Loading...
HomeMy WebLinkAbout58_Construction Management Plan and ClosuresPROPERTY LINEPROPERTY LINE PROPERTY LINEPROPERTY LINECL ALLEY N 7TH AVEW MENDENHALL ST PROPERTY LINE (SOLID) DRIVE AISLE VISION TRIANGLE ACCESS & UTILITY EASEMENT PRIMARY - STOREFRONT BLOCK FRONTAGEFIRE HYDRANT EASEMENT ALLEY VISION TRIANGLE STREET VISION TRIANGLE (DASHED) FIRE HYDRANT CL 15'-0" 15'-0" CL SECONDARY - STOREFRONT BLOCK FRONTAGE FIRE VISION TRIANGLE50' - 0"VISION TRIANGLE 50' - 0"5' - 2"B-2M B-2M B-2M B-2M 10' - 0"10' - 0"FSD 2' - 0"FSD15' - 1 1/4"STREET VISION TRIANGLE (DASHED) DRIVE AISLE VISION TRIANGLE 15'-0" 15'-0" 45 46 42 43 44 47 48 56 55 54 53 52 51 50 49 PARKING 15 SPACES 24 BIKES BIKE ELEC ROOM XFRM STAIR B 25' - 2" [25.18'] VIF140' - 1 1/2" [140.13'] PRIMARY ZONE LOT139' - 11 1/2" [139.96'] PRIMARY ZONE LOT145' - 3 1/2" [145.30'] PRIMARY ZONE LOT 32' - 6" [32.51'] VIF 144' - 11" [144.94'] PRIMARY ZONE LOT 20' - 0"FSD6' - 1"CORRIDORPARCEL 10.00% RAMP DN 19.96% RAMP DN10.00% RAMP DN 2.23% RAMP DN6.53% RAMP DN3526 SF RETAIL UTILITY 4.50% RAMP DN TRASH RM 5.00% RAMP DN4,821.77 940 SF RES. LOBBY STAIR A ELEV 1&2 STAIR C 18' - 0" DRIVE AISLE 24' - 0"18' - 0" 3' - 10 1/4"TYP9' - 0"ACCESSIBLE ROUTEOHD LOWER PARKING GARAGE ACCESS OHD UPPER PARKING GARAGE ACCESS SIDEWALK+/- 12' - 7 3/4"RESIDENTIAL ENTRY RETAIL ENTRY RESIDENTIAL ENTRY ARCHITECTURAL ELEVATION 100' -0" = USGS 4,821.77' FDC STREET TREE RE: LANDSCAPE STREET TREE RE: LANDSCAPE 4,821.77 TYP9' - 0"TYP5' - 0"RESIDENTIAL OPEN SPACE 81 TOTAL UNITS 1BR/STUDIO UNITS 67 X 100 SF = 6,700 SF 2BR UNITS 14 X 150 SF = 2,100 SF REQUIRED: 8,800 SF *UP TO 50% (4,400 SF) MAY BE PROVIDED BY PRIVATE BALCONIES. TOTAL SF OPEN SPACE CALCULATION TYPE PROVIDED 1,635 SF 2,490 SF 7,430 SF ROOF TOP AMENITY EXTERIOR DECK PRIVATE BALCONIES LEVEL 3 - 2,130 SF LEVEL 4 - 788 SF LEVEL 5 - 788 SF LEVEL 6 - 1,862 SF LEVEL 7 - 1,862 SF 1,576 SF 4,520 SF* 4,400 SF TOTAL PROVIDED: 8,800 SF SITE DEVELOPMENT PLAN REMAINDER PORTION LOT 20, LOTS 19-16, & WEST 9' OF LOT 15 OF TRACY'S SECOND ADD. CITY OF BOZEMAN, GALLATIN COUNTY MONTANA LOCATED AT 621 W MENDENHALL ST SITE DEVELOPMENT PLAN - THE NORTHERN THE NORTHERN SDP-03 ARCHITECTURAL SITE PLAN 03 OF 15 1" = 20'-0"SDP-03 ARCHITECTURAL SITE PLAN1 SDP - GFA BY TYPE [1] % PARKING SPACES PROVIDED IN ENCLOSED BICYCLE PARKING FACILITY / FIXED BICYCLE RACK PARKING TOTAL PROVIDED 87 TOTAL REQUIRED 82 RETAIL SALES 1 PER 10,000 SQ. FT. GFA 20% / 80% 3,530 SF 1 EATING & DRINKING 1 PER 1,000 SQ. FT. GFA 0% / 100% - SF - DWELLING, MULTI-UNIT 1 PER UNIT 80% / 20% 81 UNITS 81 PARKING CATEGORY MIN. SPACES REQUIRED E% / F% [1] SF or UNIT QTY ENCLOSED CALCULATIONS – BICYCLE PARKING SDP - PARKING BY LEVEL TYPE QTY LEVEL P1 9'' x 18' 37 ACCESSIBLE 2 COMPACT 2 41 LEVEL 01 9'' x 18' 13 ACCESSIBLE 2 15 LEVEL 02 9'' x 18' 19 19 TOTAL PARKING 75 SDP - PARKING BY TYPE TYPE QTY 9'' x 18' 69 ACCESSIBLE 2 ACCESSIBLE 2 COMPACT 2 TOTAL PARKING 75 SDP - SITE-SPECIFIC BASE... SPOT LOCATION ELEVATION NE CORNER 4,821.77 SE CORNER 4,821.77 SW CORNER 4,821.77 NW CORNER 4,821.77 AVERAGE 4,821.77 BIKE STORAGE 218 SF CIRCULATION 5,749 SF OUTDOOR DECK 3,582 SF PARKING 25,702 SF RES. LOBBY 979 SF RESIDENT PARKING 8,081 SF RESIDENTIAL 75,424 SF RETAIL 3,767 SF ROOFTOP AMENTIY 1,634 SF SERVICE 2,707 SF TRASH RM 451 SF UTILITY 381 SF TOTAL 128,675 SF N 20 20 40 1" = 20' 0 FEETSCALE Area Closed during construction for safety of public and to be used for dumpster storage. Area Closed during construction for safety of public and to be used for material storage, concrete pumping, etc. - Pedestrian traffic to be diverted at the opposite end of the block. - During production we will have 3-4 semi trailers of wall panels and decking being hoisted by a tower crane. Those trailers go from fully loaded to empty every other day. Sidewalk Closed during construction for safety of public and to be used for material storage, concrete pumping, etc. - Pedestrian traffic to be diverted at the opposite end of the block. North Bound Drive Lane Closure: Reviewing & Discuss with MDT for lane closures at critical phases of construction. - This traffic lane closure will be needed until we are done erecting the building 10-12 months. 40 yard roll-off 40 yard roll-off Material Storage