Loading...
HomeMy WebLinkAbout25693 Application SummaryBOZEMANMT Planning Division Submitted Date: 11-03-2025 07:35 AM DEVELOPMENT REVIEW APPLICATION Remember to obtain owner signature on this form prior to uploading with the rest of your submittal PROJECT INFORMATION Project Name:Thompson Thrift Multifamily Community Project Type(s):Site Plan SP Street Address:South of Cattail Street, West of Max Avenue Legal Description: Current: MINOR SUB 210, S35, T01 S, R05 E, Lot 3, (RE- MAINDER) LESS GALLATIN CENTER SUB PHASE 1-4 Future: LOT A, GALLATIN CENTER SUB PHASE 5 Description of Project: The development will consist of 9 residential buildings, 3 amenity buildings, and several outdoor amenity areas, as well as dedicated parkland. Current Zoning:B-2M Community Business District - Mixed Existing Use:Undeveloped Proposed Use:Residential Gross Lot Area:718304 Number of New Buildings:12 Type and Number of Dwellings:312 Building Size (SF):119971 Non-Residential Building Size (SF):7995 Building Height (ft): Affordable Housing (Y/N):No Departure/Deviation Request (Y/N):No Zoning Verification Expedited (Y/N):No Wetlands Activity (Y/N):Yes Traffic Study or Waiver:Traffic Study Is there a pre-application pertaining to this project?: Yes Project Name and Project Number:Concept: 25428, Subdivision: 25217 PROPERTY OWNER Company Name: Gallatin Center LP Name: Eugene Graf Full Address: PO Box 906, Bozeman, MT 59771 Email: eugene@eg-construction.com Phone: 4065798248 2569311.06.25 PLNAPP 16397 APPLICANT Company Name:WWC Engineering Name:Joselyn Hartwig Full Address:895 Technology Blvd Suite 203, Bozeman, Montana 59718 Email:jhartwig@wwcengineering.com Phone:4065860262 REPRESENTATIVE Company Name:WWC Engineering Name:Joselyn Hartwig Full Address:895 Technology Blvd 203, Bozeman, Montana 59718 Email:jhartwig@wwcengineering.com Phone:4065860262 CERTIFICATIONS AND SIGNATURES Applicant signature is captured electronically at time of application submittal. This application PDF must also be signed by the property owner(s) for all application types before the submittal will be accepted. The only exception to this is an informal review application that may be signed by the applicant(s) only. The applicant(s) and property owner(s) submit this application for review under the terms and provisions of the Bozeman Municipal Code. It is further indicated that any work undertaken to complete a development approved by the City of Bozeman shall be in conformance with the requirements of the Bozeman Municipal Code and any special conditions established by the approval authority. I acknowledge that the City has an Impact Fee Program and impact fees may be assessed for my project. Further, I agree to grant City personnel and other review agency representative's access to the subject site during the course of the review process (Section 38.200.050, BMC). I (We) hereby certify that the above information is true and correct to the best of my (our) knowledge. Certification of Completion and Compliance - I understand that conditions of approval may be applied to the application and that I will comply with any conditions of approval or make necessary corrections to the application materials in order to comply with municipal code provisions. Statement of Intent to Construct According to the Final Plan - I acknowledge that construction not in compliance with the approved final plan may result in delays of pccupancy or costs to correct noncompliance. Property Owner Signature: Printed Name:Eugene Graf CONTACT US Alfred M. Stiff Professional Building phone 406-582-2260 20 East Olive Street fax 406-582-2263 Bozemn, MT 59715 planning@bozeman.net www.bozeman.net/planning