HomeMy WebLinkAbout001.1 Plan Review - Review Comments CONR ResponsesPlan Review - Review Comments Report
Project Name: 24344 Velocity Carwash CONR
Workflow Started: 7/8/2024 9:34:02 AM
Report Generated: 04/16/2025 03:27 PM
REF #CYCLE REVIEWED BY TYPE FILENAME DISCUSSION STATUS
1 1 Northwestern
Energy
Matt Tilstra
3/18/25 10:30 AM
Changemark
NWE - Removal
Please submit construction application on NWE website to facilitate removal
of elec/gas services.
005 C110 Demolition Plan.pdf Info Only
2 1 Solid Waste
Russell Ward
3/19/25 11:45 AM
Changemark
SLD Waste
1. need to make sure there is enough room for garbage truck to turn around
we can not back out into the driving lanes. there can be no parking in the
area that trucks turn around in. 2. need detailed plan for refuse enclosure.
007 C300 Site Plan.pdf Info Only
3 1 Engineering
Simon Lindley
3/19/25 2:09 PM
Comment
The applicant must construct a sidewalk along the east side of the property.
The sidewalk will connect the existing sidewalk adjacent to Tire Rama to the
existing sidewalk along Huffine. Please see plannings comments on internal
roadway design.
Info Only
4 1 Engineering
Simon Lindley
3/19/25 2:09 PM
Comment
Please provide a queuing analysis diagram sheet to show how the queuing
calculations in the traffic study corresponds with the site plan layout. All
queuing must fit within the site and queuing calculations must be rounded
up to be conservative.
Info Only
5 1 Engineering
Simon Lindley
3/19/25 2:09 PM
Comment
Huffine Lane is controlled by MDT. The applicant must contact MDT to
determine if the proposed work will require permitting or Systems Impact
Analysis. The MDT review process may impact the proposed development
layout. In the event MDT requires changes, a modification or resubmittal will
be required. All work within the MDT right-of-way must meet MDT standards
and specifications and be approved by MDT prior to construction. It is
unclear if the applicant has discussed the proposed project and trip
generation with MDT. Please upload MDT correspondence with the next
submittal. Please provide a status update and timeline on any applicable
MDT review processes.
Info Only
REVIEW COMMENTS
Plan Review - Review Comments Report
Project Name: 24344 Velocity Carwash CONR
Workflow Started: 7/8/2024 9:34:02 AM
Report Generated: 04/16/2025 03:27 PM
REF #CYCLE REVIEWED BY TYPE FILENAME DISCUSSION STATUS
6 1 Engineering
Simon Lindley
3/19/25 2:09 PM
Comment
The applicant is advised the updated Engineering Design Standards have
formally been adopted and are now in effect. This is a new project and must
utilize the most recent version of the design standards. The stormwater
report in inadequate for review. Please revise the design to be in compliance
with the new standards and follow the stormwater drainage plan
requirements outlined in chapter 6.4. Chapter 6.8.1 - Runoff control facilities
shall be sized with adequate volume to limit post-development runoff rates
for the full range of potential storms (2-year through 100-year) to pre-
development levels. Full retention of post-development runoff from the
Major Storm (100-year, 24-hour) shall be required where no viable receiving
conveyance channel or drainage system is available.
Info Only
7 1 Engineering
Simon Lindley
3/19/25 3:49 PM
Library Comment
BMC 38.410.130. Water Adequacy: The development will need to satisfy the
water adequacy code requirement prior to a future site plan approval. If
sufficient water rights cant be provided to offsets the development's annual
demand then a cash-in-lieu of water rights (CILWR) payment will be
required. The City assesses the CILWR fee at a rate of $6,000 per acre-foot.
The fee determination will take place during the site plan review, however if
there are any questions or if a preliminary review is desired please contact
Griffin Nielsen with the Engineering/Utilities Department directly at
gnielsen@bozeman.net or (406) 582-2279. The City encourages the use of
groundwater wells to supply irrigation demands, which in turn will reduce
the CILWR fee. Applicant must obtain a pre-determination from the DNRC
demonstrating that a well groundwater well may be permitted under
Montanas exempt appropriation or that provide the water right
documentation if existing prior to finalization of the CILWR fee
determination. Finally, the City would like to make the owner aware of an
available CILWR rebate of approximately 20% for residential units if high-
efficiency fixtures (toilets, washers, and shower heads) meeting the City
Water Conservation Division standards are installed. The rebate would be
released at occupancy and requires an agreement defining the terms and
amount rebate be finalized and executed prior to final plan approval. If the
owner is interested or has any questions please reach out to Griffin Nielsen.
