HomeMy WebLinkAbout021 A.1 - Elevations - All Views - Cottage Bc
Date:mobile #:phone #:Project No.Drawn by:Date:Scale:GENERAL CONTRACTOR:Revised by:
Drafting & Design, IncEG CONSTRUCTION, LLCEUGEN GRAFPO BOX 10906BOZEMAN, MT 59714406-579-8248B24-0328-5Blackmore Cottages - BBON TON AVE.BOZEMAN, MONTANABLACKMORE COTTAGECO. LLC-Allison Subdivision-Master Copy
D. Johnston 15 Oct 21
D. Johnston 20 Apr 24
D. Johnston 24 Aug 21
D. Johnston 25 Aug 21
D. Johnston 04 May 24IMPACTDRAFTING & DESIGN, incwww.impactdrafting.com2024 Brentwood Professional Center1195 Stoneridge Dr., Suite 3DBozeman, MT. 59718406-522-5382All rights reserved. All designs, drawings, ideas,
and written material contained or described herein
are the sole property of IMPACT Drafting & Design
Inc. and as such may not be altered, duplicated,
used or disclosed without written consent from
IMPACT Drafting & Design Inc.scale is correct ifprinted on D-Size paperby IMPACT DraftingNote: IMPACT Drafting & Design Inc. is not responsible for engineering,construction or materials. Individual contractors are responsible for meeting codes.IMPACT
D. Johnston 13 May 24
C. Johnston 15 May 24CONTACT/OWNERA.1 1/4" = 1'Elevations
All Views
scale: 1/4" = 1'scale: 1/4" = 1'
scale: 1/4" = 1'scale: 1/4" = 1'
Front Elevation Right Elevation
Left ElevationBack Elevation
FLASHING
Flashing required at the following locations:
-exterior window and door openings
-intersection of chimneys or other masonry
with frame walls
-under and at the ends of masonry, wood or
metal copings and sills
-continuously above all projecting wood trim
-where exterior porches, decks, patios, or
stairs attach to wood framing
-at wall and roof intersections
-at built-in gutters
-roof kick-outs
This plan drawn in accordance with the:
- 2021 International Residential Code
- 2021 International Mechanical Code
- 2021 International Fuel Gas Code
- 2021 International Energy Conservation Code
- 2020 National Electrical Code
- 2021 Uniform Plumbing Code
* General Contractor is expressly responsible for
code adherence
SHEET INDEX
A.1 elevations - all
A.2 foundation
A.3 floor plan
A.4 roof sheet
S.1 braced wall lines page
S.2 sections
E.1 electrical
TRANSPARENCY: 14.04%TRANSPARENCY: 11.11%
TRANSPARENCY: 10.32%TRANSPARENCY: 10.10%