THE TRANSPORTATION BOARD OF BOZEMAN, MONTANA
TB AGENDA
Wednesday, October 22, 2025
General information about the Transportation Board can be found in our Laserfiche repository.
If you are interested in commenting in writing on items on the agenda please send an email to
comments@bozeman.net or by visiting the Public Comment Page prior to 12:00pm on the day of the
meeting. At the direction of the City Commission, anonymous public comments are not distributed to
the Board or staff.
Public comments will also be accepted in-person and through Video Conference during the appropriate
agenda items.
As always, the meeting will be streamed through the Commission's video page and available in the
City on cable channel 190.
For more information please contact Nick Ross, nross@bozeman.net
This meeting will be held both in-person and also using an online videoconferencing system. You
can join this meeting:
Via Video Conference:
Click the Register link, enter the required information, and click submit.
Click Join Now to enter the meeting.
Via Phone: This is for listening only if you cannot watch the stream, channel 190, or attend in-
person
United States Toll
+1 346 248 7799
Access code: 982 5865 6090
1
H. Special Presentations
H.1 Unified Development Code and Community Plan Transportation Review (Ross)
H.2 Citywide Traffic Calming Program Introduction (Ross)
I. Action Items
I.1 Recommendation to Adopt the FY27-31 Transportation Capital Improvement Plan (Ross)
I.2 Nomination of Transportation Advisory Board Member to MPO Long Range Transportation
Plan Community Advisory Panel(Ross)
J. FYI/Discussion
K. Adjournment
This is the time to comment on any non-agenda matter falling within the scope of the
Transportation Board. There will also be time in conjunction with each agenda item for public
comment relating to that item but you may only speak once per topic. Please note, the Board
cannot take action on any item which does not appear on the agenda. All persons addressing the
Board shall speak in a civil and courteous manner and members of the audience shall be respectful
of others. Please state your name, and state whether you are a resident of the city or a property
owner within the city in an audible tone of voice for the record and limit your comments to three
minutes.
General public comments to the Board can be found on their Laserfiche repository page.
This board generally meets the fourth Wednesday of the month from 6:00 pm to 8:00 pm.
Citizen Advisory Board meetings are open to all members of the public. If you have a disability that
requires assistance, please contact our ADA Coordinator, David Arnado, at 406.582.3232.
2
Memorandum
REPORT TO:Transportation Board
FROM:Nicholas Ross, Director of Transportation and Engineering
SUBJECT:Staff Update
MEETING DATE:October 22, 2025
AGENDA ITEM TYPE:Citizen Advisory Board/Commission
RECOMMENDATION:Receive staff update.
STRATEGIC PLAN:1.1 Outreach: Continue to strengthen and innovate in how we deliver
information to the community and our partners.
BACKGROUND:The Director of Transportation and Engineering, Nicholas Ross Provides the
Board with Staff Updates on Transportation related items.
UNRESOLVED ISSUES:None
ALTERNATIVES:None
FISCAL EFFECTS:None
Report compiled on: September 26, 2025
3
Memorandum
REPORT TO:Transportation Board
FROM:Nicholas Ross, Director of Transportation and Engineering
SUBJECT:Approval of Transportation Board Meeting Minutes
MEETING DATE:October 22, 2025
AGENDA ITEM TYPE:Citizen Advisory Board/Commission
RECOMMENDATION:I move to approve the Transportation Board Meeting Minutes.
STRATEGIC PLAN:1.1 Outreach: Continue to strengthen and innovate in how we deliver
information to the community and our partners.
BACKGROUND:Transportation Board Meeting Minutes have been completed for the
following dates:
March 26, 2025
April 23, 2025
June 25, 2025
July 23, 2025
August 27, 2025
September 24, 2025
UNRESOLVED ISSUES:None
ALTERNATIVES:As recommended by the board.
FISCAL EFFECTS:None
Attachments:
032625 Transportation Board Meeting Minutes
042325 Transportation Board Meeting Minutes
06525 Transportation Board Meeting Minutes
072325 Transportation Board Meeting Minutes
082725 Transportation Board Meeting Minutes
092425 Transportation Board Meeting Minutes
Report compiled on: September 26, 2025
4
Bozeman Transportation Board Meeting Minutes, March 26, 2025
Page 1 of 3
THE TRANSPORTATION BOARD MEETING OF BOZEMAN, MONTANA
MINUTES
March 26, 2025
A) 00:05:17 Call to Order - 6:00 PM
Present: Bryce Gordon, Shannon Mahoney, Kelly Pohl, Rio Roland, Hayden Glines, Mike Veselik
Absent: None
Excused: Paul Reichert
B) 00:05:27 Disclosures
C) 00:05:35 Changes to the Agenda
00:05:53 Motion to approve The absence of board member Paul Reichert from tonight's meeting.
Mike Veselik: Motion
Bryce Gordon: 2nd
00:05:52 Vote on the Motion to approve The absence of board member Paul Reichert from tonight's
meeting. The Motion carried 6 - 0.
Approve:
Bryce Gordon
Shannon Mahoney
Kelly Pohl
Rio Roland
Hayden Glines
Mike Veselik
Disapprove:
None
5
Bozeman Transportation Board Meeting Minutes, March 26, 2025
Page 2 of 3
D) 00:05:58 Public Service Announcements
D.1 Staff Updates on Transportation Related Items
Director of Transportation and Engineering, Nicholas Ross presented staff updates to the board on all
transportation related items.
E) 00:15:28 Approval of Minutes
E.1 Approval of the January 22, 2025 Transportation Board Meeting Minutes
012225 Transportation Board Meeting Minutes
00:15:37 Motion to approve
Shannon Mahoney: Motion
Mike Veselik: 2nd
00:15:51 Vote on the Motion to approve The Motion carried 6 - 0.
Approve:
Bryce Gordon
Shannon Mahoney
Kelly Pohl
Rio Roland
Hayden Glines
Mike Veselik
Disapprove:
None
F) Public Comments on Non-agenda Items Falling within the Purview and Jurisdiction of the
Board
Public comment was missed and recognized later in the meeting.
G) 00:17:30 FYI/Discussion
G.1 Unified Development Code (UDC) Update Supplemental Engagement Phase 1 Report
and Work Session
UDC_Open_House_Report.pdf
UDC_Survey_Results.pdf
Community Development Manager, Chris Saunders presented the Unified Development Code (UDC)
Update Supplemental Engagement Phase 1 Report and Work Session to the board.
00:34:05 Director of Transportation and Engineering, Nicholas Ross continued the presentation of
the UDC Work Session.
00:40:50 Questions from the Board
6
Bozeman Transportation Board Meeting Minutes, March 26, 2025
Page 3 of 3
00:59:20 Continued Questions from the Board.
01:38:23 Public Comment
01:38:39 Justin Bursik, Public Comment
Justin Bursik commented on mode share and transportation measures.
01:43:37 Marilee Brown, Public Comment
Marilee Brown commented on parking and a way to get more accurate data.
G.2 01:47:02 Transportation Alternatives Project Update
Transportation Engineer, Taylor Lonsdale presented the Transportation Alternatives Project Update.
01:57:03 Questions from Board
02:01:28 Public Comment
There was no Public Comment
H) 02:04:28 Adjournment
This board generally meets the fourth Wednesday of the month from 6:00 pm to 8:00 pm.
7
Bozeman Transportation Board Meeting Minutes, April 23, 2025
Page 1 of 2
THE TRANSPORTATION BOARD MEETING OF BOZEMAN, MONTANA
MINUTES
April 23, 2025
A) 00:11:31 Call to Order - 6:00 PM
Present: Bryce Gordon, Shannon Mahoney, Rio Roland, Kelly Pohl, Paul Reichert
Absent: Hayden Glines, Mike Veselik
Excused: None
Staff present at the Dias: Director of Transportation and Engineering, Nicholas Ross, Public Works Office
Manager, Marcy Yeykal and Engineering Admin, Maliah Beauchaine.
B) 00:11:31 Disclosures
C) 00:11:37 Changes to the Agenda
Board members Hayden Glines and Michael Veslik and Commission Fischer were excused from tonight's
meeting. Paul Reichert and Bryce Gordon did not attend.
D) Public Service Announcements
D.1 00:12:25 Director's Update
Director of Transportation and Engineering presented the Director update on all transportation related
items.
E) 00:20:54 Public Comments on Non-agenda Items Falling within the Purview and
Jurisdiction of the Board
00:21:35 Public Comment
00:22:08 Justin Bursik, Public Comment
Justin commented on Bozeman traffic and congestion and the level of service.
8
Bozeman Transportation Board Meeting Minutes, April 23, 2025
Page 2 of 2
F) 00:25:27 Special Presentations
F.1 On-Street Parking Management Work Session
00:25:32 Staff Presentation
Director of Transportation and Engineering, Nicholas Ross presented the On-Street Parking
Management Work Session.
01:01:48 Questions of Staff
01:27:03 Public Comment
01:27:21 Justin Bursik, Public Comment
Justin Bursik commented on commending staff on creating new signs for the On-Street Parking
Management. He also commented on enforcement of this program.
G) FYI/Discussion
H) 01:29:53 Adjournment
This board generally meets the fourth Wednesday of the month from 6:00 pm to 8:00 pm.
9
Bozeman Transportation Board Meeting Minutes, June 25, 2025
Page 1 of 4
THE TRANSPORTATION BOARD MEETING OF BOZEMAN, MONTANA
MINUTES
June 25, 2025
A) 00:04:42 Call to Order - 6:00 PM Present: Bryce Gordon, Hayden Glines, Mike Veselik, Kelly Pohl, Paul Reichert
Absent: None
Excused: Shannon Mahoney, Rio Roland
Staff present at the Dias: Director of Transportation and Engineering, Nicholas Ross, Commissioner,
Douglas Fischer and Transportation and Engineering Admin, Maliah Beauchaine.
B) 00:04:50 Disclosures
C) 00:04:56 Changes to the Agenda
00:05:08 Motion to approve I move to approve the absence of Rio Roland and Shannon Mahoney from
tonight's Transportation Board.
Mike Veselik: Motion
Bryce Gordon: 2nd 00:05:20 Vote on the Motion to approve I move to approve the absence of Rio Roland and Shannon
Mahoney from tonight's Transportation Board. The Motion carried 5 - 0.
Approve:
Bryce Gordon
Hayden Glines
Mike Veselik
Kelly Pohl
Paul Reichert
Disapprove:
10
Bozeman Transportation Board Meeting Minutes, June 25, 2025
Page 2 of 4
None
D) 00:05:32 Public Service Announcements
D.1 00:05:39 The Director of Transportation and Engineering Nicholas Ross Provides
the Board with Staff Updates and Transportation Related Items
Questions of Staff 00:16:53
E)00:26:20 Approval of Minutes
There was no approval of minutes. The minutes maker software is down. Once back up and running the
board will approval all of the missed minutes.
F)00:26:32 Consent Items
No consent items.
G)00:26:37 Public Comments on Non-agenda Items Falling within the Purview and
Jurisdiction of the Board
00:27:10 Justin Bersik, Public Comment
Justin Bersik commented on the 7th avenue project design and concern over the Peach St. trees being
demolished over intersection improvements. He also commended the Bike and Pedestrian Gap analysis.
H) 00:33:31 Special Presentations
H.1 00:33:47 Administrative Review Board 101
TAB ARB how to.pptx
Nicholas Focken presented the conditions and appeals process for parking citations.
Questions of Staff 00:38:43
Public Comment 00:55:34
There was no public comment.
I) 00:55:49 Action Items
I.1 00:55:56 A Resolution Recommending Approval of Alternate Side Parking
Regulations for Winter Maintenance
TAB Resolution 2025-01 Adopting Alternate Side Parking Regulations for Winter
Maintenance.docx
Snow_Removal-No_Parking.jpg
Director of Transportation and Engineering, Nicholas Ross presented a Resolution
recommending Approval of Alternate Side Parking Regulations for Winter Maintenance.
Questions of Staff 01:10:37
Public Comment 01:26:23
11
Bozeman Transportation Board Meeting Minutes, June 25, 2025
Page 3 of 4
Justin Bersik, Public Comment 01:26:26
Justin Bersik commented on his concerns over blocked vehicles in snow and recommended the city to
have a program to help those who are not physically able to have their vehicles more accessible.
01:28:25 Motion to approve Consider the Motion: I move to recommend approval to the Bozeman City
Commission of a Resolution adopting alternate side parking regulations for the purpose of winter
maintenance.
Mike Veselik: Motion
Hayden Glines: 2nd
01:36:57 Vote on the Motion to approve Consider the Motion: I move to recommend approval to the
Bozeman City Commission of a Resolution adopting alternate side parking regulations for the purpose of
winter maintenance. The Motion carried 5 - 0.
