HomeMy WebLinkAboutResolutions 5657 - Authorizing Change Order 4 for Fire Station 2Version April 2020
RESOLUTION 5657
A RESOLUTION OF THE CITY COMMISSION OF THE CITY OF BOZEMAN,
MONTANA, AUTHORIZING GUARANTEED MAXIMUM PRICE (GMP)
AMENDMENT #6 FOR THE RELOCATION AND CONSTRUCTION OF FIRE
STATION #2 WITH MARTEL CONSTRUCTION, INC
WHEREAS, the City Commission did, on March 19, 2024, authorize
Guaranteed Maximum Price (GMP) Amendment #5 for relocation and construction of Fire
Station #2 with Martel Construction, Inc.; and
WHEREAS, Section 7-5-4308, Montana Code Annotated, provides that any such
alterations for modification of the specifications and/or plans of the contract be made by resolution;
and
WHEREAS, it has become necessary in the prosecution of the work to make alterations
and modifications to the specifications and/or plans of the contract.
NOW, THEREFORE, BE IT RESOLVED by the City Commission of the City
of Bozeman, Montana, that the proposed modifications and/or alternates to GMP Amendment #6
for Construction of Fire Station #2, as contained in Prime Change Order #4, attached hereto, be
and the same are hereby approved; and the City Manager is hereby authorized and directed to
execute the contract change order for and on behalf of the City; and the City Clerk is
authorized and directed to attest such signature., to wit:
PASSED, ADOPTED, AND APPROVED by the City Commission of the City of
Bozeman, Montana, at a regular session thereof held on the 19th day of November 2024.
Docusign Envelope ID: 1E151B3A-3B20-42D9-A4FD-6B8098D3ABFA
Version April 2020
___________________________________
TERENCE CUNNINGHAM
Mayor
ATTEST:
___________________________________
MIKE MAAS
City Clerk
APPROVED AS TO FORM:
___________________________________
GREG SULLIVAN
City Attorney
Docusign Envelope ID: 1E151B3A-3B20-42D9-A4FD-6B8098D3ABFA
GMP AMENDMENT NO. 6
TO AGREEMENT BETWEEN OWNER AND CONSTRUCTION MANAGER
Pursuant to Subparagraphs 3.7.1-3.7.4 and 4.1 of the Preconstruction Services Conditions Agreement
between Owner and Construction Manager this amendment dated the 19th day of November, 2024,
between City of Bozeman (“Owner”) and Martel Construction, Inc. (“Contractor”) for the Fire Station No.
2 Relocation Project, hereby establishes a Guaranteed Maximum Price and Contract Time for the portion
of the Project as set forth below:
GUARANTEED MAXIMUM PRICE FOR BOZEMAN FIRE STATION #2 FULL PROJECT
The Construction Manager’s Guaranteed Maximum Price (GMP) for the Work, including the Cost of the
Work and the Construction Manager’s Fee is as follows:
Early Work Amendment No. 1 $302,663.00
General Requirements 14 Months $603,594.00
Site Work Complete $1,203,480.00
Building Construction $8,560,152.50
Subtotal $10,669,889.50
General Liability Insurance $103,061.00
Gross Receipts Tax $115,502.50
Builders Risk $11,892.00
Bond $86,685.50
Construction Fee $539,230.00
Construction Contingency $148,804.50
PV System Construction $123,402.00
AMENDMENT # 6 GUARANTEED MAXIMUM PRICE $11,798,467.00
CONTRACT TIME
The anticipated date of Certificate of Occupancy for the Work outlined above is: December 31st, 2024
OWNER: CONTRACTOR:
City of Bozeman Martel Construction, Inc.
121 N. Rouse Ave. 1203 S. Church Ave.
Bozeman, MT 59715 Bozeman, MT 59715
By: __________________________ By: __________________________
Chuck Winn, Interim City Manager Jason Martel, Executive Vice President
Docusign Envelope ID: 1E151B3A-3B20-42D9-A4FD-6B8098D3ABFA
March 20, 2024
City of Bozeman - Fire Station # 2
575 West Kagy Blvd
Bozeman, Montana 59715
ATTN: Jon Henderson
Change Order Request No. COR 019
Pricing Request No.PR 009
PROJECT: Bozeman Fire Station # 2
SUBJECT: COR 019 Landscape Modifications
REFERENCE: PR 009
Dear : Jon Henderson,
We propose to provide all labor, materials, and equipment required to
perform the above mentioned work. Our lump sum quotation is based
on our interpretation of the instructions and scope of work
identified by the Proposal Request(s). If we have misinterpreted this information in any
way (omissions, etc.) please advise us.
Other wise, our interpretation shall stand as correct.
We have not been directed to proceed with the work per the terms of the contract.X
We have proceeded with the Work per the terms of the contract.
At this time, we are hereby requesting 0 calendar days for a time extension
Please note this proposal is valid for (10) calendar days from this date and
our proposal is based on receipt of a signed Change Order within (15) calendar days.
We are adjusting the Construction Contingency in the amount of:
We are requesting an Adjustment to the GMP (Owner's Contingency) in the Amount of:6,485.00$
If you have any questions, please call me at (406) 922-5529
Sincerely,
MARTEL CONSTRUCTION, INC.City of Bozeman - Approval
Mike Wilkinson - Martel Project Manager Jon Henderson - Strategic Services Director
Enclosure(s)
Estimate PDF
CC.File
Docusign Envelope ID: 1E151B3A-3B20-42D9-A4FD-6B8098D3ABFA
Spreadsheet ReportPage 1BFS2 COR 024 - RFI #73 VRF System layout & changes3/26/2024 2:14 PMGroupDescriptionTakeoff QuantityLabor AmountMaterial AmountSub AmountEquip AmountOther AmountTotal Cost/UnitTotal Amount01-0000GENERAL REQUIREMENTS1Supervision2Superintendent5.00hr3330-0-66.67/hr3333 Supervision333/wk333Project Management4Project Manager - Procurement8.00hr533-0-66.67/hr5335Project Engineer - Submittals & Coordination8.00hr463----57.89/hr4636 Project Management996/wk996 GENERAL REQUIREMENTS1,330/ls1,33032-0000SITE IMPROVEMENTS7Landscaping8Landscaping - Subcontract1.00ls--638--638.00/ls6389Landscaping - Syn Lawn for Turf grass235.00SF--4,044--17.21/SF4,04410 Landscaping4,682/sf4,682 SITE IMPROVEMENTS4,6824,682Estimate TotalsDescriptionAmountTotalsHoursRateLabor1,33021.000hrsMaterialSubcontract4,682Equipment13.000hrsOther6,0126,012General Liability Insurance580.890%Gross Receipts Tax601.000%Bond460.750%Construction Fee3095.000%4736,485Total6,485Docusign Envelope ID: 1E151B3A-3B20-42D9-A4FD-6B8098D3ABFA
P.O. Box 10242
Bozeman, MT 59719
(406) 587-3406
Landscaping Estimate
Bozeman Fire station #2
landscape mod pr-09
2/8/2024Date
Phone #
CellEstimateE24 - 1023
Quantity Size Price Extension
1. Original Plans
Item
90 Brown River Dredge yd -$220.00 -19800.00
245 Seed (includes labor & materials)sf -$0.50 -122.50
22 Shredded Cedar Wood Mulch, fabric and install yd -$160.00 -3520.00
-$23442.50Subtotal
Quantity Size Price Extension
2. Revised Plans
Item
112 Round River rock yd $170.00 19040.00
4 Clean Rock for turf yd $60.00 240.00
300 Geotextile Turf sf $0.25 75.00
1 Turf Prep $1500.00 1500.00
6500 Erosion Control Fabric sf $0.60 3900.00
1 Irrigation Changes -$675.00 -675.00
$24080.00Subtotal
Quantity Size Price Extension
Notes
Item
Seed Price does not change
Does not included price of turf
and installing turf
Subtotal
$637.50Grand Total
Page 1
Docusign Envelope ID: 1E151B3A-3B20-42D9-A4FD-6B8098D3ABFA
Location
575 W Kagy Blvd
Bozeman, MT 59715
Proposal For
Mike Wilkinson
1203 S Church St
Bozeman, MT 59715
main: 4065868585
mobile: 4065706638
mwilkinson@martelconstruction.com
This job requires a deposit of $2021.95
City of Bozeman Fire Station 2
Terms
50% Due Prior to Order Submittal
ITEM DESCRIPTION QUANTITY UNIT PRICE AMOUNT
1) SYNTipede 243 ST243
https://www.synlawn.com/product/syntipede-243/
Roll 1.1 15x20
300 SqFt $ 4.69 $ 1,407.00
2) Turf Freight - MT
Turf Freight
1 Each $ 454.60 $ 454.60
3) Envirofill 16/30 - MT
Envirofill 16/30 Microban® Topdressing -
https://usgreentech.com/landscape/lawns/
10 Each $ 41.98 $ 419.80
4) Service:SYNLawn MT Professional LandscapeInstallation
Professional installation, in-season, including site prep, base work and
materials which includes up to 4" of aggregate base. Additional removal or
addition of aggregate material may be subject to additional charges.
235 SqFt $ 7.50 $ 1,762.50
Client Notes
Added 4 ft to the turf to meet the minimum length requirement.
Proposal #1084
Created: 12/12/2023
From: Zach Sayre
SYNLawn Mountain West | SYNLawn.com |
SYNLawn SD (605) 309-5296 | SYNLawn WY (307) 219-5296 | SYNLawn MT (406) 506-5296
| mworders@synlawn.com
Page 1 of 2
Docusign Envelope ID: 1E151B3A-3B20-42D9-A4FD-6B8098D3ABFA
Photos
$ 4,043.90
$ 0.00
$ 4,043.90
$ 2,021.95
All work will be completed in accordance with these plans unless subsequent
changes are agreed upon in writing. Balances not paid by the due date are subject
to late fees. If a deposit is noted, this will be required prior to placing an order for
materials and scheduling work.
Signature
Please sign here to accept the terms and conditions
SUBTOTAL
SALES TAX
TOTAL
DEPOSIT AMOUNT (50.0%)
Date:x
Tami DeBoer
Office: (605) 390-2044
Mobile: (605) 390-2044
tami.deboer@synlawn.com
Assigned To
Zach Sayre
Office: (406) 577-9882
zach.sayre@synlawn.com
Sales Representative
Proposal #1084
Created: 12/12/2023
From: Zach Sayre
SYNLawn Mountain West | SYNLawn.com |
SYNLawn SD (605) 309-5296 | SYNLawn WY (307) 219-5296 | SYNLawn MT (406) 506-5296
| mworders@synlawn.com
Page 2 of 2
Docusign Envelope ID: 1E151B3A-3B20-42D9-A4FD-6B8098D3ABFA
TERMS AND CONDITIONS OF SALE
ACCEPTANCE: The Distributor’s sale to Customer is limited to and expressly made conditional on Customer’s assent to the terms and conditions of sale contained herein, which supersede and reject all prior agreements, representations, discussions or negotiations, whether written or oral, with respect hereto and any conflicting terms and conditions contained in any purchase order or other writing by Customer, regardless of whether Customer purchases products through any media means, including but not limited to written purchase orders, electronic orders EDI, acknowledgments, confirmations, or other writings from Customer. Buyer’s request for delivery of materials constitutes an acceptance of these terms. PRICE: All prices are subject to change or withdrawal without notice and all shipments will be at prices in effect on the date of shipment. Unless otherwise specified or required by law, all prices will be quoted and billed exclusive of all state and local sales taxes, value added tax, import/export charges, taxes and fees related to the production, sale or delivery of material or products provided by Distributor. All such taxes, charges, and fees, where applicable, shall appear as a separate and additional item on the invoice and the Customer is solely responsible for payment of such charges. TRANSPORTATION AND DELIVERY: All sales are F.O.B. point of shipment. All costs of transportation, insurance and other related expenses are the sole responsibility of Customer unless otherwise agreed to in writing by Distributor. Shipment shall normally be made by the method and carrier Customer requests. If Distributor does not agree to Customer’s request, Distributor shall ship by the method that it deems appropriate in its sole discretion. Any claim for Freight Collect and Third-Party shipments for lost, damaged, stolen or otherwise imperiled goods during shipment are the Customer’s sole responsibility and shall be made by the Customer. Claims for ‘Prepaid’ shipments must be filed with the Carrier through Distributor. Distributor shall not be liable, directly, or indirectly, for any delivery that is delayed or fails for any reason, including, without limitation, labor difficulties, shortages, strikes or stoppages of any sort, acts of God, civil insurrection, wars, riots, strikes, terrorist acts, embargoes, fires or other casualties, or any other causes beyond Distributor’s control. TERMS OF PAYMENT: All sums due shall be paid in U. S. Dollars. For payments made from outside the United States, Customer shall be solely responsible for obtaining any governmental approval and taking any action to permit Customer to pay in U. S. Dollars. Payment(s) on shipments released on open account are subject to payment terms established by Distributor’s credit department and as stated on the face of any invoice,
(Rev: 3/2023 1
Docusign Envelope ID: 1E151B3A-3B20-42D9-A4FD-6B8098D3ABFA
if at all. No anticipation discount shall be allowed. All shipments are subject to credit arrangements satisfactory to the Distributor, and it reserves the right, at any time, to suspend credit or to change credit terms provided herein, when, in its sole opinion, the Customer’s financial condition so warrants. Any payment not made when due shall accrue interest at the rate of 1.5% per month, or the maximum rate allowed by South Dakota law, beginning on the date such payment becomes past due, and continuing thereafter until paid in full. The customer shall pay all costs, including accounting and attorneys’ fees, which Distributor incurs in collecting any past due amounts. Failure of Customer to make payment according to authorized credit terms shall entitle Distributor to suspend deliveries and/or terminate the sale agreement or future purchases. SPECIFICATIONS: Except in particulars expressly agreed in writing by the Distributor, all products shall be manufactured in accordance with the manufacturer’s specifications. Specifications are subject to change or withdrawal without notice and are subject to normal manufacturing tolerances. Distributors reserves the right to substitute or change raw materials to improve quality and/or performance in its sole discretion. Distributor reserves the right to discontinue any products without notice. It is the responsibility of the Customer to ensure final plan complies with any applicable Codes, Covenants, and Restrictions in accordance with HOA and other governing bodies and to obtain any approvals before installation. 5 YEAR WORKMANSHIP LIMITED WARRANTY: The warranty for the SYNLawn Mountain West Artificial Grass Installation (“the Surfacing”) covered under these terms and conditions is five (5) years beginning from the date of purchase. This warranty is against defects in workmanship and is effective only if the products have been properly (1) selected and are used in accordance with their normal intended use by the end user and (2) professionally installed and maintained, and (3) only touched or reviewed by a SYNLawn distributor. In the event any of the Products sold by Distributor to Customer are defective, Distributor’s sole responsibility shall be to repair or replace the non-conforming Products. Customer shall make no other warranty to any third party on Distributor’s behalf except as set forth herein above, Distributor makes no warranty of merchantability or fitness for a particular purpose, and any warranties expressed or implied, except the warranties expressly stated herein, are excluded. In no event shall the Distributor be liable to the Customer or any third-party purchaser for incidental or consequential damages, including without limitation, damages for loss of profit or contemplated use. The distributor warrants the synthetic turf installed for five years commencing from the beginning date of purchase. This limited warranty includes only the Distributor’s obligation to repair or replace, at the distributor’s discretion, for defective workmanship in surfacing that has failed during warranty period. A failure in the surfacing includes loose edges, seam failure and release from nailer boards. Distributor is under no obligation or responsibility to repair and/ or replace the surfacing if damaged by vandalism (including
(Rev: 3/2023 2
Docusign Envelope ID: 1E151B3A-3B20-42D9-A4FD-6B8098D3ABFA
cuts, burns, gouges, etc.), misuse, abuse or alteration, improper subsurface design or construction, improper drainage, improper lack of maintenance, any foreign residue that may be deposited on the surface, normal wear and tear, damage from sharp objects (high heels, spikes, etc.) or acts of God. All warranty claims shall be made in writing to Distributor within ten (10) days after Owner has knowledge thereof, but in no event later than ten (10) days after expiration of the warranty. Written notice shall include the date of discovery of failure, description of the failure, photos of the failure and a request for a warranty claim meeting with Distributor. Distributor shall not be responsible for warranty claims if Owner fails to provide written notice within ten (10) days of discovery of the failure. Distributor shall determine the validity of all warranty claims after sufficient evidence has been gathered and then decide to repair or replace the defective area. Failure to pay for the surfacing within the agreed upon terms shall void this limited warranty. LIMITED SUBSURFACE: The limited warranty does not include the subsurface (existing surface, existing or new aggregate, existing or new concrete or existing or new asphalt) if completed by anyone other than the Distributor. If the subsurface installed fails for any reason whatsoever (including hydrostatic pressure, cracking, shifting, heaving, or settling), this limited warranty shall be rendered invalid. The owner agrees that it will not, under any circumstances, make alterations to the subsurface or surfacing without the written authorization of the Distributor. Any unauthorized alterations by the Owner shall immediately void this limited warranty and should give rise to the duty of the Owner to hold harmless, defend and indemnify Distributor from any claim, suit or cause of action, personal injury, death or property damage arising out of or related to said alteration. Owner agrees that in no event shall Distributor have any liability to Owner for loss of use or loss of profits or any form of consequential damages. PRODUCT: The following chemicals can damage the surfacing and should be avoided: concentrated chlorine bleach, gasoline, diesel fuel, hydraulic and lubricating oils, acids and organic solvents. Products sold as other than “first quality” such as promotional goods and seconds are sold “AS IS” without warranty of any kind, and no claims will be considered for such goods. This warranty is not transferable and may not be used as a part of the basis for the bargain between Customer and its purchaser. CLAIMS: Claims must be made in accordance with our Claims Policy. Contact Distributor for a copy of Claims Policy. Claims against Distributor’s performance warranties must be filed in accordance with the specific warranty. Distributor’s claim forms must be used. Claims must identify invoice number and date, style number and color, roll number, yardage involved, alleged defect and location of product. Customer’s exclusive remedy for defective products shall be limited, at Distributor’s option, to repair, replacement or credit for all or an equitable portion of the amount(s) Customer paid to Distributor. Distributor
(Rev: 3/2023 3
Docusign Envelope ID: 1E151B3A-3B20-42D9-A4FD-6B8098D3ABFA
reserves the right to select the method of the adjustment and to make a usage charge for installed Product. REFUNDS AND RETURNS: No refunds, returns, or cancellations on cut rolls or special-order products, including accessories. Clean, unaltered, uninstalled full rolls must be returned within 30 days. A 20% restocking fee will be incurred on all returned products. All material must be paid in full before receiving all COD accounts. The customer is responsible for inspecting the product for defects, correct style, and desired color before installing or altering it. Failure to do so voids warranty and replacement. No refunds or returns on any products after 30 days of purchase. All products must be picked up within 7 days of placing the order and after 7 days storage fees may apply. ENTIRE AGREEMENT: These terms and conditions represent the entire agreement with respect to the terms and conditions of sale. No modification of these terms and conditions shall be binding upon Distributor unless made in writing and signed by a duly authorized agent of Distributor. WAIVER: A waiver by Distributor of any breach or default by Customer of any of these terms and conditions shall not be deemed to be a continuing waiver or a waiver of any other breach or default of any other term or condition but shall apply solely to the instance for which the waiver is directed. APPLICABLE LAW AND JURISDICTION: The construction and enforceability of this agreement shall be governed and controlled by the laws of the State of South Dakota. Any suit or proceeding relating to this agreement shall be brought in the courts, state and federal, located in or having jurisdiction over Pennington County, South Dakota. The parties hereby consent to the exclusive personal jurisdiction and venue of the courts, state and federal, located or having jurisdiction over Pennington County, South Dakota.
