Loading...
HomeMy WebLinkAboutPlan Review - Review Comments_MasterPlan Review - Review Comments Report Project Name: 25069 Nelson Meadows CONR Workflow Started: 2/8/2025 10:16:09 AM Report Generated: 06/09/2025 10:11 AM REVIEW COMMENTS REF # 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 29 30 31 32 33 34 35 36 37 38 39 40 41 42 CYCLE 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 REVIEWED BY Addressing Jenny Connelley 2/12/25 3:05 PM Solid Waste Russell Ward 2/13/25 6:41 AM Building Division Ben Abbey 2/19/25 10:31 AM Building Division Ben Abbey 2/19/25 10:32 AM Building Division Ben Abbey 2/19/25 10:39 AM Fire Department Scott Mueller 2/26/25 11:04 AM Planning Susana Montana 2/26/25 1:46 PM Planning Susana Montana 2/26/25 1:46 PM Planning Susana Montana 2/26/25 1:46 PM Planning Susana Montana 2/26/25 1:46 PM Planning Susana Montana 2/26/25 1:46 PM Planning Susana Montana 2/26/25 1:46 PM Planning Susana Montana 2/26/25 2:08 PM Planning Susana Montana 2/26/25 2:08 PM Planning Susana Montana 2/26/25 2:08 PM Planning Susana Montana 2/26/25 2:08 PM Planning Susana Montana 2/26/25 2:08 PM Planning Susana Montana 2/26/25 2:08 PM Planning Susana Montana 2/26/25 2:13 PM Planning Susana Montana 2/26/25 2:13 PM Planning Susana Montana 2/26/25 2:17 PM Stormwater Division Russ Smith 2/27/25 2:32 PM Planning Susana Montana 2/27/25 3:05 PM Planning Susana Montana 2/27/25 3:05 PM Engineering Mikaela Schultz 3/4/25 12:43 PM Engineering Mikaela Schultz 3/4/25 12:45 PM Engineering Mikaela Schultz 3/4/25 1:42 PM Engineering Mikaela Schultz 3/4/25 1:42 PM Engineering Mikaela Schultz 3/4/25 1:43 PM Engineering Mikaela Schultz 3/4/25 1:51 PM Engineering Mikaela Schultz 3/4/25 1:51 PM Engineering Mikaela Schultz 3/4/25 1:59 PM Engineering Mikaela Schultz 3/4/25 2:09 PM Engineering Mikaela Schultz 3/4/25 3:05 PM Water Conservation Division Eric Neustrup 3/5/25 2:58 PM Water Conservation Division Eric Neustrup 3/5/25 2:58 PM Water Conservation Division Eric Neustrup 3/5/25 2:59 PM Water Conservation Division Eric Neustrup 3/5/25 2:59 PM Water Conservation Division Eric Neustrup 3/5/25 2:59 PM Parks Department Ross Knapper 3/11/25 8:56 AM Parks Department Ross Knapper 3/11/25 8:56 AM Parks Department Ross Knapper 3/11/25 8:57 AM TYPE Comment There is one address on this property. Additional ones will be assigned to the buildings and units if this is approved. Changemark SLD Waste 1. need a detailed plan for refuse enclosure 2. refuse enclosure will need to be covered Changemark BLDG - Accessible Units A & B 1108.2 Design. Dwelling units and sleeping units that are required to be Accessible units, Type A units and Type B units shall comply with the applicable portions of Chapter 11 of ICC A117.1. Units required to be Type A units are permitted to be designed and constructed as Accessible units. Units required to be Type B units are permitted to be designed and constructed as Accessible units or as Type A units. Changemark BLDG - Elevator Service All floors with Elevator service are considered to be an Accessible floor. Changemark BLDG - Fire Protection Systems Where is the fire riser located? 3 stories, mixed use, would require sprinklers under ARM 24.301.146 Section 17.1 Comment Fire requires all three buildings must have complying fire sprinkler systems/fire alarm sprinkler systems due to inability to comply with following requirements: 2021 International Fire Code 503.1.1 Buildings and facilities. Approved fire apparatus access roads shall be provided for every facility, building or portion of a building hereafter constructed or moved into or within the jurisdiction. The fire apparatus access road shall comply with the requirements of this section and shall extend to within 150 feet (45 720 mm) of all portions of the facility and all portions of the exterior walls of the first story of the building as measured by an approved route around the exterior of the building or facility. Exceptions: 1. The fire code official is authorized to increase the dimension of 150 feet (45 720 mm) where any of the following conditions occur: 1.1. The building is equipped throughout with an approved automatic sprinkler system installed in accordance with Section 903.3.1.1, 903.3.1.2 or 903.3.1.3. OR Reduce all three building sizes to allow for 150 feet rule. Changemark 25058 site plan application Please see Project Dox for the City agency comments on this site plan application and respond in writing to the comments that are relevant to the proposed new design. Note that if you submit this proposal, it will be a new site plan application and we will need you to submit a written withdrawal of the 24058 application. Changemark "Other" Block Front designation; Table 38.510.030.G In your narrative and drawings, please indicate how you meet the block front standards of this Other designation. Changemark Table 38.310.040.C Apartments in the M-1 district As you are aware, residential use is an accessory use in the M-1 district. This means the square footage of residential use