HomeMy WebLinkAbout001.1 Plan Review - Review Comments CONR Responses Plan Review - Review Comments Report
Project Name: 24344 Velocity Carwash CONR
Workflow Started: 7/8/2024 9:34:02 AM
Report Generated: 04/16/2025 03:27 PM
REVIEW COMMENTS
REF# CYCLE REVIEWED BY TYPE FILENAME DISCUSSION STATUS
1 1 Northwestern Changemark 005 C110 Demolition Plan.pdf Info Only
Energy NWE- Removal
Matt Tilstra Please submit construction application on NWE website to facilitate removal
3/18/25 10:30 AM of elec/gas services.
2 1 Solid Waste Changemark 007 C300 Site Plan.pdf Info Only
Russell Ward SLD Waste
3/19/25 11:45 AM 1. need to make sure there is enough room for garbage truck to turn around
we can not back out into the driving lanes.there can be no parking in the
area that trucks turn around in. 2. need detailed plan for refuse enclosure.
3 1 Engineering Comment Info Only
Simon Lindley The applicant must construct a sidewalk along the east side of the property.
3/19/25 2:09 PM The sidewalk will connect the existing sidewalk adjacent to Tire Rama to the
existing sidewalk along Huffine. Please see plannings comments on internal
roadway design.
4 1 Engineering Comment Info Only
Simon Lindley Please provide a queuing analysis diagram sheet to show how the queuing
3/19/25 2:09 PM calculations in the traffic study corresponds with the site plan layout.All
queuing must fit within the site and queuing calculations must be rounded
up to be conservative.
5 1 Engineering Comment Info Only
Simon Lindley Huffine Lane is controlled by MDT.The applicant must contact MDT to
3/19/25 2:09 PM determine if the proposed work will require permitting or Systems Impact
Analysis.The MDT review process may impact the proposed development
layout. In the event MDT requires changes, a modification or resubmittal will
be required.All work within the MDT right-of-way must meet MDT standards
and specifications and be approved by MDT prior to construction. It is
unclear if the applicant has discussed the proposed project and trip
generation with MDT. Please upload MDT correspondence with the next
submittal. Please provide a status update and timeline on any applicable
MDT review processes.
0
Plan Review - Review Comments Report
Project Name: 24344 Velocity Carwash CONR
Workflow Started: 7/8/2024 9:34:02 AM
Report Generated: 04/16/2025 03:27 PM
REF# CYCLE REVIEWED BY TYPE FILENAME DISCUSSION STATUS
6 1 Engineering Comment Info Only
Simon Lindley The applicant is advised the updated Engineering Design Standards have
3/19/25 2:09 PM formally been adopted and are now in effect.This is a new project and must
utilize the most recent version of the design standards.The stormwater
report in inadequate for review. Please revise the design to be in compliance
with the new standards and follow the stormwater drainage plan
requirements outlined in chapter 6.4.Chapter 6.8.1 - Runoff control facilities
shall be sized with adequate volume to limit post-development runoff rates
for the full range of potential storms(2-year through 100-year)to pre-
development levels. Full retention of post-development runoff from the
Major Storm (100-year, 24-hour)shall be required where no viable receiving
conveyance channel or drainage system is available.
7 1 Engineering Library Comment Info Only
Simon Lindley BMC 38.410.130.Water Adequacy:The development will need to satisfy the
3/19/25 3:49 PM water adequacy code requirement prior to a future site plan approval. If
sufficient water rights cant be provided to offsets the development's annual
demand then a cash-in-lieu of water rights(CILWR) payment will be
required.The City assesses the CILWR fee at a rate of$6,000 per acre-foot.
The fee determination will take place during the site plan review, however if
there are any questions or if a preliminary review is desired please contact
Griffin Nielsen with the Engineering/Utilities Department directly at
or(406) 582-2279.The City encourages the use of
groundwater wells to supply irrigation demands,which in turn will reduce
the CILWR fee.Applicant must obtain a pre-determination from the DNRC
demonstrating that a well groundwater well may be permitted under
Montanas exempt appropriation or that provide the water right
documentation if existing prior to finalization of the CILWR fee
determination. Finally,the City would like to make the owner aware of an
available CILWR rebate of approximately 20%for residential units if high-
efficiency fixtures(toilets,washers,and shower heads) meeting the City
Water Conservation Division standards are installed.The rebate would be
released at occupancy and requires an agreement defining the terms and
amount rebate be finalized and executed prior to final plan approval. If the
owner is interested or has any questions please reach out to Griffin Nielsen.
