Loading...
HomeMy WebLinkAboutMT06004C Project NarrativePLNAPP-14912: T-Mobile Wireless Collocation Project Narrative: 219 E Tamarack Street, Bozeman, MT 59715 (MT06004C) T-Mobile proposes a new wireless collocation project at an existing Gallatin County-owned wireless facility, consisting of 6 new antennas and ancillary equipment on the tower along with a 10'x18' equipment pad with ancillary equipment on the ground within the existing fenced compound. There is no proposed change to the size, height, footprint or use of the facility as part of this project’s scope of work. T-Mobile is in the process of obtaining environmental review on this project and does not expect any issues with the forthcoming reports. T-Mobile is licensed with the FCC for all frequencies it intends to deploy on this new collocated facility. The existing tower has been analyzed structurally by a licensed engineer and has been found to be structurally capable to support the proposed loading of this collocation. The purpose of this proposed collocation is to improve coverage, capacity and E911 services in this area of Bozeman. The existing facility has many public safety antennas on it, a number of which will be removed as part of this project, to make room for the proposed collocation equipment. The resulting antenna array on the tower will contain fewer overall pieces of equipment than are currently present. The proposed project complies with all applicable zoning regulations found in Section 18.54.040.