for each building must be no greater than 49% of the square footage of the entire building; permitted non-residential use must occupy at least 51% of the space not counting the required parking. Please provide a calculation box for each building citing the square footage and percent of each use.. Changemark 38.520.060 usable open space Please provide a calculation box showing the required and provided usable open space for the residential use and the non-residential use. This can be for the entire site or for each building. Changemark Table 38.310.040.C M-1 district allowable uses The M-1 district does not allow rowhouses. Please ensure that the commercial/industrial use at the ground floor is designed to be functionally the principal use of the building and the studio apartments on the second floor are accessory spaces. Changemark see engineering comments on traffic signal Changemark 38.540.050.A.1.a.(1) on-street parking On-street parking is only permitted for residential units' demand on a first-come-first-served basis. Each on-street parking space must meet the standards of subsection A.1.a (1). Changemark 38.540.050.A.4 bike parking From the 24058 comments: In regards to Nelson Meadows, please ensure they have enough bike parking but also that it is situated well for usability. -For Building #2, the bike parking is too close to bumper overhand near the two parking spaces. This would negate the usability of these spaces. -For Building #1/south side of building, the bike parking appears to be inside a room of some sort. The circulation around it is limited. -For Building #1/north side by Prince, the bike parking is so close to the edge of the pavement that at least one space is not usable. Installation of bike parking should be done according to manufacturer recommendations, including spatial requirements for clearance for storage as well as removal and moving around the racks/site. Candace Mastel Changemark Maker Space Mixed Use designation Changemark 38.520.060.C usable open space Please describe how you are distinguishing residential common open spaces in Building 1 from commercial open space areas. Changemark 50% accessory use The stairs are pertinent to the residential use and, therefore, must be included in the residential use square footage totaling 9,146 sf Changemark stairs related to residential use Please include the stairs to the dwelling units in the residential square footage of the building. Changemark 38.400.010.A.8 secondary access Secondary Access - Second or emergency access. To facilitate traffic movement, the provision of emergency services and the placement of utility easements, all developments must be provided with a second means of access. If, in the judgment of the development review committee (DRC), a second dedicated right-of-way cannot be provided for reasons of topography or other physical conditions, the developer must provide an emergency access, built to the standards detailed in these regulations. a. This provision may be waived or conditionally waived by the DRC. Please provide a proposal for secondary access to the site for review by the DRC with subsequent submittals. This item will be added and monitored as unresolved with subsequent submittals until it reaches a conclusion. The resolved condition must be achieved prior to site plan approval. Mikaela Schultz 02 14 24 Changemark 38.540.050.A.1.a.(1) parallel parking requirements Please label the dimensions of the on-street parallel parking spaces. Changemark Table 38.310.0040.C M-1 uses How does this space and the front cafe space qualify as 51% of the building's non-residential square footage? Comment 38.220.080.2.g(9) Site plan submittals must include a grading and drainage plan with provisions for on-site retention/detention and water quality improvement facilities. DCS 6.4.3 requires an Operation, Inspection, and Maintenance Plan which includes a detailed list of required maintenance and inspection activities, schedule, and frequency for the various system components and cost estimates Changemark Table 38.310.040.C. Note 6. List the square footage of the total building; the square footage of the ground floor non-residential and non-parking square footage of the ground floor; the square footage of the second floor residential use; the square footage of the third floor residential use; the square footage of the indoor and/or outdoor residential common open space on the second and third floors; and label the percent of the non-parking residential use and the percent of the non-residential uses of the building. Changemark Table 38.310.040.C Does this residential figure include the ground floor parking for the exclusive use of residents? It should not. Library Comment BMC 38.410.130. Water Adequacy: The development will need to satisfy the water adequacy code requirement prior to a future site plan approval. If sufficient water rights cant be provided to offsets the development's annual demand then a cash-in-lieu of water rights (CILWR) payment will be