Loading...
HomeMy WebLinkAbout038 - PSK-1 - SITE SUBMITTAL PLUMBING PLANDN4"ø CW6"ø FP-WETNG6"ø SANFDC6"ø SD6"ø SD6"ø SD4"ø SANFDCELECTRICAL SERVICEGAS SERVICEFDC6"ø FP-WET4"ø CW6" FIRE SERVICE4" WATER SERVICE. REDUCE TO 3" DOWNSTREAM OF GATE VALVE PER COB REQUIREMENTS.GRAYWATER SUMPSEWERAGE SUMP15' - 1 1/8"19' - 6 3/8"FDCCHECK VALVE WITH BYPASS FOR FORWARD-FLOW TESTINGPARKING GARAGE DRY RISERWET STANDPIPE RISER6" FIRE SERVICEDOUBLE-CHECK BACKFLOW PREVENTER ASSEMBLYSERVICE GATE VALVE4" WATER SERVICESERVICE GATE VALVEREDUCE TO 3" AT GATE VALVE18" SPOOL SECTIONWATER METER/STRAINER ASSEMBLY PER COB REQUIREMENTS18" SPOOL SECTIONREDUCED PRESSURE ZONE ASSEMBLY BACKFLOW PREVENTERBUILDING PRESSURE REGULATING VALVEZONE PRESSURE REGULATING VALVEZONE PRESSURE REGULATING VALVE3" TO LEVELS 2-62" TO LEVELS 1 AND ROWHOMESACE JOB 23BZ586312 N. BROADWAYSECOND FLOORBELGRADE, MT 59714406-388-3320SHEET NO.:TITLE:COPYRIGHT 2021 SMA, P.C.REVISIONS:KEYMAP:ARCHITECT/ENGINEER SEAL:PROJECT:PROJECT LOCATION:PREPARED FOR:OWNER LOGO:CONSULTANT LOGO/CONTACT:PROJECT NUMBER:DRAWN BY:CHECKED BY:TEAM:PHASE:DATE:SMA PROJECT NUMBER:Plot Date:NOT FOR CONSTRUCTIONAHJ APPROVAL:HELENAP: 406-442-4933BOZEMANP: 406-219-2216 www.sma.design05/23/2024 04:00:54 PMPSK-122-10605/23/24SITE SUBMITTAL PLUMBINGPLANNTKWBRICK CAPITAL BLOCK 104 -NORTH BUILDING22-106805 N IDA, 622 E TAMARACK STBOZEMAN, MT 59715BRICK CAPITALSITE PLAN SUBMITTAL160 687.5 4" 3" 3" RPZA 145 2" @ 80 PSIG 3" @ 95 PSIGPEAKDEMAND(GPM)PEAKDEMAND(WSFU)SERVICELINE SIZEMETERSIZEBACKFLOWPREVENTERSIZEBACKFLOWPREVENTERTYPESTATICPRESSUREAT SERVICEPRESSUREREDUCINGVALVE(ZONE 1 -LEVELS 1 & 2)PRESSUREREDUCINGVALVE(ZONE 2 -LEVELS 3-5)DOMESTIC WATER SERVICE SCHEDULETOTAL FIXTURE LOAD - UPC CHAPTER 6 687.85URINAL (FLUSHOMETER VALVE) UPC TABLE 610.10 0 0WATER CLOSET (FLUSHOMETER VALVE) UPC TABLE 610.10 0 0WATER CLOSET (1.6 GPF - FLUSHOMETER TANK) 2.5 0 0WATER CLOSET (1.6 GPF - GRAVITY TANK) 2.5 75 187.5LAUNDRY SINK 1.5 2 3KITCHEN SINK 1.5 28 42LAVATORY SINK 1.0 95 95SERVICE/MOP BASIN 3 7 21DRINKING FOUNTAIN 0.5 1 0.5ADDITIONAL HOSE BIBB (EACH) 1 15 15HOSE BIBB 2.5 1 2.5DISHWASHER 1.5 26 39CLOTHES WASHER 4 26 104SHOWER (PER HEAD) 2 44 88SOAKER TUB 10 7 70BATHTUB/COMBINATION TUB/SHOWER 4 5 20FIXTURE TYPEWATER SUPPLYFIXTURE UNITS / FIX.FIXTURE COUNT TOTAL WSFUCOMMERCIAL WATER SERVICE CALCULATIONS - NEWCONSTRUCTIONNOTES:1. PLUMBING DOMESTIC WATER SYSTEM SIZING IN ACCORDANCE WITH THE 2021 UPC APPENDIX