Approve:
Bryce Gordon
Hayden Glines
Mike Veselik
Kelly Pohl
Paul Reichert
Disapprove:
None
I.2 01:37:21 Authorize the removal of spaces in the Rouse Parking Lot.
Rouse Lot Space Removal.pptx
Questions of Staff 01:41:16
Public Comment 01:50:27
Justin Bersik, Public Comment 01:50:40
Justin Bersik commented on the one-way parking lot by suggesting changes from parallel parking to
angled. As well as mentioning that the less amount of parking spaces, provides more pedestrian and
bike access.
01:52:48 Motion to approve Authorize the removal of spaces in the Rouse Parking Lot.
Hayden Glines: Motion
Bryce Gordon: 2nd
01:58:59 Vote on the Motion to approve Authorize the removal of spaces in the Rouse Parking Lot. The
Motion carried 5 - 0.
Approve:
Bryce Gordon
12
Bozeman Transportation Board Meeting Minutes, June 25, 2025
Page 4 of 4
Hayden Glines
Mike Veselik
Kelly Pohl
Paul Reichert
Disapprove:
None
K)01:59:16 Adjournment
This board generally meets the fourth Wednesday of the month from 6:00 pm to 8:00 pm.
13
Bozeman Transportation Board Meeting Minutes, July 23, 2025
Page 1 of 3
THE TRANSPORTATION BOARD MEETING OF BOZEMAN, MONTANA
MINUTES
July 23, 2025
Present: Bryce Gordon, Hayden Glines, Shannon Mahoney, Rio Roland, Mike Veselik, Kelly Pohl, Paul
Reichert
Absent: None
Excused: None
Staff present at the Dias: Director of Transportation and Engineering, Nicholas Ross, Commissioner
Douglas Fischer, and Transportation and Engineering Admin, Maliah Beauchaine
A) 00:01:29 Call to Order - 6:00 PM
B) 00:01:35 Disclosures
There were no disclosures.
C) 00:01:40 Changes to the Agenda
There were no changes to the agenda.
D) 00:01:48 Public Service Announcements
D.1 Staff Update and Board Discussion
E) 00:16:24 Approval of Minutes
There is no approval of minutes due to system being down. Once the system is operational, there will be
approval of minutes.
F) 00:16:26 Consent Items
There were no consent items.
14
Bozeman Transportation Board Meeting Minutes, July 23, 2025
Page 2 of 3
G)00:18:03 Public Comments on Non-agenda Items Falling within the Purview and
Jurisdiction of the Board
00:17:34 Alison Sweeney, Public Comment
Alison Sweeney commented on behalf of the Jandt neighborhood in concern of the safety of crosswalks
and not allowing the neighborhood streets to connect to Babcock St in the future due to uncontrolled
intersections.
00:20:21 Justin Bursik, Public Comment
Justin Bursik commented on the 19th Ave construction and the frustrations of the residents of the area
and expanding transportation access and communication between departments.
H) 00:22:46 Special Presentations
H.1 Fowler Avenue Connection 60% Design Special Presentation
Director of Transportation and Engineering, Nicholas Ross presented the Fowler Avenue Connection
60% Design to the board.
00:49:56 Questions of Staff
I) 00:50:03
01:23:30
Questions of Staff
Public Comment
01:24:12 Justin Bursik, Public Comment
Justin Bursik commented on the ideas of the Fowler Avenue project and raises the issue with the
comfort with pedestrian and bicyclists through intersection crossings.
01:27:05 Natsuki Nakamura, Public Comment
Natsuki Nakamura commented on her worry for pedestrians on shared used paths and suggesting the
bike lanes to be moved to the street. Also commenting on the concerns of how streets being affected by
the Fowler housing project.
01:29:46 Daniel Carty, Public Comment
Daniel Carty commented on the adverse impacts of the Fowler Place Subdivision and concerns over the
shared used paths regarding e-bikes.
01:32:25 Patty Dickerson, Public Comment
Patty Dickerson commented on the effects of families, health issues, and concerns of wildlife that arise
when street developments are closely impacting neighborhoods.
01:35:47 Alison Sweeney, Public Comment
Alison Sweeney commented on her worry of the shared used paths being in front of the houses in the
Fowler Place Subdivision and her concern over community acknowledgment.
01:39:01 Maggie Harrison, Public Comment
15
Bozeman Transportation Board Meeting Minutes, July 23, 2025
Page 3 of 3
Maggie Harrison commented on the environmental impacts and expresses concern over preservation of
wildlife and native plants. As well as expresses concern over the financial well-being of this project and
communicating with the community in regard to that.
01:42:34 Zehra Osman, Public Comment
Zehra Osman commented on the efforts of staff in being involved with the community but also
expresses concern over wildlife, trees, and over shared used paths.
01:45:40 Heather Higgs, Public Comment
Heather Higgs commented on behalf of Harvest Creek association on the need for parking on Fowler,
concern over the recent 4 way stop sign removal on Hunters Way and Rose St and wanting full
communication and transparency with the community.
J)01:52:28
K)02:17:10
Board Discussion/Comments
Adjournment
16
Bozeman Transportation Board Meeting Minutes, August 27, 2025
Page 1 of 2
THE TRANSPORTATION BOARD MEETING OF BOZEMAN, MONTANA
MINUTES
August 27, 2025
A) 00:00:46 Call to Order - 6:00 PM Present: Hayden Glines, Mike Veselik, Paul Reichert
Absent: Bryce Gordon
Excused: Shannon Mahoney, Rio Roland, Kelly Pohl
00:02:24 Motion to approve the excused absences of Kelly Pohl, Rio Roland, and Shannon Mahoney.
Hayden Glines: Motion
Mike Veselik: 2nd Staff present at the Dias: Director of Transportation and Engineering, Nicholas Ross, Commissioner,
Douglas Fischer, and Transportation and Engineering Admin, Maliah Beauchaine
B) 00:02:36 Disclosures
There were no disclosures.
C) 00:02:49 Changes to the Agenda
There were no changes to the agenda.
00:03:04 Public Comment
There was no public comment.
D) 00:03:17 Public Service Announcements
D.1 Staff Update
Director of Transportation and Engineering, Nicholas Ross gave an update to the board on all
transportation related items.
17
Bozeman Transportation Board Meeting Minutes, August 27, 2025
Page 2 of 2
00:08:33 Questions of Staff
E) 00:10:06 Special Presentations
F.1 FY27-31 Capital Improvement Plan Work Session
00:10:13 Staff Presentation
Director of Transportation and Engineering, Nicholas Ross presented the FY27-31 Capital Improvement
Plan to the Board.
00:29:41 Questions of Staff
00:54:49 Public Comment
There was no public comment.
F) FYI/Discussion
G) 00:54:56 Adjournment
This board generally meets the fourth Wednesday of the month from 6:00 pm to 8:00 pm.
18
Bozeman Transportation Board Meeting Minutes, September 24, 2025
Page 1 of 3
THE TRANSPORTATION BOARD MEETING OF BOZEMAN, MONTANA
MINUTES
SEPTEMBER 24, 2025
Present: Bryce Gordon, Rio Roland, Kelly Pohl, Paul Reichert
Absent: None
Excused: Hayden Glines, Shannon Mahoney, Mike Veselik
Staff present at the Dias: Director or Transportation and Engineering, Nicholas Ross, and Transportation
and Engineering Admin, Maliah Beauchaine
A) 00:00:05 Call to Order - 6:00 PM
B) 00:00:35 Disclosures
There were no disclosures.
C) 00:00:39 Changes to the Agenda
00:00:55 Motion to approve the excused absences of Shannon Mahoney, Hayden Glines, and Mike
Veselik.
Paul Reichert: Motion
Bryce Gordon: 2nd
00:00:57 Vote on the Motion to approve the excused absences of Shannon Mahoney, Hayden Glines,
and Mike Veselik. The Motion carried 4 - 0.
Approve:
Bryce Gordon
Rio Roland
Kelly Pohl
Paul Reichert
19
Bozeman Transportation Board Meeting Minutes, September 24, 2025
Page 2 of 3
Disapprove:
None
D) 00:01:09 Public Service Announcements
D.1 Staff Update
E) 00:15:52 Approval of Minutes
There is no approval of minutes due to the system being down. There will be approval of minutes during
the next meeting.
F) 00:16:07 Consent Items
F.1 Amending the Parking commission by-laws for the appointment of alternates to the
Administrative Review Board.
TAB Resolution ARB Alternates.pdf
00:17:44 Motion to approve consent item: Amending the Parking commission by-laws for the
appointment of alternates to the Administrative Review Board.
Bryce Gordon: Motion
Rio Roland: 2nd
00:17:51 Vote on the Motion to approve consent item: Amending the Parking commission by-laws for
the appointment of alternates to the Administrative Review Board. The Motion carried 4 - 0.
Approve:
Bryce Gordon
Rio Roland
Kelly Pohl
Paul Reichert
Disapprove:
None
G) 00:19:06 Public Comments on Non-agenda Items Falling within the Purview and
Jurisdiction of the Board
00:20:21 Justin Bursik, Public Comment
Justin Bursik commented on a statistic about the greenhouse gas emissions, specifically the higher rate
in the transportation sector and explains his perspective as to why the statistics are uncharacteristically
high. He also shows his concern for these new developments not having alternate opportunities of
transportation because of lack of availability in the area.
00:23:43 Roger Scott, Public Comment
20
Bozeman Transportation Board Meeting Minutes, September 24, 2025
Page 3 of 3
Roger Scott commented on the parking situation, north of the University between 8th and 11th, stating
the lack of availability of parking in his neighborhood and advocating for extending the boundaries of
available parking in his area for residents.
00:31:32 Jeff Butts, Public Comment
Jeff Butts, MPO Manager of the City of Bozeman, commented on behalf of the Long-Range
Transportation Plan and recommends members of the public to serve on the committee.
00:35:05 Madeline, Public Comment
Madeline commented on the College St., 8th to 11th Renovation stating the safety concern overall and
asked for more detailed plans for the bike paths. She encourages the City to collaborate with the
university to maximize benefits of this renovation for not only the public but for students.
H) 00:38:29 Special Presentations
H.1 College St 8th to 11th Renovation Work Session
01:17:07 Questions of Staff
01:32:18 Public Comment
01:32:52 Roger Scott, Public Comment
Roger Scott commented on his experience living in Scotland with roundabouts and advocates the design
of them but has concerns with the pedestrian crossings. He also states as a bicyclist, merging from the
path to the street is problematic and raises concern for safety. He urges the University to teach students
bicycling etiquette.
I) 01:35:30 Action Items
There were no action items.
J) 01:35:36 FYI/Discussion
K) 01:53:30 Adjournment
This board generally meets the fourth Wednesday of the month from 6:00 pm to 8:00 pm.
21
Memorandum
REPORT TO:Transportation Board
FROM:Nicholas Ross, Director of Transportation and Engineering
SUBJECT:Unified Development Code and Community Plan Transportation Review
MEETING DATE:October 22, 2025
AGENDA ITEM TYPE:Citizen Advisory Board/Commission
RECOMMENDATION:Provide staff and Commission feedback on UDC and Community Plan
transportation elements.
STRATEGIC PLAN:4.3 Strategic Infrastructure Choices: Prioritize long-term investment and
maintenance for existing and new infrastructure.
BACKGROUND:The Bozeman City Commission seeks feedback from city Boards on relevant
items within the proposed revision of the Unified Development Code and
Community Plan. The intent of this item is to allow the Board opportunity for
comment.
UDC update - Draft code and zoning map are now available for public review
here. There are two versions of a summary of changes to help make review
easier – one simple, one detailed. Also a summary of map changes. The draft
incorporates changes based on all the direction Commission provided staff in
the work sessions on 6/3, 6/24, 7/14, 8/19 and 8/26, which was also the
culmination of all the public input in the 6 months before that.
Community Plan technical compliance update
Draft document & Future Land Use map are now available for public review
here. The most recent post in the news feed has links to both, and a link to a
summary of changes. In short, none of the goals or objectives in Chapter 2
are proposed to change, and the Future Land Use Map has only been
updated to correct minor boundary errors and reflect amendments made
since initial adoption. Other changes relate to updating data, adding info
required by state law, updating process descriptions to relate to current
state law, and updating out-of-date references to adopted city plans and
zoning district names. The “Population & Housing Forecast” report by EPS is
also available on the project Engage Page.
UNRESOLVED ISSUES:None
ALTERNATIVES:As suggested by the board.
22
FISCAL EFFECTS:None
Report compiled on: September 30, 2025
23
Memorandum
REPORT TO:Transportation Board
FROM:Nicholas Ross, Director of Transportation and Engineering
SUBJECT:Citywide Traffic Calming Program Introduction
MEETING DATE:October 22, 2025
AGENDA ITEM TYPE:Citizen Advisory Board/Commission
RECOMMENDATION:Receive staff presentation on development of a Citywide Traffic Calming
Program.
