Loading...
HomeMy WebLinkAbout012 Concurrent Construction Request Letter 895 Technology Blvd Ste 203  Bozeman, MT 59718  (406) 586-0262  Fax (406) 586-5740 895 Technology Boulevard, Suite 203, Bozeman, MT 59718 | 406.586.0262 November 8th, 2024 City of Bozeman Engineering PO Box 1230 Bozeman MT 59771 RE: Concurrent Construction Request – Blackmore Cottage On behalf of our client, we are requesting concurrent construction for the required public infrastructure improvements for the proposed Blackmore Cottage located on Lot 1A of Block 2 of Allison Subdivision Phase 4A, S24, T02 S, R05 E; North of Student Drive and East of University Way in Bozeman, MT. The required public improvements are for a water and sanitary sewer main extensions to serve the property. The proposed mains run through the property West to East, connecting to existing mains running South to North along Bon Ton Avenue. The improvements are required for the development of the twenty-four proposed cottages. Once the City of Bozeman deems the request for concurrent construction appropriate for this project, in addition to this concurrent construction plan, a signed CCON, Irrevocable Offer of Dedication, and written approval from the Fire Marshall (once obtained) will be submitted. It is understood that approval of current construction will be dependent on City and DEQ approval of infrastructure design. Based on the Bozeman Unified Development Code (UDC), Section 38.270.030.C.1 b&c we believe the following conditions allowing concurrent construction are met. 38.270.030.C.1.b The water mains, sewer mains and streets to be extended to provide service to the development are: located within a publicly dedicated right- of-way or easement; constructed to city standards; are physically adjacent; are installed and accepted by the city; and are adequate in capacity to provide necessary service to the proposed development; and comply with the requirements of this subsection C.1.b and subsection C.1.c of this section; September 30th, 2024 Blackmore Cottage Concurrent Construction Request WWC Engineering Page 2 Response: 1. The water and sewer main extensions will be within a publicly dedicated right-of- way and easement. 2. The required main extensions will be constructed to City Standards. 3. The water and sewer main extensions are on the lot on which the residential development is being built. 4. The water main extension is the same size as the mains being connected to. The water and sewer main extensions are of adequate capacity to provide necessary service to the proposed development. 5. The required public utility and access easement is included in this site plan application for review and processing. 38.270.030.C.1.c Water mains, sewer mains and streets shall meet the following requirements: (1) Any required on-site extensions of water mains, sewer mains or streets to be dedicated to the public shall be located entirely within publicly held easements or rights-of-way; shall serve only a single lot; are the subject of an irrevocable offer of dedication to the city upon completion of the project; the development is under the control of a single developer who shall retain control of the entire project until final completion; all work is under the supervision of a single general contractor; and no subdivision of land is involved; Response: 1. The water and sewer main extensions will serve a single lot and will be located within a Public Right of Way and Easement. The water and sewer main extensions will be stubbed into the lot east of the project, this will allow possible future infrastructure connectivity if that lot is developed. This lot has the same owner as the project lot. The required public utility and access easement is included in this site plan application for review. 2. The water and sewer main extensions are being constructed for the Blackmore Cottage residential development. 3. The developer agrees to the required irrevocable offer of dedication of the improvements to the city upon completion of the project. September 30th, 2024 Blackmore Cottage Concurrent Construction Request WWC Engineering Page 3 4. The water and sewer main extensions will be under the control of a single developer who shall retain control of the entire project until final completion. 5. All work will be under the supervision of a single general contractor. 6. No subdivision of land is involved with this site plan approval. (2) The DRC shall determine when the standards of this subsection C.1 are met. The fire department must consider whether adequate fire protection services are available from existing hydrants, and water supply exists to meet needs during construction. If adequate fire protection does not exist then concurrent infrastructure and building construction may only occur under the provisions of subsection C.1.c.(3) of this section. Based on evaluation by the fire department, simultaneous construction of infrastructure to be dedicated to the public and private construction may be permitted only within a defined portion of the site; Response: 1. Scott Mueller of the Bozeman Fire Department will be contacted at the appropriate time with regards to this request to allow concurrent construction. (3) Approval of the final engineering design, including location and grade, for the infrastructure project must be obtained from the engineering department, and the state department of environmental quality when applicable, prior to issuance of any building permit for the development; Response: 1. Infrastructure design will be submitted for review and approval by both DEQ and the City of Bozeman for the main extensions prior to approval. (4) No occupancy, either temporary or final, may be issued until all on-site and offsite water, sewer and street or drive improvements are installed and accepted or approved as applicable by the city. Response: 1. The owner acknowledges no occupancy of any structures or commencement of any use will be allowed until required infrastructure improvements have been completed, inspected and accepted by the city, and a certificate of occupancy has been issued. September 30th, 2024 Blackmore Cottage Concurrent Construction Request WWC Engineering Page 4 Please consider our request at your earliest convenience. If you have any questions regarding this proposal, please feel free to call us at 406-586-0262. Sincerely, WWC Engineering _____________________________ Chris Budeski, PE Senior Project Manager Cc: Blackmore Cottage Co, LLC file