HomeMy WebLinkAboutCIP Presentation-2027-2031 MASTER FINALCAPITAL IMPROVEMENT PROGRAM 2027-2031CITY COMMISSION WORK SESSION
December 9, 2025
Overview
Melissa HodnettDirector of FinanceDecember 9, 2025
2027-2031 CAPITAL IMPROVEMENT PROGRAM
What is a Capital Improvement Program?
•The City of Bozeman CIP is a mid-range plan, required by state and City regulations, which identifies five years of capital infrastructure projects, equipment purchases and other capital purchases greater than $25,000.
•The CIP is a planning document adopted on an annual basis to allow for flexibility and adjustments.
•The CIP is not budgetary appropriations or and does not guarantee funding.
Projects will not be initiated unless funding is secured.
2027-2031 CAPITAL IMPROVEMENT PROGRAM
CIP Process Cycle
Departments submit CIP requests
Finance, City Manager, and Advisory Committees review
relevant CIP
CIP is presented to City Commission
prior to Dec 31 each year.
CIP will be presented for final
adoption on March 10th.
Integration into the 2027 Biennium and
2029 Biennium Budgets
Protecting What We Have
•City facilities
•Transportation network
•Wastewater treatment plant investments
•Parks and public right-of-way
Bozeman Capital Plan | Core Tenets
2027-2031 CAPITAL IMPROVEMENT PROGRAM
Planning for What We Need
•Fowler Housing Project
•Water supply
•Modernizing and professionalizing City operations through technology
How is the capital plan developed?
2027-2031 CAPITAL IMPROVEMENT PROGRAM
Recommended Capital Improvement Program
Affordability
Commission priorities
Planning documents
Adopted Plans:
•Public Works Facility Master Plan (2020)•Wastewater Collection Facility Master Plan (2024)•Water Reclamation Facilities Plan (2023)•Integrated Water Resources Plan (2013)•Water Facility Plan (2017)•Water Conservation and Efficiency Plan (2023)•Stormwater Facilities Plan (2025)•Transportation Master Plan (2017)•Facilities Condition Assessment (2023)•Bozeman Climate Plan (2020)•Annual Housing Action Plan (2025)•Parks, Recreation, and Active Transportation (PRAT) Plan (2023)
Plan Updates:•Urban Forest Management Plan (2026)•Transportation Master Plan (2027)•Integrated Water Resources Plan (TBD)•Water Facility Plan (TBD)
Cost Estimate Classification
Impact on Operating Budget
Document Tips (page 9)
2027-2031 capital improvement program
2027-2031 CAPITAL IMPROVEMENT PROGRAM
Estimate Class Purpose
Project Definition Level
Expressed as % of completion
Cost Estimate Range
Typical variation in high & low range
Class 5 Concept or Feasibility 0% to 2%+ 100% / -50%
Class 4 Preliminary Engineering 1% to 15%+ 50% / -30%
Class 3 Semi-Detailed (30%-60% Design)10% to 40%+ 30% / -20%
Class 2 Detailed (60%-100% Design)30% to 75%+ 20% / -15%
Class 1 Final (100% Design/Bid Opening)65% to 100%+ 10% / -10%
N/A Not Applicable
Impact Definition
Positive The project will result in annual operating cost savings or generate additional revenue.
None The project will not result in additional annual operating expenditures.
Negligible The project will increase annual operating expenditures by less than $10k.
Minimal The project will increase annual operating expenditures by more than $10k but less than $50k.
Moderate The project will increase annual operating expenditures by more than $50k but less than $100k.
High The project will increase annual operating expenditures by more than $100k.
Unknown The impacts of the project are unknown at this time.
