Loading...
The URL can be used to link to this page
Your browser does not support the video tag.
Home
My WebLink
About
010 A3_3 ADU BUILDING ELEVATIONS
ARCH COMPOSITE SHINGLE ROOFROUGH SAWN FIR SIDINGPAINTED CLAPBOARD SIDINGPAINTED CORNER BOARD2G2F0033" 12"9" 12"9" 12"ELECT METER & MAST2HWINDOW SAMPLE:JELD WEN SITELINE SERIES SIMULATED DOUBLE HUNG (MESA RED FRAME)CLADDING SAMPLE:CLAPBOARD HORZ SIDING, PAINTED, (3/4" NOM. THICKNESS)ROOFING SAMPLE:ASPHALT SHINGLESTIMBERLINE HDZ CHARCOAL)EXTERIOR MATERIAL SAMPLESWINDOW SAMPLE:JELD WEN SITELINE SERIESFULL LITE(MESA RED FRAME)CLADDING SAMPLE:HORZ, CLEAR, UNFINISHED DOUG FIR CLADDING (3/4" NOM. THICKNESS)1A0013A3B3C3DARCH COMPOSITE SHINGLE ROOFCLEAR, UNFINISHED FIR CLADDINGPAINTED CLAPBOARD PAINTED CORNER BOARD5'-0"45° SETBACK PLANEPROPERTY LINE @ NORTH2E2D2C2B2A9" 12"9" 12"3" 12"15'-0"0022N2M2L2K2J1D1C1BADU HEIGHT ALLOWED PER MONTANA CODE 76-2-34525'-0"DATE:PROJECT #:ORIGINAL DRAWING SIZE: 24" x 36"TRIPP LEWTONTRIPP@HOLDINGGROUNDARCHITECTS.COM406.570.2683M. ETHAN BARLOWETHAN@HOLDINGGROUNDARCHITECTS.COM406.548.2656PO BOX 273, BOZEMAN, MONTANA 59771CONSULTANTSThis drawing is not intended nor shall it be used for construction purposes unless the signed professional stamp of a registered architect employed by Holding Ground Architects llc is affixed above.C:\Users\HGA #3\HOLDING GROUND Dropbox\PROJECTS\24-09 518 SOUTH 3RD AVE\DRAWINGS\REVIT\518 S 3RD ADU - WORKING.rvt518 SOUTH 3RD AVE ADU10/14/2025A3.324-09JOANNE DORNAN & DAVID TAYLORBUILDING ELEVATIONSNCOA SET518 SOUTH 3RD AVENUEBOZEMAN, MT 597151/4" = 1'-0"A3.3EAST ELEVATION3WINDOW SCHEDULEMARK OPERATION RO WIDTH RO HEIGHT SILL HEIGHT COMMENTS1A AWNING 36" 60" 20"1B AWNING 30" 24" 56"1C FIXED 30" 24" 56"1D AWNING 30" 24" 56"2A AWNING 30" 42" 6" TEMPERED2B FIXED 30" 66" 36" TEMPERED2C FIXED 30" 66" 36"2D FIXED 30" 66" 36"2E CASEMENT 30" 42" 6" EGRESS WINDOW2F CASEMENT 30" 24" 54"2G AWNING 30" 48" 54"2H CASEMENT 30" 24" 54"2J AWNING 24" 42" 6"2K AWNING 30" 48" 22"2L FIXED 30" 48" 22"2M AWNING 30" 48" 22"2N AWNING 24" 42" 6"3A SKYLIGHT 22 5/16" 39 3/8"3B SKYLIGHT 22 5/16" 39 3/8"3C SKYLIGHT 22 5/16" 39 3/8"3D SKYLIGHT 22 5/16" 39 3/8"EXTERIOR DOOR SCHEDULEMARK OPERATION RO WIDTH RO HEIGHT COMMENTS001 INSWING 2'-10" 6'-8" FULL LITE, RECLAIMED002 INSWING 2'-10" 6'-8" FULL LITE003 OVHD 18'-0" 8'-0" OVH GARAGE DOOR1/4" = 1'-0"A3.3NORTH ELEVATION41/4" = 1'-0"A3.3WEST ELEVATION11/4" = 1'-0"A3.3SOUTH ELEVATION2# DESCRIPTION DATE