Info Only
8 1 Engineering
Simon Lindley
3/19/25 3:50 PM
Library Comment
BMC 38.220.080 A. 2.g. - The applicant must submit a peak hour trip
generation value to the City to determine whether a traffic impact study is
required, or whether the transportation team has an specific concerns with
any intersections nearby the development. The applicant is advised to submit
the trip numbers via email to the review engineer prior to submitting the site
plan so the transportation team can advise the applicant how to proceed.
Info Only
Plan Review - Review Comments Report
Project Name: 24344 Velocity Carwash CONR
Workflow Started: 7/8/2024 9:34:02 AM
Report Generated: 04/16/2025 03:27 PM
REF #CYCLE REVIEWED BY TYPE FILENAME DISCUSSION STATUS
9 1 Addressing
Jenny Connelley
3/26/25 4:23 PM
Comment
An address of 3100 W Main is assigned to the existing building and can be
re-used for this proposed building. Any additional buildings would need to
be addressed separately.
Info Only
10 1 Engineering
Simon Lindley
4/2/25 10:55 AM
Comment
City of Bozeman Design and Construction Standards 1.5 - Easements - The
proposed private stormwater chamber may not be located within the public
water easement. Please move the stormwater chamber outside the
easement.
Info Only
11 1 Engineering
Simon Lindley
4/2/25 11:04 AM
Comment
BMC 38.410.060 - Based on the proposed layout, the applicant must provide
a permanent mutual access easement between the car wash developer and
owner of the mall to allow access through the mall property to Huffine. A
copy of the recorded easement must be provided prior to final site plan
approval.
Info Only
12 1 Engineering
Simon Lindley
4/2/25 11:25 AM
Comment
BMC 38.410.060 - Based on the proposed layout, the applicant must provide
a permanent private utility service easement between the carwash developer
and the owner of the mall to allow the sewer service to run through the mall
property to the public water easement. A copy of the recorded easement
must be provided prior to final site plan approval. The applicant must also
obtain permission from the owner of the mall to make any improvements on
the mall property.
Info Only
13 1 Engineering
Simon Lindley
4/2/25 12:13 PM
Changemark
ENG Grading
BMC 38.550.050.M - The maximum slope for landscaped areas on the site is
25 percent. The applicant must demonstrate that the slope from the building
and parking area to the property boundary meets this requirement.
008 C400 Grading Plan.pdf Info Only
14 1 Water and Sewer
Division
Nick Pericich
4/2/25 2:14 PM
Changemark
W/S Storm Structure
The storm structure is currently shown in the easement to maintain the water
main. You will need to move it from this easement.
009 C500 Utility Plan.pdf Info Only
15 1 Engineering
Simon Lindley
4/2/25 4:02 PM
Comment
City of Bozeman Design and Construction Standards Chapter 6 Attachment
D - Prior to final site plan approval, please provide a copy of the
acknowledgement of stormwater facilities maintenance requirements signed
by the owner.
Info Only
16 1 Engineering
Simon Lindley
4/2/25 4:54 PM
Comment
City of Bozeman Design and Construction Standards Chapter 3.2 Design
Reports - Please follow the water, sewer and stormwater design report
requirements listed in this section of the updated design standards.
Info Only
Plan Review - Review Comments Report
Project Name: 24344 Velocity Carwash CONR
Workflow Started: 7/8/2024 9:34:02 AM
Report Generated: 04/16/2025 03:27 PM
REF #CYCLE REVIEWED BY TYPE FILENAME DISCUSSION STATUS
17 1 Transportation
Candace Mastel
4/4/25 9:03 AM
Comment
BMC 38.540.050.A: Provide bicycle parking as required for the project.
Info Only
18 1 Water Conservation
Division
Matthew Lee
4/8/25 10:19 AM
Comment
Temporary Irrigation must achieve head to head coverage. NE corner of seed
area could improve the irrigation design to achieve head to head coverage.
