Loading...
HomeMy WebLinkAbout019 A2.5 Exterior Color BoardEXTERIOR COLOR BOARDA2.5PLOT DATE: 8/4/2025 Q:\ACADFile\Velocity Carwash Bozeman\WORKING\VC-BOZEMAN_A02-01-ELEV.dwgTHESE DRAWINGS OR ANY PARTS THEREOF, AS INSTRUMENTS OF SERVICE, REMAIN THE PROPERTY OF THE ARCHITECTS AND MAY NOT BE REPRODUCED OR USED ON OTHER WORK WITHOUT THEIR WRITTEN CONSENT REVISIONS920 E 800 N, SUITE 201, OREM UT 84097 801-377-6303 WWW.HARRIS-ARCHITECTURE.COM DRAWN BYBOZEMANVELOCITY CARWASH A NEW FACILITY FOR MRAMAY 202408/04/25