(Rev: 3/2023 4
Docusign Envelope ID: 1E151B3A-3B20-42D9-A4FD-6B8098D3ABFA
April 3, 2024
City of Bozeman - Fire Station # 2
575 West Kagy Blvd
Bozeman, Montana 59715
ATTN: Jon Henderson
Change Order Request No. COR 024 R1
Pricing Request No.
PROJECT: Bozeman Fire Station # 2
SUBJECT: COR 024 RFI #73 VRF System layout & changes
REFERENCE: RFI 073
Dear : Jon Henderson,
We propose to provide all labor, materials, and equipment required to
perform the above mentioned work. Our lump sum quotation is based
on our interpretation of the instructions and scope of work
identified by the Proposal Request(s). If we have misinterpreted this information in any
way (omissions, etc.) please advise us.
Other wise, our interpretation shall stand as correct.
We have not been directed to proceed with the work per the terms of the contract.
We have proceeded with the Work per the terms of the contract.X
At this time, we are hereby requesting 0 calendar days for a time extension
Please note this proposal is valid for (10) calendar days from this date and
our proposal is based on receipt of a signed Change Order within (15) calendar days.
We are adjusting the Construction Contingency in the amount of:$4,129.00
We are requesting an Adjustment to the GMP (Owner's Contingency) in the Amount of:
If you have any questions, please call me at (406) 922-5529
Sincerely,
MARTEL CONSTRUCTION, INC.City of Bozeman - Approval
Mike Wilkinson - Martel Project Manager Jon Henderson - Strategic Services Director
Enclosure(s)
Estimate PDF
CC.File
Docusign Envelope ID: 1E151B3A-3B20-42D9-A4FD-6B8098D3ABFA
Spreadsheet Report Page 1
BFS2 COR 024 - RFI #73 VRF System layout & changes 4/3/2024 10:36 AM
Group Description Takeoff Quantity Labor Amount Material Amount Sub Amount Equip Amount Other Amount Total Cost/Unit Total Amount
26-0000 ELECTRICAL1
Electrical2
Division 16 Complete ls --3,828 --/ls 3,8283
Electrical 3,828 /sf 3,828
ELECTRICAL 3,828 /sf 3,828
Estimate Totals
Description Amount Totals Hours Rate
Labor
Material
Subcontract 3,828
Equipment
Other
3,828 3,828
General Liability Insurance 37 0.890 %
Gross Receipts Tax 38 1.000 %Bond 29 0.750 %Construction Fee 197 5.000 %301 4,129Total4,129
Docusign Envelope ID: 1E151B3A-3B20-42D9-A4FD-6B8098D3ABFA
Change Proposal No.Date of Proposal
Description of Work
Labor Breakdown (use additional sheets if necessary)
# of People Hours Labor Rate/Hr Labor Amount
Total from other sheets: ‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐
Total Labor Costs: ‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐
Material Breakdown (use additional sheets if necessary)
Material Description Quantity Unit Unit Cost Material Amounts
Total from other sheets: ‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐
Subtotal Material Costs ‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐
Sales Tax 0% ‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐
Total Material Costs: ‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐
Other Direct Costs (Subcontractors, Equipmnet, Travel, etc.)
Description Quantity Unit Unit Cost Other Cost Amounts
Total from other sheets: ‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐
Total Other Direct Costs: ‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐
1. Total Labor Costs ‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐
2. Total Material Costs ‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐
3. Total Other Direct Costs ‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐
4. Total Labor, Material & Other Direct Costs ‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐
5. Profit & Overhead (15%) of Line 1 ‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐
6. Profit & Overhead (15%) of Line 2 ‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐
7. Profit & Overhead (15%) of Line 3 ‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐
8. Total Change Proposal Costs (lines 4, 5, 6 & 7) ‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐
Contractor's Name: ______________________________________________ Signed By: __________________________________
Change Proposal
Labor Classification
24 3/27/20
SCOR 024 - RFI #73 VRF System layout & changes
$0.00
Labor 1 33.00 $90.00 $2,970.00
$0.00
$0.00
$0.00
$2,970.00
½ emt 100 $0.72 $72.00
½ emt fitting 32 $0.31 $9.92
4 square boxes 14 $2.16 $30.24
RS covers 14 $2.88 $40.32
20 amp switches 14 $3.08 $43.12
#12 thhn 360 $0.17 $61.20
12-2 mc cable 84 $0.73 $61.32
$318.12
1.00%$3.18
$321.30
MATERIALS CONTINUED $0.00
mc connectors 28 $1.32 $36.96
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$36.96
$2,970.00
$321.30
$36.96
$3,328.26
15.00%$445.50
15.00%$48.20
15.00%$5.54
$3,827.50
Slate Electrical
Docusign Envelope ID: 1E151B3A-3B20-42D9-A4FD-6B8098D3ABFA
June 24, 2024City of Bozeman - Fire Station # 2 575 West Kagy Blvd Bozeman, Montana 59715 ATTN: Jon Henderson Change Order Request No. COR 029
Pricing Request No.PR 014
PROJECT: Bozeman Fire Station # 2
SUBJECT: COR 029 PR 014 Add data drop at EMS
REFERENCE: PR014 Dear : Jon Henderson,We propose to provide all labor, materials, and equipment required toperform the above mentioned work. Our lump sum quotation is basedon our interpretation of the instructions and scope of work identified by the Proposal Request(s). If we have misinterpreted this information in anyway (omissions, etc.) please advise us.Other wise, our interpretation shall stand as correct.We have not been directed to proceed with the work per the terms of the contract.We have proceeded with the Work per the terms of the contract.X At this time, we are hereby requesting 0calendar days for a time extensionPlease note this proposal is valid for (10) calendar days from this date andour proposal is based on receipt of a signed Change Order within (15) calendar days.
We are adjusting the Construction Contingency in the amount of:$521.00We are requesting an Adjustment to the GMP (Owner's Contingency) in the Amount of:If you have any questions, please call me at (406) 922-5529 Sincerely, MARTEL CONSTRUCTION, INC.City of Bozeman - Approval Mike Wilkinson - Martel Project ManagerJon Henderson - Strategic Services DirectorEnclosure(s)Estimate PDF
CC.FileDocusign Envelope ID: 1E151B3A-3B20-42D9-A4FD-6B8098D3ABFA
Martel ConstructionSpreadsheet ReportPage 1BFS2 COR 029 PR 14 ADD Data to EMS STOR 1246/25/2024 3:44 PMGroupDescriptionTakeoff QuantityLabor AmountMaterial AmountSub AmountEquip AmountOther AmountTotal Amount27-0000COMMUNICATIONS1Communications2Comm Data - PR 14 ADD Data to EMS STOR1241.00ls--482--4823 Communications482482 COMMUNICATIONS482482Estimate TotalsDescriptionAmountTotalsHoursRateLaborMaterialSubcontract482EquipmentOther482482General Liability Insurance50.890%Gross Receipts Tax51.000%Bond40.750%Construction Fee255.000%39521Total521Docusign Envelope ID: 1E151B3A-3B20-42D9-A4FD-6B8098D3ABFA
Estimate
Date
2/27/2024
Estimate #
74748
Name / Address
Martel Construction, Inc.
1203 S Church Ave.
Bozeman, MT 59715
CompuSource, Inc.
411 East Birch St.
Bozeman, MT 59715
Job Name
PR 014
Terms
Net 30
Project
Bozeman Fire Statio...
Signature
Phone #
4065871616
Fax #Web Site
www.compusourcenow.com
Total
Item Description Qty Rate Total
Martel Construction : Bozeman Fire Station #2 ; PR 14
labor labor 3.50 85.00 297.50
CJ688TG** Panduit Cat 6 jack 4.00 9.15 36.60
CAT 6 4 PR PLE... CAT 6 Genspeed 6000 Mid grade Plenum 300.00 0.4375 131.25
CFPL4SY 4 PORT SINGLE GANG STAINLESS STEEL
FACEPLATE WITH LABELS
1.00 11.90 11.90
MISC MISCELLANEOUS, labels, ties, Velcro... 1.00 5.00 5.00
_____________________________________
$482.25
Docusign Envelope ID: 1E151B3A-3B20-42D9-A4FD-6B8098D3ABFA
March 21, 2024
City of Bozeman - Fire Station # 2
575 West Kagy Blvd
Bozeman, Montana 59715
ATTN: Jon Henderson
Change Order Request No. COR 031
Pricing Request No.
PROJECT: Bozeman Fire Station # 2
SUBJECT: COR 031 RFI #80 Fire Fighter Work Area Ceilings Elevation
REFERENCE: RFI 080
Dear : Jon Henderson,
We propose to provide all labor, materials, and equipment required to
perform the above mentioned work. Our lump sum quotation is based
on our interpretation of the instructions and scope of work
identified by the Proposal Request(s). If we have misinterpreted this information in any
way (omissions, etc.) please advise us.
Other wise, our interpretation shall stand as correct.
We have not been directed to proceed with the work per the terms of the contract.X
We have proceeded with the Work per the terms of the contract.
At this time, we are hereby requesting 0 calendar days for a time extension
Please note this proposal is valid for (10) calendar days from this date and
our proposal is based on receipt of a signed Change Order within (15) calendar days.
We are adjusting the Construction Contingency in the amount of:3,004.00$
We are requesting an Adjustment to the GMP (Owner's Contingency) in the Amount of:
If you have any questions, please call me at (406) 922-5529
Sincerely,
MARTEL CONSTRUCTION, INC.City of Bozeman - Approval
Mike Wilkinson - Martel Project Manager Jon Henderson - Strategic Services Director
Enclosure(s)
Estimate PDF
CC.File
Docusign Envelope ID: 1E151B3A-3B20-42D9-A4FD-6B8098D3ABFA
Spreadsheet ReportPage 1BFS2 COR 024 - RFI #73 VRF System layout & changes3/21/2024 3:34 PMGroupDescriptionTakeoff QuantityLabor AmountMaterial AmountSub AmountEquip AmountOther AmountTotal Cost/UnitTotal Amount01-0000GENERAL REQUIREMENTS1Supervision2Superintendent6.00hr4000-0-66.67/hr4003 Supervision400/wk400 GENERAL REQUIREMENTS400/ls40006-0000WOOD & PLASTICS4Fascia & Soffit Framing52x4 Soffit Framing122.00bf1,55366---13.27/bf1,6196 Fascia & Soffit Framing1,55366/bf1,619 WOOD & PLASTICS1,55366/sf1,61909-0000FINISHES7Gypsum Board85/8 Drywall Hang, Taping & Finishing168.00sf--430--2.56/sf4309 Gypsum Board430/sf430Paint Finishes10Interior Painting168.00sf--336--2.00/sf33611 Paint Finishes336/sf336 FINISHES766/sf766Estimate TotalsDescriptionAmountTotalsHoursRateLabor1,95338.000hrsMaterial66Subcontract766Equipment6.000hrsOther2,7852,785General Liability Insurance270.890%Gross Receipts Tax281.000%Bond210.750%Construction Fee1435.000%2193,004Total3,004Docusign Envelope ID: 1E151B3A-3B20-42D9-A4FD-6B8098D3ABFA
New Soffit height 9'-3"
ACT Ceiling 9'-4"
Window shade pocket 9'-8"
COR 031 RFI #080 - Fire Fighter Work Area Ceiling
Height
9'-11"17'-9"
All new soffits (red)
will be 12" wide and
be two sided with
sheetrock and built
down at 9'-3" and
ACT ceiling will install
at 9'-4" Vertical face
on the inside of room
sheetrock will only
need to go up 6"
Window Shade
(purple) Pocket built
up to 9'-8" wrap in
side of pocket with
sheetrock and finish
inside and Paint.
Pocket dimensions
are 4" tall x 5" wide x
128" long14'-10"Docusign Envelope ID: 1E151B3A-3B20-42D9-A4FD-6B8098D3ABFA
4524 Tacoma Ave , Sumner, Washington, 98390 T:253-863-0660 Fax: 253-863-0662
Run on:March 21, 2024 9:41 AM
http://www.sesslerinc.com
Rate
65.00
65.00
Total
$65.00
$195.00
Total Hrs
1.00
3.00
$260.00Total Labor
Labor
$348.70Subtotal for Detail
Description:
$88.70Material Total:
$260.00Labor Total:
$12.66Equipment Total:
$13.00Misc. Total:
$430.00Total:
$55.64 14.86%Mark Up:
$0.00Sub Trade Total:
$0.00Cleanup Total:
GYPSUM WALLBOARD HANGING
GYPSUM WALLBOARD FINISHING
Unit Price Total
GWB 5/8" Type "X" (Toughrock)
Beadex Super Wide Corner Bead
HAMILTON ALL PURPOSE LIGHT RED (1 BOX)
$49.92
$5.80
$32.98
Quantity
2.00
2.00
2.00
SHT
PCS
EA
UOM
4X12
10'
1 BOX
Size
SQFT
LF
EA
.52
.29
16.49
$88.70Total Material
Material
To:
CO-02434
Feb 26, 2024Date
Job #24003
Martel Construction
1203 South Church Avenue
Project:Bozeman Fire Station #2
Bozeman, MT 59715
575 West Kagy Blvd
Bozeman, MT 59715
External/RCO#
REQUEST FOR CHANGE ORDER
Ref.#
Total
Total
SMALL TOOLS 3%
SAFETY 2%
EQUIPMENT RENTAL 3.5%
$7.80
$5.20
$12.66
$13.00
$12.66
Total Miscellaneous Charges
Total Other Equipment Charges
Total Miscellaneous Charges
Total Other Equipment Charges
$374.36Sub Total:
RFI 80 - Added GWB soffit
Sub's Comments: This proposal is priced with the understanding that all Framing and GWB will be installed and firetaped prior to Mechanical and
Electrical work, if applicable. Any existing Mechanical and Electrical items must be removed before this extra work begins. If this work proceeds in
a sequence other than defined above, there will be additional impact and other costs to the extra work and potentially the original contract work, as
well as a possible impact to the schedule necessitating the need for a further time extension.
This proposal does not include any amount for changes in the sequence of work, delays, disruptions, rescheduling, extended home office
overhead, schedule acceleration, and / or impact costs. The right is expressly reserved to make claim for any or all of these and related items of
cost, in accordance with the provisions of the Contract, prior to the final settlement of this Contract. Sessler reserves and does not waive all of its
rights regarding prior notices and claims.
A notice to proceed, a CCD or a signed change order for this work will indicate acceptance of the above pricing and conditions. This additional
work will extend durations at this area of the building. The additional work may affect the critical path.
ALL
ALL
ALL
SubSection
SubSection
ALL
ALL
GC Ref#
Page 1 of 1Docusign Envelope ID: 1E151B3A-3B20-42D9-A4FD-6B8098D3ABFA
T& L Painting
* Commercial & Industrial Painting
* Dustless Sandblasting
509 Colorado Ave. NW
Great Falls, MT 59404
Phone: 406-771-7919
Since 1990 Fax: 406-454-0567
To:Martel
Attn:Mike Wilkinson Date of Proposal:
Change Request No:
mwilkinson@martelconstruction.com
Phone:406-586-8585 Job Name: Bozeman Fire Station 2
Cell:
Quantity Unit $/Unit Total
168 SF 2.00$ $336.00
$336.00
Submitted By:Matt Pancich Date:
Approved By:Date
Prime and Paint Soffit RFI 80
CHANGE ORDER PROPOSAL
3/13/2024
1
Description of Change Order Request:
Description Changes:
Prime and Paint Soffit
This change order becomes part of and in conformance with existing contract.
TOTAL PROPOSED CHANGE ORDER COSTS
Notes or Remarks:
Your immediate attention is required. Please sign and return to T&L Painting. Thank you.
3/13/2024
Docusign Envelope ID: 1E151B3A-3B20-42D9-A4FD-6B8098D3ABFA
July 15, 2024
City of Bozeman - Fire Station # 2
575 West Kagy Blvd
Bozeman, Montana 59715
ATTN: Jon Henderson
Change Order Request No. COR 034 R1
Pricing Request No.RFI 095
PROJECT: Bozeman Fire Station # 2
SUBJECT: COR 034 RFI 095 Hose Reels & Domestic Water Supply at App Bay
REFERENCE: RFI 095
Dear : Jon Henderson,
We propose to provide all labor, materials, and equipment required to
perform the above mentioned work. Our lump sum quotation is based
on our interpretation of the instructions and scope of work
identified by the Proposal Request(s). If we have misinterpreted this information in any
way (omissions, etc.) please advise us.
