Loading...
HomeMy WebLinkAboutCONCURRENT SITE LAYOUTMWSSSS16''W16''W16''W16''W16''W16''W16''W16''W16''W16''W6''S HYD8''W 8''W 8''W 8''W 8''W8''W8''W8''W8''W8''W0'30'60'90'C1.0AS NOTEDCONCURRENTCONSTRUCTION PLANCKHEC Jun 23, 2025 - 10:50amCAD FILE: M:\213740\Drawings\Exhibits\Phasing Exhibit.dwg REVISIONSDATEPROJECT NUMBERHYALITE Engineers, PLLC161 W HALEY SPRINGSBozeman, MT 59718Tel: (406) 587.2781w w w . hyaliteeng. comFax: (406) 522.92252018LOT 15 NELSON MEADOWS BOZEMAN, MT6/23/202521374022x34 originals SCALESHEET TITLEDESIGN BYMONTANABRETT C.No. 29106 PEMEGAARDPEFORSOILNASREN IG ENE P R E L I M I N A R Y ROAD, STE. 101APPROXIMATEPROPERTY BOUNDARYPROPOSEDBUILDING #2PRINCE LANEHEC Jun 23, 2025 - 10:50amCAD FILE: M:\213740\Drawings\Exhibits\Phasing Exhibit.dwg REVISIONSDATEPROJECT NUMBERHYALITE Engineers, PLLC161 W HALEY SPRINGSBozeman, MT 59718Tel: (406) 587.2781w w w . hyaliteeng. comFax: (406) 522.92252018LOT 15 NELSON MEADOWS BOZEMAN, MT6/23/202521374022x34 originals SCALESHEET TITLEDESIGN BYMONTANABRETT C.No. 29106 PEMEGAARDPEFORSOILNASREN IG ENE P R E L I M I N A R Y ROAD, STE. 101PROPOSEDBUILDING #1PROPOSEDBUILDING #3EXISTING SECONDARY ACCESS Nelson Meadows Lot 15CONCURRENT CONSTRUCTION PLANCONCURRENT CONSTRUCTIONTHE CONCURRENT CONSTRUCTION REQUEST WILL BE SUPPORTED BY THEFOLLOWING PROJECT SPECIFIC CONDITIONS AND STANDARD CONDITIONS PERBMC 38.270.30.D.A. THE PUBLIC INFRASTRUCTURE AND CONSTRUCTION SITE PROJECTS WILL BEUNDER THE CONTROL OF A SINGLE ENTITY, DELESALLE PROJECTS MONTANAINC, WITH A SINGLE GENERAL CONTRACTOR FOR BOTH PUBLICINFRASTRUCTURE IMPROVEMENTS AND SITE CONSTRUCTION. THERE WILL BENO THIRD PARTY BUILDERS UNTIL PUBLIC INFRASTRUCTURE IS COMPLETE ANDACCEPTED BY THE CITY.B. PUBLIC INFRASTRUCTURE PLANS WILL BE APPROVED PRIOR TO ANYCONCURRENT CONSTRUCTION BUILDING PERMIT ISSUANCE.C. ALL STREETS AND ACCESSES NECESSARY FOR INGRESS/EGRESS OF THESITE WILL BE IMPROVED TO GRAVEL SURFACING PRIOR TO VERTICALCONSTRUCTION ON SITE. ACCESS TO THE SITE WILL REMAIN CLOSED TO THEPUBLIC UNTIL PUBLIC INFRASTRUCTURE IMPROVEMENTS ARE COMPLETE.D. DELESALLE PROJECTS MONTANA INC WILL PROVIDE INSURANCE, RISKACKNOWLEDGEMENT, AND INDEMNIFICATION IN A FORM ACCEPTABLE TO THECITY PRIOR TO BUILDING PERMIT ISSUANCE.LEGENDPUBLIC INFRASTRUCTURE IMPROVEMENTSSITE TO BE CONSTRUCTED CONCURRENTLYSITE TO BE CONSTRUCTED AFTER PUBLIC INFRASTRUCTURE