Info Only
19 1 Fire Department
Scott Mueller
4/9/25 9:55 AM
Comment
Fire supports site plan as proposed with conditional allowance of emergency
vehicle access over 150 feet in depth without a turnaround due to site being
surrounded by other accesses allowing for fire operations.
Info Only
20 1 Planning
Zachary Moon
4/11/25 1:24 PM
Comment
Bozeman Municipal Code Section 38.520.040.B. requires that all buildings
must connect to the public sidewalk. Please provide a connection from the
office portion of the building through the site to the public sidewalk along
Huffine (Highway 191).
Info Only
21 1 Planning
Zachary Moon
4/11/25 1:28 PM
Comment
BMC Sec. 38.520.040.C. requires that there must be internal circulation
between existing and proposed buildings. Please propose pedestrian
connections to existing sidewalk infrastructure to the adjacent existing
sidewalk system in the vicinity.
Info Only
22 1 Planning
Zachary Moon
4/11/25 3:17 PM
Changemark
PLNG-Parking Spaces
BMC only allows parking up to 125% of the allowed standard. The vacuum
spaces, as they are appurtenant to the use and not official parking spaces,
must be clearly designated as such.
007 C300 Site Plan.pdf Info Only
23 1 Planning
Zachary Moon
4/11/25 3:17 PM
Changemark
PLNG- Pathway Landscaping
BMC Section 38.520.040. requires that "Pathways must be separated from
structures by at least three feet of landscaping...". Please provide landscaping
of the appropriate width between this sidewalk and the building.
022 L101 Overall Landscape Plan.pdf Info Only
24 1 Planning
Zachary Moon
4/11/25 3:17 PM
Changemark
PLNG- Parking lot trees
BMC Sec. 38.550.050.B.2.c. requires that no parking space can be more than
70 feet from the trunk of a tree. Please ensure that there are adequate trees
on site to meet this standard.
022 L101 Overall Landscape Plan.pdf Info Only
25 1 Planning
Zachary Moon
4/11/25 3:17 PM
Changemark
PLNG- Elevations
In official submittal, please use cardinal directions for elevations and not
front/rear/side as these are more subjective and can be difficult for staff to
determine the intended direction.
015 A2.1 Exterior Elevations.pdf Info Only
Plan Review - Review Comments Report
Project Name: 24344 Velocity Carwash CONR
Workflow Started: 7/8/2024 9:34:02 AM
Report Generated: 04/16/2025 03:27 PM
REF #CYCLE REVIEWED BY TYPE FILENAME DISCUSSION STATUS
26 1 Planning
Zachary Moon
4/11/25 3:17 PM
Changemark
PLNG- Facade Transparency
BMC Table 38.510.030.C.'Facade Transparency' for the Designated Block
Frontage- Landscaped- the site must meet facade transparency standards.
Please show facade transparency calculations on elevation sheets. The
elevations need to show the appropriate portion of the building where the
transparency was measured. "For buildings designed with ground level non-
residential uses, at least 25% of the ground floor between 4'-8' above the
sidewalk. "
015 A2.1 Exterior Elevations.pdf Info Only
27 1 Planning
Zachary Moon
4/11/25 3:17 PM
Changemark
PLNG- Weather Protection
BMC Table 38.510.030.C.'Weather Protection' In any official submittal, please
show that the weather protection provided meets the minimum depth
required of 3 feet.
015 A2.1 Exterior Elevations.pdf Info Only
28 1 Planning
Zachary Moon
4/11/25 3:17 PM
Changemark
PLNG- Blank Walls
BMC Sec. 38.530.070. defines a blank wall as "A wall (including building
façades and retaining walls) is considered a blank wall if it is over ten feet in
height, has a horizontal length greater than 15 feet, and does not include a
transparent window or door". Please provide blank wall treatments for this
section of the structure per the allowances in subsection C.
015 A2.1 Exterior Elevations.pdf Info Only
29 1 Planning
Zachary Moon
4/11/25 3:19 PM
Comment
BMC Section 38.520.060. requires that sites one acre in size or greater must
provide open space. Open space must be provided at an area of at least 2%
of the site area under development. Please see this section for how site area
is calculated, and propose open space in compliance with the standards
listed there under.
Info Only
30 1 Parks Department
Ross Knapper
4/16/25 8:36 AM
Comment
Commercial project no park and recreation requirements.
Info Only