HomeMy WebLinkAboutResponse to Comments NarrativeChick Fil A Site Plan Response to Concept Review Comments
Project Name 24345 Bridger Point CONR
The following comments are from the COB Review Comments Report generated on 8/16/24.
Our responses are bolded.
1. SLD Waste: Be sure that we have a 50 foot straight approach to the front of refuse
enclosure with no parking or raised curbing within the straight approach need a detailed
plan for refuse enclosure.
RESPONSE: Please see the attached site plan that includes the required 50 foot
straight approach to the front of the refuse enclosure. A refuse enclosure plan is also
included in this submittal.
2. BMC 38.410.130. Water Adequacy: The development will need to satisfy the water
adequacy code requirement prior to a future site plan approval. If sufficient water rights
cant be provided to offsets the development's annual demand then a cash-in-lieu of water
rights (CILWR) payment will be required. The City assesses the CILWR fee at a rate of
$6,000 per acre-foot. The fee determination will take place during the site plan review,
however if there are any questions or if a preliminary review is desired please contact
Griffin Nielsen with the Engineering/Utilities Department directly at
gnielsen@bozeman.net or (406) 582-2279. The City encourages the use of groundwater
wells to supply irrigation demands, which in turn will reduce the CILWR fee. Applicant
must obtain a pre-determination from the DNRC demonstrating that a well groundwater
well may be permitted under Montana’s exempt appropriation or that provide the water
right documentation if existing prior to finalization of the CILWR fee determination.
Finally, the City would like to make the owner aware of an available CILWR rebate of
approximately 20% for residential units if high efficiency fixtures (toilets, washers, and
shower heads) meeting the City Water Conservation Division standards are installed. The
rebate would be released at occupancy and requires an agreement defining the terms and
amount rebate be finalized and executed prior to final plan approval. If the owner is
interested or has any questions please reach out to Griffin Nielsen.
RESPONSE: Refer to Master Site Plan resubmittal letter for response.
3. DSSP Plans and Specifications Review Policy A. -Plans, specifications, and submittals
for public infrastructure improvements and fire service lines must be submitted to the
City Engineering Department by the design engineer through the engineering Project Dox
Portal (https://www.bozeman.net/services/development-center) for infrastructure review.
RESPONSE: Refer to Master Site Plan resubmittal for response.
4. DSSP A.1 - The development application must reach adequacy according to the
reviewing engineer prior to initial infrastructure & fire service line review.
RESPONSE: Refer to Master Site Plan resubmittal for response.
5. North 19th Avenue is an MDT urban route. The applicant must contact MDT to
determine if the proposed development will require permitting or Systems Impact
Analysis. The MDT review process may impact the proposed development layout. In the
event MDT requires changes, a modification or resubmittal will be required. All work
within the MDT right-of-way must meet MDT standards and specifications. The
applicant must provide proof of submittal and approval from MDT prior to final site plan
approval.
RESPONSE: Refer to Master Site Plan resubmittal for response.
6. DSSP Section V.A. - A water design report must be prepared by a professional engineer
for the proposed project. The water distribution system must be designed to meet the
maximum day demand plus fire flow
and the peak hour demand.
RESPONSE: Refer to Master Site Plan resubmittal for response.
7. DSSP Section V. B. - Sanitary Sewer System Design Criteria: The applicant
must provide an estimate of the peak-hour sanitary sewer demand certified
by a professional engineer for the proposed project prior to site plan
approval.
RESPONSE: Refer to Master Site Plan resubmittal for response.
8. DSSP II.B.1 A Storm Drainage Plan shall include a map or plat showing
building site(s), open areas, drainage ways, ditches, culverts, bridges, storm
sewers, inlets, storage ponds, roads, streets, and any other drainage
improvements. The map shall also include identification and square foot
coverage of the various ground surfaces (i.e. vegetation, gravel, pavement,
structures).
RESPONSE: Refer to Master Site Plan resubmittal for response.
9. DSSP Section II A. 4. - The applicant must include a storm drainage plan with post-
construction storm water management controls that are designed to infiltrate,
evapotranspire, and/or capture for reuse the post-construction runoff generated from the
first 0.5 inches of rainfall from a 24-hour storm preceded by 48 hours of no measurable
precipitation.
RESPONSE: Refer to Master Site Plan resubmittal for response.
