Loading...
HomeMy WebLinkAbout051 Lighting Plan Arch e1.2DRAWN BY: SCALE: PROJECT: pobox 2016 Bozeman, MT 59771(406)531.9671 millerdesignbuild@gmail.com DATE:PROJECT NO REVISION DATE e1.2 SM CP1 & BL1 Specs Site Overall Phase 1 B - Lot 2 Little Horse DriveBozeman, MT 59715 01254-30-2025 SITE PLAN REVIEW11 7-21-257-21-25 CP1 LIGHTING AT UNDERSIDE OF EACH BUILDING CANOPY BL1 LIGHTING AT EXTERIOR PATIO SEATING AREA - WEST BUILDING 11