STRATEGIC PLAN:4.3 Strategic Infrastructure Choices: Prioritize long-term investment and
maintenance for existing and new infrastructure.
BACKGROUND:The city of Bozeman Department of Transportation and Engineering is
preparing to launch a citywide traffic calming program. Staff seeks input
from the Transportation Advisory Board as an item in the Board's work plan.
This presentation will serve as an introduction to traffic calming concepts
and history within the city. Staff will take board feedback into account and
present a proposal during the following board meetings for review and
discussion.
Staff intends to publicly launch the program in January 2026.
UNRESOLVED ISSUES:None
ALTERNATIVES:As suggested by the board.
FISCAL EFFECTS:None
Report compiled on: September 30, 2025
24
Memorandum
REPORT TO:Transportation Board
FROM:Nicholas Ross, Director of Transportation and Engineering
SUBJECT:Recommendation to Adopt the FY27-31 Transportation Capital Improvement
Plan
MEETING DATE:October 22, 2025
AGENDA ITEM TYPE:Citizen Advisory Board/Commission
RECOMMENDATION:I move to recommend adoption of the FY27-31 Transportation Capital
Improvement Plan to the Bozeman City Commission.
STRATEGIC PLAN:4.3 Strategic Infrastructure Choices: Prioritize long-term investment and
maintenance for existing and new infrastructure.
BACKGROUND:The city of Bozeman is responsible for preparing an annual 5-yr CIP for all
transportation capital investments of at least $25,000. The Transportation
CIP is developed using the city's Street Impact Fee, Arterial & Collector, and
Street Maintenance Assessment funds. The city's Department of
Transportation and Engineering prepares this annual plan based on projects
identified in the city's Transportation Master Plan and operational
maintenance needs.
Staff held a work session on the FY27-31 CIP with the Transportation
Advisory Board on August 27, 2025 to gain feedback on direction of the
current draft plan. Staff now seeks a recommendation for approval to the
Bozeman City Commission who will hold a work session on the current CIP
during the December 9, 2025 Commission meeting. Formal adoption is
anticipated by March 2026.
Staff asks the Board to review the attached draft project pages prior to the
meeting.
UNRESOLVED ISSUES:None
ALTERNATIVES:As suggested by the board.
FISCAL EFFECTS:The CIP is a planning document and has no fiscal effect. Appropriations occur
with operating budget approval.
Attachments:
Draft Proposed FY27-31 CIP_Transportation Funds.pdf
25
Report compiled on: September 30, 2025
26
Draft FY27-31 Proposed Capital Improvement Plan
Transportation Funds
Table of Contents
CIP Criteria Tables - Estimate Class & Operating Impact . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .3
Transportation . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .5
Street Maintenance . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .7
Street Impact Fee . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .39
Arterial & Collector District . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .47
Street Reconstruction . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .61
Draft FY27-31 Proposed Capital Improvement Plan - Transportation Funds Page 1 27
Page Intentionally Left Blank
Draft FY27-31 Proposed Capital Improvement Plan - Transportation Funds Page 2 28
CIP Criteria Tables - Estimate Class & Operating Impact
Cost estimates are evaluated based on the following definitions and criteria:
Estimate Class Purpose
Project Definition Level
Expressed as % of completion
Cost Estimate Range
Typical variation in high & low range
Class 5 Concept or Feasibility 0% to 2%+ 100% / -50%
Class 4 Preliminary Engineering 1% to 15%+ 50% / -30%
Class 3 Semi-Detailed (30%-60% Design)10% to 40%+ 30% / -20%
Class 2 Detailed (60%-100% Design)30% to 75%+ 20% / -15%
Class 1 Final (100% Design/Bid Opening)65% to 100%+ 10% / -10%
N/A Not Applicable
Estimated annual impact on operating costs to maintain the facilities are evaluated based on the following definitions and criteria:
Impact Definition
Positive The project will result in annual operating cost savings or generate additional revenue.
None The project will not result in additional annual operating expenditures.
Negligible The project will increase annual operating expenditures by less than $10k.
Minimal The project will increase annual operating expenditures by more than $10k but less than $50k.
Moderate The project will increase annual operating expenditures by more than $50k but less than $100k.
High The project will increase annual operating expenditures by more than $100k.
Unknown The impacts of the project are unknown at this time.
Draft FY27-31 Proposed Capital Improvement Plan - Transportation Funds Page 3 29
Page Intentionally Left Blank
Draft FY27-31 Proposed Capital Improvement Plan - Transportation Funds Page 4 30
Transportation
Draft FY27-31 Proposed Capital Improvement Plan - Transportation Funds Page 5 31
Page Intentionally Left Blank
Draft FY27-31 Proposed Capital Improvement Plan - Transportation Funds Page 6 32
Street Maintenance
Draft FY27-31 Proposed Capital Improvement Plan - Transportation Funds Page 7 33
Scheduled Projects for Street Maintenance Fund
Page
Number
Project
Code Project Name FY27 FY28 FY29 FY30 FY31 5-Year Total
11 STR71 Street Improvement Mill and Overlay $ 1,240,600 $ 1,302,600 $ 1,367,800 $ 1,436,100 $ 1,508,000 $ 6,855,100
12 STR163 Street Sweeper Replacement 400,000 — 400,000 400,000 — 1,200,000
13 STR164 Motor Grader Replacement 400,000 — — — — 400,000
14 STR142 Lift Truck 275,000 — — — — 275,000
15 STR149 Loader Mounted Mill 250,000 — — — — 250,000
16 STR119 Tractor Truck For Trailer 210,000 — — — — 210,000
17 STR141 Rear Load Garbage Truck 200,000 — — — — 200,000
18 STR20 Annual Multimodal Improvements 150,000 150,000 150,000 150,000 150,000 750,000
19 STR75 Annual Pedestrian Ramp Repair 150,000 150,000 150,000 150,000 150,000 750,000
20 STR165 Annual Curb Spot Repair 135,000 141,800 148,800 156,300 164,100 746,000
21 STR120 Side Dump Trailer 120,000 — — — — 120,000
22 STR129 Light Duty Fleet Replacements 120,000 — — — — 120,000
23 STR117 Annual Sidewalk Improvements 100,000 100,000 100,000 100,000 100,000 500,000
24 STR166 Boom Arm Mower Attachment 90,000 — — — — 90,000
25 STR157 Wing Plows for Existing Trucks 70,000 — — — — 70,000
26 STR49 Sander Replacement 40,000 40,000 50,000 50,000 50,000 230,000
27 STR167 Signal Cabinet 35,000 — — — — 35,000
28 STR135 Diesel Fuel Tank & Kiosk 32,000 — — — — 32,000
29 STR58 Tandem Axle Dump Trucks — 375,000 375,000 — 400,000 1,150,000
30 STR92 Oak St Median Landscaping — 300,000 — — — 300,000
31 STR126 Loader — 275,000 — — — 275,000
32 STR123 Light Duty Fleet Addition — 120,000 120,000 120,000 — 360,000
33 STR151 Mini Loader — — 120,000 — — 120,000
34 STR148 Replace Sign Printer — — 65,000 — — 65,000
35 STR136 Path Tractor with Attachments — — — 250,000 — 250,000
36 STR158 Trailer Mounted Vacuum Unit — — — 80,000 — 80,000
37 STR170 Electric Gate at Lower Yard — — — — 50,000 50,000
Total $ 4,017,600 $ 2,954,400 $ 3,046,600 $ 2,892,400 $ 2,572,100 $ 15,483,100
Draft FY27-31 Proposed Capital Improvement Plan - Transportation Funds Page 8 34
Unscheduled Projects for Street Maintenance Fund
Project
Code Project Name Amount Description
STR150 Large Milling Machine $ 1,300,000 This item would add a large milling machine to the Streets Division equipment
fleet. Our current milling machine mills a 40-inch path while this replacement
will mill an 80-inch path, doubling our output. By using Streets Division crews to
do more of the local street mill and overlays, we can keep streets from failing
and avoid increasing cost to our residents. This item will serve to build internal
paving capacity that can reduce reliance on contractors and increase service to
our residents. Project is currently unscheduled to reduce assessment impacts.
STR111 Paint Truck 750,000 This item would add a line painting truck to the Streets Division fleet. Pavement
marking services are limited statewide due to contractor availability. The City
currently depends on the Montana Department of Transportation (MDT) for
refreshment of long-line pavement markings on City streets through a shared
maintenance agreement. This agreement requires the City to work around MDT
scheduling and Sign & Signal Division staff are still required to assist with traffic
control. This funding will allow Sign & Signal Division to perform line painting on
schedule and increase capacity of work without requiring staff augmentation.
Due to rate impacts and total project costs, this item is being moved to
unscheduled in an effort to balance the cost of other items in the fund.
Additionally, urgency has been reduced as recent MDT performance has
improved following staffing and equipment shortages, which had initially led to
concerns regarding quality of work.
STR94 Mastic Patch Machine 77,000 This item would purchase a hot-applied mastic machine. The mastic machine
allows City crews to repair asphalt without it needing to be compacted, which
therefore can be open to traffic within hours. It is an excellent long-lasting repair
to pavement surface imperfections that otherwise would need to be milled up
and patched. The product applied is similar to what is put on flat roofs but
includes aggregate. Project is currently unscheduled to reduce assessment
impacts.
Total $ 2,127,000
Draft FY27-31 Proposed Capital Improvement Plan - Transportation Funds Page 9 35
Map of Street Maintenance Infrastructure Projects
Draft FY27-31 Proposed Capital Improvement Plan - Transportation Funds Page 10 36
Street Improvement Mill and Overlay (STR71)
FUND DEPARTMENT PROJECT TYPE
Street Maintenance Streets Infrastructure
OPERATING IMPACT COST ESTIMATE CLASS
None Class 1
FUNDING SOURCE(S)AMOUNT
Assessment Revenue $ 6,855,100
TOTAL SCHEDULED PROJECT COST $ 6,855,100
STRATEGIC PLAN
2.2 Infrastructure Investments
DESCRIPTION OF PROJECT
This item funds the City’s annual mill and overlay phase of asphalt pavement
maintenance on arterial and collector routes. The City currently maintains
approximately 110 lane miles of arterial and collector routes and sets a goal for mill and
overlay every 15 years. Current funding levels are expected to complete approximately
6.5 lane miles annually. FY27 improvements include portions of Babcock, Baxter, and
Broadway. Final locations and limits of work will be adjusted to maximize the annual
allocation in each given year. These and future projects are selected based on the 2024
Pavement Condition Assessment and site visits by Streets Division and Engineering staff.
All routes will be evaluated for potential low-cost Complete Streets improvements prior
to completion of design.
CONSEQUENCES OF DELAYING PROJECT
Delay will create additional deferred maintenance of City street pavement assets resulting in significantly higher pavement rehabilitation costs
in the future.
CHANGES FROM PRIOR CIP
Annual costs adjusted for 5% increase per year.
FUND FY26 ADOPTED FY27 FY28 FY29 FY30 FY31
Street Maintenance $ 1,136,100 $ 1,240,600 $ 1,302,600 $ 1,367,800 $ 1,436,100 $ 1,508,000
Draft FY27-31 Proposed Capital Improvement Plan - Transportation Funds Page 11 37
Street Sweeper Replacement (STR163)
FUND DEPARTMENT PROJECT TYPE
Street Maintenance Streets Equipment
OPERATING IMPACT COST ESTIMATE CLASS
Negligible N/A
FUNDING SOURCE(S)AMOUNT
Assessment Revenue $ 1,200,000
TOTAL SCHEDULED PROJECT COST $ 1,200,000
STRATEGIC PLAN
7. A High-Performance Organization
DESCRIPTION OF PROJECT
This item funds the replacement of three street sweepers (asset #3762 in FY27, asset #4269 in FY29, and asset #3942 in FY30) in
order to maintain the City's existing fleet capacity. The City currently has five street sweepers in the fleet and schedules replacement
on a 10-year cycle. The first asset replacement is scheduled in FY27 based on timing of a contribution from Stormwater. Lease to
purchase is an option for acquisition.
CONSEQUENCES OF DELAYING PROJECT
Delay would increase air and water pollution and risk compliance with the City's Municipal Separate Storm Sewer System (MS4)
permit.
CHANGES FROM PRIOR CIP
New
FUND FY26 ADOPTED FY27 FY28 FY29 FY30 FY31
Street Maintenance $ — $ 400,000 $ — $ 400,000 $ 400,000 $ —
Draft FY27-31 Proposed Capital Improvement Plan - Transportation Funds Page 12 38
Motor Grader Replacement (STR164)
FUND DEPARTMENT PROJECT TYPE
Street Maintenance Streets Equipment
OPERATING IMPACT COST ESTIMATE CLASS
Negligible N/A
FUNDING SOURCE(S)AMOUNT
Assessment Revenue $ 400,000
TOTAL SCHEDULED PROJECT COST $ 400,000
STRATEGIC PLAN
7. A High-Performance Organization
DESCRIPTION OF PROJECT
This item funds the replacement of a 1998 motor grader (asset #2682 in FY27) in order to maintain the City's existing winter
maintenance capacity. The City currently has eight motor graders equipped with snow gates for use on local streets and certain plow
routes. Procurement strategy for motor graders is to purchase after a 5-year lease and replace on a 20-year cycle.
