HomeMy WebLinkAbout023.03 - L 603 - Irrigation Plan EastDDIRRIRRIRR1.5" PVC MAINLINE, SCH 40 PVC1.0" LATERAL LINE, SCH 40 PVC ORPOLYETHYLENE (PE)<.6 K VALUE ZONE DRIP LINE &BUBBLERS, SOFT WALL DRIP TUBING SYM DESCRIPTIONIRRIGATION LEGENDIRRIGATION SLEEVE, 4" Min. SCH 40 PVC 1.5"CONNECTION POINT1, L700HUNTER PRS40 POPUP SPRAYBODYWITH MPR 1000 NOZZLE(90°-360°)VALVE SCHEDULEDETAIL BFCPWCSEE MEP3, L7009, 11,12 L70010, L7008, L7004, L7001, L7005, L7005, L7001-2, L7016, L700**PRS 40 AND PRS 30 SPRAY BODIES DESIGNED TO REGULATEPRESSURES AT 40PSI AND 30PSI PER HEAD, HEADS TO BE ADJUSTED TOACHIEVE PROPER ARC RADIUS. DRIP VALVES DESIGNED TO REGULATEPRESSURES AT 40 PSI.ZONE #/TYPESIZEGPMZONE TYPESS= MP ROTATOR OR SPRAY NOZZLE (SEE IRRIGATION LEGEND)ST= TEMPORARY MP ROTATOR OR SPRAY NOZZLE (SEE IRRIGATION LEGEND)D= DRIP IRRIGATIONDT= DRIP TREE IRRIGATIONIRR MAINIRR MAIN12DDD>.6 K VALUE ZONE DRIP LINE &BUBBLERS, SOFT WALL DRIP TUBING1-2, L701NOTES:1.ALL BUILDING LANDSCAPE IRRIGATION TO BE COORDINATED WITHLANDSCAPE CONTRACTOR, G.C., MEP, ARCH., AND PLUMBER.---CONNECTION POINT TO BE DETERMINED BY OTHERS,GRAPHICALLY SHOWN FOR INTENT ONLY---PROVIDE BACKFLOW PREVENTION IN WET MECH ROOMABOVE FLOOR DRAIN AND STUB OUT OF THE BUILDINGDURING CONSTRUCTION OF HOME.2.FINAL IRRIGATION AND PLUMBING EQUIPMENT SUBJECT TOCHANGE.3.IRRIGATION SLEEVING TO BE PROVIDED BY CIVIL CONTRACTOR/GC;SET SLEEVES UNDER ROADS PER PLAN COORDINATE WITHLANDSCAPE/IRRIGATION INSTALLER PRIOR TO POURING ROADS ORCONCRETE AND SETTING BOULDER RETAINING WALLS4.AREAS WITHIN THE BUILDING FOOTPRINT EXEMPT FROMLANDSCAPE AND IRRIGATION STANDARDS.TREE DRIP EMITTERSBACKFLOW PREVENTER (WATTSLF919 RPZA) VERIFY WITH MEPHUNTER PRS30 POPUP SPRAYBODYWITH MPR800SR NOZZLE (90°-360°)67D DDDDD
SIZE /QNTY1 TOTAL1 TOTAL1 TOTAL4 TOTAL6 TOTAL2 TOTAL1 TOTALSEE PLANSEE PLANPER PLANPER PLANPER PLANPER PLANPER PLANPER PLAN1, L7001-2, L701QUICK COUPLER FOR BLOW OUT USE(RAINBIRD HQ44-RC OR SIMILAR)ISOLATION VALVE/GATE VALVE DRAIN(NIBO - T-113 BRONZE GATE VALVE ORSIMILAR)DRIP CONTROL VALVE(HUNTER ICZ-101-40 DRIP CONTROLKIT WITH PRESSURE REGULATOR ORAPPROVED EQUAL.)SPRAY CONTROL VALVE(HUNTER PGV, ICV OR EQUAL)WEATHER STATION(HUNTER MWX-FR OR SIMILAR)IRRIGATION CONTROLLER(HUNTER ICC2 OR EQUIVALENT)GASUEGASGASUEUECOM
M
COM
M
COM
M
COM
M
COM
M
COM
M
COM
M
COM
M
COM
M
COM
M
COMM COMM COMM COMM COMM COMMCOMMCOMMCOMMGAS
GAS
GAS
GAS
GAS
GAS
GAS
GAS
GAS
GAS
GAS
GAS GAS GAS GAS GAS GASGASGASGASUGE
UGE
UGE
UGE
UGE
UGE
UGE
UGE
UGE
UGE
UGE
UGE UGE UGE UGE UGE UGE UGEUGEUGEUGEWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSS SS SSSSSSSDSDGASGAS
WWSSSSGASGASUGEUGEUGEUGEGASGASSSSSSSSSSSSSSSUNIT 12 BED / 2.5 BATHUNIT 23 BED / 3.5 BATH + DENUNIT 32 BED / 2.5 BATH + DEN & GARAGEUNIT 42 BED / 2.5 BATH + DEN & GARAGE1 BIKE PARKINGSPACE1 BIKE PARKINGSPACECRAWL SPACEFIREPLACESPRSPRSPRSPRSPRSNOSNOPURPURPURPURPURSPRSPRFRONT STREET(35' WIDTH - 50' ROW+ 10' EASE)666666