10. Montana Post Construction Storm Water BMP Design Manual – The proposed project is
located in an area that is known to have seasonally high groundwater. The applicant must
demonstrate that seasonal high groundwater will not impact the function or maintenance
of the proposed facilities. Industry guidance recommends a three-foot minimum
separation from the bottom of the proposed facility to the underlying groundwater table.
The applicant must provide local seasonal high groundwater elevations to support the
proposed design.
RESPONSE: Refer to Master Site Plan resubmittal for response.
11. DSSP Section II C. - The applicant must provide on-site detention with release rates
limited to predevelopment runoff rates. Retention ponds must be sized based on a 10-
year, 2-hour storm intensity.
RESPONSE: Refer to Master Site Plan resubmittal for response.
12. BMC 38.220.080 A. 2.i. - A traffic impact study will be required for the proposed
development which will need to discuss how much daily traffic will be generated on
existing local and neighborhood streets, roads and alleys, when the project is fully
developed. The traffic impact study must evaluate all collector and arterial intersections
within 1/2 mile of the site at 15 years following the development application per the
requirements in BMC 38.400.060.B.4.
RESPONSE: Refer to Master Site Plan resubmittal for response. A variance has
been submitted at the City’s suggestion and Queuing analysis has been included in
submittals.
13. The applicant must submit a peak hour queuing analysis with the future site plan for the
Chick-Fil-A drive through.
RESPONSE: Queuing analysis has been included in this submittal.
14. Expecting that there will be a new plat recorded re-aligning the lot lines, an address can
be assigned once the new legal description has been determined.
RESPONSE: Refer to Master Site Plan resubmittal for response.
15. Fire approves of proposed fire riser room location with access from exterior and public
way. Please locate FACP in room also. These are required for an A2 occupancy over
5,000 sq ft. Specific to PH1, site access and circulation for fire apparatus is acceptable.
Please lose any reference to emergency access as it does not meet fire code requirements.
Minimum 20 feet wide and due to length, a hammerhead turnaround or connection to
Simmental Way. Specific to PH2, major failure is the East/Southeast side road to parking
that would require connection to main entry road or a hammerhead turnaround. Over 150
feet in length. Fire riser room shall be located similar in concept to A2 occupancy.
Although speculating, R2 occupancy will probably have fire standpipes thus requiring the
FDC be within 100 feet of a fire hydrant with clear access. Last observation, highly
suggest a secondary access to site, due to proposed density with R2 occupancy.
RESPONSE: Refer to Master Site Plan resubmittal for response.
16. DSSP V.A.8 - Hydrants shall be provided at each street intersection and at intermediate
points so that hydrants are spaced 350 to 600 feet depending on the area being served.
The applicant must relocate the existing fire hydrant and comply with any fire code
requirements from the fire department. This property likely needs a minimum of 2 fire
hydrants.
RESPONSE: Refer to Master Site Plan resubmittal for response.
17. Concurrent construction allows public infrastructure and the building to be constructed at
the same time. Concurrent construction has been an identified purpose of the initial
project review. The applicant must complete the following concurrent construction for
(https://www.bozeman.net/home/showpublisheddocument/11704/637769761956630000)
to apply for concurrent construction for on site or adjacent improvements associated with
site development.
RESPONSE: Refer to Master Site Plan resubmittal for response.
18. DSSP V.A.6 - The standard sizes for water service lines are 0.75", 1", 1.5", 2", 4", 6" or
8". Please revise the proposed 3-inch water and fire services on the concept plan.
RESPONSE: Refer to Master Site Plan resubmittal for response.
19. The applicant must ensure the water and sewer department has access to all sewer
manholes and water valves. Sewer manholes and water valves may not be located in a
parking space. The proposed layout does not allow access to the sewer manhole near the
southeast corner of the site, please revise.
RESPONSE: Refer to Master Site Plan resubmittal for response.
20. Please be sure these figures are consistent across submittals. This pond sits on a sewer
easement; other drawings show a different configuration.
RESPONSE: Refer to Master Site Plan resubmittal for response.
21. The applicant is advised that the proposed project falls within the Bozeman Solvent Site
boundary. The property is underlain by an aquifer contaminated with perchloroethylene
(PCE). No irrigation wells may be installed on this property and any excavation and
dewatering will require additional construction oversite. The applicant must abide by
institutional controls defined in the City of Bozeman agreement with Montana DEQ and
the associated permitting for work within the boundaries of the contamination. Please
contact the City’s solvent site consultant, Jim Sullivan, the Principal Engineer at Tasman
Geosciences, Inc. and the DEQ project manager, Kate Frye for additional information on
construction requirements within the solvent site.