CONSEQUENCES OF DELAYING PROJECT
Delay would decrease the City's level of service for winter maintenance on local streets.
CHANGES FROM PRIOR CIP
New
FUND FY26 ADOPTED FY27 FY28 FY29 FY30 FY31
Street Maintenance $ — $ 400,000 $ — $ — $ — $ —
Draft FY27-31 Proposed Capital Improvement Plan - Transportation Funds Page 13 39
Lift Truck (STR142)
FUND DEPARTMENT PROJECT TYPE
Street Maintenance Streets Vehicle
OPERATING IMPACT COST ESTIMATE CLASS
Negligible N/A
FUNDING SOURCE(S)AMOUNT
Assessment Revenue $ 275,000
TOTAL SCHEDULED PROJECT COST $ 275,000
STRATEGIC PLAN
7. A High-Performance Organization
DESCRIPTION OF PROJECT
This item funds an improved lift truck for the Sign and Signal Division. The current bucket truck in the Sign & Signal Division does not
reach all luminaires in the city and equipment failures are becoming more frequent. Repairs to the existing truck in FY25 took six
months to complete. This new truck would include the ability to raise light and signal poles. Currently the division has to outsource
this service to a crane company, leading to delays in work and increased operational costs.
CONSEQUENCES OF DELAYING PROJECT
Delay would reduce level of service to the community through delayed maintenance and would require the Street Division to
continue contracting for crane services.
CHANGES FROM PRIOR CIP
This item has been moved from FY29 to FY27 in response to heightened need and increased by $50k based on current quote.
FUND FY26 ADOPTED FY27 FY28 FY29 FY30 FY31
Street Maintenance $ — $ 275,000 $ — $ — $ — $ —
Draft FY27-31 Proposed Capital Improvement Plan - Transportation Funds Page 14 40
Loader Mounted Mill (STR149)
FUND DEPARTMENT PROJECT TYPE
Street Maintenance Streets Equipment
OPERATING IMPACT COST ESTIMATE CLASS
Negligible N/A
FUNDING SOURCE(S)AMOUNT
Assessment Revenue $ 250,000
TOTAL SCHEDULED PROJECT COST $ 250,000
STRATEGIC PLAN
7. A High-Performance Organization
DESCRIPTION OF PROJECT
This item replaces the Streets Division’s 20-year-old milling machine used for pavement maintenance. Milling machine technology
has made great improvements over that time and the Streets Division is due to replace the existing mill for improved operations.
CONSEQUENCES OF DELAYING PROJECT
Delay would decrease level of service to the community.
CHANGES FROM PRIOR CIP
None
FUND FY26 ADOPTED FY27 FY28 FY29 FY30 FY31
Street Maintenance $ — $ 250,000 $ — $ — $ — $ —
Draft FY27-31 Proposed Capital Improvement Plan - Transportation Funds Page 15 41
Tractor Truck For Trailer (STR119)
FUND DEPARTMENT PROJECT TYPE
Street Maintenance Streets Vehicle
OPERATING IMPACT COST ESTIMATE CLASS
Negligible N/A
FUNDING SOURCE(S)AMOUNT
Assessment Revenue $ 210,000
TOTAL SCHEDULED PROJECT COST $ 210,000
STRATEGIC PLAN
7. A High-Performance Organization
DESCRIPTION OF PROJECT
This item funds a second tractor truck to be used by the Streets Division for pulling a lowboy or side dump trailer. The tractor truck
addition provides the Division with the ability to haul three times the amount of materials and equipment, leading to fewer trips.
This improves efficiency of operations and decreases emissions.
CONSEQUENCES OF DELAYING PROJECT
Delay would result in increased labor costs from making more trips than necessary to transport materials and equipment.
CHANGES FROM PRIOR CIP
None
FUND FY26 ADOPTED FY27 FY28 FY29 FY30 FY31
Street Maintenance $ — $ 210,000 $ — $ — $ — $ —
Draft FY27-31 Proposed Capital Improvement Plan - Transportation Funds Page 16 42
Rear Load Garbage Truck (STR141)
FUND DEPARTMENT PROJECT TYPE
Street Maintenance Streets Vehicle
OPERATING IMPACT COST ESTIMATE CLASS
Negligible N/A
FUNDING SOURCE(S)AMOUNT
Assessment Revenue $ 200,000
TOTAL SCHEDULED PROJECT COST $ 200,000
STRATEGIC PLAN
7. A High-Performance Organization
DESCRIPTION OF PROJECT
This item requests funding to replace a 30-year-old truck currently used by the Streets Division for leaf cleanup and by the Solid
Waste Division as their backup compost truck. The current vehicle is extremely unreliable and sees significant maintenance and
downtime. The replacement vehicle will likely be acquired used.
CONSEQUENCES OF DELAYING PROJECT
Delay risks increased operating cost of maintenance and additional downtime due to breakdowns.
CHANGES FROM PRIOR CIP
This item has been moved from Unscheduled to FY27 based on the severely degraded condition of the existing vehicle.
FUND FY26 ADOPTED FY27 FY28 FY29 FY30 FY31
Street Maintenance $ — $ 200,000 $ — $ — $ — $ —
Draft FY27-31 Proposed Capital Improvement Plan - Transportation Funds Page 17 43
Annual Multimodal Improvements (STR20)
FUND DEPARTMENT PROJECT TYPE
Street Maintenance Streets Infrastructure
OPERATING IMPACT COST ESTIMATE CLASS
Minimal Class 1
FUNDING SOURCE(S)AMOUNT
Assessment Revenue $ 750,000
TOTAL SCHEDULED PROJECT COST $ 750,000
STRATEGIC PLAN
7.5 a) Enhance Non-motorized Transportation
DESCRIPTION OF PROJECT
This project provides annual funding for multimodal improvements intended to increase safety throughout the city and promote
active transportation modes. Multimodal improvements completed with this funding include bike racks, signage, striping, pedestrian
signals, and traffic calming. Individual improvements will be selected by City staff based on synergies with other projects, the 2017
Transportation Master Plan, and public feedback throughout the year.
CONSEQUENCES OF DELAYING PROJECT
Delay would remove funding for these improvements, causing the City to defer critical multimodal safety improvements.
CHANGES FROM PRIOR CIP
None
FUND FY26 ADOPTED FY27 FY28 FY29 FY30 FY31
Street Maintenance $ 158,200 $ 150,000 $ 150,000 $ 150,000 $ 150,000 $ 150,000
Draft FY27-31 Proposed Capital Improvement Plan - Transportation Funds Page 18 44
Annual Pedestrian Ramp Repair (STR75)
FUND DEPARTMENT PROJECT TYPE
Street Maintenance Streets Infrastructure
OPERATING IMPACT COST ESTIMATE CLASS
None Class 1
FUNDING SOURCE(S)AMOUNT
Assessment Revenue $ 750,000
TOTAL SCHEDULED PROJECT COST $ 750,000
STRATEGIC PLAN
4.5 a) Enhance Non-motorized Transportation
DESCRIPTION OF PROJECT
This project funds an annual program to continue upgrading pedestrian facilities to ADA compliance. Upgrading pedestrian facilities
will allow the City to continue steps towards compliance with the Americans with Disabilities Act of 1990 and Section 504 of the
Rehabilitation Act of 1973. Upgrading pedestrian facilities is required along all mill and overlay projects and funding levels are set
accordingly.
CONSEQUENCES OF DELAYING PROJECT
Delays will slow the pace of becoming compliant with the Americans with Disabilities Act requirements for pedestrian ramps.
CHANGES FROM PRIOR CIP
Increased annual cost to $150k to account for additional ramps required for upgrade with mill and overlay projects.
FUND FY26 ADOPTED FY27 FY28 FY29 FY30 FY31
Street Maintenance $ 120,000 $ 150,000 $ 150,000 $ 150,000 $ 150,000 $ 150,000
Draft FY27-31 Proposed Capital Improvement Plan - Transportation Funds Page 19 45
Annual Curb Spot Repair (STR165)
FUND DEPARTMENT PROJECT TYPE
Street Maintenance Streets Infrastructure
OPERATING IMPACT COST ESTIMATE CLASS
Negligible Class 1
FUNDING SOURCE(S)AMOUNT
Assessment Revenue $ 746,000
TOTAL SCHEDULED PROJECT COST $ 746,000
STRATEGIC PLAN
2.2 Infrastructure Investments
DESCRIPTION OF PROJECT
This item funds repair and construction of curbs and gutters on local streets. These improvements can be combined with ADA ramp
replacement work, inlet replacement work, and Streets Division mill and overlay services for reconstruction of local streets.
CONSEQUENCES OF DELAYING PROJECT
Delays to this project will continue deferring necessary maintenance.
CHANGES FROM PRIOR CIP
Annual costs adjusted for 5% increase per year.
FUND FY26 ADOPTED FY27 FY28 FY29 FY30 FY31
Street Maintenance $ — $ 135,000 $ 141,800 $ 148,800 $ 156,300 $ 164,100
Draft FY27-31 Proposed Capital Improvement Plan - Transportation Funds Page 20 46
Side Dump Trailer (STR120)
FUND DEPARTMENT PROJECT TYPE
Street Maintenance Streets Equipment
OPERATING IMPACT COST ESTIMATE CLASS
Negligible N/A
FUNDING SOURCE(S)AMOUNT
Assessment Revenue $ 120,000
TOTAL SCHEDULED PROJECT COST $ 120,000
STRATEGIC PLAN
7. A High-Performance Organization
DESCRIPTION OF PROJECT
This item funds a second side dump trailer to pair with STR119 Tractor Truck for the Streets Division. Scheduled for FY27, this will
enable transportation of three times the amount of snow, materials, and sweepings compared to the current equipment.
CONSEQUENCES OF DELAYING PROJECT
Delay would result in inefficient labor, requiring more trips than necessary to transport materials.
CHANGES FROM PRIOR CIP
None
FUND FY26 ADOPTED FY27 FY28 FY29 FY30 FY31
Street Maintenance $ — $ 120,000 $ — $ — $ — $ —
Draft FY27-31 Proposed Capital Improvement Plan - Transportation Funds Page 21 47
Light Duty Fleet Replacements (STR129)
FUND DEPARTMENT PROJECT TYPE
Street Maintenance Streets Vehicle
OPERATING IMPACT COST ESTIMATE CLASS
Negligible N/A
FUNDING SOURCE(S)AMOUNT
Assessment Revenue $ 120,000
TOTAL SCHEDULED PROJECT COST $ 120,000
STRATEGIC PLAN
7. A High-Performance Organization
DESCRIPTION OF PROJECT
This item funds replacements to the Streets Division light duty pickup truck fleet. The Streets Division, including Signs & Signals, is
projected to have 30 FTE staff by the end of the FY25-27 staffing plan and targets one light duty vehicle per two to four FTE for
purposes of efficient transport to various work sites across the city. One replacement is scheduled in this capital plan for existing
asset #3666 (2013 model) in FY27. Total light duty fleet is projected to be 15 vehicles by FY31 to account for anticipated staff growth.
These trucks will be outfitted with plow/sander combos for increased residential street snow service and will require towing
capacity.
CONSEQUENCES OF DELAYING PROJECT
Delay would force the Streets Division to continue using older, less efficient trucks.
CHANGES FROM PRIOR CIP
Cost per truck has increased by $40k to include plow/sander package and account for current quote.
FUND FY26 ADOPTED FY27 FY28 FY29 FY30 FY31
Street Maintenance $ 80,000 $ 120,000 $ — $ — $ — $ —
Draft FY27-31 Proposed Capital Improvement Plan - Transportation Funds Page 22 48
Annual Sidewalk Improvements (STR117)
FUND DEPARTMENT PROJECT TYPE
Street Maintenance Streets Infrastructure
OPERATING IMPACT COST ESTIMATE CLASS
Negligible Class 1
FUNDING SOURCE(S)AMOUNT
Assessment Revenue $ 500,000
TOTAL SCHEDULED PROJECT COST $ 500,000
STRATEGIC PLAN
4.5 a) Enhance Non-motorized Transportation
DESCRIPTION OF PROJECT
This item funds annual sidewalk improvements to public right-of-way allowing for sidewalk repair and construction. Priority projects
will be established by City staff working with the Transportation Advisory Board and public comment. This funding may also be used
to supplement the City's ordering of property-owner sidewalk improvements or combined with street reconstruction projects to
reconstruct sidewalks at the same time.
