Loading...
HomeMy WebLinkAbout11-03-25 Public Comment - T. Steinway - UDC Requested Edits - Open Space B-3From:Tyler Steinway To:Bozeman Public Comment Cc:Chris Saunders; Rob Pertzborn Subject:[EXTERNAL]UDC Requested Edits - Open Space B-3 Date:Monday, November 3, 2025 12:10:42 PM Attachments:UDC Requested Edits - Open Space B-3 2025.11.3.pdf CAUTION: This email originated from outside of the organization. Do not click links or open attachments unless you recognize the sender and know the content is safe. Good Morning – Please see the attached for review & consideration starting with the Community Development Board. Thank you, Tyler Tyler Steinway, AICP | Senior Planner Intrinsik Architecture, Inc. 106 East Babcock Street Suite 1A Bozeman, Montana 59715 O. 406.582.8988 Direct: 406.426.9568 M. 406.220.8210 3 November 2025 Community Development Board / City Commission via Email: Csaunders@bozeman.net RE: Unified Development Code 9/19 Draft Subject: Request for Amendments: Open Space B-3 We find that the proposed open space requirements for the B-3 Zone are problematic and should be removed. The open space requirements in B-3, while seemingly minimum, are often inordinately expensive to create in the urban core and often result in unnecessary and rarely used spaces. Open space is often met through one of the three ways: - Provided on the site/ground. - Provided in the building in lobby or basement - Provided as balconies. All three of these options are expensive to create, significantly increase project costs and are often insignificant spaces are hardly used. It should be noted that this requirement was eliminated in the B-3C zoning district. Eliminating minimum open space requirements does not mean good overall design will be eliminated on new projects. It will be able to take place when and where it makes sense. Please see the requested edits on the following page. Thank you for your considerations, Intrinsik Architecture Robert J. Pertzborn, AIA Tyler Steinway, AICP