required. The City assesses the CILWR fee at a rate of $6,000 per acre-foot. The fee determination will take place during the site plan review, however if there are any questions or if a preliminary review is desired please contact Griffin Nielsen with the Engineering/Utilities Department directly at gnielsen@bozeman.net or (406) 582-2279. The City encourages the use of groundwater wells to supply irrigation demands, which in turn will reduce the CILWR fee. Applicant must obtain a pre-determination from the DNRC demonstrating that a well groundwater well may be permitted under Montanas exempt appropriation or that provide the water right documentation if existing prior to finalization of the CILWR fee determination. Finally, the City would like to make the owner aware of an available CILWR rebate of approximately 20% for residential units if high-efficiency fixtures (toilets, washers, and shower heads) meeting the City Water Conservation Division standards are installed. The rebate would be released at occupancy and requires an agreement defining the terms and amount rebate be finalized and executed prior to final plan approval. If the owner is interested or has any questions please reach out to Griffin Nielsen. Comment BMC 38.230.100 - The applicant must review section 38.230.100. Specifically, but not exclusively, show how future utilities (i.e. water, sewer, and electrical will service the properties units) as well as any existing easements. Comment BMC 38.220.060.A.2.g/DSSP 3.2.4 - Traffic Impact Study - The applicant must submit a peak hour trip generation value to the City with conformation that the site meets the traffic volumes assigned to the subject property in the subdivision traffic impact study. A transportation impact study is required if the proposed development meets any of the criteria listed in DSSP 3.2.4. Including, but not limited to; if trip generation for the proposed site development exceeds the values assumed for the area in the Subdivision TIS or if the previous TIS is more than 5 years old. 38.270.030 - Completion of Improvements - The City transportation engineer and the review engineer will forward the trip numbers reported from the peak trip generation value requested above to representatives of the Montana Department of Transportation (MDT), the agency responsible for installation and maintenance of the adjacent signal at Nelson Road and Frontage road. Conclusive correspondence from MDT representatives concerning the active signal warrant analysis for the intersection of Nelson Road and Frontage Road must be received and reviewed with specific reference to the timing of signal installation with respect to the trips associated with this site plan, prior to site plan approval. Please contact (Jean Riley jriley@mt.gov) with MDT Systems Impact Action Process Section) Library Comment DSSP 3.2.1 Design Reports/Water - A water design report must be prepared by a professional engineer licensed in the state of Montana which addresses applicable information required by Section 1.1 of Circular DEQ-1 and fire and domestic flow requirements of the proposed project. Library Comment DSSP 3.2.2 Design Reports/Sewer - A sewer design report must be prepared by a professional engineer licensed in the state of Montana which addresses applicable information required by Section 11.1 of Circular DEQ-2 and sewer flows at full build out of the development and shall be submitted to the City. An overall plan of the development, including all areas outside of the study are which would naturally be served through the study area shall be included. Average daily flows, peak hour criteria, wastewater flow rates by zoning areas, peaking factors, and other applicable design criteria shall be used as defined in the current Sanitary Sewer Facility Plan. Library Comment DSSP 3.2.3 - Stormwater Drainage Plan Report - The purpose of the Stormwater Drainage Plan report is to describe existing drainage conditions and the plan for control of stormwater runoff from the proposed project. The plan should provide a detailed description of the stormwater management strategy along with a grading and drainage Plan, details, calculations, sizing, and locations for all proposed drainage facilities. The plan shall include a narrative describing in detail how the drainage features will function for the Water Quality Storm, the Minor storm, and the Major storm events. The written narrative shall provide sufficient information and details such that the reader has a clear understanding of how the projects stormwater system will function for each storm event. The level of detail presented in the report shall be commensurate with the level of complexity of the stormwater drainage plan. Insufficient report content will be grounds for rejection of the submittal. Additional details of the required Stormwater Drainage Plan are provided in Chapter 6 of these Design Standards. Library Comment BMC 40.04.530 - Watercourse Protection: Where a development is crossed by or is