CONSEQUENCES OF DELAYING PROJECT
Delay will remove the City’s only capital funding for missing sidewalk gaps and repair needs, leading to ADA compliance risk and
reduced pedestrian safety.
CHANGES FROM PRIOR CIP
Increased annual cost by $50k to address additional trip hazards.
FUND FY26 ADOPTED FY27 FY28 FY29 FY30 FY31
Street Maintenance $ 50,000 $ 100,000 $ 100,000 $ 100,000 $ 100,000 $ 100,000
Draft FY27-31 Proposed Capital Improvement Plan - Transportation Funds Page 23 49
Boom Arm Mower Attachment (STR166)
FUND DEPARTMENT PROJECT TYPE
Street Maintenance Streets Equipment
OPERATING IMPACT COST ESTIMATE CLASS
Negligible N/A
FUNDING SOURCE(S)AMOUNT
Assessment Revenue $ 90,000
TOTAL SCHEDULED PROJECT COST $ 90,000
STRATEGIC PLAN
7. A High-Performance Organization
DESCRIPTION OF PROJECT
This item funds the purchase of two boom-arm mower attachments for the purpose of right-of-way mowing. This item will be front-
mounted to a loader or skid steer for improved safety and visibility over the Streets Division's existing rear-mounted mower, which
requires the operator to look behind them while mowing in live traffic.
CONSEQUENCES OF DELAYING PROJECT
Delay would risk operator and public safety.
CHANGES FROM PRIOR CIP
New
FUND FY26 ADOPTED FY27 FY28 FY29 FY30 FY31
Street Maintenance $ — $ 90,000 $ — $ — $ — $ —
Draft FY27-31 Proposed Capital Improvement Plan - Transportation Funds Page 24 50
Wing Plows for Existing Trucks (STR157)
FUND DEPARTMENT PROJECT TYPE
Street Maintenance Streets Equipment
OPERATING IMPACT COST ESTIMATE CLASS
Negligible N/A
FUNDING SOURCE(S)AMOUNT
Assessment Revenue $ 70,000
TOTAL SCHEDULED PROJECT COST $ 70,000
STRATEGIC PLAN
7. A High-Performance Organization
DESCRIPTION OF PROJECT
This item would add wing attachments to the eight plow trucks currently used by the Streets Division. This equipment will allow an
additional six feet of snow removal on each pass, reducing the number of passes needed to clear a street.
CONSEQUENCES OF DELAYING PROJECT
Delay would risk an inability to clear routes in a timely manner.
CHANGES FROM PRIOR CIP
Increased cost by $10k based on updated pricing.
FUND FY26 ADOPTED FY27 FY28 FY29 FY30 FY31
Street Maintenance $ 60,000 $ 70,000 $ — $ — $ — $ —
Draft FY27-31 Proposed Capital Improvement Plan - Transportation Funds Page 25 51
Sander Replacement (STR49)
FUND DEPARTMENT PROJECT TYPE
Street Maintenance Streets Equipment
OPERATING IMPACT COST ESTIMATE CLASS
Negligible N/A
FUNDING SOURCE(S)AMOUNT
Assessment Revenue $ 230,000
TOTAL SCHEDULED PROJECT COST $ 230,000
STRATEGIC PLAN
7. A High-Performance Organization
DESCRIPTION OF PROJECT
This item funds street sanders on plow trucks required for adequate winter maintenance. Current City strategy is to replace each
sander on an eight-year cycle. Vehicle Maintenance rebuilds the conveyor and hydraulic system in the first four years, and
experience has shown that more significant structural components start to fail by the seventh year. The City currently has eight
sanders, which are typically all deployed during winter storms. Mid-winter repairs are unlikely due to time required for parts delivery
and overall winter maintenance workloads. By replacing the sander every eight years we can avoid failure to one of our plow/sander
units.
CONSEQUENCES OF DELAYING PROJECT
Failing to replace sanders on a regular basis could result in significant downtime due to maintenance and an inability to respond in a
timely manner for icy conditions, which poses significant safety risks.
CHANGES FROM PRIOR CIP
None
FUND FY26 ADOPTED FY27 FY28 FY29 FY30 FY31
Street Maintenance $ 40,000 $ 40,000 $ 40,000 $ 50,000 $ 50,000 $ 50,000
Draft FY27-31 Proposed Capital Improvement Plan - Transportation Funds Page 26 52
Signal Cabinet (STR167)
FUND DEPARTMENT PROJECT TYPE
Street Maintenance Streets Infrastructure
OPERATING IMPACT COST ESTIMATE CLASS
Negligible N/A
FUNDING SOURCE(S)AMOUNT
Assessment Revenue $ 35,000
TOTAL SCHEDULED PROJECT COST $ 35,000
STRATEGIC PLAN
2.2 Infrastructure Investments
DESCRIPTION OF PROJECT
This item funds the purchase of a signal cabinet, the roadside enclosure which houses all electronic equipment needed to operate a
traffic signal system. The Signs and Signals Division maintains all City-owned traffic signals and requires an additional signal cabinet
for timely repairs in case of damage. The Division proactively stocks signal components in a parts inventory for efficient repairs.
CONSEQUENCES OF DELAYING PROJECT
Delay would risk signal downtime while item is procured after a vehicle collision or other unexpected damage.
CHANGES FROM PRIOR CIP
New
FUND FY26 ADOPTED FY27 FY28 FY29 FY30 FY31
Street Maintenance $ — $ 35,000 $ — $ — $ — $ —
Draft FY27-31 Proposed Capital Improvement Plan - Transportation Funds Page 27 53
Diesel Fuel Tank & Kiosk (STR135)
FUND DEPARTMENT PROJECT TYPE
Street Maintenance Streets Equipment
OPERATING IMPACT COST ESTIMATE CLASS
Negligible N/A
FUNDING SOURCE(S)AMOUNT
Assessment Revenue $ 32,000
TOTAL SCHEDULED PROJECT COST $ 32,000
STRATEGIC PLAN
7. A High-Performance Organization
DESCRIPTION OF PROJECT
This item funds facility improvements at the City Shops Complex. The City currently has 1,500 gallons of fuel storage capacity at the
City Shops Complex. Fuel consumption by department is currently tracked by manual data collection. Operations staff often run out
of fuel and have to fuel large equipment at retail stations, which is not safe. This station would increase fuel capacity and be placed
in the same location of the current tank at the Shops. This item is funded as a four-year lease, with City ownership coming at the end
of the fourth year. The total cost of this project including prior year actuals and FY26 budget is anticipated to be $138,000.
CONSEQUENCES OF DELAYING PROJECT
Delay would risk fuel shortages during snowstorms.
CHANGES FROM PRIOR CIP
None
FUND FY26 ADOPTED FY27 FY28 FY29 FY30 FY31
Street Maintenance $ 32,000 $ 32,000 $ — $ — $ — $ —
Draft FY27-31 Proposed Capital Improvement Plan - Transportation Funds Page 28 54
Tandem Axle Dump Trucks (STR58)
FUND DEPARTMENT PROJECT TYPE
Street Maintenance Streets Vehicle
OPERATING IMPACT COST ESTIMATE CLASS
Negligible N/A
FUNDING SOURCE(S)AMOUNT
Assessment Revenue $ 1,150,000
TOTAL SCHEDULED PROJECT COST $ 1,150,000
STRATEGIC PLAN
7. A High-Performance Organization
DESCRIPTION OF PROJECT
This item funds three new tandem-axle dump trucks for all-season maintenance and construction. The Streets Division currently has
seven tandem axle dump trucks which are used to plow and sand arterials and collectors, haul asphalt during paving operations, haul
leaves, and perform general street maintenance. The City targets plowing and sanding by 8:00 am after a winter storm event and can
typically serve 100 miles per route. In accordance with the new vehicle replacement policy, FY28 will fund replacement of asset
#1806, FY29 will fund an addition to the fleet, and FY31 will fund replacement of asset #3626.
CONSEQUENCES OF DELAYING PROJECT
Failure to replace and increase the number of tandem axle dump trucks will lead to a declined level of service to the community.
CHANGES FROM PRIOR CIP
One of two trucks previously scheduled in FY28 have been moved back a year to FY29 due to rate impacts, and an additional truck
has been added in FY31. Amounts for trucks in FY28 and FY29 have been increase based on updated pricing plus escalation.
FUND FY26 ADOPTED FY27 FY28 FY29 FY30 FY31
Street Maintenance $ — $ — $ 375,000 $ 375,000 $ — $ 400,000
Draft FY27-31 Proposed Capital Improvement Plan - Transportation Funds Page 29 55
Oak St Median Landscaping (STR92)
FUND DEPARTMENT PROJECT TYPE
Street Maintenance Streets Infrastructure
OPERATING IMPACT COST ESTIMATE CLASS
Negligible Class 5
FUNDING SOURCE(S)AMOUNT
Assessment Revenue $ 300,000
TOTAL SCHEDULED PROJECT COST $ 300,000
STRATEGIC PLAN
4. A Well-Planned City
DESCRIPTION OF PROJECT
This project will install water-efficient landscaping and irrigation in the Oak Street
medians between Cottonwood and 27th Street. The design incorporates best
management practices to reduce water use, chemical weed control, and long-term
maintenance needs. Landscaping will be tailored to withstand harsh roadway conditions
and drought events, helping to protect community investment in public spaces and
reduce socio-economic impacts from the loss of outdoor landscapes. Beyond function,
the medians will showcase the beauty of drought-tolerant landscapes, enhancing
community aesthetics, supporting quality of life for Bozeman residents, and
demonstrating the City’s commitment to water stewardship. This project is a
partnership between the City’s Water Conservation Division and Streets Division. The
landscaping and irrigation designs were developed under the Water Fund WC01 CIP
project and will be applied here. Current funding supports only a portion of the Oak
Street medians; due to significant inflation in construction and landscaping costs,
additional funding will be required to complete improvements along the full length of
Oak Street.
CONSEQUENCES OF DELAYING PROJECT
Delay will leave Oak Street medians in their current state.
CHANGES FROM PRIOR CIP
None
FUND FY26 ADOPTED FY27 FY28 FY29 FY30 FY31
Street Maintenance $ — $ — $ 300,000 $ — $ — $ —
Draft FY27-31 Proposed Capital Improvement Plan - Transportation Funds Page 30 56
Loader (STR126)
FUND DEPARTMENT PROJECT TYPE
Street Maintenance Streets Equipment
OPERATING IMPACT COST ESTIMATE CLASS
Negligible N/A
FUNDING SOURCE(S)AMOUNT
Assessment Revenue $ 275,000
TOTAL SCHEDULED PROJECT COST $ 275,000
STRATEGIC PLAN
7. A High-Performance Organization
DESCRIPTION OF PROJECT
This item funds an addition to the City’s loader fleet. The Streets Division often deploys multiple crews, requiring use of a loader in a
given shift. This addition will give management more flexibility in project scheduling.
CONSEQUENCES OF DELAYING PROJECT
Delay would risk reduced efficiency and decreased level of service to the community.
CHANGES FROM PRIOR CIP
None
FUND FY26 ADOPTED FY27 FY28 FY29 FY30 FY31
Street Maintenance $ — $ — $ 275,000 $ — $ — $ —
Draft FY27-31 Proposed Capital Improvement Plan - Transportation Funds Page 31 57
Light Duty Fleet Addition (STR123)
FUND DEPARTMENT PROJECT TYPE
Street Maintenance Streets Vehicle
OPERATING IMPACT COST ESTIMATE CLASS
Negligible N/A
FUNDING SOURCE(S)AMOUNT
Assessment Revenue $ 360,000
TOTAL SCHEDULED PROJECT COST $ 360,000
STRATEGIC PLAN
7. A High-Performance Organization
DESCRIPTION OF PROJECT
This item funds additions to the Streets Division light duty pickup truck fleet. The Streets Division, including Signs & Signals, is
projected to have 30 FTE staff by the end of the FY25-27 staffing plan and targets one light duty vehicle per two to four FTE for
purposes of efficient transport to various work sites across the city. Total light duty fleet is projected to be 15 vehicles by FY31 to
account for anticipated staff growth. These trucks will be outfitted with plow/sander combos for increased residential street snow
service and will require towing capacity.
CONSEQUENCES OF DELAYING PROJECT
Delay would reduce the Division's ability to take on multiple assignments per shift. This inhibits our ability to service requests in a
timely manner.
CHANGES FROM PRIOR CIP
Cost per truck has increased by $40k to include plow/sander package and account for current quote. One truck previously scheduled
in FY30 has been moved to FY29 in an effort to spread out costs and achieve rate stability.
