HomeMy WebLinkAbout003 Original Permit Drawings 02-18-2017City of Bozeman Building DivisionApproved for Construction
BP17-00024897 02/28/17
Plans reviewed & approved by the City of Bozeman
Building Division.
The City of Bozeman by this approval does not accept
any responsibility for omissions in plan checking, nor
does this approval relieve the builder from
compliance with Codes and ordinances. IBC/IRC
105.4.
Date Stamped: 2/28/2017
BY: Michael Popiel
Sidewalk / drive approach permit required from
Engineering Department
Date Stamped: 2/28/2017
BY: Andy Kerr
3390 S 23rd Ave
Building Permit Informaton
Notce: Private covenants or restrictons that contain design and constructon
standards or other legal requirements may apply to your property. These private
standards are legally distnct from the City of Bozeman’s approval of a building permit;
as such, the City of Bozeman does not review your applicaton against applicable
covenants or private restrictons imposed by any entty such as a property owners
associaton. The City advises all property owners obtaining a building permit to review
all applicable covenants prior to constructon. The City’s approval of a building permit
is not the same as authorizaton of your constructon pursuant to private restrictons!
Constructon for Your Building Permit Shall Conform to the Following Regulatons:
1. Current applicable codes:
2012 Internatonal Building Code
2012 Internatonal Residental Code
2012 Internatonal Existng Building Code
2012 Internatonal Mechanical Code
2012 Internatonal Energy Conservaton Code
2012 Internatonal Fire code
2012 Internatonal Fuel Gas Code
2012 Uniform Plumbing Code
2014 Natonal Electric Code
2009 ICC A117.1 Accessible and Usable Buildings and Facilites
2. Owners and contractors are responsible for knowing the exact locaton of all
property lines and locatng them prior to the foundaton inspecton. Locaton of
boundaries shall be clearly shown on the approved plans. If the site informaton is
suspect, the building inspector may require a survey of the property.
3. Approved plans and the Inspecton Record Card are legal parts of the Building
Permit. They shall both be available on site during each requested inspecton. If
these documents are leſt on site, care shall be taken to keep them in good conditon.
4. If there are any changes to the constructon beyond what the approved plans
indicate, they must be reviewed and approved prior to the changes being made on
site. Submit the proposed changes along with the current approved plans to the
building department for re-approval.
5. The inspecton record card identfies those items requiring inspecton. It is the
responsibility of the owner or the contractor to call for the appropriate inspectons.
No work requiring inspecton shall be covered untl inspected and approved.
6. The Building Permit requires that the work must progress in a tmely manner to
completon or the permit will expire and a new permit will be required. Work must
commence within 180 days of the permit issuance. Work under a permit shall be
considered suspended or abandoned and the permit subject to expiraton if the
builder does not call for and pass one of the following five code required inspectons
within 180 days.
Foundaton
Under floor Frame
Roof Nail/Truss
Frame (frame inspecton includes rough Plumbing, Mechanical, and Electrical)
Sheetrock
Final
Please note that at the final inspecton final approvals from other departments (Fire,
Planning, Engineering, Water/Sewer) may be required.
7. During inspectons, correcton notces may be issued which identfy work that does
not meet the minimum code requirements. No work shall contnue untl the
correctons have been completed. Only with special authorizaton from the inspector
shall any additonal work contnue. Re-inspectons shall be called in order to verify
completed work and to clear the correcton notces.
8. Questons involving any code or inspecton maters shall be addressed to the
Building Division for explanaton and resoluton. If satsfactory resoluton is not
received the permit holder has the right to request that the Chief Building Official
make a determinaton. If the Chief Building Official is unable to resolve the mater,
the permit holder has the right to appeal the decision to the Building Appeals Board.
9. The Internatonal Building Codes allow for alternatve materials and methods of
constructon. Requests for the use of alternatve materials and methods of
constructon shall be made in writng to the Building Division. It is the responsibility
of the applicant to provide full documentaton in support of the request. Appeals
regarding decisions of the Building Division concerning the alternatve materials and
methods of constructon can be made to the Chief Building Official.