Facilities Management
Jon HendersonAssistant City ManagerDecember 9, 2025
2027-2031 CAPITAL IMPROVEMENT PROGRAM
Public Works Projects Map Viewer (https://gisweb.bozeman.net/Html5Viewer/?viewer=infrastructure)
2027-2031 CAPITAL IMPROVEMENT PROGRAM
Facilities Management – Facilities Condition Assessment
•Recent Issues
•Anderson Pavilion, Swim Center, Lindley Center, Bogert Pool
•Life-cycle Asset Management
•Preventative vs. Reactive, 10/20/30-year Replacement Schedule
•Applies to All Fixed Assets (not just Facilities)
•Increased Investment
•Shifting away from Deferred Maintenance
•10-year Plan for Brining All Facilities up to Standard
•Long-term Facility Planning
•Public Works
•Senior Center, etc.Category Description 1yr 5yr 10yr
1 Emergency and essential services 0.13 0.10 0.50
2 Core City services and functions 0.15 0.12 0.08
3 Secondary services and functions 0.20 0.15 0.10
FCI Targets
Financial Overview
Melissa HodnettFinance Director December 9, 2025
2027-2031 CAPITAL IMPROVEMENT PROGRAM
Scheduled 5-Year CIP by Service Area
Public Works,
$243M, 84%
Public Safety, $12M, 4%
Public Welfare, $23M, 8%
General Government,
$11M, 4%
Scheduled CIP 2027-2031
Total Scheduled = $289M
2027-2031 CAPITAL IMPROVEMENT PROGRAM
Funding Sources
•Self sustaining businesses funded by customer charges
•Cost of service analysis performed every 5-10 yearsEnterprise Funds
•City-wide districts funded by assessments to benefitted property owners
•Assessments are included on the Gallatin County property tax bill
Special Assessment Districts
•Restricted revenues go into special revenue funds
•May only be used for certain purposesSpecial Revenue
•Funds that support other City funds/departments
•Funded by interfund transfersInternal Service Funds
•Property taxes and state shared revenues pay for expenditures
•Supports other special revenue funds when restricted revenues are insufficient
General Fund & Community Housing
2027-2031 CAPITAL IMPROVEMENT PROGRAM
Funding Sources and Depts
Enterprise Funds
Water
Wastewater
Stormwater
Solid Waste & Landfill
Parking
Special Assessment Districts
Parks & Trails
Forestry
Street Maintenance
Street Arterial & Collector
Special Revenue
Fire Capital
Planning Fund
Building Fund
Parks Land Trust
Street Impact Fee
Internal Service Funds
Vehicle Maintenance
Public Works Administration
General Fund & GF Supported
Independent departments: Police, Library, Sustainabillity
Fire
Recreation & Cemetery
Community Housing
2027-2031 CAPITAL IMPROVEMENT PROGRAM
Special Assessments and Enterprise Funds
Enterprise Funds
Water
Wastewater
Stormwater
Solid Waste & Landfill
Parking
Special Assessment Districts
Parks & Trails
Forestry
Street Maintenance
Street Arterial & Collector
Special Revenue
Fire Capital
Planning Fund
Building Fund
Parks Land Trust
Street Impact Fee
Internal Service Funds
Vehicle Maintenance
Public Works Administration
General Fund & GF Supported
GF Departments include: Police, Fire, Cemetery, Recreation, Library
GF supported departments include: Library Depreciation, Story Mansion, Community Housing
•No rate/assessment impacts anticipated as a result of recommended CIP
•Full rate and assessment impacts calculated over the next few months
•Shops complex concept design underway and anticipated to have additional impacts.