FUND FY26 ADOPTED FY27 FY28 FY29 FY30 FY31
Street Maintenance $ 80,000 $ — $ 120,000 $ 120,000 $ 120,000 $ —
Draft FY27-31 Proposed Capital Improvement Plan - Transportation Funds Page 32 58
Mini Loader (STR151)
FUND DEPARTMENT PROJECT TYPE
Street Maintenance Streets Equipment
OPERATING IMPACT COST ESTIMATE CLASS
Negligible N/A
FUNDING SOURCE(S)AMOUNT
Assessment Revenue $ 120,000
TOTAL SCHEDULED PROJECT COST $ 120,000
STRATEGIC PLAN
7. A High-Performance Organization
DESCRIPTION OF PROJECT
This items funds the addition of a mini loader to the City’s equipment fleet for alternative transportation path maintenance,
residential grading support, and plowing.
CONSEQUENCES OF DELAYING PROJECT
Delay would decrease level of service to the community.
CHANGES FROM PRIOR CIP
None
FUND FY26 ADOPTED FY27 FY28 FY29 FY30 FY31
Street Maintenance $ — $ — $ — $ 120,000 $ — $ —
Draft FY27-31 Proposed Capital Improvement Plan - Transportation Funds Page 33 59
Replace Sign Printer (STR148)
FUND DEPARTMENT PROJECT TYPE
Street Maintenance Streets Equipment
OPERATING IMPACT COST ESTIMATE CLASS
Negligible N/A
FUNDING SOURCE(S)AMOUNT
Assessment Revenue $ 65,000
TOTAL SCHEDULED PROJECT COST $ 65,000
STRATEGIC PLAN
7. A High-Performance Organization
DESCRIPTION OF PROJECT
This item funds a replacement of the Sign & Signal Division's sign printer with new technology and improved efficiency. The Division’s
existing printer exceeds 10 years old and limits capacity for sign production.
CONSEQUENCES OF DELAYING PROJECT
Delay would risk downtime and an inability to print signs.
CHANGES FROM PRIOR CIP
None
FUND FY26 ADOPTED FY27 FY28 FY29 FY30 FY31
Street Maintenance $ — $ — $ — $ 65,000 $ — $ —
Draft FY27-31 Proposed Capital Improvement Plan - Transportation Funds Page 34 60
Path Tractor with Attachments (STR136)
FUND DEPARTMENT PROJECT TYPE
Street Maintenance Streets Equipment
OPERATING IMPACT COST ESTIMATE CLASS
Negligible N/A
FUNDING SOURCE(S)AMOUNT
Assessment Revenue $ 250,000
TOTAL SCHEDULED PROJECT COST $ 250,000
STRATEGIC PLAN
7. A High-Performance Organization
DESCRIPTION OF PROJECT
This item funds a tractor sized for path and sidewalk maintenance. With the addition of many multi-modal transportation facilities
and increased City Commission desire for improved maintenance, this funding would provide additional capacity to the fleet for
year-round maintenance including mowing, sweeping and plowing.
CONSEQUENCES OF DELAYING PROJECT
Delay would risk deferring maintenance on multi-use paths.
CHANGES FROM PRIOR CIP
This item has been reduced from two tractors to one following a re-evaluation of needs.
FUND FY26 ADOPTED FY27 FY28 FY29 FY30 FY31
Street Maintenance $ — $ — $ — $ — $ 250,000 $ —
Draft FY27-31 Proposed Capital Improvement Plan - Transportation Funds Page 35 61
Trailer Mounted Vacuum Unit (STR158)
FUND DEPARTMENT PROJECT TYPE
Street Maintenance Streets Equipment
OPERATING IMPACT COST ESTIMATE CLASS
Negligible N/A
FUNDING SOURCE(S)AMOUNT
Assessment Revenue $ 80,000
TOTAL SCHEDULED PROJECT COST $ 80,000
STRATEGIC PLAN
7. A High-Performance Organization
DESCRIPTION OF PROJECT
This item funds a vacuum attachment mounted to a trailer for transport. This device will be used by the Sign & Signal Division to dig
sign posts or locate utilities instead of hand digging. This will be used by the Streets Division to clean out curb chases, remove water
to prep for patching, and culvert maintenance.
CONSEQUENCES OF DELAYING PROJECT
Delay would decrease efficiency of service.
CHANGES FROM PRIOR CIP
Increased cost by $35k based on updated pricing.
FUND FY26 ADOPTED FY27 FY28 FY29 FY30 FY31
Street Maintenance $ — $ — $ — $ — $ 80,000 $ —
Draft FY27-31 Proposed Capital Improvement Plan - Transportation Funds Page 36 62
Electric Gate at Lower Yard (STR170)
FUND DEPARTMENT PROJECT TYPE
Street Maintenance Streets Infrastructure
OPERATING IMPACT COST ESTIMATE CLASS
Negligible N/A
FUNDING SOURCE(S)AMOUNT
Assessment Revenue $ 50,000
TOTAL SCHEDULED PROJECT COST $ 50,000
STRATEGIC PLAN
2.2 Infrastructure Investments
DESCRIPTION OF PROJECT
This item funds the addition of an electric gate at the lower yard to help secure the site.
The Streets Division has begun using the lower yard site for equipment storage which
would benefit from increased security from public access.
CONSEQUENCES OF DELAYING PROJECT
Delay would risk tampering with equipment.
CHANGES FROM PRIOR CIP
New
FUND FY26 ADOPTED FY27 FY28 FY29 FY30 FY31
Street Maintenance $ — $ — $ — $ — $ — $ 50,000
Draft FY27-31 Proposed Capital Improvement Plan - Transportation Funds Page 37 63
Page Intentionally Left Blank
Draft FY27-31 Proposed Capital Improvement Plan - Transportation Funds Page 38 64
Street Impact Fee
Draft FY27-31 Proposed Capital Improvement Plan - Transportation Funds Page 39 65
Scheduled Projects for Street Impact Fee Fund
Page
Number
Project
Code Project Name FY27 FY28 FY29 FY30 FY31 5-Year Total
43 SIF191 Stucky: 19th to Fowler $ 3,225,600 $ 3,509,600 $ — $ — $ — $ 6,735,200
44 SIF114 Fowler Avenue Connection: Huffine to Oak 2,289,900 — — — — 2,289,900
45 SIF159 Oak: 27th to 19th Widening — — 3,250,000 — — 3,250,000
46 SIF164 S 3rd: Kagy to Graf — — — 1,768,000 8,800,000 10,568,000
Total $ 5,515,500 $ 3,509,600 $ 3,250,000 $ 1,768,000 $ 8,800,000 $ 22,843,100
Draft FY27-31 Proposed Capital Improvement Plan - Transportation Funds Page 40 66
Unscheduled Projects for Street Impact Fee Fund
SIF193 Fowler: Cattail to E Valley
Center
$ 12,958,500 This project will complete construction of this section of Fowler to City standards
with curb and gutter as well as sidewalks/pathways and street lighting. This
project is identified in the 2017 Transportation Master Plan as MSN-11. This
project is unscheduled due to lack of funding.
SIF149 Babcock: 11th to 15th 3,531,200 This project will improve Babcock from 11th to 15th. This project increases
capacity directly with the incorporation of a left turn lane, bike lanes, and
sidewalks. A payback district or Special Improvement District may be created to
leverage other stakeholders. Design is planned to align with design work on the
Babcock project between 15th-19th. Right-of-way acquisition and construction
have been unscheduled due to funding constraints. This project is identified in
the 2017 Transportation Master Plan as CMSN-9 and is unscheduled in order to
consider a right-sized scope and prioritize higher needs within the fund.
SIF156 Highland/Kagy Intersection
Improvement
3,260,000 This project will upgrade the intersection of Highland and Kagy. An Intersection
Control Evaluation will be performed in the pre-design phase to determine
feasibility of roundabout intersection control. This project is identified in the
2017 Transportation Master Plan as TSM-24 and is unscheduled due to lack of
funding.
SIF192 Fowler: Baxter to Cattail 2,300,000 This project will complete construction of this section of Fowler to City standards
with curb and gutter as well as sidewalks/pathways and street lighting. This
project is identified in the 2017 Transportation Master Plan as MSN-11 and is
unscheduled due to lack of funding.
SIF190 N 15th: Tschache to Baxter 1,222,500 This project will construct N 15th Avenue from the intersection with Tschache
Street to the intersection with Baxter Lane to a three-lane urban collector
standard. This project is identified in the 2017 Transportation Master Plan as
MSN-4 and is unscheduled due to lack of funding.
Total $ 23,272,200
Project
Code Project Name Amount Description
Draft FY27-31 Proposed Capital Improvement Plan - Transportation Funds Page 41 67
Map of Street Impact Fee Fund Infrastructure Projects
Draft FY27-31 Proposed Capital Improvement Plan - Transportation Funds Page 42 68
Stucky: 19th to Fowler (SIF191)
FUND DEPARTMENT PROJECT TYPE
Street Impact Fee Streets Infrastructure
OPERATING IMPACT COST ESTIMATE CLASS
Negligible Class 5
FUNDING SOURCE(S)AMOUNT
Impact Fee Revenue $ 6,735,200
TOTAL SCHEDULED PROJECT COST $ 6,735,200
STRATEGIC PLAN
4.3 Strategic Infrastructure Choices
DESCRIPTION OF PROJECT
This project will complete construction of Stucky Road to a City collector standard with
curb and gutter as well as sidewalks/pathways and street lighting. Improvements to the
signal at S 19th will be included as necessary along with widening S 19th immediately
south of 19th/Stucky to complete the necessary additional traffic lane on 19th adjacent
to the existing church. This project is identified in the 2017 Transportation Master Plan
as MSN-16. Engineering: $2,060,600 | Right of Way: $1,500,000 | Construction:
$5,849,300 | Utilities: water utility included in water fund otherwise incidental to
project .
CONSEQUENCES OF DELAYING PROJECT
This project will support the higher capacity of vehicles, bicycles, and pedestrians anticipated due to substantial development immediately
south of Stucky Road. Delaying the project could compromise safety and level of service to the community.
CHANGES FROM PRIOR CIP
None
FUND FY26 ADOPTED FY27 FY28 FY29 FY30 FY31
Street Impact Fee $ — $ 3,225,600 $ 3,509,600 $ — $ — $ —
Arterial & Collector District $ — $ 405,000 $ 2,339,700 $ — $ — $ —
Total $ — $ 3,630,600 $ 5,849,300 $ — $ — $ —
Draft FY27-31 Proposed Capital Improvement Plan - Transportation Funds Page 43 69
Fowler Avenue Connection: Huffine to Oak (SIF114)
FUND DEPARTMENT PROJECT TYPE
Street Impact Fee Streets Infrastructure
OPERATING IMPACT COST ESTIMATE CLASS
Moderate Class 2
FUNDING SOURCE(S)AMOUNT
Impact Fee Revenue $ 2,289,900
TOTAL SCHEDULED PROJECT COST $ 2,289,900
STRATEGIC PLAN
4.3 Strategic Infrastructure Choices
DESCRIPTION OF PROJECT
This project will complete Fowler Avenue from Huffine to Oak in four phases; North –
Oak to Durston (FY25 & FY26), Middle – Durston to Babcock (FY26 & FY27), South –
Babcock to Huffine (FY28), Intersection of Huffine and Fowler (Unscheduled). Project
scope approved by Bozeman City Commission includes one travel lane in each direction,
shared-use paths, traffic signalization at Babcock, and roundabout at Durston. This
project is identified in the Transportation Master Plan as MSN-13 and SPOT-39. The
total cost of this project including prior-year actuals and FY26 budget is anticipated to
be $22,596,000. Design is now at 90%. Engineering: funded in prior fiscal years |
Utilities: Sewer installation included in Wastewater Impact Fee fund | Right of Way:
$8,165,000 | Construction: $14,431,000.
CONSEQUENCES OF DELAYING PROJECT
Delaying project will result in significant traffic on surrounding streets which is expected to continue to increase over the next five years.
CHANGES FROM PRIOR CIP
Costs have been updated to reflect 60% design cost estimate.
FUND FY26 ADOPTED FY27 FY28 FY29 FY30 FY31
Street Impact Fee $ 9,551,800 $ 2,289,900 $ — $ — $ — $ —
Arterial & Collector District $ 401,700 $ 1,327,900 $ 3,771,500 $ — $ — $ —
Total $ 9,953,500 $ 3,617,800 $ 3,771,500 $ — $ — $ —
Draft FY27-31 Proposed Capital Improvement Plan - Transportation Funds Page 44 70
Oak: 27th to 19th Widening (SIF159)
FUND DEPARTMENT PROJECT TYPE
Street Impact Fee Streets Infrastructure
OPERATING IMPACT COST ESTIMATE CLASS
Negligible Class 5
FUNDING SOURCE(S)AMOUNT
Impact Fee Revenue $ 3,250,000
TOTAL SCHEDULED PROJECT COST $ 3,250,000
STRATEGIC PLAN
4.3 Strategic Infrastructure Choices
DESCRIPTION OF PROJECT
This project will widen Oak St to a five-lane configuration that better aligns with the
adjacent sections of Oak St. It includes an eastbound lane reconfiguration and signal
upgrade at N 19th. These improvements will increase the intersection's capacity by
matching the lane configuration established in the 2016 Oak St 15th to 19th project.
