.CONTROLLER LOCATION "A" (STREET LEVEL)WALL MOUNT ONE CONTROLLER (REFER TO SCHEDULE FOR MODEL & STATION COUNT), REMOTEREADY, AT INDICATED LOCATION. 120 VOLT POWER IS AVAILABLE WITHIN 40 LF. OF CONTROLLERLOCATION FROM BUILDING, BY OTHERS RE=ELECTRICAL. ELECTRICAL WIRE/CONDUIT AND POWERCONNECTION TO CONTROLLER IS BY CONTRACTOR WITH WORK CONFORMING TO LOCAL CODES.LOCATE MASTER VALVE WIRES WITH SPARES AND CONNECT 2 OF THE WIRES FROM THE MASTERVALVE TO THE DATA RETRIEVAL BOARD IN ASSOCIATED CONTROLLER. FINAL CONTROLLERLOCATION SHALL BE APPROVED BY OWNER OR OWNER'S REPRESENTATIVE PRIOR TO INSTALLATION.MOUNT ONE WEATHER SENSOR ON BUILDING WHERE THERE IS 20 FT. OF CLEARANCE FROM ANYOVERHANG OR OBSTRUCTING FEATURE. INSTALL WEATHER SENSOR RECEIVER IN CONTROLLERENCLOSURE. CONNECT SENSOR RECEIVER WIRES TO IRRIGATION CONTROLLER SENSOR PORT.FINAL WEATHER SENSOR LOCATION SHALL BE APPROVED BY OWNER OR OWNER'S REPRESENTATIVEPRIOR TO INSTALLATION. ALL CONTROL WIRING WITHIN BUILDING SHALL BE INSTALLED IN EMTCONDUIT.A11ASDP-1616 OF 2813949 W. Colfax Ave, Suite 260 Lakewood, Colorado 80401o: 303.980.5327 www.hydrosystemskdi.comIrrigation Consulting & Water ManagementCALL 3 BUSINESS DAYS IN ADVANCE BEFORE YOUDIG, GRADE, OR EXCAVATE FOR THE MARKING OFUNDERGROUND MEMBER UTILITIES.RKnow what's below. Call before you dig.IRRIGATION EQUIPMENT IS SHOWN OUTSIDE LANDSCAPED AREAFOR GRAPHICAL CLARITY ONLY. INSTALL ALL IRRIGATIONEQUIPMENT WITHIN LANDSCAPED AREAS.IRRIGATION EQUIPMENT IS SHOWN OUTSIDE LANDSCAPED AREA FORGRAPHICAL CLARITY ONLY. INSTALL ALL IRRIGATION EQUIPMENT WITHINLANDSCAPED AREAS. ALL IRRIGATION COMPONENTS SHALL BEINSTALLED WITHIN RIGHT OF WAY. LANDSCAPE AND UTILITY WORKSHALL TAKE PRECEDENCE. COORDINATE WITH OTHER TRADES FORLOCATION OF IRRIGATION TRENCHING AND COMPONENT INSTALLATION.IRRIGATION PLAN - STREET LEVELDIRECTORYIRRIGATION SCHEDULE & NOTES -STREET LEVEL SDP-15IRRIGATION PLAN - STREET LEVEL SDP-16IRRIGATION DETAILS - STREET LEVEL SDP-17 - SDP-18IRRIGATION PLAN & SCHEDULE- ROOFTOP SDP-19IRRIGATION DETAILS &NOTES - ROOFTOP SDP-20 - SDP-21EXISTING IRRIGATION TO THE TWO TREES:CONTRACTOR SHALL PROTECT EXISTINGIRRIGATION. ANY DAMAGE DONE AS PART OFNEW CONSTRUCTION SHALL BE REPAIR ORREPLACED AT NO ADDITIONAL COST TOOWNER.PRIOR TO &OMMEN&ING ANY WOR. THE APPLI&ANT MUST &ONTA&T THE WATER &ONSERVATIONDIVISION TO S&HEDULE A PREINSTALLATION MEETINGGENERAL NOTES15 OF 2715