2027-2031 CAPITAL IMPROVEMENT PROGRAM
General Fund Overview
$12.2M
$3.2M
$1.9M
$1.5M
$18.8M
FY26-FY30 Previously
Adopted
Facilities Management
Projects
Public Safety
Technology
Modernization
ERP Replacement
Addition
FY27-FY31 Proposed
Walk Chart | General Fund Adopted vs Proposed CIP
2027-2031 CAPITAL IMPROVEMENT PROGRAM
General Fund – Public Safety Technology Modernization
Components
Body Worn Cameras & In-Car Cameras
Digital Evidence Platform
Language Translation in Cameras
Virtual Reality Training Simulator
Conducted Energy Devices (CEDs) Replacements
•Subscription model with annual cost = $537,100 beginning in FY29
ERP Replacement (FY27)
2027-2031 capital improvement program
•General Fund
Core Financials/HR - $1,920,000
•Planning Fund - $280,000
•Building Fund -$280,000
•Engineering (through PW Admin Fund) -$140,000
Permitting Software - $560,000
•All through PW Admin Fund
•Utility Funds –est. $660,000
•Solid Waste –est. $220,000
Utility Billing - $1,020,000
2027-2031 CAPITAL IMPROVEMENT PROGRAM
Community Housing (page 400)
Fowler Community Housing Project
•5.5 acre City owned lot
•Ongoing conversation with the community
•Long-term, affordable, for-sale
homes
•Engineering and design: $2,144,300
Questions | CIP Process & Financial Overview
2027-2031 Capital Improvement Program
General Government, Public Safety, Public Welfare
Melissa Hodnett Director of Finance
December 9, 2025
General Government,
Public Safety,
and Public Welfare
16%
Other (Public Works)
84%
Scheduled 5-year CIP
2027-2031 CAPITAL IMPROVEMENT PROGRAM
Public Safety, Public Welfare, & General Government
$18.3M $17.0M
$5.0M
$2.9M $2.3M $2.0M
$4.0M
$6.0M
$8.0M
$10.0M
$12.0M
$14.0M
$16.0M
$18.0M
$20.0M
Vehicles & Equipment Repair & Replacement
Projects
Infrastructure Software Other
Public Safety, Public Welfare, and General Government
2027-2031 CIP by Type
•$8.8 million of vehicles scheduled over 5-years, primarily replacements
•Electric/hybrid options prioritized
•Fleet Management policy finalized in FY26 – more consistent replacements City-wide
$3.2M
$2.3M
$3.1M
$0.2M $0.5M
$1.0M
$1.5M
$2.0M
$2.5M
$3.0M
$3.5M
Police Fire Parks &
Recreation
All Other
2027-2031 CIP
Vehicles by Department
Public Safety, Public Welfare, & General Government – Vehicles
2027-2031 CAPITAL IMPROVEMENT PROGRAM
2027-2031 CAPITAL IMPROVEMENT PROGRAM
Public Safety, Public Welfare, & General Government – Equipment
•$9.5 million in equipment adds and replacements
•$5.9M for upgraded public safety equipment
•$1.9M technology modernization
•$1.8M to replace nearly 200 radios at expected useful life of 10 years
•$808k to install new solar panels
•$576K for a multi-purpose snow
machines
•$16.9 million in repair and replacements
•Parks & Recreation
•$6.7 million in Parks & Trails District
•Facilities Management
•Professional Building - $3.4 million
•Senior Center - $1.4 million
•Library
•$1.0 million for children’s area renovation funded by donations to the Library Foundation
•Fire Station 3 maintenance
$7.5M $7.3M
$1.5M
$0.7M $1.0M
$2.0M
$3.0M
$4.0M
$5.0M
$6.0M
$7.0M
$8.0M
Parks &
Recreation
Facilities
Projects
Library Fire
2027-2031 Repair & Replacement
Projects by Department
Public Safety, Public Welfare, & General Government – Repair & Replacement
2027-2031 CAPITAL IMPROVEMENT PROGRAM
2027-2031 CAPITAL IMPROVEMENT PROGRAM
Public Safety, Public Welfare, & General Government – Infrastructure Projects
$1.1M $1.0M
$0.8M
$0.6M
$0.5M
$0.4M $0.4M $0.4M
$0.2M
$0.4M
$0.6M
$0.8M
$1.0M
$1.2M
Sports
Complex
Parking Lot
(FY27)
Pickleball
Courts (FY27)
Flanders Mill
Sidewalk
(FY28)
Cattail Corridor
Parks & Anchor
Route
(FY27/FY28)
Bikefill
Community
Park (FY27)
SW Montana
Veteran's
Cemetery
(FY30)
Active
Transportation
Infrastructure
(Annual)
Other
2027-2031 Infrastructure by Project
Questions
2027-2031 Capital Improvement Program
$76.0M
$38.7M $36.8M
$27.4M
$3.6M
$33.2M
$22.8M
$2.5M $1.0M $0.8M $0.3M
Water Fund Water Impact
Fee
Wastewater
Fund
Wastewater
Impact Fee
Stormwater
Funds
Transportation Street Impact
Fee
Solid Waste
Funds
Public Works
Admin.