Other wise, our interpretation shall stand as correct.
We have not been directed to proceed with the work per the terms of the contract.X
We have proceeded with the Work per the terms of the contract.
At this time, we are hereby requesting 0 calendar days for a time extension
Please note this proposal is valid for (10) calendar days from this date and
our proposal is based on receipt of a signed Change Order within (15) calendar days.
We are adjusting the Construction Contingency in the amount of:4,173.00$
We are requesting an Adjustment to the GMP (Owner's Contingency) in the Amount of:
If you have any questions, please call me at (406) 922-5529
Sincerely,
MARTEL CONSTRUCTION, INC.City of Bozeman - Approval
Mike Wilkinson - Martel Project Manager Jon Henderson - Strategic Services Director
Enclosure(s)
Estimate PDF
CC.File
Docusign Envelope ID: 1E151B3A-3B20-42D9-A4FD-6B8098D3ABFA
Martel ConstructionSpreadsheet ReportPage 1BFS2 COR 034 - RFI 095 Hose Reels & Domestic Water Supply at App Bay7/15/2024 7:46 AMGroupDescriptionTakeoff QuantityLabor AmountMaterial AmountSub AmountEquip AmountOther AmountTotal Amount22-0000PLUMBING1Plumbing Fixtures2Plumbing Hose Reel for Boot Wash Station1.00ea--4,618--4,6183Plumbing Fixtures & Equipment - Credit for RedPaint vs SS1.00ea--(750)--(750)4 Plumbing Fixtures3,8683,868 PLUMBING3,8683,868Estimate TotalsDescriptionAmountTotalsHoursRateLaborMaterialSubcontract3,868EquipmentOther3,8683,868General Liability Insurance370.890%Gross Receipts Tax391.000%Bond300.750%Construction Fee1995.000%3054,173Total4,173Docusign Envelope ID: 1E151B3A-3B20-42D9-A4FD-6B8098D3ABFA
Material/Labor Direct Costs Qty Material Unit Price Material Cost Labor Hrs
Labor
Rate/Hr Labor Cost
Add New T&S Brass Hose Real1 $3,269 $3,268.825 $125.00 $625.000
$0 $0.00 $125.00 $0.000
$0 $0.00 $125.00 $0.000
$0 $0.00 $125.00 $0.000
$0 $0.00 $125.00 $0.000
$0 $0.00 $125.00 $0.000
$0 $0.00 $125.00 $0.00
Misc. Plumbing Materials $163.44
$0.00 $125.00 $0.00
$0.00 $125.00 $0.00
$0.00 $125.00 $0.00
$0.00 $125.00 $0.00
Misc. Sheet Metal Materials $0.00
$0.00 $120.00 $0.00
$0.00 $120.00 $0.00
$0.00 $120.00 $0.00
Misc. Sheet Metal Materials $0.00
$3,432.26 $625.00
$135.00 $0.00
$135.00 $0.00
$135.00 $0.00
$0.00
SUMMARY
Materials (detail above)$3,432.26
Equipment Rent- Subsistence- Lodging Costs- Mileage (Total Miles X $1.25)- Subtotal $3,432.26
$514.84
Labor (detail above)$625.00
Subcontractors:
$0.00- - - $0.00
Bond (If Applicable)$0.00n
CGR 1% State Tax (If Applicable)$45.72y
TOTAL AMOUNT DUE $4,617.82
Sheet Metal Shop Fabrication:
Sheet Metal:
BOZEMAN WORK MOD / SMALL PROJECT PRICING WORKSHEET
Job Name: 23-4072 Bozeman Fire Station #2
Description: Hose Reel Add Per RFI #95
Date: 6/5/24 Plumbing:
Supervision:
Plumbing Supervision
Sheet Metal Supervision
Total Material/Labor Direct Costs
Subcontractors with 10% Overhead &
Profit
PM Time
Total Supervision
15% Overhead & Profit
Comm. Drive/Bid Prep forms/Change Order Worksheet
Docusign Envelope ID: 1E151B3A-3B20-42D9-A4FD-6B8098D3ABFA
Body Behind Panel.
Front TriggerMV-2522-24
Water Gun
1/2" NPT Female Inlet
Cabinet Rough-In Requirement:20 1/4" H x 14 1/4" W x 5" D
Operable From Outside of Closed Cabinet
019652-40
2" [51mm] Flange,
3/8" NPTLive Swivel
Main Shutoff Valve
Swivel Elbow w/
B-0109-01
6" Wall Bracket
2" [51mm] Closed
2 3/8" [60mm] Open
23 9/16"
599mm
EasyInstallWall MountSwing BracketMounting Holes90mm
5 9/16"
142mm
3 9/16"
1/2"
13mm
B-7142-05Hose Reel w/ Spray Valve4"
Holes
Cutout
102mm
57mm
(3)2 1/4"
13 11/16"
347mm
2 1/16"
52mm
Cutout
4"
102mm
Cutout
2 5/8"
67mm
EasyInstallVacuum Breaker w/
Quick Disconnect
Integral Check valve
Connector
Flexible Water
3/8" x 18" Riser
Thermometer 1/2" NPTFemale Outlet
Cabinet Door (Closes Flush)
3/8" NPT x 36"
1/2" NPTFemale Inlets
B-0963Continuous Pressure
Stainless Steel
102mm
4"
102mm
4"
16"
407mm
21 3/4"
553mm
B-2339-LRControl Cabinetw/ Dual CheckValves
1:16
Job Name
Product Specifications:
Scale:
Model No.
Item No.
T&S BRASS AND BRONZE WORKS, INC.
10/28/19JRM
2 Saddleback Cove / P.O. Box 1088
Rinse Control Cabinet w/ Control Valve, Dual Check Valves, Thermometer Stainless Steel Hose Reel w/ 50' Hose, High Flow Water Gun w/ Swivel,
Customer/Wholesaler______________________________
Model Specified_____________________ Quantity______
and Water Hammer Arrestor, 100 Degree EasyInstall Stainless Steel Swing
Travelers Rest, SC 29690
Date:
Bracket w/ Mounting Hardware & Hose Reel Connector Kit
__________________________Date_________
B-7142-U05WS5
Contractor_______________________________________
21ofSheet:
Architect/Engineer_________________________________
Checked:Drawn: Approved:KJG JHB
Travelers Rest, SC: 800-476-4103 • Simi Valley, CA: 800-423-0150 • Fax: 864-834-3518 • www.tsbrass.com
This Space for Architect/Engineer Approval
Product Compliance:
NSF 61 Exempt (Non-Potable)ASSE 1024 (VB)ASSE 1010 (Arrestor)2019 DOE PRSV Non-CompliantASSE 1056 (VB)
(HR-1) SPRAYDOWN HOSE REEL
T&S Brass
page 82 of 513
Docusign Envelope ID: 1E151B3A-3B20-42D9-A4FD-6B8098D3ABFA
10
11
16
1
14
13
15
17
7
4
3
2
5
6
7
8 9 7
12
ITEM NO.SALES NO. DESCRIPTION
1 B-2339-LR
Reel Control Cabinet w/ Control Valve, Dual Check Valves & Thermometer
2 014200-45 Star Washer, Anti-Rotation
3 001065-45 O-Ring
4EZ-KEasyInstall Kit: Nut, Bushing, O-Ring & Lock Washer
5 0RK-SK Hose Reel Connector Kit
6 B-0109-01 6" Wall Bracket
7 001359-40
Hex Bushing, 1/2" NPT Male x 3/8" NPT Female
8 B-0963
Vacuum Breaker 1/2" NPT Female
9 015073-40
Check Valve w/ 1/2" NPT Adapter
10 HW-2B-36
3/8" NPT x 36" Flexible Water Hose
11 AW-5B 3/8" NPT Quick Disconnect
12 002535-25 3/8" Close Nipple
13 G019430-45
EasyInstall Hose Reel StainlessSteel Swing Bracket
14 019191-45K Hose Reel Mounting Kit
15 B-7142-05
Open Stainless Steel Reel w/ 50" of 3/8" Hose w/ Front Trigger Water Gun
16 019652-40 3/8" NPT Live Swivel
17 MV-2522-24
Stainless Steel Water Gun, Front Trigger
10/28/19 Scale:
Model No.
Item No.
T&S BRASS AND BRONZE WORKS, INC.
Travelers Rest, SC: 800-476-4103 • Simi Valley, CA: 800-423-0150 • Fax: 864-834-3518 • www.tsbrass.com
JRM
ASSE 1010 (Arrestor)
B-7142-U05WS5
Bracket w/ Mounting Hardware & Hose Reel Connector Kit
Travelers Rest, SC 29690
ASSE 1024 (VB)
2019 DOE PRSV Non-Compliant
Date:
2 Saddleback Cove / P.O. Box 1088
Checked:NTS
ASSE 1056 (VB)
2of2Sheet:JHBKJGApproved:Drawn:
Product Compliance:
NSF 61 Exempt (Non-Potable)Stainless Steel Hose Reel w/ 50' Hose, High Flow Water Gun w/ Swivel, Rinse Control Cabinet w/ Control Valve, Dual Check Valves, Thermometer and Water Hammer Arrestor, 100 Degree EasyInstall Stainless Steel Swing
Product Specifications:
(HR-1) SPRAYDOWN HOSE REEL
T&S Brass
page 83 of 513
Docusign Envelope ID: 1E151B3A-3B20-42D9-A4FD-6B8098D3ABFA
July 11, 2024
City of Bozeman - Fire Station # 2
575 West Kagy Blvd
Bozeman, Montana 59715
ATTN: Jon Henderson
Change Order Request No. COR 035
Pricing Request No.RFI 097
PROJECT: Bozeman Fire Station # 2
SUBJECT: COR 035 RFI 097 Johnson Controls Panel Power
REFERENCE: RFI 095
Dear : Jon Henderson,
We propose to provide all labor, materials, and equipment required to
perform the above mentioned work. Our lump sum quotation is based
on our interpretation of the instructions and scope of work
identified by the Proposal Request(s). If we have misinterpreted this information in any
way (omissions, etc.) please advise us.
Other wise, our interpretation shall stand as correct.
We have not been directed to proceed with the work per the terms of the contract.
We have proceeded with the Work per the terms of the contract.X
At this time, we are hereby requesting 0 calendar days for a time extension
Please note this proposal is valid for (10) calendar days from this date and
our proposal is based on receipt of a signed Change Order within (15) calendar days.
We are adjusting the Construction Contingency in the amount of:4,248.00$
We are requesting an Adjustment to the GMP (Owner's Contingency) in the Amount of:
If you have any questions, please call me at (406) 922-5529
Sincerely,
MARTEL CONSTRUCTION, INC.City of Bozeman - Approval
Mike Wilkinson - Martel Project Manager Jon Henderson - Strategic Services Director
Enclosure(s)
Estimate PDF
CC.File
Docusign Envelope ID: 1E151B3A-3B20-42D9-A4FD-6B8098D3ABFA
Martel ConstructionSpreadsheet ReportPage 1BFS2 COR 035 RFI 097 Temperature Control Power7/11/2024 2:37 PMGroupDescriptionTakeoff QuantityLabor AmountMaterial AmountSub AmountEquip AmountOther AmountTotal Amount26-0000ELECTRICAL1Electrical2Add 4 Circuts - RFI 97 Johnson Controls PanelPower1.00ls--3,939--3,9393 Electrical3,9393,939 ELECTRICAL3,9393,939Estimate TotalsDescriptionAmountTotalsHoursRateLaborMaterialSubcontract3,939EquipmentOther3,9393,939General Liability Insurance380.890%Gross Receipts Tax391.000%Bond300.750%Construction Fee2025.000%3094,248Total4,248Docusign Envelope ID: 1E151B3A-3B20-42D9-A4FD-6B8098D3ABFA
Change Proposal No.Date of Proposal
Description of Work
Labor Breakdown (use additional sheets if necessary)
# of People Hours Labor Rate/Hr Labor Amount
Total from other sheets: ‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐
Total Labor Costs: ‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐
Material Breakdown (use additional sheets if necessary)
Material Description Quantity Unit Unit Cost Material Amounts
Total from other sheets: ‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐
Subtotal Material Costs ‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐
Sales Tax 0% ‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐
Total Material Costs: ‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐
Other Direct Costs (Subcontractors, Equipmnet, Travel, etc.)
Description Quantity Unit Unit Cost Other Cost Amounts
Total from other sheets: ‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐
Total Other Direct Costs: ‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐
1. Total Labor Costs ‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐
2. Total Material Costs ‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐
3. Total Other Direct Costs ‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐
4. Total Labor, Material & Other Direct Costs ‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐
5. Profit & Overhead (15%) of Line 1 ‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐
6. Profit & Overhead (15%) of Line 2 ‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐
7. Profit & Overhead (15%) of Line 3 ‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐
8. Total Change Proposal Costs (lines 4, 5, 6 & 7) ‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐
Contractor's Name: ______________________________________________ Signed By: __________________________________
Change Proposal
Labor Classification
COR 035 RFI 097 5/30/24
provide 120v power to temp control panels
rough in 1 16 95 1520
equipment connection 1 16 95 1520
$0.00
$0.00
$0.00
3040.00
material quote attached 381.12
381.12
1.00%3.81
384.93
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
3040.00
384.93
0
3424.93
.05 456.00
15.00%57.74
15.00%$0.00
3938.67
Slate Electrical
Docusign Envelope ID: 1E151B3A-3B20-42D9-A4FD-6B8098D3ABFA
Description:
Martel Change order 1
Quote #2086379
Updated On: 06/25/2024
Company Name:
Slate Electrical
Billing Address:
Slate Electrical (427124)
3210 Canyon Ferry Rd Unit 1
East Helena, MT 59635-3027
Created Date:
6/25/24
Shipping Address:
3210 Canyon Ferry Rd Unit 1
East Helena, MT 59635-3027 US
Shipping Method:
Hold For Pickup
FOB:
Destination
Sales Person:
Shawn Schroeder
shawn.schroeder@platt.com
Branch:
Helena #92
4064425947
PRODUCTS QTY UNT PR / UOM TOTALS
Entire Quote:
Sub Total:$381.12
S/H:Not Included
Other Charges:$0.00
Tax:$0.00
Total:$381.12
Prices are subject to change at any time prior to shipment unless agreed to otherwise in writing signed by an authorized Seller representative.
Orders related to this quotation must be received, accepted and released by Seller within 48 hours of issuance of the quotation and are subject to
availability. Many of Seller’s manufacturing partners have advised that until further notice they reserve the right to amend the delivery date, price,
scope and quantity of supply and/or other terms and conditions set out in their offer or quotation and Seller equally reserves the right to pass
through any such changes from its manufacturing partners to the Buyer. Delivery dates are estimated only. Seller shall not be liable for failure to
meet such dates resulting from product shortages or manufacturing delays. Be advised that Seller considers any changes imposed by its
manufacturing partners and other vendors outside of Seller’s reasonable control and therefore subject to Force Majeure provisions or similar
common law doctrines such as “frustration” or “impossibility”.
Seller’s Standard Terms and Conditions of Sale are incorporated by reference into this quotation. A copy of the most current version of Seller’s
Standard Terms and Conditions of Sale is available at. https://www.rexelusa.com/terms
Full phone support at (888) 739-3577
Delivery dates are estimated only. Seller shall not be liable for failure to meet such dates resulting from product shortages or manufacturing
delays.
CUTBAB1020 | Item# 60446
20A, 1P, 120/240V, Type BAB, 10 kAlC, Bolt On
MFR:Eaton
4 $17.18 EA $68.75
1.
824
34E | Item# 65970
3/4" EMT Conduit, Steel, 10' Length
MFR:Multiple
190 $89.52 C $170.09
2.
000
34ESSSCP | Item# 66497
EMT Set Screw Coupling, Steel, 3/4 inch
MFR:Multiple
19 $38.00 C $7.22
3.
000
34ESSSCN | Item# 66496
EMT Set Screw Connector, Steel, 3/4 inch
MFR:Multiple
12 $31.00 C $3.72
4.
000
RAC232 | Item# 52181
4" Square Box, Welded, 2-1/8" Deep, 1/2 and 3/4" Knockouts,
Steel
MFR:Hubbell-Raco
4 $141.62 C $5.66
5.
000
RAC752 | Item# 52387
4" Square Cover, 0-Device, Cover, No Raise, Drawn, Metallic
MFR:Hubbell-Raco
4 $44.05 C $1.76
6.
000
DOTGP1050 | Item# 483822
Grounding Pigtail, 12 AWG, 10-1/2" Long, Pack of 50
MFR:Dottie
4 $82.76 C $3.31
7.
400
12THHNCSOLBLAX500 | Item# 62605
12 AWG THHN/THWN-2 Solid Copper, Black, 500'
MFR:Multiple
655 $172.75 M $113.15
8.
000
34ES1H | Item# 66488
1-Hole EMT Strap 3/4"
MFR:Multiple
35 $21.31 C $7.46
9.
000
Docusign Envelope ID: 1E151B3A-3B20-42D9-A4FD-6B8098D3ABFA
Description:Martel Change order 1 Quote #2086379Updated On: 06/25/2024Company Name:Slate Electrical Billing Address:Slate Electrical (427124)3210 Canyon Ferry Rd Unit 1East Helena, MT 59635-3027 Created Date:6/25/24Shipping Address:3210 Canyon Ferry Rd Unit 1East Helena, MT 59635-3027 US Shipping Method:Hold For Pickup FOB:DestinationSales Person:Shawn Schroedershawn.schroeder@platt.com Branch:Helena #924064425947PRODUCTS QTY UNT PR / UOM TOTALS
Entire Quote:
Sub Total:$381.12
S/H:Not Included
Other Charges:$0.00
Tax:$0.00
Total:$381.12
Prices are subject to change at any time prior to shipment unless agreed to otherwise in writing signed by an authorized Seller representative.