RESPONSE: Refer to Master Site Plan resubmittal for response.
22. Concept Review Checklist Items 16)a) and 17) are missing. For more information, visit
https://www.bozeman.net/services/developmentcenter/checklists-guides-brochures
RESPONSE: Refer to Master Site Plan resubmittal for response.
23. On June 15th, 2024, Ordinance 2155 and Resolution 5586 were adopted by the Bozeman
City Commission as well as the associated City of Bozeman Landscape and Irrigation
Performance and Design Standards Manual. To familiarize yourself with these
requirements, please visit https://www.bozeman.net/departments/utilities/water-
conservation/newdevelopment-standards-3620.\
RESPONSE: Noted. Plans have been prepared in accordance with the Landscape
and Irrigation Performance and Design Standards Manual.
24. "City of Bozeman Landscape and Irrigation Performance and Design Standards Manual"
- 3.2.2 - "Required Elements of the Landscape Design Plan for Final Plat and Site Plan" -
Item 1) AND 3.2.1 - "Landscape Design Approval Pathways". Landscape design
approval pathway needs to be selected for the upcoming site plan submittal. Plants will
need to either be very low or low water use OR a water budget calculator will need to be
completed depending on the performance pathway.
RESPONSE: Noted. Plans have been prepared in accordance with the Landscape
and Irrigation Performance and Design Standards Manual.
25. "City of Bozeman Landscape and Irrigation Performance and Design Standards Manual"
- 3.3. - Irrigation Requirements. Review irrigation requirements for the irrigation plan
submittal. Irrigation source will need to be identified to make sure the irrigation system
can operate during all phases of development.
RESPONSE: Noted. Plans have been prepared in accordance with the Landscape
and Irrigation Performance and Design Standards Manual. Irrigation plans are to
be prepared with the permit submittal.
26. "City of Bozeman Landscape and Irrigation Performance and Design Standards Manual"
- 3.3. - Irrigation Requirements. Review irrigation requirements for the irrigation plan
submittal. Irrigation source will need to be identified to make sure the irrigation system
can operate during all phases of development.
RESPONSE: Noted. Plans have been prepared in accordance with the Landscape
and Irrigation Performance and Design Standards Manual. Irrigation plans are to
be prepared with the permit submittal.
27. "City of Bozeman Landscape and Irrigation Performance and Design Standards Manual"
- 3.2.2 - "Required Elements of the Landscape Design Plan for Final Plat and Site Plan" -
Item 8) AND 3.2.1 - "Soil Preparation and Amendment Requirements". Imported topsoil
is subject to a soil test. Lawn areas proposed must also have a 6" soil depth.
RESPONSE: Noted. Plans have been prepared in accordance with the Landscape
and Irrigation Performance and Design Standards Manual.
28. "City of Bozeman Landscape and Irrigation Performance and Design Standards Manual"
- 3.1.2. A signed copy of the Building Permit Landscape & Irrigation Self-Certification
Form (Appendix E) is necessary to receive a building permit.
RESPONSE: Noted. A signed copy of the certification form will be provided prior to
receiving the building permit.
29. We will need some kind of driveable access to this manhole. I realize it's not on the
property, but it looks like there won't be any access to it from this property along our
easement. You could use the water easement for access instead.
RESPONSE: Refer to Master Site Plan submittal for response.
30. In most of the drawings this pond isn't located in this position. This version won't be
allowed.
RESPONSE: Refer to Master Site Plan submittal for response.
31. The other utility drawing shows a different water service arrangement and sizing, but a 3"
service isn't allowed. You can have a 3" domestic meter, but the plumbing leading up to it
must be 4".
RESPONSE: Refer to Master Site Plan submittal for response.
32. With this hydrant removal there are no fire hydrants in this entire vicinity. You will need
to work with the fire department and choose locations and install new fire hydrants.
RESPONSE: Refer to Master Site Plan submittal for response.
33. DSSP V.D.5 - The stormwater pond in the southeast corner of the site near the fast food
restaurant may not be located in the sewer easement.
RESPONSE: Refer to Master Site Plan submittal for response.
34. At building permit application please provide a detailed Kitchen equipment layout and
equipment speciation's. This includes any and all mechanical hoods type I or Type II.