Parking Vehicle
Maintenance
2027-2031 CAPITAL IMPROVEMENT PROGRAM
Public Works Scheduled CIP by Fund/Department
Public Works
84%
All Other CIP
16%
Questions | Transportation & Engineering Funds
2027-2031 Capital Improvement Program
Utility Funds | Water, Wastewater, and
Stormwater
Shawn KohtzDirector of UtilitiesDecember 9, 2025
2027-2031 CAPITAL IMPROVEMENT PROGRAM
Utility Funds Overview
•Water Fund
•Wastewater Fund
•Stormwater Fund
•Water Impact Fee Fund
•Wastewater Impact Fee Fund
2027-2031 CAPITAL IMPROVEMENT PROGRAM
Utility Department Themes
Protecting existing City assets
•Maximizing existing water supplies by optimizing water resources
•Capital replacement associated with an aging system
•Mitigating risk with proactive replacement of critical aging pipelines
2027-2031 CAPITAL IMPROVEMENT PROGRAM
Utility Department Themes
Planning for the Future
•Pipe replacement and capacity increases
•Water Reclamation Facility Capacity Increase
•Use impact fees for water and sewer capacity expanding projects – “Growth pays for growth.”
2027-2031 CAPITAL IMPROVEMENT PROGRAM
Utility Department Themes
Protecting the Environment
•Nutrients reduction at Water Reclamation Facility with wetlands system (*pending State regulatory changes)
•Stormwater runoff treatment and pollution prevention – Bozeman Creek
•Using existing water resources sustainably
2027-2031 CAPITAL IMPROVEMENT PROGRAM
System Growth
2027-2031 CAPITAL IMPROVEMENT PROGRAM
System Growth
2027-2031 CAPITAL IMPROVEMENT PROGRAM
Utility Funds Overview
•Water Fund
•Wastewater Fund
•Stormwater Fund
•Water Impact Fee Fund
•Wastewater Impact Fee Fund
2027-2031 CAPITAL IMPROVEMENT PROGRAM
Water Fund CIP (CIP Project Pages 263-316)
2027-2031 CAPITAL IMPROVEMENT PROGRAM
Water Fund Key Projects and Changes
Protecting existing City Assets
•Annual Water Main Replacement Program
•Lyman Tank and Transmission Main Replacement
•Hyalite Intake Rehabilitation
•Water Treatment Plant Capital Replacement
•Sourdough Tank Rehab Phase 2
•Sourdough Transmission Main & Water Treatment Tank Hydraulic Improvements
•Hilltop Tank Painting
2027-2031 CAPITAL IMPROVEMENT PROGRAM
Water Fund Key Projects and Changes
Planning for the Future
•Hyalite Dam and Reservoir Optimization Improvements
•Hyalite Reservoir and Equalization Storage
•Install water mains with streets capital projects – Stucky Road and Fowler Corridor
•Sourdough Weather Station – joint project with MSU
•Sourdough Canyon Natural Storage*
•Hydrant Leak Detection
•Equipment purchases to match growth of the system
2027-2031 CAPITAL IMPROVEMENT PROGRAM
Wastewater Fund CIP (Project Pages 203-248)
2027-2031 CAPITAL IMPROVEMENT PROGRAM
Wastewater Fund Key Projects and Changes
Protecting existing City Assets
•Annual Sewer Main Replacement Program
•Equipment replacements
•WRF Aeration Optimization
2027-2031 CAPITAL IMPROVEMENT PROGRAM
Planning for the Future
•Infill sanitary sewer main capacity upgrade projects in conjunction with impact fee program*
•Treatment wetlands – Water Reclamation Facility**
•Install sewer mains with streets capital projects – Fowler Corridor
•New equipment to maintain level-of-service
•East Gallatin River Nutrient TMDL Revision
2027-2031 CAPITAL IMPROVEMENT PROGRAM
Stormwater Fund CIP (CIP Project Pages 125-136)
•Pipe replacement and capacity increases to reduce flooding near downtown
•Mechanical treatment systems for Water Quality Improvement