Orders related to this quotation must be received, accepted and released by Seller within 48 hours of issuance of the quotation and are subject to
availability. Many of Seller’s manufacturing partners have advised that until further notice they reserve the right to amend the delivery date, price,
scope and quantity of supply and/or other terms and conditions set out in their offer or quotation and Seller equally reserves the right to pass
through any such changes from its manufacturing partners to the Buyer. Delivery dates are estimated only. Seller shall not be liable for failure to
meet such dates resulting from product shortages or manufacturing delays. Be advised that Seller considers any changes imposed by its
manufacturing partners and other vendors outside of Seller’s reasonable control and therefore subject to Force Majeure provisions or similar
common law doctrines such as “frustration” or “impossibility”.
Seller’s Standard Terms and Conditions of Sale are incorporated by reference into this quotation. A copy of the most current version of Seller’s
Standard Terms and Conditions of Sale is available at. https://www.rexelusa.com/terms
Full phone support at (888) 739-3577
Delivery dates are estimated only. Seller shall not be liable for failure to meet such dates resulting from product shortages or manufacturing
delays.
CUTBAB1020 | Item# 6044620A, 1P, 120/240V, Type BAB, 10 kAlC, Bolt OnMFR:Eaton 4 $17.18 EA $68.751.82434E | Item# 659703/4" EMT Conduit, Steel, 10' LengthMFR:Multiple 190 $89.52 C $170.092.00034ESSSCP | Item# 66497EMT Set Screw Coupling, Steel, 3/4 inchMFR:Multiple 19 $38.00 C $7.223.00034ESSSCN | Item# 66496EMT Set Screw Connector, Steel, 3/4 inchMFR:Multiple 12 $31.00 C $3.724.000RAC232 | Item# 521814" Square Box, Welded, 2-1/8" Deep, 1/2 and 3/4" Knockouts,SteelMFR:Hubbell-Raco 4 $141.62 C $5.665.000RAC752 | Item# 523874" Square Cover, 0-Device, Cover, No Raise, Drawn, MetallicMFR:Hubbell-Raco 4 $44.05 C $1.766.000DOTGP1050 | Item# 483822Grounding Pigtail, 12 AWG, 10-1/2" Long, Pack of 50MFR:Dottie 4 $82.76 C $3.317.40012THHNCSOLBLAX500 | Item# 6260512 AWG THHN/THWN-2 Solid Copper, Black, 500'MFR:Multiple 655 $172.75 M $113.158.000
34ES1H | Item# 66488
1-Hole EMT Strap 3/4"
MFR:Multiple
35 $21.31 C $7.46
9.
000
Docusign Envelope ID: 1E151B3A-3B20-42D9-A4FD-6B8098D3ABFA
June 24, 2024City of Bozeman - Fire Station # 2 575 West Kagy Blvd Bozeman, Montana 59715 ATTN: Jon Henderson Change Order Request No. COR 036
Pricing Request No.PR 016
PROJECT: Bozeman Fire Station # 2
SUBJECT: COR 036 PR 016 Add Coax Cable for TVs
REFERENCE: PR 016 Dear : Jon Henderson,We propose to provide all labor, materials, and equipment required toperform the above mentioned work. Our lump sum quotation is basedon our interpretation of the instructions and scope of work identified by the Proposal Request(s). If we have misinterpreted this information in anyway (omissions, etc.) please advise us.Other wise, our interpretation shall stand as correct.We have not been directed to proceed with the work per the terms of the contract.XWe have proceeded with the Work per the terms of the contract. At this time, we are hereby requesting 0calendar days for a time extensionPlease note this proposal is valid for (10) calendar days from this date andour proposal is based on receipt of a signed Change Order within (15) calendar days.
We are adjusting the Construction Contingency in the amount of:
We are requesting an Adjustment to the GMP (Owner's Contingency) in the Amount of:1,058.00$ If you have any questions, please call me at (406) 922-5529 Sincerely, MARTEL CONSTRUCTION, INC.City of Bozeman - Approval Mike Wilkinson - Martel Project ManagerJon Henderson - Strategic Services DirectorEnclosure(s)Estimate PDF
CC.FileDocusign Envelope ID: 1E151B3A-3B20-42D9-A4FD-6B8098D3ABFA
Martel ConstructionSpreadsheet ReportPage 1COR 036 PR 016 Add Coax Cable for TVs6/24/2024 3:46 PMGroupDescriptionTakeoff QuantityLabor AmountMaterial AmountSub AmountEquip AmountOther AmountTotal Amount27-0000COMMUNICATIONS1Communications2COR 036 PR 016 Add Coax Cable for TVs - 3locations1.00ls--981--9813 Communications981981 COMMUNICATIONS981981Estimate TotalsDescriptionAmountTotalsHoursRateLaborMaterialSubcontract981EquipmentOther981981General Liability Insurance90.890%Gross Receipts Tax101.000%Bond80.750%Construction Fee505.000%771,058Total1,058Docusign Envelope ID: 1E151B3A-3B20-42D9-A4FD-6B8098D3ABFA
Estimate
Date
6/24/2024
Estimate #
74783
Name / Address
Martel Construction, Inc.
1203 S Church Ave.
Bozeman, MT 59715
CompuSource, Inc.
411 East Birch St.
Bozeman, MT 59715
Job Name
PR-16
Terms
Net 30
Project
Bozeman Fire Statio...
Signature _____________________________________
Phone #
4065871616
Fax #Web Site
www.compusourcenow.com
Total
Item Description Qty Rate
Martel Construction : BZN Fire Station #2 : PR-16 Coax
labor labor to add one coax to 3 locations. Room 136 using existing 1/2 "
Conduit and should be 3/4" we may not be able to feed all three
cables down this 1/2" EMT. The other two locations will have no
problem.
8.00 90.00
RG-6 Plenum RG-6 Coax Plenum Rated 350.00 0.59211
CMF** Panduit Minicom F Type Jack 6.00 7.97
SNS6 Snap-N-Seal® “F” Series Male One-Piece Compression Connectors 6.00 1.00
$981.06
Docusign Envelope ID: 1E151B3A-3B20-42D9-A4FD-6B8098D3ABFA
June 24, 2024City of Bozeman - Fire Station # 2 575 West Kagy Blvd Bozeman, Montana 59715 ATTN: Jon Henderson Change Order Request No. COR 037
Pricing Request No.PR 017
PROJECT: Bozeman Fire Station # 2
SUBJECT: COR 037 PR 017 ADD Sprinkler Head under stair 2
REFERENCE: PR 017 Dear : Jon Henderson,We propose to provide all labor, materials, and equipment required toperform the above mentioned work. Our lump sum quotation is basedon our interpretation of the instructions and scope of work identified by the Proposal Request(s). If we have misinterpreted this information in anyway (omissions, etc.) please advise us.Other wise, our interpretation shall stand as correct.We have not been directed to proceed with the work per the terms of the contract.We have proceeded with the Work per the terms of the contract.X At this time, we are hereby requesting 0calendar days for a time extensionPlease note this proposal is valid for (10) calendar days from this date andour proposal is based on receipt of a signed Change Order within (15) calendar days.
We are adjusting the Construction Contingency in the amount of:527.00$ We are requesting an Adjustment to the GMP (Owner's Contingency) in the Amount of:If you have any questions, please call me at (406) 922-5529 Sincerely, MARTEL CONSTRUCTION, INC.City of Bozeman - Approval Mike Wilkinson - Martel Project ManagerJon Henderson - Strategic Services DirectorEnclosure(s)Estimate PDF
CC.FileDocusign Envelope ID: 1E151B3A-3B20-42D9-A4FD-6B8098D3ABFA
Martel ConstructionSpreadsheet ReportPage 1COR 037 PR 017 ADD Sprinkler Head under stair 26/24/2024 3:09 PMGroupDescriptionTakeoff QuantityLabor AmountMaterial AmountSub AmountEquip AmountOther AmountTotal Amount21-0000FIRE SUPPRESSION1Fire Suppression2Fire Suppression Systems - COR 037 PR 017ADD Sprinkler Head under stair 22.00EA--488--4883 Fire Suppression488488 FIRE SUPPRESSION488488Estimate TotalsDescriptionAmountTotalsHoursRateLaborMaterialSubcontract488EquipmentOther488488General Liability Insurance50.890%Gross Receipts Tax51.000%Bond40.750%Construction Fee255.000%39527Total527Docusign Envelope ID: 1E151B3A-3B20-42D9-A4FD-6B8098D3ABFA
Docusign Envelope ID: 1E151B3A-3B20-42D9-A4FD-6B8098D3ABFA
Docusign Envelope ID: 1E151B3A-3B20-42D9-A4FD-6B8098D3ABFA
July 12, 2024
City of Bozeman - Fire Station # 2
575 West Kagy Blvd
Bozeman, Montana 59715
ATTN: Jon Henderson
Change Order Request No. COR 039
Pricing Request No.RFI 086
PROJECT: Bozeman Fire Station # 2
SUBJECT:COR 039 RFI 086 electric water heater and boiler
REFERENCE: RFI 086
Dear : Jon Henderson,
We propose to provide all labor, materials, and equipment required to
perform the above mentioned work. Our lump sum quotation is based
on our interpretation of the instructions and scope of work
identified by the Proposal Request(s). If we have misinterpreted this information in any
way (omissions, etc.) please advise us.
Other wise, our interpretation shall stand as correct.
We have not been directed to proceed with the work per the terms of the contract.
We have proceeded with the Work per the terms of the contract.X
At this time, we are hereby requesting 0 calendar days for a time extension
Please note this proposal is valid for (10) calendar days from this date and
our proposal is based on receipt of a signed Change Order within (15) calendar days.
We are adjusting the Construction Contingency in the amount of:7,502.00$
We are requesting an Adjustment to the GMP (Owner's Contingency) in the Amount of:
If you have any questions, please call me at (406) 922-5529
Sincerely,
MARTEL CONSTRUCTION, INC.City of Bozeman - Approval
Mike Wilkinson - Martel Project Manager Jon Henderson - Strategic Services Director
Enclosure(s)
Estimate PDF
CC.File
Docusign Envelope ID: 1E151B3A-3B20-42D9-A4FD-6B8098D3ABFA
Martel ConstructionSpreadsheet ReportPage 1COR 039 RFI 086 electric water heater and boiler7/12/2024 8:14 AMGroupDescriptionTakeoff QuantityLabor AmountMaterial AmountSub AmountEquip AmountOther AmountTotal Amount26-0000ELECTRICAL1Electrical2Division 16 COR 039 RFI 086 electric waterheater and boiler1.00ls--6,955--6,9553 Electrical6,9556,955 ELECTRICAL6,9556,955Estimate TotalsDescriptionAmountTotalsHoursRateLaborMaterialSubcontract6,955EquipmentOther6,9556,955General Liability Insurance670.890%Gross Receipts Tax701.000%Bond530.750%Construction Fee3575.000%5477,502Total7,502Docusign Envelope ID: 1E151B3A-3B20-42D9-A4FD-6B8098D3ABFA
Change Proposal No.Date of Proposal
Description of Work
Labor Breakdown (use additional sheets if necessary)
# of People Hours Labor Rate/Hr Labor Amount
Total from other sheets: ‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐
Total Labor Costs: ‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐
Material Breakdown (use additional sheets if necessary)
Material Description Quantity Unit Unit Cost Material Amounts
Total from other sheets: ‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐
Subtotal Material Costs ‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐
Sales Tax 0% ‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐
Total Material Costs: ‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐
Other Direct Costs (Subcontractors, Equipmnet, Travel, etc.)
Description Quantity Unit Unit Cost Other Cost Amounts
Total from other sheets: ‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐
Total Other Direct Costs: ‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐
1. Total Labor Costs ‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐
2. Total Material Costs ‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐
3. Total Other Direct Costs ‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐
4. Total Labor, Material & Other Direct Costs ‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐
5. Profit & Overhead (15%) of Line 1 ‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐
6. Profit & Overhead (15%) of Line 2 ‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐
7. Profit & Overhead (15%) of Line 3 ‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐
8. Total Change Proposal Costs (lines 4, 5, 6 & 7) ‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐
Contractor's Name: ______________________________________________ Signed By: __________________________________
Change Proposal
Labor Classification
COR 035 RFI 097 5/30/24
provide 120v power to temp control panels
rough in 1 16 95 1520
equipment connection 1 16 95 1520
0
0
0
3040.00
material quote attached 381.12
381.12
.01 3.81
384.93
0
0
0
0
0
0
0
0
0
3040.00
384.93
0
3424.93
.05 456.00
.15 57.74
.15 0
3938.67
Slate Electrical
Docusign Envelope ID: 1E151B3A-3B20-42D9-A4FD-6B8098D3ABFA
Description:
Fire Station Pricing
Quote #2069096
Updated On: 06/13/2024
Company Name:
Slate Electrical
Billing Address:
Slate Electrical (427124)
3210 Canyon Ferry Rd Unit 1
East Helena, MT 59635-3027
Created Date:
6/13/24
Shipping Address:
3210 Canyon Ferry Rd Unit 1
East Helena, MT 59635-3027 US
Shipping Method:
Hold For Pickup
FOB:
Destination
Sales Person:
Hunter Hopkins
hunter.hopkins@platt.com
Branch:
Helena #92
4064425947
PRODUCTS QTY UNT PR / UOM TOTALS
Entire Quote:
Sub Total:$1,987.25
S/H:Not Included
Other Charges:$0.00
Tax:$0.00
Total:$1,987.25
Prices are subject to change at any time prior to shipment unless agreed to otherwise in writing signed by an authorized Seller representative.
Orders related to this quotation must be received, accepted and released by Seller within 48 hours of issuance of the quotation and are subject to
availability. Many of Seller’s manufacturing partners have advised that until further notice they reserve the right to amend the delivery date, price,
scope and quantity of supply and/or other terms and conditions set out in their offer or quotation and Seller equally reserves the right to pass
through any such changes from its manufacturing partners to the Buyer. Delivery dates are estimated only. Seller shall not be liable for failure to
meet such dates resulting from product shortages or manufacturing delays. Be advised that Seller considers any changes imposed by its
manufacturing partners and other vendors outside of Seller’s reasonable control and therefore subject to Force Majeure provisions or similar
common law doctrines such as “frustration” or “impossibility”.
Seller’s Standard Terms and Conditions of Sale are incorporated by reference into this quotation. A copy of the most current version of Seller’s
Standard Terms and Conditions of Sale is available at. https://www.rexelusa.com/terms
Full phone support at (888) 739-3577
Delivery dates are estimated only. Seller shall not be liable for failure to meet such dates resulting from product shortages or manufacturing
delays.
CUTDH362FGK | Item# 10647
Safety Switch, 60A, 3P, 600VAC/250VDC, Type DH, Fusible,
NEMA 1
MFR:Eaton
2 $217.24 EA $434.48
1.
000
BUSFRSR45 | Item# 330442
Fuse, 45 Amp Class RK5 Dual-Element, Time-Delay, 600V
MFR:Eaton/Bussmann Series
6 $37.61 EA $225.67
2.
100
34E | Item# 65970
3/4" EMT Conduit, Steel, 10' Length
MFR:Multiple
280 $87.80 C $245.84
3.
000
34ESSSCP | Item# 66497
EMT Set Screw Coupling, Steel, 3/4 inch
MFR:Multiple
36 $38.00 C $13.68
4.
000
34ESSSCN | Item# 66496
EMT Set Screw Connector, Steel, 3/4 inch
MFR:Multiple
12 $31.00 C $3.72
5.
000
PSTPS1300AS34EG | Item# 158452
Strut Strap, Universal, 3/4", Steel
MFR:Power-Strut
36 $88.16 C $31.74
6.
000
RAC232 | Item# 52181
4" Square Box, Welded, 2-1/8" Deep, 1/2 and 3/4" Knockouts,
Steel
MFR:Hubbell-Raco
6 $141.62 C $8.50
7.
000
RAC752 | Item# 52387
4" Square Cover, 0-Device, Cover, No Raise, Drawn, Metallic
MFR:Hubbell-Raco
6 $44.05 C $2.64
8.
000
8THHNCSTRBLAX2500 | Item# 62740
8 AWG THHN/THWN-2 Stranded Copper, Black, 2500'
MFR:Multiple
1,764 $521.06 M $919.15
9.
000
10THHNCSTRBLAX500 | Item# 62557
10 AWG THHN/THWN-2 Stranded Copper, Black, 500'
MFR:Multiple
294 $273.70 M $80.47
10.
000
*** 500' ROLL ***11.
34FAX100 | Item# 65972
Aluminum Flex, 3/4", 100' Coil
MFR:Multiple
12 $88.34 C $10.60
12.
000
34FDCSQZCN | Item# 65270
Flex Fitting, Squeeze Type, 3/4", Zinc Die Cast
MFR:Multiple
4 $268.89 C $10.76
13.
180
Docusign Envelope ID: 1E151B3A-3B20-42D9-A4FD-6B8098D3ABFA
Description:Fire Station Pricing Quote #2069096Updated On: 06/13/2024Company Name:Slate Electrical Billing Address:Slate Electrical (427124)3210 Canyon Ferry Rd Unit 1East Helena, MT 59635-3027 Created Date:6/13/24Shipping Address:3210 Canyon Ferry Rd Unit 1East Helena, MT 59635-3027 US Shipping Method:Hold For Pickup FOB:DestinationSales Person:Hunter Hopkinshunter.hopkins@platt.com Branch:Helena #924064425947PRODUCTS QTY UNT PR / UOM TOTALS
Entire Quote:
Sub Total:$1,987.25
S/H:Not Included
Other Charges:$0.00
Tax:$0.00
Total:$1,987.25
Prices are subject to change at any time prior to shipment unless agreed to otherwise in writing signed by an authorized Seller representative.
Orders related to this quotation must be received, accepted and released by Seller within 48 hours of issuance of the quotation and are subject to
availability. Many of Seller’s manufacturing partners have advised that until further notice they reserve the right to amend the delivery date, price,
scope and quantity of supply and/or other terms and conditions set out in their offer or quotation and Seller equally reserves the right to pass
through any such changes from its manufacturing partners to the Buyer. Delivery dates are estimated only. Seller shall not be liable for failure to
meet such dates resulting from product shortages or manufacturing delays. Be advised that Seller considers any changes imposed by its
manufacturing partners and other vendors outside of Seller’s reasonable control and therefore subject to Force Majeure provisions or similar
common law doctrines such as “frustration” or “impossibility”.