8 1 Engineering Library Comment Info Only
Simon Lindley BMC 38.220.080 A.2.g. -The applicant must submit a peak hour trip
3/19/25 3:50 PM generation value to the City to determine whether a traffic impact study is
required,or whether the transportation team has an specific concerns with
any intersections nearby the development.The applicant is advised to submit
the trip numbers via email to the review engineer prior to submitting the site
plan so the transportation team can advise the applicant how to proceed.
0
Plan Review - Review Comments Report
Project Name: 24344 Velocity Carwash CONR
Workflow Started: 7/8/2024 9:34:02 AM
Report Generated: 04/16/2025 03:27 PM
REF# CYCLE REVIEWED BY TYPE FILENAME DISCUSSION STATUS
9 1 Addressing Comment Info Only
Jenny Connelley An address of 3100 W Main is assigned to the existing building and can be
3/26/25 423 PM re-used for this proposed building.Any additional buildings would need to
be addressed separately.
10 1 Engineering Comment Info Only
Simon Lindley City of Bozeman Design and Construction Standards 1.5 - Easements-The
4/2/25 10:55 AM proposed private stormwater chamber may not be located within the public
water easement. Please move the stormwater chamber outside the
easement.
11 1 Engineering Comment Info Only
Simon Lindley BMC 38.410.060- Based on the proposed layout,the applicant must provide
4/2/25 11:04 AM a permanent mutual access easement between the car wash developer and
owner of the mall to allow access through the mall property to Huffine.A
copy of the recorded easement must be provided prior to final site plan
approval.
12 1 Engineering Comment Info Only
Simon Lindley BMC 38.410.060- Based on the proposed layout,the applicant must provide
4/2/25 1125 AM a permanent private utility service easement between the carwash developer
and the owner of the mall to allow the sewer service to run through the mall
property to the public water easement.A copy of the recorded easement
must be provided prior to final site plan approval.The applicant must also
obtain permission from the owner of the mall to make any improvements on
the mall property.
13 1 Engineering Changemark 008 C400 Grading Plan.pdf Info Only
Simon Lindley ENG Grading
4/2/25 12:13 PM BMC 38.550.050.M -The maximum slope for landscaped areas on the site is
25 percent.The applicant must demonstrate that the slope from the building
and parking area to the property boundary meets this requirement.
14 1 Water and Sewer Changemark 009 C500 Utility Plan.pdf Info Only
Division W/S Storm Structure
Nick Pericich The storm structure is currently shown in the easement to maintain the water
4/2/25 2:14 PM main.You will need to move it from this easement.
15 1 Engineering Comment Info Only
Simon Lindley City of Bozeman Design and Construction Standards Chapter 6 Attachment
4/2/25 4:02 PM D - Prior to final site plan approval, please provide a copy of the
acknowledgement of stormwater facilities maintenance requirements signed
by the owner.
16 1 Engineering Comment Info Only
Simon Lindley City of Bozeman Design and Construction Standards Chapter 3.2 Design
4/2/25 4:54 PM Reports- Please follow the water,sewer and stormwater design report
requirements listed in this section of the updated design standards.
0
Plan Review - Review Comments Report
Project Name: 24344 Velocity Carwash CONR
Workflow Started: 7/8/2024 9:34:02 AM
Report Generated: 04/16/2025 03:27 PM
REF# CYCLE REVIEWED BY TYPE FILENAME DISCUSSION STATUS
17 1 Transportation Comment Info Only
Candace Mastel BMC 38.540.050.A: Provide bicycle parking as required for the project.
4/4/25 9:03 AM
18 1 Water Conservation Comment Info Only
Division Temporary Irrigation must achieve head to head coverage. NE corner of seed
Matthew Lee area could improve the irrigation design to achieve head to head coverage.
