Loading...
HomeMy WebLinkAbout022 NWE Construction MapSTUDENT DRIVEBON TON AVENUE PPPPSSSSSSSSSPNORMAL OPEN3P-1: (130') of (3) Runsof #2AL in 2" conduit3J-1: 3-Ph J-Can1P-1: (44')of #2ALS1: (72') of 350MCMS2: (74') of 350MCM1P-2: (208') of #2ALS3: (36') of350MCM1P-3: (148') of #2ALS4: (36') of 350MCM1P-4: (150') of #2AL1P-5: (47') of #2ALS5:(34') of350MCM1P-6: (160') of #2ALWith a Normal OpenS6:(74') of350MCMS7:(74') of350MCM1P-7: (165') of #2AL1J-1: 1-Ph J-CanWith a NORMAL OPENS8:(48') of350MCMS9:(35') of350MCMXFMR-1: 1-PH,120/240V, 50KVAXFMR-2: 1-PH,120/240V, 25KVAXFMR-3: 1-PH,120/240V, 25KVAXFMR-4: 1-PH,120/240V, 25KVAXFMR-5: 1-PH,120/240V, 50KVAG1: (770') of 2" IPSExisting GasMain Dead EndExisting 25KVA,1-Ph, 120/240VXFMR, Phase (B),Fid:30085655Existing Source Primary:Fid: 30085651, 1-PH#2AL, Phase (B),Circuit: 0744FExisting Source Primary:Fid: 29961535, 3-PH,#2AL, Circuit: 0744FExisting 3-PH J-Can:Fid: 29961541,Tag ID: 48113Circuit: 0744FExisting Normal OPENExisting 2" Plastic GasMain Fid:29962264MAOP:35Existing 2"Plastic Gas MainFid:29962269MAOP:35Utilize Phase (B) forsingle phase primarySqueeze andAttach toExisting Main