Seller’s Standard Terms and Conditions of Sale are incorporated by reference into this quotation. A copy of the most current version of Seller’s
Standard Terms and Conditions of Sale is available at. https://www.rexelusa.com/terms
Full phone support at (888) 739-3577
Delivery dates are estimated only. Seller shall not be liable for failure to meet such dates resulting from product shortages or manufacturing
delays.
CUTDH362FGK | Item# 10647Safety Switch, 60A, 3P, 600VAC/250VDC, Type DH, Fusible,NEMA 1MFR:Eaton 2 $217.24 EA $434.481.000BUSFRSR45 | Item# 330442Fuse, 45 Amp Class RK5 Dual-Element, Time-Delay, 600VMFR:Eaton/Bussmann Series 6 $37.61 EA $225.672.10034E | Item# 659703/4" EMT Conduit, Steel, 10' LengthMFR:Multiple 280 $87.80 C $245.843.00034ESSSCP | Item# 66497EMT Set Screw Coupling, Steel, 3/4 inchMFR:Multiple 36 $38.00 C $13.684.00034ESSSCN | Item# 66496EMT Set Screw Connector, Steel, 3/4 inchMFR:Multiple 12 $31.00 C $3.725.000PSTPS1300AS34EG | Item# 158452Strut Strap, Universal, 3/4", SteelMFR:Power-Strut 36 $88.16 C $31.746.000RAC232 | Item# 521814" Square Box, Welded, 2-1/8" Deep, 1/2 and 3/4" Knockouts,SteelMFR:Hubbell-Raco 6 $141.62 C $8.507.000RAC752 | Item# 523874" Square Cover, 0-Device, Cover, No Raise, Drawn, MetallicMFR:Hubbell-Raco 6 $44.05 C $2.648.000
8THHNCSTRBLAX2500 | Item# 62740
8 AWG THHN/THWN-2 Stranded Copper, Black, 2500'
MFR:Multiple
1,764 $521.06 M $919.15
9.
000
10THHNCSTRBLAX500 | Item# 62557
10 AWG THHN/THWN-2 Stranded Copper, Black, 500'
MFR:Multiple
294 $273.70 M $80.47
10.
000
*** 500' ROLL ***11.
34FAX100 | Item# 65972
Aluminum Flex, 3/4", 100' Coil
MFR:Multiple
12 $88.34 C $10.60
12.
000
34FDCSQZCN | Item# 65270
Flex Fitting, Squeeze Type, 3/4", Zinc Die Cast
MFR:Multiple
4 $268.89 C $10.76
13.
180
Docusign Envelope ID: 1E151B3A-3B20-42D9-A4FD-6B8098D3ABFA
3210 CANYON FERRY RD
EAST HELENA, MT 59635
TEL: (406) 461-7374
CUS PO #:
JOB NAME:
SHIPPING POINT PREPAID
FV-67466
38 QUAIL RUN RD
BOZEMAN MT 59718
TEL: 406 587-5566 FAX: 406 587-4043
QUOTE FOR:
QUOTE EXPIRES
CONTACT:
004
MATT HALEY
BOZEMAN FIRE STATION #2
BOZEMAN FIRE 2
0711
1050974 06/05/24 06/05/24
SLATE ELECTRICAL
CONSOLIDATED ELECTRICAL DISTRIBUTORS, INC.
07/05/2024
QUOTATION PAGE 001 OF 001
DATE REV # REV DATE
SLS INSL
0710
FOB FREIGHT
PREPARED BY
MH
QUOTE #
ACCT #:
QTY MFR CATALOG #DESCRIPTION PRICE UOM
EXT
AMTLN
01 *** WE CAN HAVE IN 3 DAYS
02 * SQD
03 496.00EGB34040MISC. 1 496.00E
04 504.00EGB34045MISC. 1 504.00E
1,000.00TOTAL:
PLEASE NOTE: THIS IS NOT AN OFFER TO CONTRACT, BUT MERELY A QUOTATION OF CURRENT PRICES FOR YOUR
CONVENIENCE AND INFORMATION. ORDERS BASED ON THIS QUOTATION ARE SUBJECT TO YOUR ACCEPTANCE OF
THE TERMS AND CONDITIONS LOCATED AT SALES.OUR-TERMS.COM, WHICH WE MAY CHANGE FROM TIME TO TIME
WITHOUT PRIOR NOTICE. WE MAKE NO REPRESENTATION WITH RESPECT TO COMPLIANCE WITH JOB
SPECIFICATIONS.
Docusign Envelope ID: 1E151B3A-3B20-42D9-A4FD-6B8098D3ABFA
June 24, 2024City of Bozeman - Fire Station # 2 575 West Kagy Blvd Bozeman, Montana 59715 ATTN: Jon Henderson Change Order Request No. COR 040
Pricing Request No.RFI 100
PROJECT: Bozeman Fire Station # 2
SUBJECT:COR 040 RFI 100 Electrical Panel Schedule 2HA Breaker
REFERENCE: RFI 100 Dear : Jon Henderson,We propose to provide all labor, materials, and equipment required toperform the above mentioned work. Our lump sum quotation is basedon our interpretation of the instructions and scope of work identified by the Proposal Request(s). If we have misinterpreted this information in anyway (omissions, etc.) please advise us.Other wise, our interpretation shall stand as correct.We have not been directed to proceed with the work per the terms of the contract.We have proceeded with the Work per the terms of the contract.X At this time, we are hereby requesting 0calendar days for a time extensionPlease note this proposal is valid for (10) calendar days from this date andour proposal is based on receipt of a signed Change Order within (15) calendar days.
We are adjusting the Construction Contingency in the amount of:2,555.00$ We are requesting an Adjustment to the GMP (Owner's Contingency) in the Amount of:If you have any questions, please call me at (406) 922-5529 Sincerely, MARTEL CONSTRUCTION, INC.City of Bozeman - Approval Mike Wilkinson - Martel Project ManagerJon Henderson - Strategic Services DirectorEnclosure(s)Estimate PDF
CC.FileDocusign Envelope ID: 1E151B3A-3B20-42D9-A4FD-6B8098D3ABFA
Martel ConstructionSpreadsheet ReportPage 1COR 040 RFI 100 Electrical Panel Schedule 2HA6/25/2024 4:23 PMGroupDescriptionTakeoff QuantityLabor AmountMaterial AmountSub AmountEquip AmountOther AmountTotal Amount26-0000ELECTRICAL1Electrical2Division 16 COR 040 RFI 100 Electrical PanelSchedule 2HA1.00ls--2,368--2,3683 Electrical2,3682,368 ELECTRICAL2,3682,368Estimate TotalsDescriptionAmountTotalsHoursRateLaborMaterialSubcontract2,368EquipmentOther2,3682,368General Liability Insurance230.890%Gross Receipts Tax241.000%Bond180.750%Construction Fee1225.000%1872,555Total2,555Docusign Envelope ID: 1E151B3A-3B20-42D9-A4FD-6B8098D3ABFA
Change Proposal No.Date of Proposal
Description of Work
Labor Breakdown (use additional sheets if necessary)
# of People Hours Labor Rate/Hr Labor Amount
Total from other sheets: ‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐
Total Labor Costs: ‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐
Material Breakdown (use additional sheets if necessary)
Material Description Quantity Unit Unit Cost Material Amounts
Total from other sheets: ‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐
Subtotal Material Costs ‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐
Sales Tax 0% ‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐
Total Material Costs: ‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐
Other Direct Costs (Subcontractors, Equipmnet, Travel, etc.)
Description Quantity Unit Unit Cost Other Cost Amounts
Total from other sheets: ‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐
Total Other Direct Costs: ‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐
1. Total Labor Costs ‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐
2. Total Material Costs ‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐
3. Total Other Direct Costs ‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐
4. Total Labor, Material & Other Direct Costs ‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐
5. Profit & Overhead (15%) of Line 1 ‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐
6. Profit & Overhead (15%) of Line 2 ‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐
7. Profit & Overhead (15%) of Line 3 ‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐
8. Total Change Proposal Costs (lines 4, 5, 6 & 7) ‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐
Contractor's Name: ______________________________________________ Signed By: __________________________________
Change Proposal
Labor Classification
COR 035 RFI 097 5/30/24
provide 120v power to temp control panels
rough in 1 16 95 1520
equipment connection 1 16 95 1520
0
0
0
3040.00
material quote attached 381.12
381.12
.01 3.81
384.93
0
0
0
0
0
0
0
0
0
3040.00
384.93
0
3424.93
.05 456.00
.15 57.74
.15 0
3938.67
Slate Electrical
Docusign Envelope ID: 1E151B3A-3B20-42D9-A4FD-6B8098D3ABFA
38 QUAIL RUN RD
BOZEMAN, MT 59718
T: 4065875566 F: 4065874043
Invoice
SOLD TO:
SLATE ELECTRICAL
3210 CANYON FERRY RD
EAST HELENA, MT 59635
SHIP TO:
SLATE ELECTRICAL
38 QUAIL RUN RD
BOZEMAN, MT 59718
INVOICE NO.
0819-1175165
INVOICE DATE
06/11/2024
PLEASE SHOW INVOICE NO. AND REMIT TO:
P.O. BOX 913120
DENVER, CO 80291-3120
ACCOUNT #/NAME
FV-67466 BOZEMAN FIRE STATION #2
JOB NAME
EGB BREAKER
CUSTOMER ORDER NO.
BZN FIRE STATION
SALESPERSON
0739 JW
SHIPPING INFORMATION
PREPAID
SHIP VIA
WILL CALL
SHIP DATE
06/11/2024
QTY
ORDERED
1
1
PRODUCT CODE
SQD
S&H
EGB34125
SHIPPING
DESCRIPTION
MINIATURE CIRCUIT
QTY
SHIPPED
1
1
PRICE
1891.50
25.00
E
E
DISC.EXTENSION
1891.50
25.00
1.0
0.0
T
T
PLEASE CALL CODY WHEN IN
AND DELIVER TO JOB
C
O
D
E
P
E
R
C
/
D
MERCHANDISE
SALES TAX 0.00000
SHIPPING CHARGE
1916.50
0.00
0.00
TOTAL DUE 1,916.50
Page 1 of 1
TITLE TO MERCHANDISE AND RISK OF LOSS OR DAMAGE PASSES AT POINT OF SHIPMENT. CLAIMS
FOR SHORT OR DAMAGED MERCHANDISE SHOULD BE MADE TO CARRIER.
MERCHANDISE RETURNED WITHOUT OUR CONSENT WILL NOT BE ACCEPTED. A RESTOCKINGCHARGE WILL BE MADE ON RETURNED GOODS UNLESS DEFECTIVE OR THROUGH ERROR ON OUR
PART.
A SERVICE CHARGE OF 1 ½% PER MONTH, BUT NOT TO EXCEED THE HIGHEST AMOUNT LAWFULLYALLOWED BY APPLICABLE STATE LAW, WILL BE MADE ON ALL PAST DUE ACCOUNTS.
THIS SALE IS SUBJECT TO OUR TERMS LOCATED AT SALES.OUR-TERMS.COM, WHICH WE MAY
CHANGE FROM TIME TO TIME WITHOUT PRIOR NOTICE.
CODE: TO ADVISE YOU PROMPTLY CONCERNING YOUR ORDER,
THIS CODE IS USED ON OUR INVOICES.
B - BACK ORDERED. WILL SHIP AS SOON AS RECEIVED UNLESS INSTRUCTEDTO CANCEL.
C - CANCELLED. NOT IN STOCK. UNABLE TO PURCHASE LOCALLY.
NET PAYMENT IS DUE BY THE 15TH OF THE MONTH
FOLLOWING PURCHASE
Docusign Envelope ID: 1E151B3A-3B20-42D9-A4FD-6B8098D3ABFA
August 19, 2024
City of Bozeman - Fire Station # 2
575 West Kagy Blvd
Bozeman, Montana 59715
ATTN: Jon Henderson
Change Order Request No. COR 043
Pricing Request No.RFI 061
PROJECT: Bozeman Fire Station # 2
SUBJECT:COR 043 RFI #061 Generator & Fuel Tank Pad Layout - Fuel Pedistal
REFERENCE: RFI 061
Dear : Jon Henderson,
We propose to provide all labor, materials, and equipment required to
perform the above mentioned work. Our lump sum quotation is based
on our interpretation of the instructions and scope of work
identified by the Proposal Request(s). If we have misinterpreted this information in any
way (omissions, etc.) please advise us.
Other wise, our interpretation shall stand as correct.
We have not been directed to proceed with the work per the terms of the contract.
We have proceeded with the Work per the terms of the contract.X
At this time, we are hereby requesting 0 calendar days for a time extension
Please note this proposal is valid for (10) calendar days from this date and
our proposal is based on receipt of a signed Change Order within (15) calendar days.
We are adjusting the Construction Contingency in the amount of:3,191.00$
We are requesting an Adjustment to the GMP (Owner's Contingency) in the Amount of:
If you have any questions, please call me at (406) 922-5529
Sincerely,
MARTEL CONSTRUCTION, INC.City of Bozeman - Approval
Mike Wilkinson - Martel Project Manager Jon Henderson - Strategic Services Director
Enclosure(s)
Estimate PDF
CC.File
Docusign Envelope ID: 1E151B3A-3B20-42D9-A4FD-6B8098D3ABFA
Martel ConstructionSpreadsheet ReportPage 1COR 043 RFI 061 Generator & Fuel Tank - Fuel Pedistal 8/18/2024 3:08 PMGroupDescriptionTakeoff QuantityLabor AmountMaterial AmountSub AmountEquip AmountOther AmountTotal Amount22-0000PLUMBING1Building Services Piping2COR 043 RFI 061 Generator & Fuel Tank - FuelPedistalls--2,958--2,9583 Building Services Piping2,9582,958 PLUMBING2,9582,958Estimate TotalsDescriptionAmountTotalsHoursRateLaborMaterialSubcontract2,958EquipmentOther2,9582,958General Liability Insurance280.890%Gross Receipts Tax301.000%Bond230.750%Construction Fee1525.000%2333,191Total3,191Docusign Envelope ID: 1E151B3A-3B20-42D9-A4FD-6B8098D3ABFA
Material/Labor Direct Costs Qty Material Unit Price Material Cost Labor Hrs
Labor
Rate/Hr Labor Cost
Original Side Tank Mount was $800 - New Pedistal
Mount is $1,952.1 $1,152 $1,152.00 $125.00 $0.00
Add Fuel Hose to Hose Reel - Per RFI 1 $963 $963.00 3 $125.00 $375.00
0 $0 $0.00 $125.00 $0.00
0 $0 $0.00 $125.00 $0.00
0 $0 $0.00 $125.00 $0.00
0 $0 $0.00 $125.00 $0.00
0 $0 $0.00 $125.00 $0.00
Misc. Plumbing Materials 0 $0 $105.75
$0.00 $125.00 $0.00
$0.00 $125.00 $0.00
$0.00 $125.00 $0.00
$0.00 $125.00 $0.00
Misc. Sheet Metal Materials $0.00
$0.00 $120.00 $0.00
$0.00 $120.00 $0.00
$0.00 $120.00 $0.00
Misc. Sheet Metal Materials $0.00
$2,220.75 $375.00
$130.00 $0.00
$130.00 $0.00
$130.00 $0.00
$0.00
SUMMARY
Materials (detail above)$2,220.75
Equipment Rent
Subsistence -
Lodging Costs -
Mileage (Total Miles X $1.25)-
Subtotal $2,220.75
$333.11
Labor (detail above)$375.00
Subcontractors:
$0.00
-
-
-
$0.00
Bond (If Applicable)$0.00 n
CGR 1% State Tax (If Applicable)$29.29 y
TOTAL AMOUNT DUE $2,958.15
Subcontractors with 10% Overhead &
Profit
PM Time
Total Supervision
15% Overhead & Profit
Supervision:
Plumbing Supervision
Sheet Metal Supervision
Total Material/Labor Direct Costs
Sheet Metal Shop Fabrication:
Sheet Metal:
BOZEMAN WORK MOD / SMALL PROJECT PRICING WORKSHEET
Job Name: 23-4072 Bozeman Fire Station #2
Description: Fuel Truck Fill Adds
Date: 7/17/24
Plumbing:
Comm. Drive/Bid Prep forms/Change Order Worksheet
Docusign Envelope ID: 1E151B3A-3B20-42D9-A4FD-6B8098D3ABFA
October 17, 2024
City of Bozeman - Fire Station # 2
575 West Kagy Blvd
Bozeman, Montana 59715
ATTN: Jon Henderson
Change Order Request No. COR 044 R1
Pricing Request No.RFI 107
PROJECT: Bozeman Fire Station # 2
SUBJECT:COR 044 RFI #107 Kagy Blvd Sidewalk Replacement - Replace existing
REFERENCE: RFI 107
Dear : Jon Henderson,
We propose to provide all labor, materials, and equipment required to
perform the above mentioned work. Our lump sum quotation is based
on our interpretation of the instructions and scope of work
identified by the Proposal Request(s). If we have misinterpreted this information in any
way (omissions, etc.) please advise us.
Other wise, our interpretation shall stand as correct.
We have not been directed to proceed with the work per the terms of the contract.
We have proceeded with the Work per the terms of the contract.X
At this time, we are hereby requesting 0 calendar days for a time extension
Please note this proposal is valid for (10) calendar days from this date and
our proposal is based on receipt of a signed Change Order within (15) calendar days.
