HomeMy WebLinkAbout25703 Application SummaryBOZEMANMT
Planning Division
Submitted Date: 11-11-2025 05:43 PM
DEVELOPMENT REVIEW APPLICATION
Remember to obtain owner signature on this form prior to uploading with the rest of your submittal
PROJECT INFORMATION
Project Name:Gran Cielo Subdivision Ph3 PP
Project Type(s):Subdivision - Preliminary Plat PP
Street Address:South of Apex Drive, east of S. 29th Avenue, north of Bennett
Blvd, and west of S. 27th Avenue
Legal Description:
GRAN CIELO SUB PH 2, S23, T02 S, R05 E, Block 14,
LOTS 1-4 and Common Open Space C.
Description of Project:
Major Subdivision consisting of 49 lots intended for residential
use.
Current Zoning:R-5 Residential Mixed-Use High Density District
Existing Use:Undeveloped
Proposed Use:Residential
Gross Lot Area:291616
Number of New Buildings:0
Type and Number of Dwellings:0
Building Size (SF):0
Non-Residential Building Size (SF):0
Building Height (ft):
Affordable Housing (Y/N):No
Departure/Deviation Request (Y/N):No
Zoning Verification Expedited (Y/N):No
Wetlands Activity (Y/N):No
Traffic Study or Waiver:Traffic Study
Is there a pre-application pertaining to this project?: Yes
Project Name and Project Number:25456
PROPERTY OWNER
Company Name: Bozeman Haus, LLC
Name: Ray Akrawi
Full Address: 15267 SE Rivershore Dr, Vancouver, WA 98683
Email: rayakrawi@me.com
Phone: 7076943690
2570311.13.25
PLNAPP 16490
APPLICANT
Company Name:WWC Engineering
Name:Henry Wilkey
Full Address:895 Technology Blvd 203, Bozeman, Montana 59718
Email:hwilkey@wwcengineering.com
Phone:4068984456
REPRESENTATIVE
Company Name:WWC Engineering
Name:Henry Wilkey
Full Address:895 Technology Blvd 203, Bozeman, Montana 59718
Email:hwilkey@wwcengineering.com
Phone:4068984456
CERTIFICATIONS AND SIGNATURES
Applicant signature is captured electronically at time of application submittal. This application PDF must also be
signed by the property owner(s) for all application types before the submittal will be accepted. The only exception
to this is an informal review application that may be signed by the applicant(s) only. The applicant(s) and property
owner(s) submit this application for review under the terms and provisions of the Bozeman Municipal Code. It is
further indicated that any work undertaken to complete a development approved by the City of Bozeman shall be
in conformance with the requirements of the Bozeman Municipal Code and any special conditions established by
the approval authority. I acknowledge that the City has an Impact Fee Program and impact fees may be assessed
for my project. Further, I agree to grant City personnel and other review agency representative's access to the
subject site during the course of the review process (Section 38.200.050, BMC). I (We) hereby certify that the
above information is true and correct to the best of my (our) knowledge.
Certification of Completion and Compliance - I understand that conditions of approval may be applied to the
application and that I will comply with any conditions of approval or make necessary corrections to the application
materials in order to comply with municipal code provisions.
Statement of Intent to Construct According to the Final Plan - I acknowledge that construction not in
compliance with the approved final plan may result in delays of pccupancy or costs to correct noncompliance.
Property Owner Signature:
Printed Name:Ray Akrawi
CONTACT US
Alfred M. Stiff Professional Building phone 406-582-2260
20 East Olive Street fax 406-582-2263
Bozemn, MT 59715 planning@bozeman.net
www.bozeman.net/planning