Loading...
HomeMy WebLinkAboutSDP-06 - CONSTRUCTION MANAGEMEN PLANT 4" 4"N00°04'35"E 120.04'W. MENDENHALL STREET (50' ROW) ALLEY (20' ROW)N. 7TH AVENUES00°04'52"E 140.13'S89°39'46"W 126.32' PROPERTY LINE PROPERTY LINE PROPERTY LINE PROPERTY LINE L = 30.34' R = 20.00' Δ = 86°55'29" PROPERTY LINE 20.0'10.0'10.0'6.1'30.0' 106.7'20.0'30.0'11.5'SPOILS LOCATION AREA (TO BE REMOVED OR RELOCATED AFTER DEMOLITION PHASE TO FACILITATE CONSTRUCTION) STABILIZED CONSTRUCTON ENTRANCE (TO BE REMOVED AFTER DEMOLITION PHASE) STABILIZED CONSTRUCTON ENTRANCE (TO BE REMOVED AFTER DEMOLITION PHASE) TRASH ENCLOSURE - SEE DETAIL THIS SHEET (TO BE RELOCATED AS NEEDED TO FACILITATE CONSTRUCTION) NORTHBOUND LANE CLOSURES ON N. 7TH AVENUE WILL BE KEPT TO A MINIMUM & LIMITED TO SHORT TERM DURATIONS AS NEEDED FOR MISC. CONSTRUCTION TASKS - LONG TERM LANE CLOSURES ARE NOT ANTICIPATED LANE CLOSURES ON W. MENDENHALL STREET WILL BE LIMITED TO THE NORTHERN TRAFFIC LANE & ARE EXPECTED TO LAST 12-14 MONTHS CONSTRUCTION OF THE SANITARY SEWER MAIN WILL REQUIRE COMPLETE CLOSURE FOR THE DURATION OF CONSTRUCTION ALLEY TO REMAIN OPEN AT ALL TIMES DURING BUILDING CONSTRUCTION COMPLETE ALLEY CLOSURE WILL BE REQUIRED DURING ALLEY RECONSTRUCTION SIDEWALKS ADJACENT TO PROPERTY WILL BE CLOSED DURING CONSTRUCTION TO PROVIDE PEDESTRIAN SAFETY & CONSTRUCTION STAGING SIDEWALKS ADJACENT TO PROPERTY WILL BE CLOSED DURING CONSTRUCTION TO PROVIDE PEDESTRIAN SAFETY & CONSTRUCTION STAGING TOWER CRANE TO BE LOCATED IN STAIR CORE CONSTRUCTION MATERIAL STAGING AREA N89°38'30"E 144.94' ONE-WAY TRAFFIC HEADING WEST 63.9'11.5'CONSTRUCTION MATERIAL STAGING & TRAILER AREA 11.5'42.8'11.5'23.1'NOTES: 1.ALL CONSTRUCTION TRAFFIC SHALL FOLLOW ROUTES AND UTILIZE CONSTRUCTION ENTRANCE LOCATIONS DEPICTED ON THE CONSTRUCTION ROUTE MAP (SHEET EX-1). 2.CONTRACTOR TO MODIFY LOCATIONS SHOWN ON THIS PLAN AS NECESSARY TO ACCOMMODATE EACH PHASE OF CONSTRUCTION. 3.ALL SPOILS GENERATED FROM DEMOLITION ACTIVITIES ARE TO BE STORED IN THE DESIGNATED LOCATION OR AN ALTERNATE LOCATION DETERMINED BY THE CONTRACTOR AND REMOVED IN A TIMELY MANNER. SPOILS GENERATED DURING EARTHWORK PROCESSES SHALL BE STORED IN THE DESIGNATED LOCATION AND MAY REMAIN ONSITE FOR UP TO 6 MONTHS IF RESERVED FOR BACKFILL AND FINAL GRADING PURPOSES. 4.NOTIFY ENGINEER IF FIELD CONDITIONS DIFFER FROM WHAT IS SHOWN ON THESE PLANS. 40-YARD ROLL OFF DUMPSTER DETAIL NTS SITE DEVELOPMENT PLAN THE NORTHERN REMAINDER PORTION LOT 20, LOTS 19-16, & WEST 9' OF LOT 15 OF TRACY'S SECOND ADD. CITY OF BOZEMAN, GALLATIN COUNTY MONTANA LOCATED AT 621 W MENDENHALL ST 101 E. Loucks Street, #300 Sheridan, WY 82801 PHONE: 970-227-0714 SDP-06 CONSTRUCTION MANAGEMENT PLAN 6 OF 28 0'10'20' SCALE: 1" = 10' N FOR THE MARKING OF UNDERGROUND BEFORE YOU DIG, GRADE, OR EXCAVATE CALL 2 BUSINESS DAYS IN ADVANCE CENTER OF MONTANA CALL UTILITY NOTIFICATION 1-800-424-5555 MEMBER UTILITIES. BENCHMARK: ELEVATION DATUM IS NAVD 88 BASIS OF BEARING: BOBCAT LDP COORDINATE SYSTEM POINT NORTHING EASTING ELEVATION DESCRIPTION 30 120391.19 380214.59 4821.11 MDT Cu Plug LS59853 96 120340.70 380215.51 4822.33 CH MAG DISK 97 120549.24 380217.82 4819.94 MAG NAIL 98 120536.01 380339.37 4820.54 MAG NAIL 99 120440.54 380329.09 4821.26 MAG NAIL CONTROL POINT TABLE: PROPOSED SANITARY SEWER LINE PROPOSED WATER SERVICE PROPOSED WATER VALVE EXISTING FIRE HYDRANT EXISTING WATER VALVE EXISTING POWER POLE EXISTING GUY WIRE EXISTING WATER METER EXISTING LIGHT POLE EXISTING FIBER OPTIC LINE EXISTING GAS LINE EXISTING WATER LINE EXISTING OVERHEAD POWER LINE EXISTING SANITARY SEWER LINE EXISTING UNDERGROUND POWER LINE EXISTING UNDERGROUND TELEPHONE LINE PROPOSED CURB BOX PROPOSED CORP STOP PROPOSED BACKFLOW PREVENTER EX RIGHT-OF-WAY/ PROPERTY BOUNDARY LEGEND: CONTROL POINT PROPOSED SANITARY SEWER MANHOLE PROPOSED FIRE HYDRANT PROPOSED SEWER CLEANOUT PROPOSED ELECTRIC SERVICE PROPOSED TELEPHONE SERVICE PROPOSED GAS SERVICE PROPOSED FIRE DEPARTMENT CONNECTION 11/7/25 6 OF 27