Suppression requirements, specifications, make-up air etc. This shall not be a deferred
submittal.
RESPONSE: Noted, a detailed kitchen equipment plan and equipment details will
be provided at building permit application.
35. It is unclear how stormwater from the access to North 19th will be treated and comply
with the DSSP stormwater requirements. Please provide additional information with the
site plan as stated in the previous engineering comments.
RESPONSE: Refer to Master Site Plan submittal for response.
36. BMC 38.540.050.A.2.4, Parking/Bicycle Parking: The rack location on the east side of
the building is not located within 50 feet of the main entry and is also not easily
accessible from the shared space for pedestrian plaza/sidewalk. A separated shared use
path will be requested with another comment associated with this submittal. That path
will allow bicyclists and users of active modes to access the site. Ideally these users
would not have to integrate with heavy vehicular access from North 19th Avenue. In
addition to correcting the location and access issue, consider other user comfort concerns
given the location of the proposed bike rack.
RESPONSE: Bike racks are proposed within close proximity to the eastern patio
seating and the shared use path just south of the building.
37. BMC 38.230.020.B - A master site plan is a generalized development plan that
establishes building envelopes and overall entitlements for complex, large-scale projects
that will require multiple years to reach completion. Use of a master site plan is not
required unless necessary to address phasing of a proposed development (see section
38.230.090.B.3) or if required as part of the residential emphasis mixed-use district. A
master site plan is recommended when development phasing is proposed to extend
beyond two years. The application proposes two phases of development. The applicant
has the option of providing a master site plan application for review concurrently with the
phase 1 fast food restaurant application. The master site plan can be a generalized
development plan at a high level that will help staff identify improvements to be
completed with each phase, as well as post demolition treatment to the area proposed to
later be occupied. This is the recommended path. Alternatively the applicant can develop
one area of the site for the fast food restaurant, but the application will need to stand
alone in all areas of the code including site design, block frontage, zoning, and
infrastructure. With either a phased master site plan application or a standalone phase 1
application all public landscaping and facilities at the 19th street frontage including
sidewalks or shared use paths, and street trees will need to be provided with phase 1.
RESPONSE: A Master site plan is being submitted concurrently with this site plan
submittal. Refer to Master Site Plan submittal for response
38. Staff understands that a lot aggregation has been completed with subdivision exemption
application #22167. Provide a copy of the recorded amended plat with formal submittal.
RESPONSE: Refer to Master Site Plan submittal for response.
39. Staff understand that a zone map amendment (application #24185) is currently under
review with the City and scheduled for a public hearing on 9/24 to change the zoning to
B-2 (Community Business). The applicant assumes that a B-2 zoning designation will be
approved within the submitted application materials. Staff comments regarding zoning
will provided against the B-2 standards for this conceptual review.
RESPONSE: Refer to Master Site Plan submittal for response.
40. Convenience uses, which include "the sale of food or drink for consumption, either on or
off premises, over a counter, or from an outdoor service window or automobile service
window," are principal uses in B-2 zoning per BMC 38.310.040.A. Hotels are also
principal uses. BMC 38.360.110 provides supplemental use criteria for convenience uses
and drive-through restaurants. Provide a response narrative in the formal application
detailing why the building and site design meet criteria 1-5.
RESPONSE: Refer to Master Site Plan submittal for response.
41. Provide a cover sheet with formal submittal that details project statistics according to the
site plan submittal checklist. These should include form and intensity standards located in
Article 3 BMC (lot coverage, FAR, etc.), and commercial open space and parking
calculations located in Article 5 BMC.
RESPONSE: Cover sheet has information as required on site plan checklist.
42. BMC 38.320.050 requires a minimum floor to floor height of 15-feet. Floor-to-floor
height is defined as the height between each floor plate in a building measured from the
top of the ground floor to the top of the floor above. This standard applies to non-
residential buildings, and mixed-use buildings, except for residential portions of mixed-
use buildings. Provide a section or other detail demonstrating that the proposed restaurant
will meet this standard with formal submittal.
RESPONSE: Refer to Master Site Plan submittal for response.
43. Identify setbacks on the site plan label the front, side, and rear setbacks and annotate
dimensions. BMC 38.320.050. The applicant is required to identify BMC setback
requirements and is not sure where the setbacks of 50 and 128-feet listed on the site plan
are derived from.