10.There are numerous underground utlites within the city limits. Owners and
Contractors are responsible for knowing the locatons of all utlites that may run
through the constructon site. If there are queston concerning underground utlites
please contact;
The underground Utlites Center phone number is 811.
Scheduling Inspectons
Inspectons on constructon projects may be scheduled by phoning 406-582-2375. This
is a 24-hour phone line.
Please give your informaton in the following order:
1. Building, Electrical, Plumbing, Mechanical, Permit number(s)
2. Project address
3. Type of inspecton (What will the Building Inspector be inspectng?)
Example: frame; roof nailing; plumbing, etc.
4. Day and date of Inspecton- (OPTIONAL)
Example: Thursday, June 14, 2014
Note: Inspectons are automatcally scheduled for the next Building Division business
day if no specific date is requested and the call is received before 4:30 p.m. the day
before.
5. Requested tme of inspecton: AM or PM opton is available.
AM is between 9:00 a.m. and 12:00 p.m.
PM is between 1:00 p.m. and 3:00 p.m.
Note: The AM or PM opton is available most of the tme. Every effort will be made to
keep your requested appointment, but due to the variability of the inspecton process
appointments may be delayed to later in the day.
Special Time Requests
On the day of the inspecton, between 7:30-8:00a.m., you may phone the Building
inspector (582-2375) to ask for a more specific tme for your inspecton. Specific tme
requests can/may be taken when it works with the inspector’s schedule but they will be
limited to a two-hour window.
Closed for the Holidays:
Please note that the City of Bozeman is closed on the following holidays. Staff will not
be available to answer questons and inspectons will not be done on these days.
New Year's Day - January 1st
Martn Luther King, Jr. Day - 3rd Monday in January
President's Day - 3rd Monday in February
Memorial Day - Last Monday in May
Independence Day - July 4th
Labor Day – First Monday in September
Veteran's Day – November 11th
Thanksgiving Day – Fourth Thursday in November
Day aſter Thanksgiving – Fourth Friday in November Friday
Christmas Day – December 25th
Note: Permit fees include a maximum of three inspectons for each individual
inspecton item. Additonal inspectons for each item may be requested at our hourly
rate of $75.00 per hour.
Site Inspecton
Property Lines/Setbacks
Rough Sewer
Rough Water
Electrical Conduit
Meter Box
Temporary Power
Foundaton
Footngs
Ufer Ground/Ground rod
Underslab Plumbing (test)
Underslab Water (test)
Holdowns/Anchors
Vapor Barrier
Structural Slab
Bond Beam
UnderFloor (Raised Floor Const)
Underfloor Plumbing (test)
Underfloor Gas (test)
Underfloor Water (test)
Underfloor Ducts
Underfloor Frame
Underfloor Insulaton
Frame and Rough
Roof Nail/Truss Calcs (w/beams, hardware)
Holdowns
Exterior Shear/Braced Walls
Interior Shear/Braced Walls
Elect Service Panel
Sub Panels
Bonding
Rough Electric
Rough Plumbing (test)
Rough Gas (test)
Rough Water (test)
Ducts and Vents
Flues and Chimneys
Frame and Plans
Exterior Siding
Water Resistve Barrier
Insulaton
Wall
Ceiling
Windows
Blown-in Certficate
Sheetrock
Nailing/screws
Braced Walls
Interior Firewalls
Exterior Firewalls
T-Bar
Strut
Wall Support
Light Support
Fire Separaton
STANDARD INSPECTION ITEMS
Final Inspectons
Sidewalks
Finish Grading
Finish Roof
Finish Plumbing
Finish Electrical
Smoke Detector Test
Fireplace
Furnace
AC Condenser
Ductwork