Stormwater Fund Themes
2027-2031 CAPITAL IMPROVEMENT PROGRAM
2027-2031 CAPITAL IMPROVEMENT PROGRAM
Stormwater Fund Projects
River Health – Mechanical Treatment Systems
•Peach Street drainage
•Tamarack Street drainage
2027-2031 CAPITAL IMPROVEMENT PROGRAM
Utility Funds Overview
•Water Fund
•Wastewater Fund
•Stormwater Fund
•Water Impact Fee Fund
•Wastewater Impact Fee Fund
2027-2031 CAPITAL IMPROVEMENT PROGRAM
Utility Impact Fee Funds Overview
•New areas for sanitary sewer service
•Increasing existing sewer sizes
2027-2031 CAPITAL IMPROVEMENT PROGRAM
Water Impact Fee Projects (Project Pages 317-326)
2027-2031 CAPITAL IMPROVEMENT PROGRAM
Water Impact Fee Highlights
•Impact fee funds may only be used for capacity expanding projects
•Water supply addition
•Develop groundwater supply
•Water main construction in conjunction with Street Impact Fee Program
•New water pressure zone development in south portion of the community
•Development oversizing
2027-2031 CAPITAL IMPROVEMENT PROGRAM
Water Impact Fee Project
•Drill new test well(s) to determine locations for groundwater source•Upon determining best location for new water supply well: permit, design, and construct new water supply well
2027-2031 CAPITAL IMPROVEMENT PROGRAM
Water Impact Fee Project
Water main construction in conjunction with Stucky Road Street Impact Fee Project
2027-2031 CAPITAL IMPROVEMENT PROGRAM
Water Impact Fee Project
New water pressure zone development on
south side of
community
2027-2031 CAPITAL IMPROVEMENT PROGRAM
Water Impact Fee Project
Public-Private Partnership Project: Pipe oversizing in conjunction with development projects
Northwest Crossing
Subdivision Urban Farm Subdivision
Turnrow SubdivisionRange 5 Development
2027-2031 CAPITAL IMPROVEMENT PROGRAM
Water Impact Fee Project
Sourdough Bypass Expansion
2027-2031 CAPITAL IMPROVEMENT PROGRAM
Wastewater Impact Fee Projects (Project Pages 249-262)
2027-2031 CAPITAL IMPROVEMENT PROGRAM
Wastewater Impact Fee Fund Highlights
•Impact fees may only be used for capacity expanding projects
•Water Reclamation Facility Capacity Upgrade –serves entire community
•Service Area Expansions – northwest and southwest parts of community
•Sewer construction in conjunction with Street Impact Fee Program
•Existing sewers - capacity increases
•Development oversizing
2027-2031 CAPITAL IMPROVEMENT PROGRAM
Water Reclamation Facility Phase 1 Upgrades
2027-2031 CAPITAL IMPROVEMENT PROGRAM
Gooch Hill Lift Station Phase 1
2027-2031 CAPITAL IMPROVEMENT PROGRAM
Cottonwood Road Sewer
2027-2031 CAPITAL IMPROVEMENT PROGRAM
Fowler Sewer Upgrade in Conjunction with Street Impact Fee Project
2027-2031 CAPITAL IMPROVEMENT PROGRAM
North Frontage Road and WRF Interceptor Sewers
2027-2031 CAPITAL IMPROVEMENT PROGRAM
Infill Sewer Upgrades
N. 9th, W. Villard, and S. 9th
Sewer Main
MSU Interceptor 4th Ave, Babcock, and
Grand Ave Sewer Mains
2027-2031 CAPITAL IMPROVEMENT PROGRAM
Development Pipe Oversizing
Northwest Crossing
Subdivision Turnrow Subdivision
Urban Farm Subdivision
Range 5 Development
Gooch Hill Gravity Sewer
Oversize
Questions | Utility Funds
2027-2031 capital improvement program
Support Slides| Utility Funds
2027-2031 capital improvement program
2027-2031 CAPITAL IMPROVEMENT PROGRAM
Construction Inflation Trends
•8-inch water pipe construction costs increased from $214/foot to
$366/foot between 2019-2024 and decreased to $324/foot in 2025.