RESPONSE: Setbacks have been labelled and shown on the plan.
44. BMC 38.410.080 - Stormwater retention/detention facilities in landscaped areas must be
designed as landscape amenities. They must be an organic feature with a natural,
curvilinear shape. The facilities must have 75 percent of surface area covered with live
vegetation appropriate for the depth and design of the retention/detention facility, and be
lined with native grasses, indigenous plants, wet root tolerant plant types and groupings
of boulders to create a functional, yet natural site feature. A cross section and landscape
detail of each facility must be submitted with the final landscape plan for review and
approval. Facilities with a slope up to and including ten percent grade may be grassed and
irrigated to blend into the adjacent landscaped area.
RESPONSE: The project is proposing an underground detention system for
stormwater control. Landscaping stormwater facilities have been removed.
45. This site has significant block length and width issues. BMC 38.410.040. In order to
mitigate this condition pedestrian access along the southern access road and between the
two phases will need to be provided. Rights-of-way not less than ten feet wide for
pedestrian walks are required where deemed necessary to provide circulation. In addition,
no continuous length of block may exceed 600 feet without intersecting a street or
pedestrian walk. Provide a pedestrian walkway along the north-south access road that
includes a sidewalk and street trees at the 1/50-foot metric. Additionally, per engineering
comments, a local street connection is required to connect to the property to the south.
Sidewalks and street trees on both sides of that street connection connecting to 19th
Avenue are required. The emergency access road, will need to be designed as a bike/ped
amenity with public landscaping and access easements for bike/ped connections to
Simmental Way.
RESPONSE: Refer to Master Site Plan submittal for response.
46. Block frontage is a required design standard in the City of Bozeman. The current design
of the site does not provide a building along the primary 19th and Valley Center frontage,
but along an emergency access area. The applicant will be required to demonstrate at
formal submittal that the proposed restaurant is meeting block frontage standards located
in BMC 38.510.030. One option would be the internal roadway standard located in BMC
38.510.030.F. When demonstrating compliance with block frontage the applicant will
need to provide the appropriate building placement, building entrances, facad
transparency, weather protection, parking location, landscaping, and sidewalk width.
RESPONSE: Refer to Master Site Plan submittal for response.
47. The applicant is required to meet the site planning and design elements required in BMC
38.520 including the following related to non-motorized and motorized circulation and
design: - Non-motorized circulation (BMC 38.520.040) and design which requires
connecting paths between sites with multiple buildings, crosswalks made of contrasting
material (such as stamped concrete), safe paths through parking lots, and connections to
adjacent properties. All sidewalks must be separated from structures by at least 3-feet of
landscaping, except where the adjacent building facades meets the storefront block
frontage standards. Pathway design is also required which details the width of sidewalks
adjacent and not adjacent to perpendicular parking. - Vehicular circulation and parking
(BMC 38.520.050) which requires inter-site connectivity, and internal roadway design
for sites greater than 2-acres. This requires street trees and sidewalks be provided on all
internal access roadways. - Provisions for drive-through facilities require screening for
queueing lanes with evergreen shrubs or architectural screening, and the location of
walkways in BMC 38.520.050.D.3
RESPONSE: Refer to Master Site Plan submittal for response.
48. The applicant is required to meet the site planning and design elements required in BMC
38.520 including the following related to commercial open space and mechanical
equipment: - Usable commercial open space (BMC 38.520.060.C) is required for new
developments on sites with a total area greater than one acre. For commercial sites, an
areas equal to at least two percent of the site area is required. The open space may be in
the form of pedestrian-oriented open space per subsection D, garden, play area or other
open space feature that serves both as a visual amenity and a place for human activity.
Portions of sidewalks that are wider than 12 feet and which meet the standards of
pedestrian-oriented open space may be counted toward this requirement. With a master
site plan application, staff would support dividing this open space area between the two
developments. - Location and design of service areas and mechanical equipment (BMC
38.520.070) requires service areas (trash enclosures, back of house, etc.) to be screen and
located away from sidewalks and adjacent properties. There are specific provisions for
architectural screening and 5-feet of adjacent landscaping. The applicant will also be
required to demonstrate architectural screening of rooftop mechanical equipment, and
utility meters per this section.
RESPONSE: Screening for the trash enclosure is provided in this submittal using
appropriate landscaping. Rooftop mechanical screening is provided using a parapet
that completely screens the rooftop mechanical equipment.