adjacent to a watercourse, the developer must mitigate the impacts of the development on the watercourse. Comment Sewer volumes and design proposed for the subject site must undergo additional review and approval with the Montana Department of Environmental Quality. A COSA re-write took place recently with direct respect to subdivision sewer design, given that the subdivision is served by a privately owned and operated lift station. Please coordinate with the subdivision design engineer (Matt E. Ekstrom mekstrom@m-m.net) of Morrison Maierle and MTDEQ to solicit review of the proposed sewer demand and the preliminary design. Upload any conclusive correspondence from the after mentioned parties to this application with subsequent submittals. The City of Bozeman does not have authority to provide and execute Municipal Facilities Exclusion (MFE) for the subject project, and others in Nelson Meadows subdivision, at this time. Receipt of conclusive correspondence from subdivision design engineer and MTDEQ must be submitted with this application. Submittal of a copy of the published COSA with certification from the site civil engineer that the site meets the intent of the COSA would also be acceptable to resolve this request for additional sanitary review and should be received prior to site plan approval. MTDEQ posts the following information on their site with respect to COSA FAQ's: DEQ tries to have digital copies of the COSA and Lot Layouts available, however, local county environmental health departments are the best resource for obtaining copies of these documents. Library Comment City of Bozeman Resolution 5076, Policy 1 - The applicant must provide and file with the County Clerk and Recorder's office executed Waivers of Right to Protest Creation of Special Improvement Districts (SIDs) on City standard record Form. A project specific SID waiver template has been uploaded to the City documents file for processing and execution. The applicant must execute and record the SID waiver, prior to site plan approval. Changemark ENG - Planning application TIS waiver - not valid DSSP Chapter 3.2.4 Traffic Impact Study criteria apply to this project, and waivers that may have been granted in previous application sets, separate in whole to the present application set, do not apply. Comment On June 15th, 2024, Ordinance 2155 and Resolution 5586 were adopted by the Bozeman City Commission as well as the associated City of Bozeman Landscape and Irrigation Performance and Design Standards Manual. Projects not deemed "adequate” by June 15, 2024 are now subject to these new code requirements. To familiarize yourself with these requirements please visit https://www.bozeman.net/departments/utilities/water-conservation/new-development-standards-3620. Comment Applicant is advised that pursuant to BMC 38.550.070, the City must obtain legal ownership of any irrigation water rights used for City-owned and -maintained irrigation systems. These public systems must be entirely discrete and separate from any irrigation system that is privately owned and maintained. Depending on the water supply source, Applicant may be required to work with various agencies to develop a legal water supply source. Comment If an exempt well is identified as the water supply source for the City-owned system, then Applicant is advised that they will be required to complete a MT DNRC Notice of Completion of Groundwater Development Form No. 602 for the well. The City will sign the 602 form only after it has determined that it is correct and complete. After the irrigation system is completed and irrigation water is put to beneficial use, Applicant must file the 602 form with the DNRC, pay any required application fee, and provide proof of filing back to the City. Comment Applicant is advised that the MT DNRC is no longer issuing pre-determination letters for exempt wells, so the City’s requirement that an exempt well pre-determination letter be provided has been nullified. If an exempt irrigation well is proposed, applicant is advised that they proceed at their own risk that a legal water right can be obtained from MT DNRC. Applicant should conduct their own due diligence and familiarize themself with the MT DNRC’s current combined appropriation guidance. Applicant will not know whether MT DNRC will issue a groundwater certificate for the exempt well until a 602 form is filed, which according to current law may only occur after the well is drilled, the irrigation system is constructed, and water is put to beneficial use. If a water right for the exempt well is not issued by MT DNRC, then Applicant is advised that they will be required to modify the irrigation plan and secure an alternative legal water source. Applicant is advised to convert any existing irrigation water rights associated with the property to irrigation of parks, public rights-of-way, and open space if a water right for the exempt well cannot be obtained from the MT DNRC. In this case, Applicant is encouraged to meet with the City