•8-inch sewer pipe construction costs increased from $177/foot to
$315/foot between 2019-2023 but leveled off in 2024 and 2025 at
$252/foot.
$-
$50.00
$100.00
$150.00
$200.00
$250.00
$300.00
$350.00
$400.00
2019 2020 2021 2022 2023 2024 2025Cost per FootWater Pipe Unit Costs
$-
$50.00
$100.00
$150.00
$200.00
$250.00
$300.00
$350.00
2019 2020 2021 2022 2023 2024 2025Cost per FootSewer Pipe Unit Costs
Transportation and Engineering
including Solid Waste
Nicholas RossDirector of Transportation and EngineeringDecember 9, 2025
Transportation & Engineering Dept.
20%
All Other CIP
80%
2027-2031 CAPITAL IMPROVEMENT PROGRAM
TRANSPORTATION CAPITAL FUNDING SOURCES
Street Maintenance Fund
Street Reconstruction Fund
Street Impact Fee Fund
Arterial & Collector Fund
STPU
$900,000 Fuel Taxes
$2,800,000
A&C
$2,000,000STREETS
$1,000,000
SIF
$7,000,000
Transportation Capital Revenue
5-yr Projected Annual Average
STPU: Restricted to Urban Routes
Fuel Taxes: Combined gas tax and BARSAA allocationSIF: Restricted to capacity-expanding projects
A&C: Must first fund "local share" of SIF projectsSTREETS: Capital share of Street Maintenance Assessments
2027-2031 CAPITAL IMPROVEMENT PROGRAM
TRANSPORTATION CAPITAL COST TRENDS
$2.03 $2.00 $1.90
$3.90 $4.30 $4.50 $4.80
$-
$1.00
$2.00
$3.00
$4.00
$5.00
$6.00
2019 2020 2021 2022 2023 2024 2025
Street Maintenance
Chip/Friction Seal Unit Cost
$12.87 $12.53
$14.46 $13.42
$16.33
$17.48 $16.61
$-
$2.00
$4.00
$6.00
$8.00
$10.00
$12.00
$14.00
$16.00
$18.00
$20.00
2019 2020 2021 2022 2023 2024 2025
Street Maintenance
Mill & Overlay Unit Cost
2027-2031 CAPITAL IMPROVEMENT PROGRAM
STREET MAINTENANCE FUND
Pavement & Sidewalk Maintenance
•City maintains ~110 A&C lane miles
•15-yr M&O cycle = ~7.5 lane miles per year
•Current funding = ~6.5 lane miles per year
•City Maintains ~500 Local lane miles
•10-yr Friction Seal cycle
•2000 ton/yr in-house production target
•City funds ADA ramps with paving projects
•Funding scaled to paving, no proactive repair
•$20-25k per intersection
•City funds sidewalk repair to cover trip hazards
•Funding levels insufficient for proactive repair
2027-2031 CAPITAL IMPROVEMENT PROGRAM
STREET MAINTENANCE FUND
5-year Total: $15.5m
•Infrastructure: $10.0m
•Mill & Overlay: $6.8m
•Multimodal: $2.8m
•Landscaping: $300k
•Equipment: $3.2m
•Vehicles: $2.3m
•Light Duty $480k
•Heavy Duty $1.8m
Grant funding anticipated
2027-2031 CAPITAL IMPROVEMENT PROGRAM
STREET MAINTENANCE FUND
New Items & Increases:
•Motor Grader Replacement
•Street Sweeper Replacements
•Boom Arm Mowers
•Annual Ped Ramp (+$50k/yr)
•Annual Sidewalk (+$50k/yr)
•Light Duty Plow Packages (+$40k/ea)