We are adjusting the Construction Contingency in the amount of:2,331.00$
We are requesting an Adjustment to the GMP (Owner's Contingency) in the Amount of:
If you have any questions, please call me at (406) 922-5529
Sincerely,
MARTEL CONSTRUCTION, INC.City of Bozeman - Approval
Mike Wilkinson - Martel Project Manager Jon Henderson - Strategic Services Director
Enclosure(s)
Estimate PDF
CC.File
Docusign Envelope ID: 1E151B3A-3B20-42D9-A4FD-6B8098D3ABFA
Martel ConstructionSpreadsheet ReportPage 1COR 044 RFI #107 Kagy Blvd Sidewalk Replacement - Replace existing10/9/2024 11:17 AMGroupDescriptionTakeoff QuantityLabor AmountMaterial AmountSub AmountEquip AmountOther AmountTotal Amount31-0000EARTHWORK1Misc Site Construction2COR 044 RFI #107 Kagy Blvd SidewalkReplacement - Replace existing1.00ls2,6551,668--4,3233 Misc Site Construction2,6551,6684,323 EARTHWORK2,6551,6684,323Estimate TotalsDescriptionAmountTotalsHoursRateLabor2,655Material1,668SubcontractEquipmentOther4,3234,323General Liability Insurance420.890%Gross Receipts Tax431.000%Bond330.750%Construction Fee2225.000%3404,663Total4,663Martel has agreed to split the cost of thisCOR and pay 50% for the brokensidewalks the other sidewalk was thesection for Northwestern energy and aTriangle section for the trash pad on thenorth side of the building.Total for the COR will be $ 2,331.00Docusign Envelope ID: 1E151B3A-3B20-42D9-A4FD-6B8098D3ABFA
Entries by JobMartel Construction, Inc. Page 110-09-24
System Time: 12:12 pm
Acctg Tran Transaction
Date Cat Date Type Description Units Amount
23-002 Bozeman Fire Station 2
FIELD WORK ORDERS
FWO-011 Martel Concrete Sidewalk
09-27-2024 L 09-16-24 PR cost Lindsley; Steven A 3.00 141.00
09-27-2024 L 09-16-24 PR cost Shea; Timothy A 7.00 308.00
09-27-2024 L 09-16-24 PR cost Haniuk; John L 3.00 111.00
09-27-2024 L 09-16-24 PR cost Bertolasio; Jonathan P 4.00 168.00
09-27-2024 L 09-16-24 PR cost Pliley; Jason L. 4.00 152.00
09-27-2024 L 09-16-24 PR cost Bailey; Jacob M. 3.00 78.00
09-27-2024 L 09-16-24 PR cost Schmitz; Mason A. 4.00 140.00
09-20-2024 L 09-14-24 PR cost Shea; Timothy A 3.00 132.00
09-20-2024 L 09-14-24 PR cost Rongitsch; Thomas H. 3.00 104.19
09-20-2024 L 09-14-24 PR cost Pierson; Trenton S 4.00 126.00
09-20-2024 L 09-14-24 PR cost Bailey; Jacob M. 4.00 126.44
09-20-2024 L 09-14-24 PR cost Schmitz; Mason A. 4.00 140.00
09-20-2024 L 09-14-24 PR cost Pliley; Jason L. 3.00 114.00
09-27-2024 LB 09-21-24 PR cost Lindsley; Steven A 61.49
09-27-2024 LB 09-21-24 PR cost Shea; Timothy A 133.80
09-27-2024 LB 09-21-24 PR cost Haniuk; John L 49.79
09-27-2024 LB 09-21-24 PR cost Bertolasio; Jonathan P 76.56
09-27-2024 LB 09-21-24 PR cost Pliley; Jason L. 64.10
09-27-2024 LB 09-21-24 PR cost Bailey; Jacob M. 41.31
09-27-2024 LB 09-21-24 PR cost Schmitz; Mason A. 59.16
09-20-2024 LB 09-14-24 PR cost Shea; Timothy A 57.00
09-20-2024 LB 09-14-24 PR cost Rongitsch; Thomas H. 45.91
09-20-2024 LB 09-14-24 PR cost Pierson; Trenton S 58.85
09-20-2024 LB 09-14-24 PR cost Bailey; Jacob M. 59.01
09-20-2024 LB 09-14-24 PR cost Schmitz; Mason A. 59.16
09-20-2024 LB 09-14-24 PR cost Pliley; Jason L. 48.08
09-20-2024 LB 09-14-24 PR cost Rongitsch; Thomas H. .02-
09-20-2024 LB 09-14-24 PR cost Pierson; Trenton S .22
09-27-2024 LB 09-21-24 PR cost Shea; Timothy A .02
09-19-2024 M 09-05-24 AP cost Kenyon Noble Lumber & Hrdwr 52.63
09-23-2024 M 09-16-24 AP cost Knife River - Belgrade 1,020.00
09-26-2024 M 09-25-24 AP cost Duneman Construction, Inc. 595.00
Cost Code Total 4,322.70*
Job Total 4,322.70*
Docusign Envelope ID: 1E151B3A-3B20-42D9-A4FD-6B8098D3ABFA
Entries by JobMartel Construction, Inc. Page 210-09-24
System Time: 12:12 pm
Acctg Tran Transaction
Date Cat Date Type Description Units Amount
Report Total 4,322.70*
Docusign Envelope ID: 1E151B3A-3B20-42D9-A4FD-6B8098D3ABFA
August 19, 2024
City of Bozeman - Fire Station # 2
575 West Kagy Blvd
Bozeman, Montana 59715
ATTN: Jon Henderson
Change Order Request No. COR 048
Pricing Request No.
PROJECT: Bozeman Fire Station # 2
SUBJECT: COR 048 Owner Requested items
REFERENCE: Owner Site Walk - Punch List
Dear : Jon Henderson,
We propose to provide all labor, materials, and equipment required to
perform the above mentioned work. Our lump sum quotation is based
on our interpretation of the instructions and scope of work
identified by the Proposal Request(s). If we have misinterpreted this information in any
way (omissions, etc.) please advise us.
Other wise, our interpretation shall stand as correct.
We have not been directed to proceed with the work per the terms of the contract.X
We have proceeded with the Work per the terms of the contract.
At this time, we are hereby requesting 0 calendar days for a time extension
Please note this proposal is valid for (10) calendar days from this date and
our proposal is based on receipt of a signed Change Order within (15) calendar days.
We are adjusting the Construction Contingency in the amount of:4,059.00$
We are requesting an Adjustment to the GMP (Owner's Contingency) in the Amount of:
If you have any questions, please call me at (406) 922-5529
Sincerely,
MARTEL CONSTRUCTION, INC.City of Bozeman - Approval
Mike Wilkinson - Martel Project Manager Jon Henderson - Strategic Services Director
Enclosure(s)
Estimate PDF
CC.File
Docusign Envelope ID: 1E151B3A-3B20-42D9-A4FD-6B8098D3ABFA
Martel Construction Spreadsheet Report Page 1
COR 048 Owner Requested items 8/18/2024 10:41 PM
Group Description Takeoff Quantity Labor Amount Material Amount Sub Amount Equip Amount Other Amount Total Amount
10-0000 SPECIALTIES1
Flagpoles2
Owner Requested - Flag Pole Lock Box (3)3.00 ea 150 506 ---6563
Flagpoles 150 506 656
Lockers4
Owner Requested - Gear Grid Lockers - Coat rack
hanger bar one Earch Bar
1.00 ea 800 917 ---1,7175
Lockers 800 917 1,717
SPECIALTIES 950 1,423 2,373
12-0000 FURNISHINGS6
Site Furnishings - Mail Box and
Concrete Pad
7
Site Furnishings - Mail Box SD1.0 shows and 2'x2'
Concrete Pad
1.00 ea 600 790 --1,3908
Site Furnishings - Mail Box and
Concrete Pad
600 790 1,390
FURNISHINGS 600 790 1,390
Estimate Totals
Description Amount Totals Hours RateLabor1,550 5.091 hrsMaterial2,213SubcontractEquipmentOther3,763 3,763General Liability Insurance 36 0.890 %Gross Receipts Tax 38 1.000 %Bond 29 0.750 %
Construction Fee 193 5.000 %
296 4,059
Total 4,059
Docusign Envelope ID: 1E151B3A-3B20-42D9-A4FD-6B8098D3ABFA
August 12, 2024
PROJECT: Bozeman Fire Station
ARCHITECT: ThinkOne
ADDENDUM: 1,2
CHANGE ORDER
SECTION 107516 – FLAGPOLES by Poletech.
$506.00
TERMS: All items are quoted F.O.B. factory, full freight allowed to jobsite. QUOTE MUST BE ACCEPTED WITHIN 30 DAYS,
PRICES ARE PROTECTED FOR DELIVERY By December 31, 2023. Installation, blocking, field verifications, state, local or TERO
taxes are not included unless specifically noted.
10 10th St W
Billings, MT 59102
(406) 969-1280
(406) 969-1473 fax
Docusign Envelope ID: 1E151B3A-3B20-42D9-A4FD-6B8098D3ABFA
Contact us with any questions or concerns.
Tony Schweitzer
tony@sylvansiteservices.com
Docusign Envelope ID: 1E151B3A-3B20-42D9-A4FD-6B8098D3ABFA
Net Order:$864.00
Freight:$53.00
Sales Tax:
Order Total US $:$917.00
1.
2.
3.
4.
5.
6.
Quotation
GearGrid Corporation
670 15th St SW
Forest Lake, MN 55025
Phone: (651) 464-4468 Fax: (651) 464-4780
www.geargridcorp.com
Quote Number:00013049
Quote Date:8/12/2024
Customer Number:
Project Name: Bozeman Fire Station #2 - Locker Hanging Rod Accessory
Specification Section:
Addenda Acknowledged:
Sold To:Ship To:
Martel Construction Inc
1203 South Church Ave`
Bozeman, MT 59715
Martel Construction Inc
c/o Bozeman Fire Station #2 - 575 W Kagy Blvd
Bozeman, MT 59715
(406) 586-8585Phone: Fax: jakem@martelconstruction.comE-mail:
Confirm To:Carrier F.O.B.Terms Quote Provided By:
Jake Martel FedEx Origin Net 30 Renee Alexander
Part Number Description UOM Quantity Ordered Price Extended Amount
401130 Kit-Hang Bar-30 In-GearGrid 21 $40.00 $840.00
492031 Kit, Hangbar Secure Bracket EA 4 $6.00 $24.00
Quote Notes:
(21) GearHanger - Horizontal Hanging Rod
Fits Existing Locker Size: 30"W
Assembly required
No tax included (GearGrid is not responsible for collecting or remitting out of state sales tax)
3% processing fee applies to credit card transactions
Assembly/Installation provided by: Martel Construction Inc
GearGrid can provide (NON-UNION, NON-CERTIFIED PAYROLL) Assembly
and Installation for an ADDED price of: N/A
Estimated Ship Date: Approximately Please check at time of order weeks after
receipt of order.
This quote does not include nameplates, please source at www.firehouseid.com
or locally
If Doors are ordered GearGrid does not provide padlocks or other locking
devices unless otherwise indicated.
When Powerbars are ordered, electrical wiring, receptacles and installation of
electrical are not included. Please consult local certified electrician.
GearGrid products are packaged on 74" long x 44" wide skids, standard trailer
delivery. Off-loading by others. If lift gate or other special services are desired,
this must be requested at the time of initial quote request.
Quotation is valid for days for product costs; freight charges are valid for days.90 30
Docusign Envelope ID: 1E151B3A-3B20-42D9-A4FD-6B8098D3ABFA
TERMS AND CONDITIONS OF SALE
1. These Terms and Conditions apply to all sales of goods (“Goods”) by GearGrid, LLC (“GearGrid”) to any proposed Buyer (“Buyer”).GENERAL.
Any additional or different terms and conditions proposed by the Buyer are objected to and hereby rejected, notwithstanding any terms and conditions
that may be contained in any purchase order, acknowledgment, notice, communication or other Buyer form, unless such additional or different terms
are expressly accepted by Seller in writing, signed by an authorized officer of Seller. Acceptance by Buyer of any goods from Seller shall be considered
acceptance of these Terms and Conditions. If these Terms and Conditions, or any related documents from Seller, are deemed to be a response to a
Buyer document, then notwithstanding any additional or different terms that may be embodied in Buyer’s document, Seller’s response is expressly
conditional on Buyer’s consent to the additional and/or different terms and conditions set forth in these Terms and Conditions. If these Terms and
Conditions are not acceptable to Buyer, Buyer must notify Seller in writing at once.
2. Verbal orders are accepted only on the terms herein and in Seller’s order acknowledgment. Any discrepancies between Seller’sVERBAL ORDERS.
order acknowledgment and the Buyer’s verbal order are not binding on Seller. PLEASE REVIEW GEARGRID’S ORDER ACKNOWLEDGMENT
CAREFULLY.
3. Unless otherwise stated in GearGrid’s order acknowledgment or quotation, all invoices are due 30 days after the invoice date. Past duePAYMENT.
accounts will be charged interest at 1.5% per month, but not more the maximum interest rate allowed by law. Any wire transfer or related fees
associated with payment of individual invoices will be the responsibility of the Buyer. A 3% fee will be added to any order paid using a credit card.
4. All shipping dates represent only a reasonable estimate of the time required for manufacturing at the time of order acceptance orSHIPPING DATES.
quotation. These dates shall not be construed as promises or agreements to ship or deliver goods on specific dates.
5. Except as otherwise provided in Seller’s invoice, all shipments will be made by F.O.B. Seller’s manufacturing facilitySHIPMENT - RISK OF LOSS.
in Forest Lake, Minnesota. Shipping and insurance costs are not included in the individual product prices and shall be paid by Buyer. All goods are
shipped at Buyer’s risk. Title to the goods and risk of loss or damage shall pass to Buyer upon tender of delivery to the carrier in Forest Lake,
Minnesota. All claims for shortage or for damage in transit must be reported to Seller within 10 days of delivery.
6. Delivery shall be subject to, and contingent upon, strikes, labor difficulties, riot, war, fire, delay or defaults of common carriers,DELAYS.
governmental decrees or orders, inability to obtain necessary material or facilities or any other delays beyond Seller’s reasonable control. Seller shall
not be liable for any losses caused by such delays.
7. A cancelation fee will be applied to all cancelled orders. The amount of the cancellation fee will be based on the percentCANCELLATION.
completion of the customer order.
8. - Seller’s prices do not include taxes or other governmental charges with respect to the sale, purchase, delivery, use or transportation of Goods.TAXES
Any such taxes which Seller may be required to pay or collect under any existing or future law shall be promptly paid to Seller by Buyer upon demand.
9. Seller warrants to the Buyer that the Goods shall be free from defects in materials and workmanship for aWARRANTIES AND DISCLAIMERS.
period of one year from time of shipment. If Buyer notifies Seller in writing within the applicable period from the date of shipment by Seller
(“Warranty Period”) of such a defect in any Goods, and if Seller determines that such Goods are not in conformity with this warranty, Seller will repair
or replace such Goods or refund to Buyer the purchase price of such Goods. Any claims not made within the Warranty Period are deemed waived by
Buyer. SELLER MAKES NO OTHER WARRANTY, EXPRESS OR IMPLIED, INCLUDING ANY WARRANTY OF
MERCHANTABILITY, FITNESS FOR A PARTICULAR PURPOSE OR USE OR AGAINST INFRINGEMENT, ALL OF WHICH ARE
HEREBY DISCLAIMED BY SELLER.
10. Unless otherwise stated, all GearGrid products are warranted as described in Warranties and Disclaimers, for aPRODUCT WARRANTY PERIOD.
period of 2 years, except for the GridIron locker line which carries a 10 year standard warranty.
11. Goods may not be returned without the Seller’s consent, at its discretion and will be subject to a restockingRETURN & RESTOCKING POLICY.
fee. A minimum 25% restocking fee will apply to all returned products. No product may be returned without a Return Authorization and agreement
provided by GearGrid. Any returned product received in damaged condition, will be subject to credit adjustment.
12.LIMITATION OF REMEDIES. IN NO EVENT SHALL SELLER’S OBLIGATIONS WITH RESPECT TO ANY GOODS EXCEED THE
PURCHASE PRICE PAID TO SELLER BY BUYER FOR THOSE GOODS. IN NO EVENT SHALL SELLER BE LIABLE TO BUYER
FOR ANY SPECIAL, CONSEQUENTIAL OR INCIDENTAL DAMAGE, LOSS OR EXPENSE (INCLUDING WITHOUT LIMITATION,
LOSS OF PROFITS OR GOODWILL), WHETHER SUCH CLAIM IS BASED ON CONTRACT, NEGLIGENCE, STRICT TORT OR
WARRANTY.
13. If the Goods are to be shipped outside of the United States, no shipment will be authorized until Seller hasINTERNATIONAL TRANSACTIONS.
received an irrevocable letter of credit issued to Seller for the entire purchase price of the Goods and issued or confirmed by a bank located in the
United States that is acceptable to Seller in its sole discretion. The Convention on Contracts for the International Sale of Goods shall not apply to any
transaction subject to these Terms and Conditions.
14. - These Terms and Conditions shall be governed by and interpreted in accordance with the internal laws ofGOVERNING LAW/DISPUTES
Minnesota. No action with respect to the Goods or arising out of these Terms and Conditions may be brought by Buyer more than one year after the
cause of action has accrued. All disputes shall be resolved in state or Federal courts located in Hennepin County, Minnesota.
15. - No agreement varying these Terms and Conditions will be binding upon Seller unless in writing and signed by anEXCLUSIVE AGREEMENT
officer of Seller.
16. GearGrid will be responsible for assembly/installation for the items quoted when theASSEMBLY AND INSTALLATION (WHEN APPLICABLE)
price is indicated on quote and accepted by customer. Customer will be responsible for off-loading material from carrier and storing in a safe, secure
environment until scheduled installation. Customer is responsible for noting any damage to shipment with carrier at the time of delivery. The damage to
be noted on Bill of Lading prior to signing and accepting shipment. Customer will also immediately notify GearGrid of shipment damage via email to
. Evidence of damage including description and pictures will be necessary. Customer will be responsible for providing a trashsales@geargrid.com
receptacle for packing materials and skid disposal. Customer will be responsible for accurate field measurements prior to GearGrid releasing order for
production. Field dimensions should also note the material make-up of walls or floors that lockers will be anchored into and any impediments that will
require special installation circumstances. Inaccurate field dimensions or omission of special installation circumstances that require additional costs in
terms of materials or labor will be the sole responsibility of Customer. Customer will coordinate a firm installation date no later than 30 days prior to
the required install date to allow for installer to coordinate travel logistics. If jobsite is not ready for installation as of previously agreed upon date,
Docusign Envelope ID: 1E151B3A-3B20-42D9-A4FD-6B8098D3ABFA
Customer will be responsible for additional travel, lodging and other costs associated with delay. Customer will make sure area is free and clear of any
obstructions/clutter to allow for adequate space to work freely. Customer will advise of open days/hours work can be performed on site. GearGrid is not
able to provide Certified Payroll or Union Wages.