A.2. CONTRACTOR SHALL VERIFY SITE WATER SUPPLY STATIC PRESSURE AND SHALL NOTE DISCREPANCIES TO THE ENGINEER.3. SITE CONTRACTOR SHALL PROVIDE WATER SERVICE PIPING AND ACCESSORIES UP TO AND INCLUDING THE SERVICE GATE VALVE. SITE CONTRACTOR SHALL PROVIDE DISINFECTION, FLUSHING, PRESSURE TESTING, AND BACTERIOLOGICAL TESTING OF THE SERVICE PIPING. PLUMBING CONTRACTOR SHALL PROVIDE PIPING AND ACCESSORIES DOWNSTREAM OF THE SERVICE GATE VALVE.4. COORDINATE WITH THE CITY OF BOZEMAN FOR PROCUREMENT AND INSTALLATION OF THE SERVICE WATER METER.5. SEE PLUMBING SECTIONS AND DETAILS FOR ADDITIONAL REQUIREMENTS.NOTES:1. FIXTURE TAKEOFF AND ASSOCIATED SERVICE CALCULATION IN ACCORDANCE WITH 2021 UPC CHAPTER 6 AND THE CITY OF BOZEMAN WATER SERVICE WORKSHEET. FIXTURE COUNTS AND CALCULATION PROVIDE ONLY FOR PERMITTING WITH THE CITY OF BOZEMAN. CONTRACTOR SHALL NOT UTILIZE INFORMATION FOR ANY BIDDING OR CONSTRUCTION PURPOSES.TOTAL 6,606 MBHEQ-## DWELLING UNIT DOAS SYSTEM 350 MBHEQ-## COORIDOR HEATING/COOLING RTU 100 MBHEQ-## UNIT FIREPLACES (ALLOWANCE) 875 MBHEQ-## UNIT BBQ'S (ALLOWANCE) 525 MBHEQ-## UNIT RANGES (ALLOWANCE) 3250 MBHEQ-## GARAGE & SNOWMELT BOILERS 1197 MBHEQ-## LOBBY OUTDOOR FIREPLACE 399 MBHTAG DESCRIPTIONITEMINPUT DEMAND DEMAND UNITSNATURAL GAS FUEL LOAD SUMMARY - TOTAL BUILDINGLOADNOTES:1. EACH DWELLING UNIT AS WELL AS THE LOBBY SPACE AND COMMERCIAL LEASE SPACE SHALL BE PROVIDED WITH A NATURAL GAS METER. 40 METERS ARE ANTICIPATED TO SERVE THE BUILDING.2. EQUIPMENT INPUT DEMAND AT SITE ELEVATION IS BASED ON "ANSI Z21-13/CSA 4.9 INPUT RATING REQUIREMENTS AT SITE ELEVATION" OR THE PUBLISHED INPUT DEMAND RATING AT SITE ELEVATION BY THE EQUIPMENT MANUFACTURER. 3. SYSTEM DELIVERY PRESSURE SHALL BE 2 PSIG AND SHALL BE REDUED TO 14" W.C. AT EACH PIECE OR GROUP OF EQUIPMENT OR UNIT SERVICE VALVE. COORDINATE WITH THE LOCAL UTILITY PROVIDER. 4. MOST REMOTE FIXTURE IS EQ-### ~#### FEET EQUIVALENT PIPE LENGTH FROM METER.5. PLUMBING CONTRACTOR SHALL PRIME AND PAINT ALL NATURAL GAS PIPING ON THE BUILDING EXTERIOR TO MATCH THE BUILDING COLOR. COORDINATE WITH GENERAL CONTRACTOR. 6. SEE BUILDING PLUMBING DRAWINGS FOR COORDIANTION AND ADDITIONAL REQUIREMENTS.1/16" = 1'-0"PSK-11SITE PLUMBING CONNECTION PLAN1/16" = 1'-0"PSK-12FIRST FLOOR SCHEMATIC PLUMBING PLAN1/2" = 1'-0"PSK-13WATER SERVICE ROOM ENLARGED PLANPSK-14WATER SERVICE ROOMMONTANAPROFESSIONALENGINEERLICENSEDTWEEDAKIP A.No. 12615 PE05/23/2024NO.DATEREVISION DESCRIPTION038