4/8/25 10:19 AM
19 1 Fire Department Comment Info Only
Scott Mueller Fire supports site plan as proposed with conditional allowance of emergency
4/9/25 9:55 AM vehicle access over 150 feet in depth without a turnaround due to site being
surrounded by other accesses allowing for fire operations.
20 1 Planning Comment Info Only
Zachary Moon Bozeman Municipal Code Section 38.520.040.B. requires that all buildings
4/11/25 124 PM must connect to the public sidewalk. Please provide a connection from the
office portion of the building through the site to the public sidewalk along
Huffine(Highway 191).
21 1 Planning Comment Info Only
Zachary Moon BMC Sec. 38.520.040.C. requires that there must be internal circulation
4/11/25 128 PM between existing and proposed buildings. Please propose pedestrian
connections to existing sidewalk infrastructure to the adjacent existing
sidewalk system in the vicinity.
22 1 Planning Changemark 007 C300 Site Plan.pdf Info Only
Zachary Moon PLNG-Parking Spaces
4/11/25 3:17 PM BMC only allows parking up to 125%of the allowed standard.The vacuum
spaces,as they are appurtenant to the use and not official parking spaces,
must be clearly designated as such.
23 1 Planning Changemark 022 L101 Overall Landscape Plan.pdf Info Only
Zachary Moon PLNG- Pathway Landscaping
4/11/25 3:17 PM BMC Section 38.520.040. requires that"Pathways must be separated from
structures by at least three feet of landscaping...". Please provide landscaping
of the appropriate width between this sidewalk and the building.
24 1 Planning Changemark 022 L101 Overall Landscape Plan.pdf Info Only
Zachary Moon PLNG- Parking lot trees
4/11/25 3:17 PM BMC Sec. 38.550.050.B.2.c. requires that no parking space can be more than
70 feet from the trunk of a tree. Please ensure that there are adequate trees
on site to meet this standard.
25 1 Planning Changemark 015 A2.1 Exterior Elevations.pdf Info Only
Zachary Moon PLNG- Elevations
4/11/25 3:17 PM In official submittal, please use cardinal directions for elevations and not
front/rear/side as these are more subjective and can be difficult for staff to
determine the intended direction.
0
Plan Review - Review Comments Report
Project Name: 24344 Velocity Carwash CONR
Workflow Started: 7/8/2024 9:34:02 AM
Report Generated: 04/16/2025 03:27 PM
REF# CYCLE REVIEWED BY TYPE FILENAME DISCUSSION STATUS
26 1 Planning Changemark 015 A2.1 Exterior Elevations.pdf Info Only
Zachary Moon PLNG- Facade Transparency
4/11/25 3:17 PM BMC Table 38.510.030.C.'Facade Transparency'for the Designated Block
Frontage- Landscaped-the site must meet facade transparency standards.
Please show facade transparency calculations on elevation sheets.The
elevations need to show the appropriate portion of the building where the
transparency was measured. "For buildings designed with ground level non-
residential uses, at least 25%of the ground floor between 4'-8' above the
sidewalk. "
27 1 Planning Changemark 015 A2.1 Exterior Elevations.pdf Info Only
Zachary Moon PLNG-Weather Protection
4/11/25 3:17 PM BMC Table 38.510.030.C.'Weather Protection' In any official submittal, please
show that the weather protection provided meets the minimum depth
required of 3 feet.
28 1 Planning Changemark 015 A2.1 Exterior Elevations.pdf Info Only
Zachary Moon PLNG- Blank Walls
4/11/25 3:17 PM BMC Sec. 38.530.070.defines a blank wall as "A wall (including building
faA§ades and retaining walls) is considered a blank wall if it is over ten feet in
height, has a horizontal length greater than 15 feet, and does not include a
transparent window or door". Please provide blank wall treatments for this
section of the structure per the allowances in subsection C.
29 1 Planning Comment Info Only
Zachary Moon BMC Section 38.520.060. requires that sites one acre in size or greater must
4/11/25 3:19 PM provide open space.Open space must be provided at an area of at least 2%
of the site area under development. Please see this section for how site area
is calculated,and propose open space in compliance with the standards
listed there under.
30 1 Parks Department Comment Info Only
Ross Knapper Commercial project no park and recreation requirements.
4/16/25 8:36 AM
0