Commercial Kitchen Hood
Kitchen Make Up Air
Water Heater
T-Bar Ceiling Final
Planning Clearance
Engineering Clearance
Fire Clearance
Building Accessibility
Site Accessibility
Final/C of O
MISCELLANEOUS INSPECTIONS
Photo Voltaic/Solar
Site Inspecton (remote arrays)
Setback/Property Lines
Foundaton
Frame and Plans
Plans and Specs
Array Atachment
Rough Electric
Plumbing w/ Test
Grounding
Bonding
Batery Enclosures
Final
Placarding
Finish Electrical
Finish Plumbing
Solar Final
Electrical Service
Service ______ Amp
Sub Panel
Grounding
Bonding
Electrical Final
Misc. Mechanical/HVAC
Gas (Test)
Plumbing (Test)
Electrical
Bonding
Furnace
AC Condenser
Duct Work
Water Heater/Boiler
Radiant Heat/Snow Melt
Combuston Air/Makeup Air
Commercial Kitchen Hood
Exhaust
Mechanical Final
Misc. Electrical
Service ______ Amp
Sub Panel
Rough Electrical
Grounding
Bonding
Electrical Final
T-Bar
Strut
Wall Support
Light Support
Fire Separaton
Re-Roof
Pre-Roof
Sheathing/Roof Nail
Roofing Dry In
Roof Final
Masonry Wall
Foundaton
Bond Beam 1
Bond Beam 2
Bond Beam 3
Bond Beam 4
Wall Final
Swimming Pool Inspectons
Pre-Gunite
Setback/Property lines
Soil/Compacton
Steel
Bonding
Electrical Conduit
Plumbing & Test
Gas & Test
Solar Piping
Pre-Deck
Electrical Conduit Extension
Slab Grade & Reinforcement
Bonding of Diving Board, Handrails, etc.
Expansion Joint Material at Coping
Pre-Plaster
Barrier/Enclosures Installed
Door Alarms
Final
GFI Test, Lights & Equipment Wiring
Barriers and Alarms
Pool /Spa Covers
Pool Final
City of Bozeman Building DivisionApproved for Construction
BP17-00024897 02/28/17
City of Bozeman Building DivisionApproved for Construction
BP17-00024897 02/28/17
City of Bozeman Building DivisionApproved for Construction
BP17-00024897 02/28/17
City of Bozeman Building DivisionApproved for Construction
BP17-00024897 02/28/17
City of Bozeman Building DivisionApproved for Construction
BP17-00024897 02/28/17
IRC 312.2: Provide fall protection at window sills <24” AFF & >72” above grade (ground level). Window shall display stamp confirming ASTM 2090 compliance at final completion (C of O).
IRC 312.2: Provide fall protection at window sills <24” AFF & >72” above grade (ground level). Window shall display stamp confirming ASTM 2090 compliance at final completion (C of O).
City of Bozeman Building DivisionApproved for Construction
BP17-00024897 02/28/17
City of Bozeman Building DivisionApproved for Construction
BP17-00024897 02/28/17
City of Bozeman Building DivisionApproved for Construction
BP17-00024897 02/28/17
City of Bozeman Building DivisionApproved for Construction
BP17-00024897 02/28/17
City of Bozeman Building DivisionApproved for Construction
BP17-00024897 02/28/17
City of Bozeman Building DivisionApproved for Construction
BP17-00024897 02/28/17
City of Bozeman Building DivisionApproved for Construction
BP17-00024897 02/28/17
City of Bozeman Building DivisionApproved for Construction
BP17-00024897 02/28/17
City of Bozeman Building DivisionApproved for Construction
BP17-00024897 02/28/17
City of Bozeman Building DivisionApproved for Construction
BP17-00024897 02/28/17
City of Bozeman Building DivisionApproved for Construction
BP17-00024897 02/28/17
City of Bozeman Building DivisionApproved for Construction
BP17-00024897 02/28/17
City of Bozeman Building DivisionApproved for Construction
BP17-00024897 02/28/17
Type 4 Shear wall
City of Bozeman Building DivisionApproved for Construction
BP17-00024897 02/28/17