2027-2031 CAPITAL IMPROVEMENT PROGRAM
STREET RECONSTRUCTION FUND
NO PROJECTS CURRENTLY SCHEDULED
•Priority projects identified for FY27-31 total a projected $7.3M
•Staff will attempt to combine street & utility improvements within capital funding appropriations
•S Grand – College to Babcock
2027-2031 CAPITAL IMPROVEMENT PROGRAM
STREET IMPACT FEE FUND
CIP Engagement
•Advisory Board Work Sessions:
•TAB – August 27, 2025
•Advisory Board Reviews:
•TAB – October 22, 2025
•CDB – October 20, 2025
Project Prioritization
•Infill Connectivity
•Support of Housing Creation
•Multimodal Safety & Capacity
Street Impact Fees are collected from development to expand transportation capacity proportionate with growth in the community.
•May only be used on capacity-expanding projects
•Cannot pay for Operations & Maintenance
•FY27-31 SIF recommended for approval by Impact Fee Review Committee and Transportation Advisory Board
2027-2031 CAPITAL IMPROVEMENT PROGRAM
STREET IMPACT FEE FUND
5-year Total: $22.8m
FY 26-30 Comparison: -$6.1m
Major Changes
•None
New Projects
•S 3rd: Kagy to Graf
Removed Projects
•None
Grant funding anticipated
2026-2030 CAPITAL IMPROVEMENT PROGRAM
STREET IMPACT FEE FUND
Previously Scheduled Projects:
•Fowler Avenue Connection
•Kagy: 19th to Willson
•N 27th: Baxter to Cattail
•Babcock: 15th to 19th
•Stucky: Fowler to 19th
2027-2031 CAPITAL IMPROVEMENT PROGRAM
STREET IMPACT FEE FUND
New Project:
•S 3rd: Kagy to Graf
2027-2031 CAPITAL IMPROVEMENT PROGRAM
ARTERIAL & COLLECTOR FUND
5-year Total: $17.8m
FY 26-30 Comparison: -$8.4m
Major Changes
•College: 11th to 19th scope revision
New Projects
•Transportation Master Plan (FY27)
•TA – ADA & Ped Safety (FY28)
Removed Projects
•None Grant funding anticipated
2027-2031 CAPITAL IMPROVEMENT PROGRAM
ARTERIAL & COLLECTOR FUND
New Project:
•Transportation Master Plan
2027-2031 CAPITAL IMPROVEMENT PROGRAM
ARTERIAL & COLLECTOR FUND
New Project:
•Transportation Alternatives ADA Upgrades & Pedestrian Safety
2027-2031 CAPITAL IMPROVEMENT PROGRAM
SOLID WASTE FUND
5-year Total: $1.4m
FY 26-30 Comparison: -$1.3m
Major Changes
•None
New Projects
•SW77 Side Load Truck (FY31)
Removed Projects
•SW81 Tote/Dumpster Wash Truck (FY27)
•SW64 Side Load Truck (FY29)
2027-2031 CAPITAL IMPROVEMENT PROGRAM
LANDFILL POST-CLOSURE FUND
5-year Total: $1.1m
FY 26-30 Comparison: -$92k
Major Changes
•Pushed projects back one year
New Projects
•None
Removed Projects
•None
Questions | Transportation & Engineering Funds
2027-2031 Capital Improvement Program
•Discuss and provide feedback on recommended CIP
•CIP Adoption scheduled for March 10th, 2025
Next Steps
DRAFT
2027-2031 CAPITAL IMPROVEMENT PROGRAM