17. Using the information below will allow you to approximateAPPROXIMATE LABOR REQUIRED FOR ASSEMBLY AND INSTALLATION.
the Man Hours required to assemble and install GearGrid products. These figures are provided as a courtesy and are dependent on a variety of factors
including: labor experience and skill, jobsite conditions, accessories included, layout, etc. Please feel free to use these calculations, however GearGrid
is not responsible for actual assembly and installation times.
First 6 Lockers: 1 hour per locker
Each locker after the first 6: .75 hours per locker
Locker Doors: Add .25 hours per door
Hose Racks, Slingers, Miami, Suffolk, etc: 2 hours each
Docusign Envelope ID: 1E151B3A-3B20-42D9-A4FD-6B8098D3ABFA
DATE: 08-14-24
SUBJECT: Bozeman Fire Hall #2
LOCATION: Bozeman, MT.
ADDENDUMS: 1, 2
PROJECT BID DATE: 02/14/2023
We Are Pleased To Provide The Following Quote:
SPEC QTY Model # DESCRIPTION MANU TOTAL
No Spec 1 4350BLK Mail Chest Salsbury
1 4365BLK Mailbox Pedestal Salsbury
TOTAL: $790.00
Qualifications:
• Contractor to verify all quantities. Pricing subject to change.
• SUPPLY ONLY, NO INSTALL
• THIS QUOTE IS GOOD FOR 30 DAYS. PRICING SUBJECT TO REVIEW EVERY 30 DAYS UNTIL
MATERIAL IS ORDERED BY MONTANA DOORWAYS PLUS DUE TO MARKET CONDITIONS.
• FOB: FULL FREIGHT ALLOWED TO THE NEAREST SHIPPING POINT
• IF APPLICABLE, QUOTE DOES NOT INCLUDE SALES TAX
SINCERELY,
Cole Mclaughlin
Estimator Division 10
Docusign Envelope ID: 1E151B3A-3B20-42D9-A4FD-6B8098D3ABFA
September 24, 2024
City of Bozeman - Fire Station # 2
575 West Kagy Blvd
Bozeman, Montana 59715
ATTN: Jon Henderson
Change Order Request No. COR 051
Pricing Request No.
PROJECT: Bozeman Fire Station # 2
SUBJECT: COR 051 Builder Risk Insurance
REFERENCE: Builders Risk
Dear : Jon Henderson,
We propose to provide all labor, materials, and equipment required to
perform the above mentioned work. Our lump sum quotation is based
on our interpretation of the instructions and scope of work
identified by the Proposal Request(s). If we have misinterpreted this information in any
way (omissions, etc.) please advise us.
Other wise, our interpretation shall stand as correct.
We have not been directed to proceed with the work per the terms of the contract.
We have proceeded with the Work per the terms of the contract.X
At this time, we are hereby requesting 0 calendar days for a time extension
Please note this proposal is valid for (10) calendar days from this date and
our proposal is based on receipt of a signed Change Order within (15) calendar days.
We are adjusting the Construction Contingency in the amount of:4,654.00$
We are requesting an Adjustment to the GMP (Owner's Contingency) in the Amount of:
If you have any questions, please call me at (406) 922-5529
Sincerely,
MARTEL CONSTRUCTION, INC.City of Bozeman - Approval
Mike Wilkinson - Martel Project Manager Jon Henderson - Strategic Services Director
Enclosure(s)
Estimate PDF
CC.File
Docusign Envelope ID: 1E151B3A-3B20-42D9-A4FD-6B8098D3ABFA
Martel Construction Spreadsheet Report Page 1
COR 051 Builder Risk Insurance 9/24/2024 10:50 PM
Group Description Takeoff Quantity Labor Amount Material Amount Sub Amount Equip Amount Other Amount Total Amount
01-0000 GENERAL REQUIREMENTS1
General Insurance2
Builders Risk Insurance Two Months extended
July 1st to August 15th
1.00 ls -2,569 --2,5693
Builders Risk Insurance Two Months extended
August 15th to Sept 15th
1.00 ls -1,746 --1,7464
General Insurance 4,315 4,315
GENERAL REQUIREMENTS 4,315 4,315
Estimate Totals
Description Amount Totals Hours Rate
Labor
Material 4,315
SubcontractEquipmentOther 4,315 4,315General Liability Insurance 41 0.890 %Gross Receipts Tax 43 1.000 %Bond 33 0.750 %Construction Fee 222 5.000 %339 4,654Total4,654
Docusign Envelope ID: 1E151B3A-3B20-42D9-A4FD-6B8098D3ABFA
Docusign Envelope ID: 1E151B3A-3B20-42D9-A4FD-6B8098D3ABFA
Docusign Envelope ID: 1E151B3A-3B20-42D9-A4FD-6B8098D3ABFA
Docusign Envelope ID: 1E151B3A-3B20-42D9-A4FD-6B8098D3ABFA
September 24, 2024
City of Bozeman - Fire Station # 2
575 West Kagy Blvd
Bozeman, Montana 59715
ATTN: Jon Henderson
Change Order Request No. COR 052
Pricing Request No.
PROJECT: Bozeman Fire Station # 2
SUBJECT: COR 052 Walk Off Pad for PV System
REFERENCE: PV System
Dear : Jon Henderson,
We propose to provide all labor, materials, and equipment required to
perform the above mentioned work. Our lump sum quotation is based
on our interpretation of the instructions and scope of work
identified by the Proposal Request(s). If we have misinterpreted this information in any
way (omissions, etc.) please advise us.
Other wise, our interpretation shall stand as correct.
We have not been directed to proceed with the work per the terms of the contract.
We have proceeded with the Work per the terms of the contract.X
At this time, we are hereby requesting 0 calendar days for a time extension
Please note this proposal is valid for (10) calendar days from this date and
our proposal is based on receipt of a signed Change Order within (15) calendar days.
We are adjusting the Construction Contingency in the amount of:2,324.00$
We are requesting an Adjustment to the GMP (Owner's Contingency) in the Amount of:
If you have any questions, please call me at (406) 922-5529
Sincerely,
MARTEL CONSTRUCTION, INC.City of Bozeman - Approval
Mike Wilkinson - Martel Project Manager Jon Henderson - Strategic Services Director
Enclosure(s)
Estimate PDF
CC.File
Docusign Envelope ID: 1E151B3A-3B20-42D9-A4FD-6B8098D3ABFA
Martel Construction Spreadsheet Report Page 1
COR 052 Walk Off Pad for PV System 9/25/2024 12:46 AM
Group Description Takeoff Quantity Labor Amount Material Amount Sub Amount Equip Amount Other Amount Total Amount
07-0000 THERMAL & MOISTURE PROT.1
Membrane Roofing2
Membrane Roofing sf --2,154 --2,1543
Membrane Roofing 2,154 2,154
THERMAL & MOISTURE PROT.2,154 2,154
Estimate Totals
Description Amount Totals Hours Rate
Labor
Material
Subcontract 2,154
Equipment
Other
2,154 2,154
General Liability Insurance 21 0.890 %
Gross Receipts Tax 22 1.000 %
Bond 16 0.750 %
Construction Fee 111 5.000 %
170 2,324
Total 2,324
Docusign Envelope ID: 1E151B3A-3B20-42D9-A4FD-6B8098D3ABFA
P.O. Box 17227
Missoula, MT 59808
Phone 406-829-9100
Fax: 406-829-8450
TO:Martel Construction, Inc
1203 South Church
Bozeman, Mt 59715
CHANGE ORDER REQUEST
DATE:CHANGE ORDER #:2
JOB NAME:Bozeman Fire Station #2
JOB #:
WE HEREBY PROPOSE TO MAKE THE FOLLOWING CHANGES:
Add 75 LF of walk pad for Solar array panels $2,154.00
WE AGREE HEREBY TO MAKE THE FOLLOWING CHANGE SPECIFIED ABOVE AT THIS PRICE:2,154.00$
PREVIOUS CONTRACT AMOUNT:263,400.00$
REVISED CONTRACT TOTAL:265,554.00$
Summit Roofing Inc.DATE ACCEPTED BY DATE
Bill Johns / President
PRINTED NAME/TITLE PRINTED NAME/TITLE
9/9/2024
Docusign Envelope ID: 1E151B3A-3B20-42D9-A4FD-6B8098D3ABFA
October 9, 2024
City of Bozeman - Fire Station # 2
575 West Kagy Blvd
Bozeman, Montana 59715
ATTN: Jon Henderson
Change Order Request No. COR 053
Pricing Request No.
PROJECT: Bozeman Fire Station # 2
SUBJECT: COR 053 Metal Boxes Extrerior
REFERENCE: Charging Station and Generator 2 covers
Dear : Jon Henderson,
We propose to provide all labor, materials, and equipment required to
perform the above mentioned work. Our lump sum quotation is based
on our interpretation of the instructions and scope of work
identified by the Proposal Request(s). If we have misinterpreted this information in any
way (omissions, etc.) please advise us.
Other wise, our interpretation shall stand as correct.
We have not been directed to proceed with the work per the terms of the contract.
We have proceeded with the Work per the terms of the contract.X
At this time, we are hereby requesting 0 calendar days for a time extension
Please note this proposal is valid for (10) calendar days from this date and
our proposal is based on receipt of a signed Change Order within (15) calendar days.
We are adjusting the Construction Contingency in the amount of:1,510.00$
We are requesting an Adjustment to the GMP (Owner's Contingency) in the Amount of:
If you have any questions, please call me at (406) 922-5529
Sincerely,
MARTEL CONSTRUCTION, INC.City of Bozeman - Approval
Mike Wilkinson - Martel Project Manager Jon Henderson - Strategic Services Director
Enclosure(s)
Estimate PDF
CC.File
Docusign Envelope ID: 1E151B3A-3B20-42D9-A4FD-6B8098D3ABFA
Martel ConstructionSpreadsheet ReportPage 1COR 053 Metal Boxes Extrerior9/25/2024 2:49 PMGroupDescriptionTakeoff QuantityLabor AmountMaterial AmountSub AmountEquip AmountOther AmountTotal Amount07-0000THERMAL & MOISTURE PROT.1Flashing & Sheet Metal2COR 053 Metal Boxes Extrerior - Sheet MetalFabrications1.00ls3001,100--1,4003 Flashing & Sheet Metal3001,1001,400 THERMAL & MOISTURE PROT.3001,1001,400Estimate TotalsDescriptionAmountTotalsHoursRateLabor300Material1,100SubcontractEquipmentOther1,4001,400General Liability Insurance130.890%Gross Receipts Tax141.000%Bond110.750%Construction Fee725.000%1101,510Total1,510Docusign Envelope ID: 1E151B3A-3B20-42D9-A4FD-6B8098D3ABFA
Docusign Envelope ID: 1E151B3A-3B20-42D9-A4FD-6B8098D3ABFA
October 9, 2024
City of Bozeman - Fire Station # 2
575 West Kagy Blvd
Bozeman, Montana 59715
ATTN: Jon Henderson
Change Order Request No. COR 055
Pricing Request No.COB Eng
PROJECT: Bozeman Fire Station # 2
SUBJECT: COR 055 CoB Paint Lines Kagy ROW
REFERENCE: City of Bozeman Inspections - Engneering
Dear : Jon Henderson,
We propose to provide all labor, materials, and equipment required to
perform the above mentioned work. Our lump sum quotation is based
on our interpretation of the instructions and scope of work
identified by the Proposal Request(s). If we have misinterpreted this information in any
way (omissions, etc.) please advise us.
Other wise, our interpretation shall stand as correct.
We have not been directed to proceed with the work per the terms of the contract.X
We have proceeded with the Work per the terms of the contract.
At this time, we are hereby requesting 0 calendar days for a time extension
Please note this proposal is valid for (10) calendar days from this date and
our proposal is based on receipt of a signed Change Order within (15) calendar days.
We are adjusting the Construction Contingency in the amount of:648.00$
We are requesting an Adjustment to the GMP (Owner's Contingency) in the Amount of:
If you have any questions, please call me at (406) 922-5529
Sincerely,
MARTEL CONSTRUCTION, INC.City of Bozeman - Approval
Mike Wilkinson - Martel Project Manager Jon Henderson - Strategic Services Director
Enclosure(s)
Estimate PDF
CC.File
Docusign Envelope ID: 1E151B3A-3B20-42D9-A4FD-6B8098D3ABFA
Martel ConstructionSpreadsheet ReportPage 1COR 055 CoB Paint Lines Kagy ROW9/25/2024 2:30 PMGroupDescriptionTakeoff QuantityLabor AmountMaterial AmountSub AmountEquip AmountOther AmountTotal Amount31-0000EARTHWORK1Misc Site Construction2COR 055 CoB Paint Lines Kagy ROW1.00LS--600--6003 Misc Site Construction600600 EARTHWORK600600Estimate TotalsDescriptionAmountTotalsHoursRateLaborMaterialSubcontract600EquipmentOther600600General Liability Insurance60.890%Gross Receipts Tax61.000%Bond50.750%Construction Fee315.000%48648Total648Docusign Envelope ID: 1E151B3A-3B20-42D9-A4FD-6B8098D3ABFA
CHANGE ORDER
PROJECT: CHANGE ORDER NO.
Bozeman Fire Station 12
REFERENCE:
Bozeman, MT 59718
CONTRACTOR:Subcontractor:
Martel Walker Excavation
This CHANGE ORDER is issued by Bret
This CHANGE ORDER includes all material, labor, tools and equipment necessary to complete the following work
Description
Connect Kagy Blvd. Striping from median to existing with latex paint
QUANTITY U/M AMOUNT
1.00 LS 600.00$
TOTAL $600.00
The date of substantial completion as of the date of this change order is Increased by 1 Day.
CONTRACTOR SUBCONTRACTOR
Martel Walker Excavation
By: By:
Date: Date:9/19/2024
Latex Striping on Kagy
- All traffic control is to be completed by others (if needed)
- All street cleaning is to be completed by others (if needed)
Stripe
9/20/24
Docusign Envelope ID: 1E151B3A-3B20-42D9-A4FD-6B8098D3ABFA
October 9, 2024
City of Bozeman - Fire Station # 2
575 West Kagy Blvd
Bozeman, Montana 59715
ATTN: Jon Henderson
Change Order Request No. COR 056
Pricing Request No.RFI 112
PROJECT: Bozeman Fire Station # 2
SUBJECT: COR 056 RFI 112 Insulation on Fuel Piping
REFERENCE: City of Bozeman Inspections - Engneering
Dear : Jon Henderson,
We propose to provide all labor, materials, and equipment required to
perform the above mentioned work. Our lump sum quotation is based
on our interpretation of the instructions and scope of work
identified by the Proposal Request(s). If we have misinterpreted this information in any
way (omissions, etc.) please advise us.
Other wise, our interpretation shall stand as correct.
We have not been directed to proceed with the work per the terms of the contract.X
We have proceeded with the Work per the terms of the contract.
At this time, we are hereby requesting 0 calendar days for a time extension
Please note this proposal is valid for (10) calendar days from this date and
our proposal is based on receipt of a signed Change Order within (15) calendar days.
We are adjusting the Construction Contingency in the amount of:3,178.00$
We are requesting an Adjustment to the GMP (Owner's Contingency) in the Amount of:
If you have any questions, please call me at (406) 922-5529
Sincerely,
MARTEL CONSTRUCTION, INC.City of Bozeman - Approval
Mike Wilkinson - Martel Project Manager Jon Henderson - Strategic Services Director
Enclosure(s)
Estimate PDF
CC.File
Docusign Envelope ID: 1E151B3A-3B20-42D9-A4FD-6B8098D3ABFA
Martel ConstructionSpreadsheet ReportPage 1COR 056 RFI 112 Insulation on Fuel Piping9/25/2024 2:23 PMGroupDescriptionTakeoff QuantityLabor AmountMaterial AmountSub AmountEquip AmountOther AmountTotal Amount22-0000PLUMBING1Building Services Piping2Fuel Pipping - Insulation and metal jacket1.00ls--2,947--2,9473 Building Services Piping2,9472,947 PLUMBING2,9472,947Estimate TotalsDescriptionAmountTotalsHoursRateLaborMaterialSubcontract2,947EquipmentOther2,9472,947General Liability Insurance280.890%Gross Receipts Tax291.000%Bond230.750%Construction Fee1515.000%2313,178Total3,178Docusign Envelope ID: 1E151B3A-3B20-42D9-A4FD-6B8098D3ABFA
Material/Labor Direct Costs Qty Material Unit Price Material Cost Labor Hrs
Labor
Rate/Hr Labor Cost
0 $0 $0.00 0 $125.00 $0.00
0 $0 $0.00 $125.00 $0.00
0 $0 $0.00 $125.00 $0.00
0 $0 $0.00 $125.00 $0.00
0 $0 $0.00 $125.00 $0.00
0 $0 $0.00 $125.00 $0.00
0 $0 $0.00 $125.00 $0.00
Misc. Plumbing Materials 0 $0 $0.00
$0.00 $125.00 $0.00
$0.00 $125.00 $0.00
$0.00 $125.00 $0.00
$0.00 $125.00 $0.00
Misc. Sheet Metal Materials $0.00
$0.00 $120.00 $0.00
$0.00 $120.00 $0.00
$0.00 $120.00 $0.00
Misc. Sheet Metal Materials $0.00
$0.00 $0.00
$130.00 $0.00
$130.00 $0.00
0.5 $130.00 $65.00
$65.00
SUMMARY
Materials (detail above)$0.00
Equipment Rent
Subsistence -
Lodging Costs -
Mileage (Total Miles X $1.25)-
Subtotal $0.00
$0.00
Labor (detail above)$65.00
Subcontractors:
HBI $2,620.00
-
-
-
$2,882.00
Bond (If Applicable)$0.00 n
CGR 1% State Tax (If Applicable)$0.00 n
TOTAL AMOUNT DUE $2,947.00
Subcontractors with 10% Overhead &
Profit
PM Time
Total Supervision
20% Overhead & Profit
Supervision:
Plumbing Supervision
Sheet Metal Supervision
Total Material/Labor Direct Costs
Sheet Metal Shop Fabrication:
Sheet Metal:
BOZEMAN WORK MOD / SMALL PROJECT PRICING WORKSHEET
Job Name: 23-4072 Bozeman Fire Station #2
Description: Insulate Fuel Lines
Date: 9/16/24
Plumbing:
Comm. Drive/Bid Prep forms/Change Order Worksheet
Docusign Envelope ID: 1E151B3A-3B20-42D9-A4FD-6B8098D3ABFA
ENERGY EFFICIENCY SPECIALISTS
P: (406) 697-9238
P.O. BOX 80424 Seattle, WA 98108 MT #163134
September 11, 2024
Andy Hanson
Central Plumbing & Heating
387 Floss Flats Rd Belgrade, MT 59714
Re: Bozeman Fire Station #2 – Fuel Line Insulation
Andy,
Thank you for the opportunity to provide insulation for the above referenced project. After review of the site I have prepared the following pricing. We offer supervision, labor and materials to insulate the fuel lines.