Water Conservation and Parks Divisions to discuss low water use landscaping design alternatives. Comment Applicant is advised that a change in the water supply source constitutes a material modification pursuant to BMC 38.100.070.B that requires additional review and may result in added conditions of approval after final action to grant preliminary approval of the modification. Changemark Parks Please see updated parkland tracking table provided in the City Documents Folder. Max zoning cap for M-1 zone is 12 dwelling units. Estimated parkland requirement is 0.64 acres land dedication and 0.32 acres of CILP. Applicant proposes 0.96 acres of CILP equivalent. Comment Current CILP value is $2.65/sf. Please update the value on the parkland tracking table. Final value determined at time of site plan adequacy. Comment CILP payment due prior to final site plan approval. Current CILP estimate is $110,815.05. FILENAME 002_A1.1_SITE LAYOUT.pdf 004_A2.2-1_BLDG1-SECOND LEVEL.pdf 004_A2.2-1_BLDG1-SECOND LEVEL.pdf 003_A2.1-1_BLDG1-MAIN LEVEL.pdf NARRATIVE_NELSON 15_2-7-25.pdf NARRATIVE_NELSON 15_2-7-25.pdf NARRATIVE_NELSON 15_2-7-25.pdf NARRATIVE_NELSON 15_2-7-25.pdf NARRATIVE_NELSON 15_2-7-25.pdf NARRATIVE_NELSON 15_2-7-25.pdf 001_COVER.pdf 001_COVER.pdf 001_COVER.pdf 001_COVER.pdf 001_COVER.pdf 001_COVER.pdf 002_A1.1_SITE LAYOUT.pdf 002_A1.1_SITE LAYOUT.pdf 003_A2.1-1_BLDG1-MAIN LEVEL.pdf 001_COVER.pdf 001_COVER.pdf Notification Letter - Bozeman Planning Application Submitted.pdf 001_COVER.pdf DISCUSSION OK This is included on Sheet A1.2 Noted - This will be detailed on the Building Permit Submittal Buildings 1 and 3 will have an elevator. Anticipated Fire Riser Locations are noted on Building 1 and 3 Floor Plans. Buildings 1 and 3 will have fire suppression for sure. I believe we do meet the fire access road requirments, however, if we do not comply - fires suppression will be provided throughout the project. I have reviewed provided a response to the pertinent comments in a separate document. This is provided in narrative and drawings. An exhibit ratio for the residential percentage of Buildings 1 and 3 has been provided. This calculation is shown is the site statistics on the cover sheet. The square footage breakdown is show on the cover an an exhibit is provided on sheet A0.1 Noted, we will coordinate with Engineering. So Noted. The requirements are met. The bike parking is scattered outisde of any buildings and exceeds the mimimums as indicated on the cover sheet. So Noted. The requirements are met. The open spaces are shown on Sheet A0.1 The only commercial open space is shown outside of the street facing unit. I am also providing a commercial open space on Bldg 2 facing the street. I have provided a gym on the second level that will be open to more than the residential users. I am including the stairs that access this gym space in the comm. Calcs. The other stairs are shown included in the residential calcs. So Noted. See above. Noted, the secondary easement as shown on the eastern side of the property will be utilized for the secondary means of access. However, this isn't a required component since this is only a site plan application. Noted, see the updated sheets. The project has been reworked and a use diagram is included on sheet A0.1 Included The project has been reworked and a use diagram is included on sheet A0.1 No Acknowledged Acknowledged, please see the updated civil sheets. An updated Traffic Impact Letter has been submitted and we are in converations with the City and MDT to resolve any traffic concerns. The Engineering Report is provided with submittal. The Engineering Report is provided with submittal. The Engineering Report is provided with submittal. Acknowledged, the impacts to the watercouse have been considered in the design and therefore there should be no impacts. Acknowledged, the updated sewer flow generation numbers take into account the updated approvals. Please see the included Engineering Report. Acknowledged An updated Traffic Impact Letter has been submitted and we are in converations with the City and MDT to resolve any traffic concerns. The Landscape plans have been updated to meet the new Landscape and Irrigation performance standards. Irrigation plans are conceptual and will be developed further with the next site plan submission Acknowledged This project will not be using a well for water source, water source will be municipal This project will not be using a well for water source, water source will be municipal Understood This has been updated. This has been updated. This has been updated. STATUS Info Only Info Only Info Only Info Only Info Only Info Only Info Only Info Only Info Only Info Only Info Only Info Only Info Only Info Only Info Only Info Only Info Only Info Only Info Only Info Only Info Only Info Only Info Only Info Only Info Only Info Only Info Only Info Only Info Only Info Only Info Only Info Only Info Only Info Only Info Only Info Only Info Only Info Only Info Only Info Only Info Only Info Only