49. The applicant must meet the building design standards of BMC 38.530 including building
character, massing and articulation, use of durable materials, building details, and
mitigation of any blank walls as defined in this section. The applicant must demonstrate
in the narrative and drawings in the formal submittal that the standards of this section are
met.
RESPONSE: Our design incorporates use storefront window system with clear
glazing providing transparency to the interior. Metal awnings/canopies are added
over the window & entry/exits to provide sun & whether protection. The
incorporation of metal and turnbuckles (tie rods) back to the building accentuates
the structural detail support and attachment. The use of stone veneer, vertical
siding, cement plaster creates a variation of texture along with the use of different
exterior colors helps break the massing of the building and architectural enhance
the façade. In plan and elevation, a variation of furr-outs and heights are combined
in the design to enhance the architectural detailing of the building.
50. The concept plan provided a basic parking calculation for the hotel and restaurant. For
the restaurant, the applicant must include a gross and a net floor area calculation. Per
BMC 38.540.010 the net calculation may be either 85% of gross or a manual calculation
that removes storage areas, kitchens, walkways, etc. as listed. When providing the
parking calculation in the formal submittal the applicant is required to show gross floor
area, net floor area (by either calculation), and the number and location of provided
spaces. The applicant will need to demonstrate that provide parking areas do not exceed
the 125% maximum from the minimum requirement. The applicant is also required to
provide a bicycle parking calculation and meet the location, rack type, and dimensional
standards provided in BMC 38.540.050.A.4-5.
RESPONSE: The coversheet has been provided and includes the required project
statistics.
51. Landscaping requirements were recently updated with ordinance 2155 and resolution
5586. These requirements have not yet been incorporated into the code. The applicant
must reference the ordinance for landscaping standards including parking lot landscaping,
screening requirements, and other mandatory landscaping provisions. The water
conservation division will review for water efficient design requirements in their adopted
manual which includes required and prohibited plant materials and efficient irrigation
components. Additionally, per BMC 38.550.050 subsection D all street rights-of-way
contiguous to or within the proposed development site not used for street pavement,
curbs, gutters, sidewalks or drive aisles must be landscaped, as defined in this chapter,
and must include one large canopy tree for each 50 feet of total street frontage rounded to
the nearest whole number. This includes the 19th avenue frontage, and the local street
extension into the property.
RESPONSE: Noted. Plans have been prepared in accordance with the Landscape
and Irrigation Performance and Design Standards Manual.
52. BMC 38.560.060 caps allow sign area at 400 square feet per lot. Because 2 developments
are proposed for a single lot the applicant is also required to provide a comprehensive
sign plan per BMC 38.560.080 which allocates area and dictates sign design for the
property prior to the issuance of any sign permits. Additionally, according to the
drawings a monument sign is proposed along the south side of the 19th street entrance to
the site. Monument signs may not be located in the public ROW and have setback
provisions in the sign code. This sign will need to be relocated.
RESPONSE: Refer to Master Site Plan submittal for response.
53. The formal submittal will need to demonstrate compliance with the site lighting
provisions in BMC 38.570.040. This includes parking lot lighting, building entrances,
and full cutoff fixtures. An electrical plan, photometric plan that provides footcandle
values to all property lines, and fixture details are required with formal submittal.
RESPONSE: Photometric plan, lighting and details are provided in this submittal.
54. BMC 38.400.010.A.1 - Relation to Undeveloped Areas The applicant must provide a
local street connection to the southern property boundary for the convenient movement of
vehicles and multimodal traffic to the adjoining undeveloped land. The current
development proposal does not satisfy this code requirement.
RESPONSE: Refer to Master Site Plan submittal for response.
55. BMC 38.400.110 - Transportation Pathways The development review committee (DRC)
will require the applicant to construct a 10-foot shared use path along the North 19th
street frontage with phase 1. The applicant must allow for multimodal connectivity along
North 19th to the north and south of the subject property. Shared use path is required to
complete the North 19th street section and is supported by the growth policy. Any
improvements within MDT ROW must be designed to MDT standards and be approved
by MDT. Typically, MDT doesn’t allow shared use path in their ROW and a shared use
path outside of the ROW will require a trail easement. A template trail easement has been
uploaded to the city documents folder. The current development proposal does not satisfy
this code requirement.
RESPONSE: A 10’ wide shared use path has been provided along the south end of
the site .