The project will also address multimodal considerations by adding a shared-use path to
this corner of the intersection. It is identified in the 2017 Transportation Master Plan as
TSM-16 and MSN-9.
CONSEQUENCES OF DELAYING PROJECT
Increased delays and reduced level-of-service at the intersection as growth continues to add demand.
CHANGES FROM PRIOR CIP
None
FUND FY26 ADOPTED FY27 FY28 FY29 FY30 FY31
Street Impact Fee $ — $ — $ — $ 3,250,000 $ — $ —
Arterial & Collector District $ — $ — $ — $ 1,000,000 $ — $ —
Total $ — $ — $ — $ 4,250,000 $ — $ —
Draft FY27-31 Proposed Capital Improvement Plan - Transportation Funds Page 45 71
S 3rd: Kagy to Graf (SIF164)
FUND DEPARTMENT PROJECT TYPE
Street Impact Fee Streets Infrastructure
OPERATING IMPACT COST ESTIMATE CLASS
Negligible Class 5
FUNDING SOURCE(S)AMOUNT
Grant(s) & Impact Fee Revenue $ 10,568,000
TOTAL SCHEDULED PROJECT COST $ 10,568,000
STRATEGIC PLAN
4.3 Strategic Infrastructure Choices
DESCRIPTION OF PROJECT
This project consists of reconstructing S 3rd from Graf to Kagy with a 2-lane urban
arterial roadway. Project scope includes one travel lane in each direction, sidewalks or
shared-use path on each side, curb and gutter, and street lighting. This project also
includes intersection improvements to address operational improvements for
multimodal traffic. An Intersection Control Evaluation will be performed in the pre-
design phase to determine feasibility of roundabout intersection control. This project is
identified in the 2017 Transportation Master Plan as MSN-3 and SPOT-36. The project is
anticipated to be selected by City Commission for prioritization of Urban Route funding
following College: 11th to 19th. If not selected for Urban Route funding, the project will
be delayed. Engineering: $1,768,000 | Construction: $8,800,000
CONSEQUENCES OF DELAYING PROJECT
Delays will prolong pedestrian safety challenges and allow pavement to deteriorate further.
CHANGES FROM PRIOR CIP
Moved from unscheduled as the project is anticipated to be prioritized and receive full funding via Urban Route.
FUND FY26 ADOPTED FY27 FY28 FY29 FY30 FY31
Street Impact Fee $ — $ — $ — $ — $ 1,768,000 $ 8,800,000
Draft FY27-31 Proposed Capital Improvement Plan - Transportation Funds Page 46 72
Arterial & Collector District
Draft FY27-31 Proposed Capital Improvement Plan - Transportation Funds Page 47 73
Scheduled Projects for Arterial & Collector District Fund
Page
Number
Project
Code Project Name FY27 FY28 FY29 FY30 FY31 5-Year Total
52 A&C029 McIlhattan: Bikefill Access Improvements $ 1,500,000 $ — $ — $ — $ — $ 1,500,000
53 SIF114 Fowler Avenue Connection: Huffine to Oak 1,327,900 3,771,500 — — — 5,099,400
54 A&C024 Shared Use Path: Frontage 500,000 — 200,000 — — 700,000
55 SIF191 Stucky: 19th to Fowler 405,000 2,339,700 — — — 2,744,700
56 TMP27 Transportation Master Plan 250,000 — — — — 250,000
57 A&C030
Transportation Alternatives - ADA Upgrades and
Pedestrian Safety — 789,700 — — — 789,700
58 SIF158 College: 11th to 19th — 611,700 3,058,700 — — 3,670,400
59 A&C001 Shared Use Paths: Citywide Improvements — 500,000 500,000 500,000 500,000 2,000,000
60 SIF159 Oak: 27th to 19th Widening — — 1,000,000 — — 1,000,000
Total $ 3,982,900 $ 8,012,600 $ 4,758,700 $ 500,000 $ 500,000 $ 17,754,200
Draft FY27-31 Proposed Capital Improvement Plan - Transportation Funds Page 48 74
Unscheduled Projects for Arterial & Collector District Fund
SIF195 Church: Garfield to Kagy $ 4,840,000 This project consists of reconstructing Church Street from the intersection with
Garfield Street to Kagy Boulevard with a two-lane urban collector standard.
Project scope would include one travel lane in each direction, curb and gutter,
and shared-use path. This project will improve the capacity of motorized vehicles
as well as pedestrians and cyclists. Due to land constraints, it is possible that a
shared-use path may not be feasible on both sides of the street. This project is
identified in the 2017 Transportation Master Plan as MSN-30 and is unscheduled
due to lack of funding.
SIF194 Church: Story to Garfield 3,330,000 This project consists of reconstructing Church Street from the intersection with
Story to Garfield with a two-lane urban collector standard. Project scope would
include one travel lane in each direction, curb and gutter, and shared-use path.
This project will improve the capacity of motorized vehicles as well as
pedestrians and cyclists. Due to land constraints, it is possible that a shared-use
path may not be feasible on both sides of the street. This project is identified in
the 2017 Transportation Master Plan as MSN-30 and is unscheduled due to lack
of funding.
A&C014 S 19th/Blackwood
Intersection Improvement
2,445,000 This project will design and construct upgrades to the intersection of S 19th and
Blackwood. Development in this area is contributing to increased demand at this
intersection, leading to the eventual need for traffic control. An Intersection
Control Evaluation will be performed in the pre-design phase to determine
feasibility of roundabout or traffic signal control. This project is unscheduled due
to lack of funding.
SIF192 Fowler: Baxter to Cattail 2,300,000 This project will complete construction of this section of Fowler to City standards
with curb and gutter as well as sidewalks/pathways and street lighting. This
project is identified in the 2017 Transportation Master Plan as MSN-11 and is
unscheduled due to lack of funding.
Project
Code Project Name Amount Description
Draft FY27-31 Proposed Capital Improvement Plan - Transportation Funds Page 49 75
SIF149 Babcock: 11th to 15th 1,367,000 This project will improve Babcock from 11th to 15th. This project increases
capacity directly with the incorporation of a left turn lane, bike lanes, and
sidewalks. A payback district or Special Improvement District may be created to
leverage other stakeholders. Design is planned to align with design work on the
Babcock project between 15th-19th. Right-of-way acquisition and construction
have been unscheduled due to funding constraints. This project is identified in
the 2017 Transportation Master Plan as CMSN-9 and is unscheduled in order to
consider a right-sized scope and prioritize higher needs within the fund.
A&C019 Huffine Lane Crossing 1,222,500 This project will construct an enhanced active transportation crossing of Huffine
Lane in the area of Fowler Ave. This project is identified in the 2017
Transportation Master Plan as a grade-separated crossing, SPOT-39. It is
unscheduled due to lack of funding.
SIF156 Highland/Kagy Intersection
Improvement
500,000 This project will upgrade the intersection of Highland and Kagy. An Intersection
Control Evaluation will be performed in the pre-design phase to determine
feasibility of roundabout intersection control. This project is identified in the
2017 Transportation Master Plan as TSM-24 and is unscheduled due to lack of
funding.
Total $ 16,004,500
Project
Code Project Name Amount Description
Draft FY27-31 Proposed Capital Improvement Plan - Transportation Funds Page 50 76
Map of Arterial & Collector District Infrastructure Projects
Draft FY27-31 Proposed Capital Improvement Plan - Transportation Funds Page 51 77
McIlhattan: Bikefill Access Improvements (A&C029)
FUND DEPARTMENT PROJECT TYPE
Arterial & Collector District Streets Infrastructure
OPERATING IMPACT COST ESTIMATE CLASS
Negligible Class 4
FUNDING SOURCE(S)AMOUNT
Assessment Revenue $ 1,500,000
TOTAL SCHEDULED PROJECT COST $ 1,500,000
STRATEGIC PLAN
4.3 Strategic Infrastructure Choices
DESCRIPTION OF PROJECT
This project consists of roadway improvements to McIlhattan Road to support the
future development of the Bikefill Park. Anticipated scope includes pavement
construction, slope remediation, and stormwater management. Conceptual Design and
cost estimate have been completed in partnership with Gallatin Valley Land Trust
(GVLT). GVLT will continue leading design with approvals from City staff. Upon
completion, the City will bid the construction project and assist in construction
administration.
CONSEQUENCES OF DELAYING PROJECT
Reduction in safety induced by lack of adequate roadway, and increased traffic volume due to park operations.
CHANGES FROM PRIOR CIP
None
FUND FY26 ADOPTED FY27 FY28 FY29 FY30 FY31
Arterial & Collector District $ — $ 1,500,000 $ — $ — $ — $ —
Draft FY27-31 Proposed Capital Improvement Plan - Transportation Funds Page 52 78
Fowler Avenue Connection: Huffine to Oak (SIF114)
FUND DEPARTMENT PROJECT TYPE
Arterial & Collector District Streets Infrastructure
OPERATING IMPACT COST ESTIMATE CLASS
Moderate Class 2
FUNDING SOURCE(S)AMOUNT
Assessment Revenue $ 5,099,400
TOTAL SCHEDULED PROJECT COST $ 5,099,400
STRATEGIC PLAN
4.3 Strategic Infrastructure Choices
DESCRIPTION OF PROJECT
This project will complete Fowler Avenue from Huffine to Oak in four phases; North –
Oak to Durston (FY25 & FY26), Middle – Durston to Babcock (FY26 & FY27), South –
Babcock to Huffine (FY28), Intersection of Huffine and Fowler (Unscheduled). Project
scope approved by Bozeman City Commission includes one travel lane in each direction,
shared-use paths, traffic signalization at Babcock, and roundabout at Durston. This
project is identified in the Transportation Master Plan as MSN-13 and SPOT-39. The
total cost of this project including prior-year actuals and FY26 budget is anticipated to
be $22,596,000. Design is now at 90%. Engineering: funded in prior fiscal years |
Utilities: Sewer installation included in Wastewater Impact Fee fund | Right of Way:
$8,165,000 | Construction: $14,431,000.
CONSEQUENCES OF DELAYING PROJECT
Delaying project will result in significant traffic on surrounding streets which is expected to continue to increase over the next five years.
CHANGES FROM PRIOR CIP
Costs have been updated to reflect 60% design cost estimate.
FUND FY26 ADOPTED FY27 FY28 FY29 FY30 FY31
Arterial & Collector District $ 401,700 $ 1,327,900 $ 3,771,500 $ — $ — $ —
Street Impact Fee $ 9,551,800 $ 2,289,900 $ — $ — $ — $ —
Total $ 9,953,500 $ 3,617,800 $ 3,771,500 $ — $ — $ —
Draft FY27-31 Proposed Capital Improvement Plan - Transportation Funds Page 53 79
Shared Use Path: Frontage (A&C024)
FUND DEPARTMENT PROJECT TYPE
Arterial & Collector District Streets Infrastructure
OPERATING IMPACT COST ESTIMATE CLASS
Minimal Class 5
FUNDING SOURCE(S)AMOUNT
Assessment Revenue $ 700,000
TOTAL SCHEDULED PROJECT COST $ 700,000
STRATEGIC PLAN
4.5 a) Enhance Non-motorized Transportation
DESCRIPTION OF PROJECT
This project will construct a 10-foot shared-use path along Frontage Road between
Cherry River fishing access and Springhill Road. This is an initial portion of the overall
Frontage Pathway from Bozeman to Belgrade, however, no County or City of Belgrade
support has currently been identified to complete the path outside of city limits.
Additional funding for this project is provided through a Trails, Open Space, and Parks
(TOP) grant and through private fundraising identified in the TOP application. This
project was identified in the 2017 Transportation Master Plan as SP-34. Right of Way
agreements are required before this project can advance to construction.
CONSEQUENCES OF DELAYING PROJECT
The Bozeman SAFE Plan of 2023 identifies separated bicycles facilities as a priority improvement. Further need for project prioritization is
requested in the next Transportation Master Plan.
