Loading...
HomeMy WebLinkAbout037 West Building Arch Plan a4.1Level 10' - 0" T.O. FOOTING-5' - 4" RIDGE33' - 0" Level 1 T.O.P.13' - 0" T.O.Wall-0' - 4" Level 215' - 0" Level 2 T.O.P.24' - 1" 1 a4.2 Office200 RESTAURANT103 Level 10' - 0" T.O. FOOTING-5' - 4" RIDGE33' - 0" Level 1 T.O.P.13' - 0" T.O.Wall-0' - 4" Level 215' - 0" Level 2 T.O.P.24' - 1" 1 a4.2 Office200 RESTAURANT1039' - 1"8' - 11"9' - 1"2' - 0"13' - 0"SLAB ON GRADE SUGGESTED BY CIVIL ENGINEER REPORT-FOOTING DEPTH DETERMINED DURING EXCAVATION TO NATIVE SOILS 13' - 0" 11' - 8" 10' - 1 1/4" Level 10' - 0" T.O. FOOTING-5' - 4" RIDGE33' - 0" Level 1 T.O.P.13' - 0" T.O.Wall-0' - 4" Level 215' - 0" Level 2 T.O.P.24' - 1"8' - 6"105106102-1 1 a4.2 OPEN ATRIUM Open Walkway201 KITCHEN102ATRIUM100 BATHROOM / JANITOR CLOSET VOLUME Level 10' - 0" T.O. FOOTING-5' - 4" RIDGE33' - 0" Level 1 T.O.P.13' - 0" T.O.Wall-0' - 4" Level 215' - 0" Level 2 T.O.P.24' - 1" 1 a4.2 OPEN ATRIUM Open Walkway201 KITCHEN102ATRIUM100 WOOD FENCE STYLE MECHANICAL SCREENING DRAWN BY: SCALE: PROJECT: pobox 2016 Bozeman, MT 59771(406)531.9671 millerdesignbuild@gmail.com DATE:PROJECT NO REVISION DATE 1/4" = 1'-0" a4.1 SM Sections - West Bldg. WEST BLDG.Phase 1 B - Lot2 Little Horse DriveBozeman, MT 59715 01254-30-2025 Site Plan Reivew0 2 10 18 1/4" = 1'-0"2 Section 2 0 2 10 18 1/4" = 1'-0"1 Section 1 021018 1/4" = 1'-0"3Section 3 021018 1/4" = 1'-0"4Section 4