Pricing Summary
Provide & Install 1.5” Insulation and .016 Aluminum Jacketing on fuel lines where heat traced.
TOTAL ADD…………………………………………$ 2,620.00
Please review and let me know if you have any questions.
Sincerely,
Kyle Myers
Estimator/Project Manager
1"
Docusign Envelope ID: 1E151B3A-3B20-42D9-A4FD-6B8098D3ABFA
October 9, 2024
City of Bozeman - Fire Station # 2
575 West Kagy Blvd
Bozeman, Montana 59715
ATTN: Jon Henderson
Change Order Request No. COR 057
Pricing Request No.
PROJECT: Bozeman Fire Station # 2
SUBJECT: COR 057 Add Corner Guards at Gym Doors
REFERENCE: BFD Request
Dear : Jon Henderson,
We propose to provide all labor, materials, and equipment required to
perform the above mentioned work. Our lump sum quotation is based
on our interpretation of the instructions and scope of work
identified by the Proposal Request(s). If we have misinterpreted this information in any
way (omissions, etc.) please advise us.
Other wise, our interpretation shall stand as correct.
We have not been directed to proceed with the work per the terms of the contract.X
We have proceeded with the Work per the terms of the contract.
At this time, we are hereby requesting 0 calendar days for a time extension
Please note this proposal is valid for (10) calendar days from this date and
our proposal is based on receipt of a signed Change Order within (15) calendar days.
We are adjusting the Construction Contingency in the amount of:486.00$
We are requesting an Adjustment to the GMP (Owner's Contingency) in the Amount of:
If you have any questions, please call me at (406) 922-5529
Sincerely,
MARTEL CONSTRUCTION, INC.City of Bozeman - Approval
Mike Wilkinson - Martel Project Manager Jon Henderson - Strategic Services Director
Enclosure(s)
Estimate PDF
CC.File
Docusign Envelope ID: 1E151B3A-3B20-42D9-A4FD-6B8098D3ABFA
Martel ConstructionSpreadsheet ReportPage 1COR 057 Add 96in Stainless Steel Corner Guards10/9/2024 12:51 PMGroupDescriptionTakeoff QuantityLabor AmountMaterial AmountSub AmountEquip AmountOther AmountTotal Amount10-0000SPECIALTIES1Wall & Corner Guards2COR 057 Add 96in Stainless Steel CornerGuards2.00ea100351---4513 Wall & Corner Guards100351451 SPECIALTIES100351451Estimate TotalsDescriptionAmountTotalsHoursRateLabor1002.061hrsMaterial351SubcontractEquipmentOther451451General Liability Insurance40.890%Gross Receipts Tax51.000%Bond30.750%Construction Fee235.000%35486Total486Docusign Envelope ID: 1E151B3A-3B20-42D9-A4FD-6B8098D3ABFA
DATE: 09/12/2024
SUBJECT: Bozeman Fire Station #2
LOCATION:
ADDENDUMS:
PROJECT BID DATE:
We Are Pleased To Provide The Following Quote: 102600 Corner Guards
Section: QTY Part # Item Manu. Total
102600
2 SAS-1828C-304 2” x 96” Stainless Steel Corner Guards Inpro
TOTAL: $351.00
Qualifications:
• Contractor to verify all quantities. Pricing subject to change.
• SUPPLY ONLY, NO INSTALL
• BID EXCLUDES KNOX BOXES
• THIS QUOTE IS GOOD FOR 30 DAYS. PRICING SUBJECT TO REVIEW EVERY 30 DAYS UNTIL
MATERIAL IS ORDERED BY MONTANA DOORWAYS PLUS DUE TO MARKET CONDITIONS.
• A 50% DEPOSIT WILL BE REQUIRED ON ALL ORDERS, FOR CUSTOMERS WITHOUT A
CREDIT ACCOUNT.
• FOB: FULL FREIGHT ALLOWED TO THE NEAREST SHIPPING POINT
• IF APPLICABLE, QUOTE DOES NOT INCLUDE SALES TAX
SINCERELY,
Cole Mclaughlin
Estimator Division 8 & 10
Docusign Envelope ID: 1E151B3A-3B20-42D9-A4FD-6B8098D3ABFA
October 9, 2024
City of Bozeman - Fire Station # 2
575 West Kagy Blvd
Bozeman, Montana 59715
ATTN: Jon Henderson
Change Order Request No. COR 058
Pricing Request No.
PROJECT: Bozeman Fire Station # 2
SUBJECT: COR 058 Add and Swap out 3 Locksets to Passage
REFERENCE: BFD Request
Dear : Jon Henderson,
We propose to provide all labor, materials, and equipment required to
perform the above mentioned work. Our lump sum quotation is based
on our interpretation of the instructions and scope of work
identified by the Proposal Request(s). If we have misinterpreted this information in any
way (omissions, etc.) please advise us.
Other wise, our interpretation shall stand as correct.
We have not been directed to proceed with the work per the terms of the contract.X
We have proceeded with the Work per the terms of the contract.
At this time, we are hereby requesting 0 calendar days for a time extension
Please note this proposal is valid for (10) calendar days from this date and
our proposal is based on receipt of a signed Change Order within (15) calendar days.
We are adjusting the Construction Contingency in the amount of:
We are requesting an Adjustment to the GMP (Owner's Contingency) in the Amount of:1,331.00$
If you have any questions, please call me at (406) 922-5529
Sincerely,
MARTEL CONSTRUCTION, INC.City of Bozeman - Approval
Mike Wilkinson - Martel Project Manager Jon Henderson - Strategic Services Director
Enclosure(s)
Estimate PDF
CC.File
Docusign Envelope ID: 1E151B3A-3B20-42D9-A4FD-6B8098D3ABFA
Martel ConstructionSpreadsheet ReportPage 1COR 057 Add 96in Stainless Steel Corner Guards10/9/2024 1:06 PMGroupDescriptionTakeoff QuantityLabor AmountMaterial AmountSub AmountEquip AmountOther AmountTotal Amount08-0000DOORS & WINDOWS1Door Hardware2Add Passage Locksets to 3 Doors3.00ea2001,035---1,2353 Door Hardware2001,0351,235 DOORS & WINDOWS2001,0351,235Estimate TotalsDescriptionAmountTotalsHoursRateLabor2004.119hrsMaterial1,035SubcontractEquipmentOther1,2351,235General Liability Insurance120.890%Gross Receipts Tax121.000%Bond90.750%Construction Fee635.000%961,331Total1,331Docusign Envelope ID: 1E151B3A-3B20-42D9-A4FD-6B8098D3ABFA
1
Mike Wilkinson
From:Dan Ruud <dan@mtdoorwaysplus.com>
Sent:Wednesday, October 2, 2024 6:25 AM
To:Mike Wilkinson
Cc:Tim Shea; Jake Martel
Subject:RE: Bozeman Fire Station - Passage Locksets
Tim,
1 ea. passage set to match other locks $345.00 each. In stock
Dan Ruud, President
Montana Doorways Plus, Inc.
330 Skyway Blvd.
Belgrade, MT 59714
406-871-4716 CELL
406-388-7995 EXT. 101 OFFICE
dan@mtdoorwaysplus.com
From: Mike Wilkinson <mwilkinson@martelconstruction.com>
Sent: Tuesday, October 1, 2024 8:16 PM
To: Dan Ruud <dan@mtdoorwaysplus.com>
Cc: Tim Shea <TShea@martelconstruction.com>; Jake Martel <jakem@martelconstruction.com>
Subject: Bozeman Fire Station - Passage Locksets
Dan,
Can you please send me a quote for the 3 Passage Locksets for the Bozeman Fire Station.
I believe you said $345 each to Tim.
Thanks,
Mike
Michael Wilkinson
Project Manager
Martel Construction, Inc.
1203 S. Church Avenue
Bozeman, MT 59715
(406) 586-8585 Office | (406) 922-5529 Direct
(406) 570-6638 Mobile
Docusign Envelope ID: 1E151B3A-3B20-42D9-A4FD-6B8098D3ABFA
2
Save a tree. Please do not print this email unless necessary.
Docusign Envelope ID: 1E151B3A-3B20-42D9-A4FD-6B8098D3ABFA
June 5, 2024City of Bozeman - Fire Station # 2 575 West Kagy Blvd Bozeman, Montana 59715 ATTN: Jon Henderson Change Order Request No. COR 033
Pricing Request No.
PROJECT: Bozeman Fire Station # 2
SUBJECT: COR 033 Generator Wire Feeds Alum Wire vs Copper Wire
REFERENCE: Wire Feed Credit Dear : Jon Henderson,We propose to provide all labor, materials, and equipment required toperform the above mentioned work. Our lump sum quotation is basedon our interpretation of the instructions and scope of work identified by the Proposal Request(s). If we have misinterpreted this information in anyway (omissions, etc.) please advise us.Other wise, our interpretation shall stand as correct.We have not been directed to proceed with the work per the terms of the contract.XWe have proceeded with the Work per the terms of the contract. At this time, we are hereby requesting 0calendar days for a time extensionPlease note this proposal is valid for (10) calendar days from this date andour proposal is based on receipt of a signed Change Order within (15) calendar days.
We are adjusting the Construction Contingency in the amount of:
We are requesting an Adjustment to the GMP (Owner's Contingency) in the Amount of:(20,994.00)$ If you have any questions, please call me at (406) 922-5529 Sincerely, MARTEL CONSTRUCTION, INC.City of Bozeman - Approval Mike Wilkinson - Martel Project ManagerJon Henderson - Strategic Services DirectorEnclosure(s)Estimate PDF
CC.FileDocusign Envelope ID: 1E151B3A-3B20-42D9-A4FD-6B8098D3ABFA
Martel ConstructionSpreadsheet ReportPage 1BFS2 COR 024 - RFI #73 VRF System layout & changes6/6/2024 4:05 PMGroupDescriptionTakeoff QuantityLabor AmountMaterial AmountSub AmountEquip AmountOther AmountTotal Amount26-0000ELECTRICAL1Electrical2Generator Wire Feeds Alum Wire vs CopperWire(1.00)ls--(19,463)--(19,463)3 Electrical(19,463)(19,463) ELECTRICAL(19,463)(19,463)Estimate TotalsDescriptionAmountTotalsHoursRateLaborMaterialSubcontract(19,463)EquipmentOther(19,463)(19,463)General Liability Insurance(187)0.890%Gross Receipts Tax(195)1.000%Bond(149)0.750%Construction Fee(1,000)5.000%(1,531)(20,994)Total(20,994)Docusign Envelope ID: 1E151B3A-3B20-42D9-A4FD-6B8098D3ABFA
3210 Canyon Ferry Rd 406-461-7374 office@slateelectrical.com
Generator Wiring Copper vs. Aluminum Savings - COR 033
ATS to the Docking Station
Has five parallel runs between them.
4 runs of 400 copper of 600 aluminum in each.
1 run of 4/0 cooper or 350 Aluminum in each
Panel 1L&1 to the existing generator
Has one run between them
3 runs of #3 Copper or #1 Aluminum
1 run of #8 Copper or #4 Aluminum
Savings in switching from Copper to Aluminum would be $19,463.22
Cooper quoted $27,939.00
Aluminum quoted $8,553.20
Docusign Envelope ID: 1E151B3A-3B20-42D9-A4FD-6B8098D3ABFA
Docusign Envelope ID: 1E151B3A-3B20-42D9-A4FD-6B8098D3ABFA
Docusign Envelope ID: 1E151B3A-3B20-42D9-A4FD-6B8098D3ABFA
Docusign Envelope ID: 1E151B3A-3B20-42D9-A4FD-6B8098D3ABFA
This is a safe-printed document.
The original attachment had 5 page(s).
Safeprint maximum page count configuration is 10 page(s).
Number of pages truncated are 0 page(s).
Docusign Envelope ID: 1E151B3A-3B20-42D9-A4FD-6B8098D3ABFA
Docusign Envelope ID: 1E151B3A-3B20-42D9-A4FD-6B8098D3ABFA
Docusign Envelope ID: 1E151B3A-3B20-42D9-A4FD-6B8098D3ABFA
Docusign Envelope ID: 1E151B3A-3B20-42D9-A4FD-6B8098D3ABFA
Docusign Envelope ID: 1E151B3A-3B20-42D9-A4FD-6B8098D3ABFA
Docusign Envelope ID: 1E151B3A-3B20-42D9-A4FD-6B8098D3ABFA
This is a safe-printed document.
The original attachment had 4 page(s).
Safeprint maximum page count configuration is 10 page(s).
Number of pages truncated are 0 page(s).
Docusign Envelope ID: 1E151B3A-3B20-42D9-A4FD-6B8098D3ABFA
Docusign Envelope ID: 1E151B3A-3B20-42D9-A4FD-6B8098D3ABFA
Docusign Envelope ID: 1E151B3A-3B20-42D9-A4FD-6B8098D3ABFA
Docusign Envelope ID: 1E151B3A-3B20-42D9-A4FD-6B8098D3ABFA
Docusign Envelope ID: 1E151B3A-3B20-42D9-A4FD-6B8098D3ABFA
This is a safe-printed document.
The original attachment had 6 page(s).
Safeprint maximum page count configuration is 10 page(s).
Number of pages truncated are 0 page(s).
Docusign Envelope ID: 1E151B3A-3B20-42D9-A4FD-6B8098D3ABFA
Docusign Envelope ID: 1E151B3A-3B20-42D9-A4FD-6B8098D3ABFA
Docusign Envelope ID: 1E151B3A-3B20-42D9-A4FD-6B8098D3ABFA
Docusign Envelope ID: 1E151B3A-3B20-42D9-A4FD-6B8098D3ABFA
Docusign Envelope ID: 1E151B3A-3B20-42D9-A4FD-6B8098D3ABFA
Docusign Envelope ID: 1E151B3A-3B20-42D9-A4FD-6B8098D3ABFA
Docusign Envelope ID: 1E151B3A-3B20-42D9-A4FD-6B8098D3ABFA
This is a safe-printed document.
The original attachment had 4 page(s).
Safeprint maximum page count configuration is 10 page(s).
Number of pages truncated are 0 page(s).
Docusign Envelope ID: 1E151B3A-3B20-42D9-A4FD-6B8098D3ABFA
Docusign Envelope ID: 1E151B3A-3B20-42D9-A4FD-6B8098D3ABFA
Docusign Envelope ID: 1E151B3A-3B20-42D9-A4FD-6B8098D3ABFA
Docusign Envelope ID: 1E151B3A-3B20-42D9-A4FD-6B8098D3ABFA
Docusign Envelope ID: 1E151B3A-3B20-42D9-A4FD-6B8098D3ABFA
This is a safe-printed document.
The original attachment had 3 page(s).
Safeprint maximum page count configuration is 10 page(s).
Number of pages truncated are 0 page(s).
Docusign Envelope ID: 1E151B3A-3B20-42D9-A4FD-6B8098D3ABFA
Docusign Envelope ID: 1E151B3A-3B20-42D9-A4FD-6B8098D3ABFA
Docusign Envelope ID: 1E151B3A-3B20-42D9-A4FD-6B8098D3ABFA
Docusign Envelope ID: 1E151B3A-3B20-42D9-A4FD-6B8098D3ABFA
This is a safe-printed document.
The original attachment had 10 page(s).
Safeprint maximum page count configuration is 10 page(s).
Number of pages truncated are 0 page(s).
Docusign Envelope ID: 1E151B3A-3B20-42D9-A4FD-6B8098D3ABFA
Docusign Envelope ID: 1E151B3A-3B20-42D9-A4FD-6B8098D3ABFA
Docusign Envelope ID: 1E151B3A-3B20-42D9-A4FD-6B8098D3ABFA
Docusign Envelope ID: 1E151B3A-3B20-42D9-A4FD-6B8098D3ABFA
Docusign Envelope ID: 1E151B3A-3B20-42D9-A4FD-6B8098D3ABFA
Docusign Envelope ID: 1E151B3A-3B20-42D9-A4FD-6B8098D3ABFA
Docusign Envelope ID: 1E151B3A-3B20-42D9-A4FD-6B8098D3ABFA
Docusign Envelope ID: 1E151B3A-3B20-42D9-A4FD-6B8098D3ABFA
Docusign Envelope ID: 1E151B3A-3B20-42D9-A4FD-6B8098D3ABFA
Docusign Envelope ID: 1E151B3A-3B20-42D9-A4FD-6B8098D3ABFA
Docusign Envelope ID: 1E151B3A-3B20-42D9-A4FD-6B8098D3ABFA