CHANGES FROM PRIOR CIP
None
FUND FY26 ADOPTED FY27 FY28 FY29 FY30 FY31
Arterial & Collector District $ — $ 500,000 $ — $ 200,000 $ — $ —
Draft FY27-31 Proposed Capital Improvement Plan - Transportation Funds Page 54 80
Stucky: 19th to Fowler (SIF191)
FUND DEPARTMENT PROJECT TYPE
Arterial & Collector District Streets Infrastructure
OPERATING IMPACT COST ESTIMATE CLASS
Negligible Class 5
FUNDING SOURCE(S)AMOUNT
Assessment Revenue $ 2,744,700
TOTAL SCHEDULED PROJECT COST $ 2,744,700
STRATEGIC PLAN
4.3 Strategic Infrastructure Choices
DESCRIPTION OF PROJECT
This project will complete construction of Stucky Road to a City collector standard with
curb and gutter as well as sidewalks/pathways and street lighting. Improvements to the
signal at S 19th will be included as necessary along with widening S 19th immediately
south of 19th/Stucky to complete the necessary additional traffic lane on 19th adjacent
to the existing church. This project is identified in the 2017 Transportation Master Plan
as MSN-16. Engineering: $2,060,600 | Right of Way: $1,500,000 | Construction:
$5,849,300 | Utilities: water utility included in water fund otherwise incidental to
project
CONSEQUENCES OF DELAYING PROJECT
This project will support the higher capacity of vehicles, bicycles, and pedestrians anticipated due to substantial development immediately
south of Stucky Road. Delaying the project could compromise safety and level of service to the community.
CHANGES FROM PRIOR CIP
None
FUND FY26 ADOPTED FY27 FY28 FY29 FY30 FY31
Arterial & Collector District $ — $ 405,000 $ 2,339,700 $ — $ — $ —
Street Impact Fee $ — $ 3,225,600 $ 3,509,600 $ — $ — $ —
Total $ — $ 3,630,600 $ 5,849,300 $ — $ — $ —
Draft FY27-31 Proposed Capital Improvement Plan - Transportation Funds Page 55 81
Transportation Master Plan (TMP27)
FUND DEPARTMENT PROJECT TYPE
Arterial & Collector District Streets Other
OPERATING IMPACT COST ESTIMATE CLASS
Negligible N/A
FUNDING SOURCE(S)AMOUNT
Assessment Revenue $ 250,000
TOTAL SCHEDULED PROJECT COST $ 250,000
STRATEGIC PLAN
4.3 Strategic Infrastructure Choices
DESCRIPTION OF PROJECT
This project funds an update to the city’s Transportation Master Plan (TMP) last completed in 2017. The TMP serves as an official
facility plan for transportation management and capital investment within the city. This update will focus on operational analysis and
capital project prioritization while incorporating the city’s recently-completed Bicycle and Pedestrian Gap Analysis Study and in-
progress Safe Streets for All Safety Action Plan.
CONSEQUENCES OF DELAYING PROJECT
The City’s current Transportation Master Plan is outdated and requires revision to align with its expanded population and updated
Unified Development Code.
CHANGES FROM PRIOR CIP
New project previously identified in the City’s operating budget.
FUND FY26 ADOPTED FY27 FY28 FY29 FY30 FY31
Arterial & Collector District $ — $ 250,000 $ — $ — $ — $ —
Draft FY27-31 Proposed Capital Improvement Plan - Transportation Funds Page 56 82
Transportation Alternatives - ADA Upgrades and Pedestrian Safety (A&C030)
FUND DEPARTMENT PROJECT TYPE
Arterial & Collector District Streets Infrastructure
OPERATING IMPACT COST ESTIMATE CLASS
Negligible Class 4
FUNDING SOURCE(S)AMOUNT
Grant(s) & Assessment Revenue $ 789,700
TOTAL SCHEDULED PROJECT COST $ 789,700
STRATEGIC PLAN
4.5 a) Enhance Non-motorized Transportation
DESCRIPTION OF PROJECT
This project constructs sidewalks and curb ramps to comply with the Americans with Disabilities Act (ADA) at existing Streamline
stops and enhanced safety elements at crosswalks on arterial and collector streets at various locations across the city. The project
received a 2025 Transportation Alternatives grant and requires a 13.42% local match.
CONSEQUENCES OF DELAYING PROJECT
Delay would default on the Transportation Alternatives grant award and leave a substantial gaps in the city's multimodal
transportation system.
CHANGES FROM PRIOR CIP
New
FUND FY26 ADOPTED FY27 FY28 FY29 FY30 FY31
Arterial & Collector District $ — $ — $ 789,700 $ — $ — $ —
Draft FY27-31 Proposed Capital Improvement Plan - Transportation Funds Page 57 83
College: 11th to 19th (SIF158)
FUND DEPARTMENT PROJECT TYPE
Arterial & Collector District Streets Infrastructure
OPERATING IMPACT COST ESTIMATE CLASS
Minimal Class 5
FUNDING SOURCE(S)AMOUNT
Grant(s) & Assessment Revenue $ 3,670,400
TOTAL SCHEDULED PROJECT COST $ 3,670,400
STRATEGIC PLAN
4.3 Strategic Infrastructure Choices
DESCRIPTION OF PROJECT
This project will design and reconstruct College between 11th and 19th to a two-lane
urban minor arterial standard including Rectangular Rapid Flashing Beacons at 13th and
15th crossings. Anticipated improvements will include pavement reconstruction,
addition of left turn lanes where warranted, storm drainage, new sidewalk or shared-
use paths on both side of the street, and updated street lighting. This project was
identified in the 2017 Transportation Master Plan as MSN-17, SPOT-9, SPOT-10, and
BL-10. Project is anticipated to be selected by City Commission for prioritization of
Urban Route funding. If not selected, the project will be delayed due to lack of funding.
Engineering: $611,742 | Construction: $3,670,454
CONSEQUENCES OF DELAYING PROJECT
Delays will prolong pedestrian safety challenges and allow pavement to deteriorate further.
CHANGES FROM PRIOR CIP
Project scope has been adjusted and anticipated cost reduced by $5,686,000, as initial design included right-of-way and widening based on
Fowler project improvements.
FUND FY26 ADOPTED FY27 FY28 FY29 FY30 FY31
Arterial & Collector District $ — $ — $ 611,700 $ 3,058,700 $ — $ —
Draft FY27-31 Proposed Capital Improvement Plan - Transportation Funds Page 58 84
Shared Use Paths: Citywide Improvements (A&C001)
FUND DEPARTMENT PROJECT TYPE
Arterial & Collector District Streets Infrastructure
OPERATING IMPACT COST ESTIMATE CLASS
Minimal Class 5
FUNDING SOURCE(S)AMOUNT
Assessment Revenue $ 2,000,000
TOTAL SCHEDULED PROJECT COST $ 2,000,000
STRATEGIC PLAN
4.5 a) Enhance Non-motorized Transportation
DESCRIPTION OF PROJECT
This annual project allocation will serve to construct missing sections of shared-use path identified for prioritization through the
City's upcoming Bike/Ped Gap Analysis Study and Transportation Master Plan Update.
CONSEQUENCES OF DELAYING PROJECT
City lacks dedicated funding sources to construct standalone shared-use path projects. Delays to this request will prolong the
absence of safe, connected bicycle infrastructure.
CHANGES FROM PRIOR CIP
None
FUND FY26 ADOPTED FY27 FY28 FY29 FY30 FY31
Arterial & Collector District $ — $ — $ 500,000 $ 500,000 $ 500,000 $ 500,000
Draft FY27-31 Proposed Capital Improvement Plan - Transportation Funds Page 59 85
Oak: 27th to 19th Widening (SIF159)
FUND DEPARTMENT PROJECT TYPE
Arterial & Collector District Streets Infrastructure
OPERATING IMPACT COST ESTIMATE CLASS
Negligible Class 5
FUNDING SOURCE(S)AMOUNT
Assessment Revenue $ 1,000,000
TOTAL SCHEDULED PROJECT COST $ 1,000,000
STRATEGIC PLAN
4.3 Strategic Infrastructure Choices
DESCRIPTION OF PROJECT
This project will widen Oak St to a five-lane configuration that better aligns with the
adjacent sections of Oak St. It includes an eastbound lane reconfiguration and signal
upgrade at N 19th. These improvements will increase the intersection's capacity by
matching the lane configuration established in the 2016 Oak St 15th to 19th project.
The project will also address multimodal considerations by adding a shared-use path to
this corner of the intersection. It is identified in the 2017 Transportation Master Plan as
TSM-16 and MSN-9.
CONSEQUENCES OF DELAYING PROJECT
Increased delays and reduced level of service at the intersection as growth continues to add demand.
CHANGES FROM PRIOR CIP
None
FUND FY26 ADOPTED FY27 FY28 FY29 FY30 FY31
Arterial & Collector District $ — $ — $ — $ 1,000,000 $ — $ —
Street Impact Fee $ — $ — $ — $ 3,250,000 $ — $ —
Total $ — $ — $ — $ 4,250,000 $ — $ —
Draft FY27-31 Proposed Capital Improvement Plan - Transportation Funds Page 60 86
Street Reconstruction
Draft FY27-31 Proposed Capital Improvement Plan - Transportation Funds Page 61 87
Scheduled Projects for Street Reconstruction Fund
No scheduled projects.
Unscheduled Projects for Street Reconstruction Fund
SCR31 S Grand (Olive to College)$ 2,101,800 This project involves the reconstruction of South Grand Avenue from Olive Street
to College Street, including replacement of failed curb and gutters, a City
standard street section, asphalt, pedestrian ramps, pavement markings and
signage. Additionally, the project will include replacement of failed City utilities
under the street. Utility costs are budgeted in their respective annual
replacement projects including water (W03), sewer (WW07), and storm drains
(STDM05). Americans with Disabilities Act (ADA) compliance and Municipal
Separated Storm Sewer (MS4) compliance will be met through this project. This
project has been unscheduled until an updated funding policy for Local Street
Reconstructions is determined.
SCR32 W Lamme (7th to Tracy) 2,071,100 This project scope includes reconstruction of West Lamme Street from 7th
Avenue to Tracy Avenue, including replacement of failed curb and gutters, a City
standard street section, asphalt, pedestrian ramps, pavement markings and
signage. Replacement of failed City utilities under the street will take place
concurrently. Utility costs are budgeted in their respective annual replacement
projects including water (W03), sewer (WW07), and storm drains (STDM05).
Americans with Disabilities Act (ADA) compliance and Municipal Separated
Storm Sewer (MS4) compliance will be met through this project. This project has
been unscheduled until an updated funding policy for Local Street
Reconstructions is determined.
Project
Code Project Name Amount Description
Draft FY27-31 Proposed Capital Improvement Plan - Transportation Funds Page 62 88
SCR30 N Grand (Beall to Peach) 1,769,400 This project entails the reconstruction of North Grand Avenue from Beall Street
to Peach Street, including replacement of failed curb and gutters, a City standard
street section, asphalt, pedestrian ramps, pavement markings and signage.
Replacement of failed City utilities under the street will take place concurrently.
Associated utility costs are budgeted in their respective annual replacement
projects including water (W03), sewer (WW07), and storm drains (STDM05).
Americans with Disabilities Act (ADA) compliance and Municipal Separated
Storm Sewer (MS4) compliance will be met through this project. This project has
been unscheduled until updated funding policy for Local Street Reconstructions
is determined.
SCR34 W Koch (4th to 8th) 1,302,200 This project consists of the reconstruction of West Koch Street from 4th Avenue
to 8th Avenue, including replacement of failed curb and gutters, a City standard
street section, asphalt, pedestrian ramps, pavement markings, and signage.
Project scope will also include replacement of failed City utilities under the
street. Utility costs are budgeted in their respective annual replacement projects
including water (W03), sewer (WW07), and storm drains (STDM05). Americans
with Disabilities Act (ADA) compliance and Municipal Separated Storm Sewer
(MS4) compliance will be met through this project. This project has been
unscheduled until updated funding policy for Local Street Reconstructions is
determined.
Total $ 7,244,500
Project
Code Project Name Amount Description
Draft FY27-31 Proposed Capital Improvement Plan - Transportation Funds Page 63 89
Page Intentionally Left Blank
Draft FY27-31 Proposed Capital Improvement Plan - Transportation Funds Page 64 90
Memorandum
REPORT TO:Transportation Board
FROM:Nicholas Ross, Director of transportation and Engineering
SUBJECT:Nomination of Transportation Advisory Board Member to MPO Long Range
Transportation Plan Community Advisory Panel
MEETING DATE:October 22, 2025
AGENDA ITEM TYPE:Citizen Advisory Board/Commission
RECOMMENDATION:Nominate and appoint a member of the Transportation Advisory Board to
serve on the MPO Long Range Transportation Plan Community Advisory
Panel.
STRATEGIC PLAN:1.1 Outreach: Continue to strengthen and innovate in how we deliver
information to the community and our partners.
BACKGROUND:The Gallatin Valley Metropolitan Planning Organization (MPO) has begun
development of its first Long Range Transportation Plan (LRTP). The MPO is
creating a Community Advisory Panel (CAP) to help guide LRTP development
as part of its public engagement plan and has asked for participation from
the Bozeman Transportation Advisory Board. Time commitment for CAP
involvement is expected to be four meetings of 1-2 hour durations across 1
yr period.
The Board is asked to nominate and appoint a member for CAP participation.
UNRESOLVED ISSUES:None
ALTERNATIVES:As suggested by the board.
FISCAL EFFECTS:None.
Report compiled on: October 3, 2025
91