Loading...
HomeMy WebLinkAbout013 A.1 - Elevations - All Views - Cottage Ac Date:mobile #:phone #:Project No.Drawn by:Date:Scale:GENERAL CONTRACTOR:Revised by: Drafting & Design, IncEG CONSTRUCTION, LLCEUGEN GRAFPO BOX 10906BOZEMAN, MT 59714406-579-8248B24-0328-5Blackmore Cottages - ABON TON AVE.BOZEMAN, MONTANABLACKMORE COTTAGECO. LLC-Allison Subdivision-Master Copy D. Johnston 15 Oct 21 D. Johnston 20 Apr 24 D. Johnston 24 Aug 21 D. Johnston 25 Aug 21 D. Johnston 04 May 24IMPACTDRAFTING & DESIGN, incwww.impactdrafting.com2024 Brentwood Professional Center1195 Stoneridge Dr., Suite 3DBozeman, MT. 59718406-522-5382All rights reserved. All designs, drawings, ideas, and written material contained or described herein are the sole property of IMPACT Drafting & Design Inc. and as such may not be altered, duplicated, used or disclosed without written consent from IMPACT Drafting & Design Inc.scale is correct ifprinted on D-Size paperby IMPACT DraftingNote: IMPACT Drafting & Design Inc. is not responsible for engineering,construction or materials. Individual contractors are responsible for meeting codes.IMPACT D. Johnston 13 May 24 C. Johnston 15 May 24CONTACT/OWNERA.1 1/4" = 1'Elevations All Views scale: 1/4" = 1'scale: 1/4" = 1' scale: 1/4" = 1'scale: 1/4" = 1' Front Elevation Right Elevation Left ElevationBack Elevation FLASHING Flashing required at the following locations: -exterior window and door openings -intersection of chimneys or other masonry with frame walls -under and at the ends of masonry, wood or metal copings and sills -continuously above all projecting wood trim -where exterior porches, decks, patios, or stairs attach to wood framing -at wall and roof intersections -at built-in gutters -roof kick-outs This plan drawn in accordance with the: - 2021 International Residential Code - 2021 International Mechanical Code - 2021 International Fuel Gas Code - 2021 International Energy Conservation Code - 2020 National Electrical Code - 2021 Uniform Plumbing Code * General Contractor is expressly responsible for code adherence SHEET INDEX A.1 elevations - all A.2 foundation A.3 floor plan A.4 roof sheet S.1 braced wall lines page S.2 sections E.1 electrical TRANSPARENCY: 14.04%TRANSPARENCY: 11.11% TRANSPARENCY: 10.32%TRANSPARENCY: 10.10%