Loading...
HomeMy WebLinkAbout009 Storm Water Maintenance PlanSTORM WATER MAINTENANCE PLAN TRS Management Dance Studio City of Bozeman, Montana PROPERTY OWNER'S RESPONSIBILITIES FOR ROUTINE INSPECTION AND MAINTENANCE: 1. Routine Maintenance Activities (1-3 month interval) • Remove trash, leaves, grass clippings and debris from inlets, swales & retention structures. • Remove any obstruction to flow • Establish a chemical free zone in and around the basins • Inspect for uniform ponding, and that water disappears within three days of rain events • Inspect inlets, piping, swales & curbs for sediment buildup and/or evidence of erosion • Check for eroded or channelized areas. Repair immediately, find the cause and take action to prevent further erosion. • Inspect structures and retention structures for oil sheens • Inspect swales for undesirable vegetation or noxious weeds 2. Annual Maintenance Activities (Annually) • Re-establish vegetation on eroded and barren areas • Remove excess sediment build-up in inlets, piping, swales and retention structures. • Update maintenance plan and inspection log • Clear and remove accumulated winter sand in parking lots and structures • Underground retention vaults shall be thoroughly inspected o If sediment is at, or above, 3” chambers shall be cleaned using the jetvac process. o A fixed culvert cleaning nozzle with rear facing spread of 45” or more is preferred. o Apply multiple passes of jetvac until backflush water is clean. 3. Long Term Maintenance Activities (5-10 year interval) • Dredge basin if sediment buildup is greater than 6” • Re-establish vegetation • Repair or replace damaged storm water structures and/or piping • Re-grade swales to ensure proper drainage. 4. Maintenance of the site, drainage paths and storm structures shall be the responsibility of the property owner. 21013\Storm Water Maintenance Plan.Doc