HomeMy WebLinkAbout58_Construction Management Plan and ClosuresPROPERTY LINEPROPERTY LINE
PROPERTY LINEPROPERTY LINECL
ALLEY
N 7TH AVEW MENDENHALL ST
PROPERTY LINE
(SOLID)
DRIVE AISLE VISION
TRIANGLE
ACCESS & UTILITY
EASEMENT
PRIMARY - STOREFRONT BLOCK FRONTAGEFIRE HYDRANT
EASEMENT
ALLEY VISION
TRIANGLE
STREET VISION
TRIANGLE (DASHED)
FIRE
HYDRANT
CL
15'-0" 15'-0"
CL
SECONDARY - STOREFRONT
BLOCK FRONTAGE
FIRE
VISION TRIANGLE50' - 0"VISION TRIANGLE
50' - 0"5' - 2"B-2M
B-2M
B-2M
B-2M 10' - 0"10' - 0"FSD
2' - 0"FSD15' - 1 1/4"STREET VISION
TRIANGLE (DASHED)
DRIVE AISLE
VISION TRIANGLE
15'-0" 15'-0"
45
46
42
43
44
47
48
56
55
54
53
52
51
50
49
PARKING
15 SPACES
24 BIKES
BIKE
ELEC
ROOM
XFRM
STAIR B
25' - 2" [25.18'] VIF140' - 1 1/2" [140.13'] PRIMARY ZONE LOT139' - 11 1/2" [139.96'] PRIMARY ZONE LOT145' - 3 1/2" [145.30'] PRIMARY ZONE LOT
32' - 6" [32.51'] VIF 144' - 11" [144.94'] PRIMARY ZONE LOT
20' - 0"FSD6' - 1"CORRIDORPARCEL
10.00% RAMP DN
19.96% RAMP DN10.00% RAMP DN
2.23% RAMP DN6.53% RAMP DN3526 SF
RETAIL
UTILITY
4.50% RAMP DN
TRASH RM
5.00% RAMP DN4,821.77
940 SF
RES.
LOBBY
STAIR A
ELEV 1&2
STAIR C
18' - 0"
DRIVE AISLE
24' - 0"18' - 0"
3' - 10 1/4"TYP9' - 0"ACCESSIBLE ROUTEOHD
LOWER PARKING GARAGE ACCESS
OHD
UPPER PARKING
GARAGE ACCESS
SIDEWALK+/- 12' - 7 3/4"RESIDENTIAL
ENTRY
RETAIL
ENTRY
RESIDENTIAL
ENTRY
ARCHITECTURAL ELEVATION
100' -0" = USGS 4,821.77'
FDC
STREET TREE
RE: LANDSCAPE
STREET TREE
RE: LANDSCAPE
4,821.77 TYP9' - 0"TYP5' - 0"RESIDENTIAL OPEN SPACE
81 TOTAL UNITS
1BR/STUDIO UNITS
67 X 100 SF = 6,700 SF
2BR UNITS
14 X 150 SF = 2,100 SF
REQUIRED: 8,800 SF
*UP TO 50% (4,400 SF) MAY BE
PROVIDED BY PRIVATE
BALCONIES.
TOTAL SF
OPEN SPACE CALCULATION
TYPE PROVIDED
1,635 SF
2,490 SF
7,430 SF
ROOF TOP AMENITY
EXTERIOR DECK
PRIVATE BALCONIES
LEVEL 3 - 2,130 SF
LEVEL 4 - 788 SF
LEVEL 5 - 788 SF
LEVEL 6 - 1,862 SF
LEVEL 7 - 1,862 SF
1,576 SF
4,520 SF*
4,400 SF
TOTAL PROVIDED: 8,800 SF
SITE DEVELOPMENT PLAN
REMAINDER PORTION LOT 20, LOTS 19-16, & WEST 9' OF LOT 15 OF TRACY'S SECOND ADD.
CITY OF BOZEMAN, GALLATIN COUNTY MONTANA
LOCATED AT 621 W MENDENHALL ST
SITE DEVELOPMENT PLAN - THE NORTHERN
THE NORTHERN
SDP-03
ARCHITECTURAL SITE PLAN
03 OF 15
1" = 20'-0"SDP-03
ARCHITECTURAL SITE PLAN1
SDP - GFA BY TYPE
[1] % PARKING SPACES PROVIDED IN ENCLOSED BICYCLE PARKING FACILITY / FIXED BICYCLE RACK PARKING
TOTAL PROVIDED 87
TOTAL REQUIRED 82
RETAIL SALES 1 PER 10,000 SQ. FT. GFA 20% / 80% 3,530 SF 1
EATING & DRINKING 1 PER 1,000 SQ. FT. GFA 0% / 100% - SF -
DWELLING, MULTI-UNIT 1 PER UNIT 80% / 20% 81 UNITS 81
PARKING CATEGORY MIN. SPACES REQUIRED E% / F% [1] SF or UNIT QTY ENCLOSED
CALCULATIONS – BICYCLE PARKING
SDP - PARKING BY LEVEL
TYPE QTY
LEVEL P1
9'' x 18' 37
ACCESSIBLE 2
COMPACT 2
41
LEVEL 01
9'' x 18' 13
ACCESSIBLE 2
15
LEVEL 02
9'' x 18' 19
19
TOTAL PARKING 75
SDP - PARKING BY TYPE
TYPE QTY
9'' x 18' 69
ACCESSIBLE 2
ACCESSIBLE 2
COMPACT 2
TOTAL PARKING 75
SDP - SITE-SPECIFIC BASE...
SPOT LOCATION ELEVATION
NE CORNER 4,821.77
SE CORNER 4,821.77
SW CORNER 4,821.77
NW CORNER 4,821.77
AVERAGE 4,821.77
BIKE STORAGE 218 SF
CIRCULATION 5,749 SF
OUTDOOR DECK 3,582 SF
PARKING 25,702 SF
RES. LOBBY 979 SF
RESIDENT PARKING 8,081 SF
RESIDENTIAL 75,424 SF
RETAIL 3,767 SF
ROOFTOP AMENTIY 1,634 SF
SERVICE 2,707 SF
TRASH RM 451 SF
UTILITY 381 SF
TOTAL 128,675 SF
N
20 20 40
1" = 20'
0
FEETSCALE
Area Closed during
construction for safety
of public and to be
used for dumpster
storage.
Area Closed during
construction for safety
of public and to be
used for material
storage, concrete
pumping, etc.
- Pedestrian traffic to
be diverted at the
opposite end of the
block.
- During production we
will have 3-4 semi
trailers of wall panels
and decking being
hoisted by a tower
crane. Those trailers
go from fully loaded to
empty every other day.
Sidewalk Closed during
construction for safety
of public and to be
used for material
storage, concrete
pumping, etc.
- Pedestrian traffic to
be diverted at the
opposite end of the
block.
North Bound Drive
Lane Closure:
Reviewing & Discuss
with MDT for lane
closures at critical
phases of construction.
- This traffic lane
closure will be needed
until we are done
erecting the building
10-12 months.
40 yard roll-off 40 yard roll-off Material Storage