76666667777777777777777
7
77
77777
7
7777777777777
7 DDDDDDDD D D DDDD DDDDDDDDDD DDDDDDDDDDDDDDDDDDDDDDDDDD DDD DD DDDDDDDDDD DDDDDDDDDDDDDDDDDDDDDDD DDDD DDDDDDDDDDDDDDDDDDDDDDDD
D
DDDD DDDDDDDDDDDDDDDDDDDDDDDDDDDD DD
DDDDDDDDDDDD
DDD
DDDDD DDDDDDDDDDDDDDDDD
DDIRRIRRIRRIRRIRRIRRIRRIRRIRRIRRIRRIRRIRRIRRIRRIRRIRRIRRIRRIRRIRRIRRIRRIRRIRR
IRRIRRIRRIRRIRRIRRIRRIRRIRRIRRIRRIRRIRRIRRIRRIRR
IRRIRR
IRRIRRIRRIRRIRRIRRIRRIRRIRRIRRIRRIRRIRRIRRIRRIRR IRR IR
R
IR
R
IR
R
IRR
IRR
IRRIRRIRRIRR
IRRIRRIRRIRRIRRIRRIRRIRRIRRIRRIRRIRRIRRIRRIRRIRRIRRIRR IRR IRR IRRIRRIRRIRRIRRIRRIRRIRRIRRIRRIRRIRRIRRIRRIRRIRRIRR MAINIRR MAINIRR MAINIRR MAINIRR MAINIRR MAINIRR MAINIRR MAINIRR MAINIRR MAINIRR MAINIRR MAINIRR MAINIRR MAINIRR MAINIRR MAINIRR MAINIRR MAINIRR MAINIRR MAINIRR MAINIRR MAINIRR MAINIRR MAINIRR MAINIRR MAINIRR MAINIRR MAINIRR MAINIRR MAINIRR MAINIRR MAINIRR MAINIRR MAINIRR MAINIRR MAINIRR MAINIRR MAINIRR MAINIRR MAINIRR MAINIRR MAINIRR MAINIRR MAINIRR MAINIRR MAINIRR MAINIRR MAINIRRIRRIRRIRRIRRIRRIRRIRRIRRIRRIRRIRRIRRIRRIRRIRRIRRIRRIRRIRRIRRIRRIRRIRRIRRIRRIRRIRRIRRIRRIRRIRR
IRR
IRR
IRR IRR IRR IRR
IRR
IRR
IRR
IRR
IRR IRR IRR IRR IRR IRR IRR IRR IRR IRR IRR IRR IRR IRR IRR IRR IRR IRR IRR IRR IRR IRRIRRIRRIRRIRRIRRIRRIRRIRRIRRIRRIRRIRRIRRIRRIRRIRRIRRIRRIRRIRRIRR IRR IRR IRR
IRR IRR IRRIRRIRR
IRRIRRIRRIRRIRRIRRIRRIRRIRRIRRIRRIRRIRRIRRIRRIRRIRRIRRIRRIRRIRRIRRIRRIRRIRRIRRIRRIRRIRR IRR IRR IRR IRR
IRR
IRR IRR IRR IRR IRR
IRR
IRR IRR IRR IRR IRR
IRR
IRR IRRIRRD DD D D
DDDDDDDD
D
DD
DD
DDDDDDDDDDDDDDDDDDDDDDDDDD D D D D DDD
DDDDD
D
D
D
D
D
DDD
D
DDDDDD
D
D DDDDDDD
D D
D
DDDDDDDDDDD
D
DDDDD
DDDDD
DDDDDDDDDDDDD
D
D DD
DD DDDDDDDDDD
D D
D DDDDDDDD
D D DDDDDD
D DDDDDD
D DDDDD
DDD
DDDDDDDDDDDDDDDDDDDDD
DDDDDDDDDD D DDDD D DDDD DDDD
D DDDD
D DDDD
D DDDD
DDDDD
D DDD6'-6"7'
6
'
-
6
"5'-6"IR
R
IRR
IRR
IR
R
IRR
IR
R
IRR
IR
R
IRR
IRR
IR
R
IRR
IR
R
IRR
IR
R
IRR
IRR
IR
R
IR
R
IRR
IR
R
IR
R
IR
R
IRR
IR
RDDDDD
D DDDD DDDDD
IRR
IRR
IR
R
IR
R TEMP ZONE 7ST1.0"10.91ZONE 8D1.0".65ZONE 9DT1.0"0.73ZONE 10D1.0"2.29MAIN LINE DRAIN VALVE,DRAIN TO LOW POINT ON SITEDD
DDDDDDDDDD ZONE 4ST (BOULEVARD) ISTEMPORARY ZONE THAT WILL BEDISCONNECTED PRIOR TO 3 YEARSOF INSTALLATION.DDDDD
D DDDD
IRR IRR IRR IRRIRRIRRDDD
IRRIRRIRRIRRN1L6031/8"=1'-0"Irrigation Plan - EastIrrigation Plan -EastL603design5la.com406.587.4873dateissuedrawn by:checked by:filename:z:\brick capital block 104\autocad\01_sheets\block104-north_irrigation.dwg
Bozeman Yards - North Building
Bozeman, Montana
AVD TMS/AVD
05/31/24Site Plan ReviewFO
R
S
I
T
E
P
L
A
N
R
E
V
I
E
W09/12/25SPR RC111/04/25SPR RC2SEE L60284016PLANTING AREAS WITHIN BUILDINGFOOTPRINT EXEMPT FROM CITY OFBOZEMAN LANDSCAPE AREA ANDIRRIGATION REQUIREMENTS